Bank of the West v. Prince et al
Filing
54
MEMORANDUM RULING denying 46 Motion for Summary Judgment; and denying 47 Motion for Summary Judgment. The Court orders additional briefing as requested herein. Plaintiff is to file briefing by 7/2/2018, and Defendant must file briefing by 7/23/2018. Once briefing is completed, the Court intends to set an evidentiary hearing to resolve all remaining issues. Signed by Judge Elizabeth E Foote on 6/7/2018. (crt,Keifer, K)
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF LOUISIANA
SHREVEPORT DIVISION
BANK OF THE WEST
CIVIL ACTION NO.: 16-1098
v.
JUDGE ELIZABETH ERNY FOOTE
DANNY K. PRINCE, ET AL
MAGISTRATE JUDGE HAYES
MEMORANDUM RULING
Pending before the Court are cross Motions for Summary Judgment [Record
Documents 46 & 47] filed by Defendant, Danny K. Prince (“Prince”) and Plaintiff, Bank of
the West (“BOW” or “the Bank”). For the reasons announced below, the Court DENIES
both motions. The Court ORDERS additional briefing on matters addressed herein, and
will hold a hearing to resolve remaining issues at a later date.
FACTUAL AND PROCEDURAL HISTORY
Gladiator Energy Services, LLC, a Louisiana limited liability company, subsequently
converted to a Texas limited liability company, GES Gladiator Energy Services of Texas, LLC
(collectively “Gladiator” or “GES”) before it ceased doing business. See Record Documents
46-1 & 52. GES, as lessee, executed Master Lease Agreement No. 2530 (the “Lease”),
effective May 13, 2014, in favor of Summit Funding Group, Inc. (“Summit”). In accordance
with the Lease, GES executed Equipment Schedule No. 12 (the “Equipment Schedule”),
under which it leased certain movable equipment (the “Equipment”) from Summit at a
monthly base rent of $19,819.41. Id. At that same time, Defendants Prince and Steven
Page 1 of 15
Cloy Gantt1 ("Gantt") executed personal guaranties in favor of Summit. Summit later
assigned its rights in and to the Lease and the Equipment Schedule to BOW. Id.
GES defaulted on its payments under the Lease by failing to make the monthly
payment in February of 2016. Id. GES voluntarily surrendered the leased Equipment to
BOW on July 13, 2016, at GES’s yard in Arcadia, Louisiana. Prince initially indicated, and
BOW agreed, that at the time GES surrendered the Equipment to BOW, the amount of past
due rent under the lease was $138,735.87.2 Id. However, in his opposition to BOW’s
Motion for Summary Judgment, Prince claims the actual amount owed as past due rent,
based on a surrender date of July 13, 2016, is $118,916.46. See Record Document 50-2;
50, pp. 8-9.3 BOW represents that the Equipment was then sold, and the Bank recovered
net proceeds in the amount of $320,964.00. Record Document 47-1, p. 3.
BOW filed this suit seeking to recover from Gantt and Prince amounts due under the
Lease, plus costs and attorneys’ fees. It moved for summary judgment in May 2017,
Record Document 13, and this Court held a hearing on the motion in July 2017, see Record
Document 30. The Court orally granted in part and denied in part BOW’s motion. The Court
found that BOW was entitled to a judgment against Prince for amounts owed by GES under
1
Gantt filed a voluntary petition for relief under Chapter 7 of the United States
Bankruptcy Code after BOW filed its complaint. BOW, Summit, and Prince have all filed
proofs of claim in the Gantt bankruptcy case. Proceedings in this matter against Gantt
were stayed on October 20, 2016, due to his bankruptcy. See Docket Entry 10.
2
Prince initially represented that the Equipment was surrendered on or before
August 31, 2016. Record Document 46-1, p. 3.
3
See also Record Document 47-1, p. 3, Plaintiff’s Statement of Uncontested Facts
(representing that the Equipment was surrendered on or about July 13, 2016).
Page 2 of 15
the terms of the lease agreement, and granted the motion to that extent. The Court
declined to declare an exact amount owed due to inconsistencies and uncertainties
regarding the amount. Record Document 30, p. 2. The Court set a telephone conference
and the parties were ordered to confer prior to the conference and attempt to resolve any
uncertainties as to the specific amount owed. Id. Defendant retained new counsel and
another telephone conference was set. See Record Document 34. At that conference, BOW
was granted leave to file an amended complaint and Defendant raised new legal issues
regarding the amount owed. Record Document 40. The Court set deadlines for BOW to file
its amended complaint and for dispositive motions. Id. Now before the Court are cross
motions for summary judgment regarding the amounts owed by Prince under the Lease.
a. Plaintiff’s Position
Plaintiff argues that, under the terms of the Lease, it is entitled to: (1) recovery of
the Equipment; (2) liquidated damages equal to the present value of the remaining
payments due under the Lease, discounted at a rate of 2% per annum; and (3) attorneys’
fees, expenses, and costs incurred by BOW in enforcing the Lease documents. BOW cites
the Lease itself as the authority for recovery of these amounts. Specifically, the Lease
provides:
Lessor may exercise one or more of the following remedies upon an Event
of Default: . . . (iv) recover from Lessee all accrued and unpaid amounts, (v)
recover from Lessee, as liquidated damages for loss of bargain and not as a
penalty, the present value of all amounts to be paid by Lessee for the
remainder of the Firm Term, or any successive period then in effect,
discounted at the rate of 2% per annum, which amount will become
immediately due and payable, (vi) demand that Lessee return the Equipment
in strict compliance with the terms hereof . . . (xi) recover from Lessee all
Page 3 of 15
amounts incurred by Lessor in enforcing its rights and remedies hereunder,
including, but not limited to, Lessor’s repossession costs, transportation
costs, storage costs, insurance costs, repair and maintenance costs, appraisal
costs, remarketing costs and commissions, disposal costs, filing fees,
reasonable attorneys’ fees, and reasonable internal costs. . . .
Record Document 47-3, p. 4. Additionally, the Lease provides that interest on unpaid
recoverable amounts will accrue at a rate equal to the lesser of 1.5% per month and the
highest rate allowed under applicable law. Id.
The equipment has already been returned and sold at auction. Thus, BOW calculates
the amount owed as follows:
Original Balance Due ($19,819.41 x 46 months)
Less Payments Made (12 payments)
Gross Remaining Balance (34 payments)
$911,692.86
(237,832.92)
$673,859.94
Liquidated Damages (34 payments at $19,819.41 discounted at 2%)
Less Sales Proceeds
Net Amount Owed
$654,592.79
(320,964.00)
$333,628.79
Record Document 47-14, p. 11. BOW thus seeks summary judgment against Prince in the
amount of $333,628.79, plus interest at the rate of 1.5% per month from September 9,
20164 until paid, plus attorneys’ fees and expenses, and costs incurred in enforcing the
Lease and related documents.
b. Defendant’s Position
Prince does not dispute that BOW is entitled to past due monthly rentals from the
time of default in February 2016 until BOW recovered the Equipment from GES on July 13,
4
BOW represents that this is the date the Equipment was sold at auction, and
therefore the date on which the amount of liquidated damages could be determined.
Record Document 47-14, p. 10.
Page 4 of 15
2016. See Record Document 44, p. 12; 46-2, p. 8; 50, p. 8. He calculates this amount to
be $118,916.46. Record Document 50, p. 8. However, Prince does dispute that Plaintiff can
also recover accelerated rent after having recovered the Equipment. He argues that
because the Equipment was located in Louisiana when it was surrendered following default,
Plaintiff’s remedy is limited by the Louisiana Lease of Movables Act (“LLMA”), La. R.S.
§§ 9:3301 et seq. Specifically, Louisiana Revised Statute 9:3318 provides that, in the event
of default by the lessee, the lessor may: (1) file an action to recover accelerated rental
payments and additional amounts due under the lease; or (2) “cancel the lease, recover
possession of the leased property and recover such additional amounts and liquidated
damages as may be contractually provided under the lease agreement, as provided under
R.S. 9:3320 through 3328.” La. R.S. § 9:3318(A)(1). The statute explicitly states that these
two remedies are not cumulative; the lessor “may not seek to collect accelerated rental
payments under the lease and also to cancel the lease and recover possession of the
leased equipment.” La. R.S. § 9:3318(A)(2). Thus, because BOW has already recovered
possession of the leased property, Prince claims that BOW is precluded by Louisiana law
from also recovering accelerated rent, even if characterized as reasonable liquidated
damages. Instead, BOW may only recover “such additional amounts and liquidated
damages” as allowed by the Lease that are permitted by La. R.S. §§ 9:3320-3328.5 Record
Document 46-2, p. 19. Accordingly, Prince seeks summary judgment to this effect.
Specifically, he asks the Court to grant judgment in favor of BOW in the principal amount
5
Prince suggests this includes past-due rentals, financing charges, interest,
storage fees, and repair costs. Record Document 46-2, p. 21.
Page 5 of 15
of $118,916.46, together with contractual interest on the amount owed from the date this
Court determines the exact amount due until paid. Record Document 50, pp. 8-9. Further,
while Prince admits that BOW has incurred attorneys’ fees and expenses, he submits that
BOW should not be allowed to recover fees and expenses incurred in collection of amounts
prohibited by law. Id.
STANDARD
Federal Rule of Civil Procedure 56(a) directs that a court “shall grant summary
judgment if the movant shows that there is no genuine dispute as to any material fact and
the movant is entitled to judgment as a matter of law.”6 Summary judgment is appropriate
when the pleadings, answers to interrogatories, admissions, depositions, and affidavits on
file indicate that there is no genuine issue of material fact and that the moving party is
entitled to judgment as a matter of law. See Celotex Corp. v. Catrett, 477 U.S. 317, 322
(1986). When the burden at trial will rest on the non-moving party, the moving party need
not produce evidence to negate the elements of the non-moving party’s case; rather, it
need only point out the absence of supporting evidence. See Celotex, 477 U.S. at 322-323.
If the movant satisfies its initial burden of showing that there is no genuine dispute
of material fact with the motion for summary judgment, the nonmovant must demonstrate
that there is, in fact, a genuine issue for dispute at trial by going “beyond the pleadings”
6
Rule 56 was amended effective December 1, 2010. Per the comments, the 2010
amendment was intended “to improve the procedures for presenting and deciding
summary judgment motions and to make the procedures more consistent with those
already used in many courts. The standard for granting summary judgment remains
unchanged.” Therefore, the case law applicable to Rule 56 prior to its amendment
remains authoritative, and this Court will rely on it accordingly.
Page 6 of 15
and designating specific facts for support. Little v. Liquid Air Corp., 37 F.3d 1069, 1075
(5th Cir. 1994). “This burden is not satisfied with ‘some metaphysical doubt as to the
material facts,’” by conclusory or unsubstantiated allegations, or by a mere scintilla of
evidence. Id. (quoting Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574,
586 (1986)). However, “[t]he evidence of the non-movant is to be believed, and all
justifiable inferences are to be drawn in his favor.” Anderson v. Liberty Lobby, Inc., 477
U.S. 242, 255 (1985) (internal citations omitted); Reid v. State Farm Mut. Auto Ins. Co.,
784 F.2d 577, 578 (5th Cir. 1986) (the court must “review the facts drawing all inferences
most favorable to the party opposing the motion”). While not weighing the evidence or
evaluating the credibility of witnesses, courts should grant summary judgment where the
critical evidence in support of the nonmovant is so weak and tenuous that it could not
support a judgment in the nonmovant’s favor. Little, 37 F.3d at 1075.
Additionally, Local Rule 56.1 requires the moving party to file a statement of
material facts as to which it contends there is no genuine issue to be tried. Pursuant to
Local Rule 56.2, the party opposing the motion for summary judgment must set forth a
“short and concise statement of the material facts as to which there exists a genuine issue
to be tried.” All material facts set forth in the statement required to be served by the
moving party “will be deemed admitted, for purposes of the motion, unless controverted
as required by this rule.” Local Rule 56.2.
Page 7 of 15
LAW AND ANALYSIS
BOW does not dispute that this matter is governed by the LLMA. Instead, BOW
argues that the LLMA allows for recovery of the leased property as well as liquidated
damages, and here, the liquidated damages are contractually provided to equal the present
value of all amounts to be paid by the lessee for the remainder of the Lease, discounted
at the rate of 2% per annum. See Record Document 49, p. 8; 47-3, p. 4. Thus, according
to BOW, it is not seeking to recover accelerated rent after having exercised its option to
terminate the Lease and recover the property. Instead, it is exercising its rights under the
liquidated damages provision, which happens to measure damages using future rent
payment amounts.
The LLMA provides, “Whenever a lessor seeks to enforce remedies under any lease
of movable property, no matter where consummated, following the lessee’s default and the
leased property is then located in this state, the lessor shall comply with the remedy
provisions under Part IV of this Chapter. . . .” La. R.S. § 9:3303(D). Part IV encompasses
§§ 9:3318-3330. Section 3318(A) generally provides that, in the event of default, a lessor
can file a collection action to recover accelerated rental payments and additional amounts
due and outstanding or that will become due in the future; or cancel the lease, recover
possession of the leased property, and recover liquidated damages contractually provided
for under the lease agreement. The remedies are not cumulative; a lessor cannot both
collect accelerated rental payments and also cancel the lease and recover possession of the
leased equipment.
Page 8 of 15
Additionally, § 3325, entitled “Recovery of liquidated damages,” provides that a
lessor can commence an ordinary proceeding to recover “amounts then due and owing
under the lease as well as such liquidated damages as may be provided under the lease
agreement.” La. R.S. 9:3325(A). However, a “court shall award liquidated damages to the
lessor only if it finds the amount thereof to be reasonable. If the court finds the amount
of liquidated damages to be unreasonable, or if there is no such stipulation, then the court
may, in its discretion, award liquidated damages to the lessor.” La. R.S. § 9:3325(B). A
survey of cases decided by Louisiana appellate courts suggests this reasonableness
determination is the central issue when a lease provision purports to award damages
calculated using future rental amounts.
In Cenval Leasing Corp. v. Nunnery, 577 So. 2d 1042 (La. App. 4 Cir. 1991), the
Louisiana Fourth Circuit Court of Appeal upheld a damages award that included future
rental amounts following the termination of a lease and return of the leased item. The
court noted that the parties had stipulated to the measure of damages and nothing in the
record indicated the damages were unreasonable. Cenval, 577 So. 2d at 1046.
In AT&T Information Systems, Inc. v. Smith, 593 So. 2d 673 (La. App. 1 Cir. 1991),
the defendant ceased making payments on its lease of telephone equipment. Under the
terms of the lease, upon default, the plaintiff could recover both the leased equipment and
termination charges of “one-half (½) of the monthly payments for the original term or 70
percent (70%) of the sum of all remaining monthly payments, whichever is less.” AT&T
Info. Sys., Inc., 593 So. 2d at 674. The trial court invalidated this provision, but the
Page 9 of 15
Louisiana First Circuit Court of Appeal reversed. The appellate court noted that the LLMA
“contemplates and permits reasonable liquidated damages and repossession of the leased
property following lessee’s default.” Id. at 676 (emphasis in original). The court then
remanded the matter so that the trial court could take additional evidence on the
reasonableness of the damages. Id.
In McFillen Rent-A-Car, Inc. v. Brierty, 625 So. 2d 364, 367 (La. App. 3 Cir. 1993),
the lease at issue provided for attorney’s fees of 25% of the total amount remaining due
under the lease contract. The court found this to be an agreement to pay stipulated
damages which was subject to a showing of reasonableness. McFillen Rent-A-Car, Inc., 625
So. 2d at 367. Ultimately, the court found the stipulated amount to be unreasonable in light
of the issues involved, the brevity of the trial, and the amount of discovery done.
Therefore, pursuant to La. R.S. § 9:3325(B), the court set an amount of liquidated
damages that it found to be a reasonable attorney’s fee. Id. at 368.
Defendant additionally cites American Leasing Co. of Monroe v. Lannon E. Miller &
Son, General Contracting, Inc., 469 So. 2d 325 (La. App. 2 Cir. 1985). In that case, the
parties entered into a 36-month lease of a tractor and accessories. American Leasing, 469
So. 2d at 327. The defendant-lessee made 19 monthly rental payments before notifying
the plaintiff-lessor that he was unable to fulfill his continued obligations under the lease.
When the defendant returned the equipment, $34,750 in future rentals was owed. The
plaintiff then sold the equipment for $20,000. Id. The lease provided that, upon default,
the lessor could terminate the lease, recover the equipment, and collect unpaid rent for the
Page 10 of 15
balance of the term, plus damages. Id. First, the court held that Louisiana law only allowed
accelerated rentals or cancellation of the lease, not both.7 Then, relying on Louisiana Civil
Code articles 2005 and 1995, the court held that “[a] stipulated damage clause should
reasonably approximate the lessor’s loss and profits and should not be penal.” Id. at 328.
Additionally, “When a stipulated damages provision is enforced, the court must determine
the reasonableness of the amount by inquiring whether the parties, by the clause, truly
attempted to reasonably approximate actual damages.” Id. at 329. The court found that
the language which allowed for termination of the lease and the balance of the rent, plus
damages, was not a stipulated damages clause. Furthermore, the court would not enforce
such a clause because it “requires full payment of the balance of the [future] rent whether
default occurs in the first month or the last month of the lease.” Id. (emphasis and
alteration in original). Ultimately, the court remanded the case to allow the lessor an
opportunity to prove actual damages sustained as a result of the lessee’s default. Notably,
the court would not declare the principle judgment amount8 to be per se unreasonable; it
simply held that such a determination could only be made by the trial court on additional
evidence. Id.
7
The court cited La. R.S. 9:3261, which at that time provided: “In the event of
default by the lessee, the lessor of movable property has the option to enforce judicially
all of his rights under the lease contract, including, if the lease so provides, his right to
accelerate all rentals that will become due in the future for the full base term of the
lease, or to cancel the lease and to exercise the rights granted him under this chapter.”
The statute was repealed in July 1985.
8
The principle judgment amount was $14,750. This is the difference between
past and future rentals due under the 36-month lease ($34,750) and the amount the
tractor was sold for ($20,000) by the lessor. See American Leasing, 469 So. 2d at 326.
Page 11 of 15
This Court interprets the above caselaw to consistently stand for one proposition:
the parties may stipulate to whatever measure of damages they choose, but the Court
must ultimately determine that the damages awarded are reasonable.
a. Are the damages sought by BOW reasonable?
While Prince claims this Court has “vast discretion” to make its own damages
calculation, Record Document 46-2, p. 21, BOW contends the Court should only make its
own calculation if it finds the stipulated damages amount to be unreasonable, Record
Document 49, pp. 12-13 (citing Ouachita Equip. Rental Co., Inc. v. Baker Brush Co., 388
So. 2d 477, 480 (La. App. 2 Cir. 1980) (“[W]here the parties to a contract stipulate the
measure of damages in case of default, our courts generally do not inquire whether the
actual damage suffered equals or approximates the agreed amount.”)). BOW contends that
the amount it seeks to recover, $333,628.79, is reasonable because it is commensurate
with the Bank’s actual cash loss of $273,350.99. BOW states:
The parties’ effort at estimating actual damages in the liquidated damages
clause turns out to have been on target, considering both a cash loss and
damages for loss of return on investment. The liquidated damages calculated
according to Section 20(v) of the Lease is $333,628.79, and the actual cash
loss (exclusive of any damages for loss of return on investment) to the Bank
as a result of the lessee’s breach was $273,350.99–a difference of only
approximately $60,000.00 on an investment by the Bank of $832,147.91.
Record Document 49, p. 7.
BOW explains that its investment in the Lease was $832,147.91. This amount is
reflected in a promissory note executed by Summit in favor of BOW, Record Document 4712, and BOW claims that it paid Summit this amount in connection with the assignment of
Page 12 of 15
the Lease, Record Document 47-14, p. 9. The “actual cash loss” of $273,350.99 is
calculated by subtracting $237,832.92 (the payments made) and $320,964.00 (the
proceeds from the sale of the Equipment) from $832,147.91 (the promissory note amount).
See Record Document 47-14, p. 15.
Prince challenges this argument and claims the amount due to BOW under the
promissory note has no bearing on any actual or potential damages sustained by BOW as
the assignee of Summit under the Lease. He characterizes the facts as follows: GES
executed the Lease in favor of Summit; Summit assigned its rights under the Lease to BOW
pursuant to a security agreement and assignment of the Lease, by virtue of which it also
granted a security interest in the Equipment to BOW; the security agreement secures the
obligations of Summit to BOW under a non-recourse promissory note executed by Summit
in favor of BOW in the principle amount of $832,147.91. Record Document 50, p. 3.
According to Prince, when GES defaulted, Summit owed nothing to BOW because BOW’s
rights to collect under the note were limited to the Equipment. Id. Furthermore, Prince
claims that the “net loss to the Bank” claimed by BOW of $273,350.99 is the amount owed
under the non-recourse note, not the Lease, after crediting payments made and amounts
recovered from the sale of the Equipment. Id. Prince claims that BOW now seeks to
recover from him the damages allegedly owed to Summit, but that Summit has not, and
never will, incur. Id. at 4. Prince further claims that the amount of damages sought by
BOW is 280% greater than the past due amounts under the Lease and, as a result, this
amount is per se unreasonable. Record Document 46-2, p. 21.
Page 13 of 15
BOW responds that it has submitted competent summary judgment evidence,
through the affidavit of George Alpi (the Vice President of BOW), that the amount of the
Bank’s initial investment in the Lease was $832,147.91, and that this investment amount
was the result of the costs of the particular equipment GES chose. Record Document 53,
p. 2. BOW claims that its initial expenditure to acquire the Lease is a crucial consideration
for the Court in making its reasonableness determination. Id. at 3.
Plaintiff prays for judgment in its favor in the amount of $333,628.79, plus interest
at the rate of 1.5% per month from September 9, 2016 until paid, plus attorneys’ fees,
expenses, and costs incurred by the Bank in enforcing the Lease. Record Document 47, p.
2; 47-14, p. 17. Prince seeks a judgment against him and in favor of BOW in the principal
amount of $118,916.46, plus interest on the amount owed under the Lease from the date
the Court determines the precise amount due until paid. He further submits that BOW
should not be allowed to recover attorneys’ fees and expenses to the extent such fees and
expenses were incurred in the collection of amounts he claims are prohibited by Louisiana
law. Record Document 50, pp. 8-9. Because a number of material facts remain in dispute,
both parties’ motions are DENIED.
The Court identifies the following issues in need of resolution: (1) the amount of
past due rent; (2) the reasonableness of the liquidated damages sought and the exact
amount, if any, of liquidated damages to be awarded; (3) the date(s) on which interest
began and/or will begin to accrue; and (4) the amount of attorneys’ fees. The Court
requires additional briefing on these matters. Plaintiff is to file briefing addressing each of
these issues by July 2, 2018. Plaintiff’s briefing should specifically include an updated
Page 14 of 15
accounting of the attorneys’ fees sought. Defendant must file briefing on each of the issues
by July 23, 2018. Once briefing is completed, the Court intends to set an evidentiary
hearing to resolve all remaining issues.
CONCLUSION
For the foregoing reasons, the Court DENIES the parties’ Motions for Summary
Judgment [Record Documents 46 & 47]. A hearing to resolve the remaining issues in this
case will be set at a later date.
THUS DONE AND SIGNED this 7th day of June, 2018 in Shreveport, Louisiana.
Page 15 of 15
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?