Thompson v. Naval Academy Athletic Association et al
Filing
79
MEMORANDUM OPINION. Signed by Judge Richard D Bennett on 12/19/2014. (hmls, Deputy Clerk)
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF MARYLAND
ROBERT D. THOMPSON,
*
Plaintiff,
*
v.
*
NAVAL ACADEMY ATHLETIC
ASSOCIATION,
Civil Action No. RDB-12-2676
*
*
Defendant.
*
*
*
*
*
*
*
*
*
*
*
*
*
*
MEMORANDUM OPINION
Plaintiff Robert D. Thompson (“Mr. Thompson” or “Plaintiff”) brings this action
against Defendant Naval Academy Athletic Association (“the NAAA” or “Defendant”),
alleging that the NAAA breached a written contract between the parties by terminating said
contract prior to the expiration of the three-year term.1 Currently pending before this Court
is the NAAA’s Motion for Summary Judgment (ECF No. 62) and Mr. Thompson’s Motion
Objecting to Untimely Errata Submission (ECF No. 68). The parties’ submissions have been
reviewed and no hearing is necessary. See Local Rule 105.6 (D. Md. 2014). For the reasons
1 In his Complaint, Plaintiff alleged two additional claims: (1) breach of the implied covenant of good faith and fair
dealing; and (2) violations of the Maryland Wage Payment and Collection Law, Md. Code Ann., Lab. & Empl. §§
3-501, et seq. He initially named as defendants the United States; the NAAA; Vice Admiral Michael H. Miller, in his
official and individual capacities; and Chester S. Gladchuk, Jr., President of the NAAA, also in his official and
individual capacities. On August 1, 2013, this Court dismissed all claims against the United States, Vice Admiral
Miller, and President Gladchuk. See Mem. Op., 2, ECF No. 29. As to the NAAA, this Court dismissed the breach
of the implied covenant of good faith and fair dealing and the Maryland Wage Payment and Collection Law claims,
but preserved the breach of contract claim. See id.
1
that follow, Defendant Naval Academy Athletic Association’s Motion for Summary
Judgment (ECF No. 62) is GRANTED and Plaintiff Robert Thompson’s Motion Objecting
to Untimely Errata Submission (ECF No. 68) is DENIED.2
BACKGROUND
In ruling on a motion for summary judgment, this Court reviews the facts and all
reasonable inferences in the light most favorable to the nonmoving party. Scott v. Harris, 550
U.S. 372, 378 (2007); see also Hardwick ex rel. Hardwick v. Heyward, 711 F.3d 426, 433 (4th Cir.
2013).
Plaintiff Robert Thompson entered into a “Letter Agreement” with Defendant
Naval Academy Athletic Association on October 29, 2010.3 Def.’s Mot. for Summ. J. Ex. 3,
ECF No. 62-5. Defendant Naval Academy Athletic Association is a non-profit, non-
Mr. Thompson bases his Motion Objecting to Untimely Errata Submission solely on the ground that U.S. Navy
Commander Justin Francis, a non-party witness, submitted an errata sheet after the required thirty-day deadline of
Rule 30(e) of the Federal Rules of Civil Procedure. Pl.’s Mot. Objecting to Untimely Errata Submission, 2-3, ECF
No. 68. According to Mr. Thompson, Commander Francis submitted his errata sheet 37 days after notification. Id.
Under Rule 30(e)(1), a deponent “must be allowed 30 days after being notified by the officer that the transcript or
recording is available.” Fed. R. Civ. P. 30(e)(1). The plain language of Rule 30(e)(1) does not set an absolute
deadline for submission of errata sheets. See EBC, Inc. v. Clark Building Systems, Inc., 618 F.3d 253, 266 n.12 (3rd Cir.
2010) (explaining that the “natural language of the rule . . . does not preclude courts from . . . forgiving minor
untimeliness after the fact”); but see Hambleton Bros. Lumber Co. v. Balkin Enterprises, Inc., 397 F.3d 1217, 1224 (9th
Cir. 2005) (in holding that Rule 30(e)(1) set a hard deadline of thirty days, the court acknowledged that a minor
delay may not require exclusion). In this case, a delay of seven days does not justify excluding the errata sheet at
issue. Commander Francis only sought to correct errors in the transcript, rather than make substantive changes in
his deposition. Accordingly, Mr. Thompson’s Motion Objecting to Untimely Errata Submission is DENIED.
3 This “Letter Agreement” was the third such contract between Mr. Thompson and the NAAA. See Mem. Op., at
3. Mr. Thompson first entered into two-year agreement to provide a range of marketing services to Defendant on
May 1, 2006. See Compl. ¶ 14; Mem. Op., at 3. Before the expiration of the first “Letter Agreement,” the parties
agreed to a second contract for the same services, but for a period of three years. Mem. Op., at 3. The second
“Letter Agreement,” drafted by Mr. Thompson, was nearly identical to the first such agreement, but increased Mr.
Thompson’s monthly retainer and the notice period for early termination. Mem. in Supp. of Def.’s Mot. for
Summ. J., 4-5, ECF No. 62-1. The “Letter Agreement” that is the subject of the instant action explicitly
superseded and replaced the second agreement between the parties. Def.’s Mot. for Summ. J. Ex. 3, 1, ECF No.
62-5.
2
2
governmental organization that “operates the intercollegiate athletic programs of the United
States Naval Academy (“the Naval Academy”). Mem. in Supp. of Def.’s Mot. for Summ. J.,
2, ECF No. 62-1. As with the prior two contracts between the parties, Mr. Thompson
drafted the subject Letter Agreement. Id. at 5; see also Thompson Dep. 127:21-128:16, Aug. 5,
2014, ECF No. 62-6. Under the terms of the contract, Mr. Thompson was to provide
various marketing services for the NAAA for a period of three years. Def.’s Mot. for Summ.
J. Ex. 3, at 1-2. The NAAA agreed to pay Mr. Thompson a monthly retainer of $17,500,
with the option of a bonus at the discretion of the Deputy of Finance for the Naval
Academy.4 Id. at 4. Although the stated term of the contract was November 1, 2010 through
October 31, 2013, either party had the right to terminate upon 180 days written notice to the
other party. Id. at 5.
In January 2011, after a series of government investigations into the Naval Academy’s
financial records, the Naval Academy established the Financial Management Assessment
Group to address the problems identified by the investigations. Mem. in Supp. of Def.’s
Mot. for Summ. J., at 7; see also Commander Francis Dep. 10:13-11:9, 131:13-136:5, Sept. 3,
2014, ECF No. 62-8. Commander Justin Francis, a member of the Financial Management
Assessment Group, reviewed the Letter Agreement between Mr. Thompson and the NAAA.
Commander Francis Dep. 10:13-21, 12:13-16:9. He found several issues with the contract
As explained by the NAAA, the Naval Academy provides all funding for NAAA contracts, but it is the NAAA
that actually pays the contractors. Mem. in Supp. of Def.’s Mot. for Summ. J., at 4. After a Naval Academy officer
approves the contractor’s invoice, the NAAA pays the contractor, and the Naval Academy reimburses the NAAA.
Id. Mr. Thompson clearly understood this financial arrangement. See Thompson Dep. 25:6-77:7.
4
3
and recommended that it be terminated immediately.5 Def.’s Mot. for Summ. J. Ex. 9, ECF
No. 62-11. Vice Admiral Michael H. Miller, then the Superintendent of the Naval Academy,
directed the immediate termination, stating that “[his] legal advisers explained that neither its
award nor its provisions comported with government contracting regulations.” Vice Admiral
Miller Aff., ECF No. 62-14.
On May 20, 2011, the acting Deputy of Finance, Lou Giannotti, notified Mr.
Thompson in writing that the NAAA would be terminating the Letter Agreement, thus “no
further work should be performed under the terms outlined in the Agreement.” Def.’s Mot.
for Summ. J. Ex. 10, ECF No. 62-12. Following termination, the NAAA paid Mr.
Thompson a pro-rated sum for the month of May. Thompson Dep. 152:6-20. Mr.
Thompson then submitted an invoice for $105,000, representing his compensation under
the contract’s 180-day notice period. Id. at 160:14-162:12. The NAAA never paid Mr.
Thompson the requested $105,000, as the Letter Agreement had become part of a larger
investigation into the former Deputy of Finance’s actions while serving in that capacity. Id. at
169:13-18. All efforts by Mr. Giannotti to obtain authorization to reinstate the relationship
with Mr. Thompson were unsuccessful. Id. at 134:15-135:13, 137:9-11; see also Giannotti Dep.
137:1-21, ECF No. 62-7.
Among other issues, Commander Francis stated that the (now former) Deputy of Finance had no authority to
enter into the contract in the first place because the Naval Academy reimbursed the NAAA with appropriated
funds. Commander Francis Dep. 13:10-13. Only a “valid contracting officer” may enter into contracts using
appropriated funds, and the former Deputy of Finance was not such an officer. Mem. in Supp. of Def.’s Mot. for
Summ. J, at 7-8; see also Commander Francis Dep. 32:7-14.
5
4
Plaintiff filed the instant action on September 7, 2012, alleging claims of breach of
contract, breach of the implied covenant of good faith and fair dealing, and a violation of the
Maryland Wage Payment and Collection Law, Md. Code Ann., Lab. & Empl. §§ 3-501, et
seq.6 Compl. ¶ 36, ECF No. 1. On August 1, 2013, this Court dismissed all claims except Mr.
Thompson’s claim of breach of contract against the NAAA. Mem. Op., at 2. Subsequently,
the NAAA deposited $120,085.487 into this Court, pursuant to Rule 67 of the Federal Rules
of Procedure. Mem. in Supp. of Def.’s Mot. for Summ. J., at 11. After conducting discovery
on Plaintiff’s remaining claim, the NAAA moved for summary judgment under Rule 56 of
the Federal Rules of Civil Procedure (ECF No. 62).8
The NAAA argues that Mr.
Thompsons only viable claim for breach of contract is that the NAAA failed to provide the
required 180 days notice when it terminated the Letter Agreement.9 Mem. in Supp. of Def.’s
Mot. for Summ. J., at 1. Since Defendant deposited the sum owed under the notice period, it
asks this Court for judgment as a matter of law. Id. at 1-2. In response, Plaintiff argues that
the May 20, 2011 letter did not terminate the Letter Agreement. Pl.’s Resp. in Opp. to Def.’s
Mot. for Summ. J., 3-5, ECF No. 67. Mr. Thompson further contends that, even if the May
Mr. Thompson filed his Complaint pro se, but subsequently retained counsel. Mem. Op., at 1.
This figure is the sum of $105,000, the amount allegedly owed under the Letter Agreement’s 180-day termination
notice period, plus accrued interest. Mem. in Supp. of Def.’s Mot. for Summ. J., at 11. In moving for summary
judgment, Defendant conceded that, if its pending Motion is granted, then Plaintiff is “entitled to the 180 days’
compensation” deposited with this Court. Id. at 2 n.2.
8 The NAAA and Mr. Thompson each moved for summary judgment in October and November of 2013,
respectively. See Def.’s Mot. for Summ. J., ECF No. 34; Pl.’s Mot. for Summ. J., ECF No. 45. This Court denied
both motions without prejudice by Order dated June 4, 2014 (ECF No. 52).
9 Although conceding, for purposes of this Motion, that the 180-day notice period is the maximum amount the
NAAA would owe Mr. Thompson, the NAAA maintains that the Letter Agreement was never a valid contract.
Mem. in Supp. of Def.’s Mot. for Summ. J., at 2 n.2. As Defendant’s Motion for Summary Judgment is granted,
this Court need not reach this defense.
6
7
5
20, 2011 letter did terminate the contract, NAAA must compensate him for the intended
three years of the contract. Id. at 16-18. Prior to his Response, Plaintiff also filed a Motion
Objecting to Untimely Errata Submission (ECF No. 68) regarding an errata sheet submitted
by Commander Francis.
STANDARD OF REVIEW
Rule 56 of the Federal Rules of Civil Procedure provides that a court “shall grant
summary judgment if the movant shows that there is no genuine dispute as to any material
fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(c). A
material fact is one that “might affect the outcome of the suit under the governing law.”
Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). A genuine issue over a material fact
exists “if the evidence is such that a reasonable jury could return a verdict for the
nonmoving party.” Id. When considering a motion for summary judgment, a judge’s
function is limited to determining whether sufficient evidence exists on a claimed factual
dispute to warrant submission of the matter to a jury for resolution at trial. Id. at 249.
In undertaking this inquiry, this Court must consider the facts and all reasonable
inferences in the light most favorable to the nonmoving party. Scott v. Harris, 550 U.S. 372,
378 (2007). However, this Court must also abide by its affirmative obligation to prevent
factually unsupported claims and defenses from going to trial. Drewitt v. Pratt, 999 F.2d 774,
778-79 (4th Cir. 1993).
If the evidence presented by the nonmoving party is merely
colorable, or is not significantly probative, summary judgment must be granted. Anderson,
6
477 U.S. at 249-50. On the other hand, a party opposing summary judgment must “do more
than simply show that there is some metaphysical doubt as to the material facts.” Matsushita
Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586 (1986); see also In re Apex Express Corp.,
190 F.3d 624, 633 (4th Cir. 1999). This Court has previously explained that a “party cannot
create a genuine dispute of material fact through mere speculation or compilation of
inferences.” Shin v. Shalala, 166 F. Supp. 2d 373, 375 (D. Md. 2001) (citations omitted).
ANALYSIS
In moving for summary judgment, the NAAA contends that the only possible breach
of contract at issue is its failure to compensate Mr. Thompson under the Letter Agreement’s
180-day notice period. Since, for purposes of this Motion, the NAAA does not contest the
alleged breach, the clear and unambiguous language of the contract controls the sum it owes
to Mr. Thompson. Judgment as a matter of law is thus appropriate, as the NAAA contends
that no genuine issue of material fact remains regarding the breach and resulting damages.
Mr. Thompson, however, argues that the May 20, 2011 letter did not terminate the Letter
Agreement because it was not intended to terminate the contract, nor did it follow the
Federal Acquisition Guidelines. Even if the May 20, 2011 letter did terminate the contract,
Mr. Thompson maintains that the NAAA must compensate him for the entirety of the
three-year term.
Before considering any damages owed to Mr. Thompson under the Letter
Agreement, this Court first must determine whether the May 20, 2011 letter did, in fact,
7
terminate the subject contract. Under Maryland law, a contract may be terminated “by either
party, if such act is in accordance with its terms.” Blum v. Blum, 477 A.2d 289, 294 (Md. Ct.
Spec. App. 1984); see also Questar Builders, Inc. v. CB Flooring, LLC, 978 A.2d 651, 671 (Md.
2009); 7-Eleven, Inc. v. McEvoy, 300 F. Supp. 2d 352, 359 (D. Md. 2004). When a contract
includes a notice provision, the failure to provide the requisite notice does not extinguish the
moving party’s right of termination. Storetrax.com, Inc. v. Gurland, 895 A.2d 355, 367-68 (Md.
2006) (citing Delvecchio v. Bayside Chrysler Plymouth Jeep Eage, Inc., 271 A.2d 636, 726 (N.Y. App.
Div. 2000)). In Storetrax.com, the Maryland Court of Appeals agreed with the New York
Supreme Court Appellate Division’s conclusion that an employer who did not give an
employee the proscribed notice was “liable . . . for certain damages . . . [but] did not forfeit
its right to terminate the agreement.” Id. In this case, the Letter Agreement expressly grants
each party the right to terminate the contract in writing “for any reason upon one hundred
eighty (180) days written notice to the other [party].” Def.’s Mot. for Summ. J. Ex. 3, at 5.
The parties thus clearly contemplated that written notification could effectively terminate the
contract. The NAAA, as a non-governmental organization, was not required to adhere to the
termination procedures required by the Federal Acquisition Regulations for governmental
entities. See Def.’s Reply to Pl.’s Opp. to Def.’s Mot. for Summ. J., 6-8, ECF No. 70.
Furthermore, the NAAA did not forfeit its right to terminate the contract when it acted to
terminate the contract immediately, rather than provide Mr. Thompson with 180 days
notice. Mr. Giannotti’s efforts to reinstate the relationship between Mr. Thompson and the
8
NAAA, rather than negating the termination, demonstrate that the NAAA had exercised its
contractual right of termination.
Moreover, Mr. Thompson understood that the purpose and effect of the May 20,
2011 letter was to terminate the subject contract. He admitted that he was notified of the
termination in May, 2011, and that the letter terminated the contract “because the attorneys
[for the Naval Academy] were saying it was an invalid contract.” Thompson Dep. 131:10-12;
143:7-12. Further, in an exchange of emails between Mr. Thompson and Mr. Giannotti, Mr.
Thompson specifically acknowledged that the May 20, 2011 letter “notified [him] that the
above referenced three-party Agreement was terminated.” Def.’s Reply to Pl.’s Opp. to
Def.’s Mot. for Summ. J. Ex. 15, 2, ECF No. 70-2. Throughout the correspondence, Mr.
Thompson repeatedly referred to the contract as terminated by the letter at issue. See id. at 25. This Court thus can conceive of no genuine dispute of material fact as to the purpose and
validity of the May 20, 2011 termination letter.
By terminating the Letter Agreement without the requisite 180 days notice, the
NAAA breached the contract and must compensate Mr. Thompson for the appropriate
damages. When a party to a contract may terminate that contract at any time upon a specific
period of notice to the other party, the injured party may recover only those profits he would
have accrued during that period.10 Cottman v. State of Maryland, Dept. of Natural Resources, 443
Maryland is not alone in limiting damages for termination without the requisite notice to the net profits of the
notice period. See Enterprise Wheel & Car Corp. v. United Steelworkers, 269 F.2d 327, 331 (4th Cir. 1959), rev’d on other
grounds, 363 U.S. 593 (1960) (“[W]here a contract of employment contains a provision allowing termination after a
period of notice has been given[,] . . . damages for wrongful discharge are limited to the notice period”); Strategic
Outsourcing, Inc. v. Continental Casualty Co., 274 Fed. App’x 228, 232-34 (4th Cir. 2008) (stating that, when a party
10
9
A.2d 638, 639-640 (Md. 1982); see also Storetrax.com, 895 A.2d at 368. In Cottman, the
Maryland Court of Appeals explained that, under the thirty-day notice provision in the
contract at issue, “[a]ll the appellant could expect under the terms of his lease was a thirty
days written notice by the Department of its intention to terminate the lease.” Cottman, 443
A.2d at 640. This limitation on damages ensures that the aggrieved party does not receive
“any more than he would have gained had the terms of the contract been fulfilled.” Id.
In this case, the Letter Agreement expressly provided that “either party shall have the
right to terminate this Agreement for any reason upon one hundred eighty (180) days written
notice to the other.” Def.’s Mot. for Summ. J. Ex. 3, at 5. As the NAAA terminated the
contract on May 20, 2011 without the requisite 180 days notice, Mr. Thompson is entitled to
the net profits he would have received during the notice period. Per the terms of the Letter
Agreement, the NAAA paid Mr. Thompson a monthly retainer of $17,500.00. Id. at 4. Mr.
Thompson’s damages are thus $105,000, or $17,500 multiplied by the six-month notice
period. On October 11, 2013, the NAAA deposited $120,085.48 with this Court, pursuant to
Rule 67 of the Federal Rules of Civil Procedure.11 As this figure represents the $105,000 plus
breaches a contract by terminating the contract without the required notice, the injured party may recover only
those damages accrued under the notice period); Odell v. Humble Oil & Refining Co., 201 F.2d 123, 128 (10th Cir.
1953) (“Where a contract of employment expressly empowers an employer to terminate the contract upon giving
notice, recovery for wrongful breach is limited to the notice period.”); Osborn v. Commanche Cattle Industries, Inc., 545
P.2d 827, 831 (Okl. Civ. App. 1975) (explaining that the “courts of other jurisdictions are virtually unanimous in
holding that breach of a contract terminable at any time upon notice entitles the aggrieved party to recover only
those net profits which he could have earned during the notice period[.]”).
11
Under Rule 67(a) of the Federal Rules of Civil Procedure, “[i]f any part of the relief sought is a money judgment
or the disposition of a sum of money . . ., a party . . . may deposit with the court all or part of the money or thing,
whether or not that party claims any of it.”
10
accrued interest, the NAAA has satisfied its obligation to pay Mr. Thompson damages for
the breach.
In contrast, Mr. Thompson contends that the NAAA must compensate him for the
duration of the contract period, rather than merely the notice period. Mr. Thompson’s
argument rests solely on his alleged belief that the contract would continue for the entirety
of the prescribed period. This expectation is premised on two grounds. First, Mr. Thompson
argues that he anticipated that the Letter Agreement would run its natural length because he
had forfeited his right to accrued bonuses when agreeing to the contract at issue. Second, he
asserts that this Court’s decision in Jorgensen v. United Commc’ns Group Ltd. P’ship, Civ. A. No.
8:10-cv-00429-AW, 2013 WL 66640 (D. Md. Jan. 3, 2013), requires the NAAA to
compensate him for the entire contract period. This Court will address each argument in
turn.
First, Mr. Thompson argues that, in agreeing to the subject Letter Agreement, he
waived bonuses that he had earned under the parties’ earlier contracts. Mr. Thompson
contends that the preamble of the contract, in which he is recognized for his “initiative and
willingness . . . to waive significant bonuses that otherwise accrued . . .,” proves that the
parties expected the contract to continue for the full three-year term. Def.’s Mot. for Summ.
J. Ex. 3, at 1. This argument, however, runs afoul of the parol evidence rule, as it offers
extrinsic evidence to contradict clear and unambiguous contractual language. In Maryland,
the “construction of contractual language is, in the first instance, a question of law for the
court to resolve.” Storetrax.com, 895 A.2d at 367 (internal citation omitted). When the
11
contractual language is “clear and unambiguous,” that language “will not give way to what a
party thought the agreement meant or was intended to mean.” County Comm’rs of Charles
County v. St. Charles Assocs. Ltd. P’ship, 784 A.2d 545, 556 (Md. 2001); see also Ocean Petroleum
Co., Inc. v. Yanek, 5 A.3d 684, 690 (Md. 2010) (explaining that, “unless a contract’s language is
ambiguous, we give effect to that language as written without concern for the subjective
intent of the parties at the time of formation”). Extrinsic evidence may not be used to “vary,
alter, or contradict the terms of” unambiguous contractual language. Ubom v. Suntrust Bank,
17 A.3d 168, 173 (Md. Ct. Spec. App. 2011).
Yet, by offering evidence of the parties’ alleged contrary intentions, Mr. Thompson
attempts to thwart the plain language of the Letter Agreement. The contractual language
governing termination clearly and unambiguously permits early termination “for any reason
upon one hundred eighty (180) days written notice.” Def.’s Mot. for Summ. J. Ex. 3, at 5.
This language is not conditional, nor does it mention any expectation that the contract
should continue for the full term due to Mr. Thompson’s waiver of bonuses. Mr. Thompson
personally drafted the Letter Agreement, extending the notice period for early termination
from the 120-day period of the prior contract to the 180-day period in the subject contract.
Def.’s Mot. for Summ. J. Ex. 2, 5, ECF No. 62-4; cf. Def.’s Mot. for Summ. J. Ex. 3, at 5.
Although the preamble does the accrued (and waived) bonuses, it does not connect that
acknowledgment to any expectation that the contract is not terminable. Even if the parties
intended the contract to run for the duration of the three-year period, this extrinsic evidence
12
may not alter or contradict the clear and unambiguous language of the termination
provision.
Second, Mr. Thompson argues that this Court’s decision in Jorgensen requires the
NAAA to compensate him for the full three-year contract term. Mr. Thompson’s reliance on
Jorgensen, however, is misplaced. Jorgensen held that expectation damages for the breached
employment contract at issue are not limited to those damages accrued during the notice
period. 2013 WL 66640 at *7-9. In so holding, this Court placed particular emphasis on the
contractual language, which allowed for termination “[w]ithout [c]ause, upon not less than 30
days prior written notice of termination from the Company to Jorgensen[.]” Id. at *1
(emphasis added). This Court concluded that the inclusion of “not less than,” rather than
language setting a fixed notice period, supported the “inference that the firing could have
occurred upon 30 days’ notice or more.” Id. at *8 (emphasis in original).
In contrast, the Letter Agreement between Mr. Thompson and the NAAA
specifically required 180 days written notice if either party chose to terminate the contract
before the end of the stipulated three-year term. Conditional language, such as that
modifying the notice period in Jorgensen, is absent in this case. The fixed 180-day period
cannot support a belief that a longer notice period was required. Mr. Thompson, who
drafted the contract, chose the absolute language employed in the termination provision.
Like a drafter of any contract, he gave careful consideration to each provision, even
amending the current Letter Agreement to increase the length of the notice period from 120
to 180 days. Thompson Dep. 127:21-128:16. Although Mr. Thompson argues that he did
13
not anticipate early termination, the absolute language of the termination provision supports
the opposite conclusion.
In sum, the NAAA breached the Letter Agreement when it terminated the contract
on May 20, 2011 without providing 180 days written notice to Mr. Thompson. Under the
clear and unambiguous language of the contract, the NAAA must compensate Mr.
Thompson for his expected net profits during the notice period. As the NAAA deposited
the requisite sum with this Court, it is entitled to judgment as a matter of law. Accordingly,
Defendant’s Motion for Summary Judgment is GRANTED.
CONCLUSION
For the reasons stated above, Defendant Naval Academy Athletic Association’s
Motion for Summary Judgment (ECF No. 62) is GRANTED and Plaintiff Robert
Thompson’s Motion Objecting to Untimely Errata Submission (ECF No. 68) is DENIED.
A separate Order follows.
Dated: December 19, 2014
_______/s/_________________
Richard D. Bennett
United States District Judge