Consolidated Rail Corporation v. Grand Trunk Western Railroad Company
Filing
149
ORDER granting in part 113 Motion for Summary Judgment and 114 Motion for Summary Judgment. Signed by District Judge Nancy G. Edmunds. (CHem)
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF MICHIGAN
SOUTHERN DIVISION
CONSOLIDATED RAIL CORPORATION
and NORFOLK SOUTHERN RAILROAD
COMPANY,
Case No. 09-cv-10179
Plaintiffs/Counter-Defendants,
Honorable Nancy G. Edmunds
v.
GRAND TRUNK WESTERN RAILROAD
COMPANY,
Defendant/Counter-Plaintiff.
/
OPINION AND ORDER GRANTING IN PART AND DENYING IN PART PLAINTIFFS’
AND DEFENDANT’S MOTIONS FOR SUMMARY JUDGMENT
This matter comes before the Court on cross motions for summary judgment filed
by Plaintiffs Consolidated Rail Corporation and Norfolk Southern Railway Company and
Defendant Grand Truck Western Railroad Company. For the reasons set forth below,
Plaintiffs’ motion for summary judgment should be GRANTED in part and DENIED in
part and Defendant’s motion for summary judgment should be GRANTED in part and
DENIED in part.
I.
Facts
A.
1897 Agreement
In the late 1800s, Plaintiffs operated parallel rail lines that extended south of the
1
city of Trenton, Michigan and north to Detroit.1 (Pls.’ Mot. for Summ. J. 2; Def.’s Mot. for
Summ. J. 1.) By 1897, Defendant had tracks to the southwest of the Trenton area and
sought to extend those tracks northward to Detroit and construct a new line of railroad in
the vicinity of Trenton that would, in part, run parallel to the north-south lines owned by
Plaintiffs. (Pls.’ Mot. for Summ. J. 2; Def.’s Mot. for Summ. J. 2.) Defendant’s line
would approach Trenton from the west, veer north and run parallel to the west of
Plaintiffs’ lines. (Pls.’ Mot. for Summ. J. 2.) In the vicinity of Trenton, Defendant’s line
would cross Plaintiffs’ lines and continue north, running parallel and to the east of
Plaintiffs’ lines. (Id.) On November 11, 1897, Plaintiffs and Defendant entered into an
agreement (“1897 Agreement”), allowing Defendant to put in an interlocking system “at
or near Trenton” in order to cross Plaintiffs’ lines.2 In addition, the 1897 Agreement
stated:
[Plaintiffs] shall . . . have the right at any time hereafter to construct additional
tracks crossing [Defendant’s] track at said point and connect such additional
tracks . . . with said interlocking system . . . . [Defendant] shall put in and
maintain at its own expense crossings of all the spur tracks of [Plaintiffs]
which run eastward from the main line of [Plaintiffs] toward Detroit River and
protect the same by gates . . . . Plaintiffs shall [] have the right at any time
or times hereafter to cross with spur tracks any portion of [Defendant’s]
tracks and right of way between Trenton and the Wabash Railway near
Delray without cost or payment of compensation therefor to [Defendant].
[Plaintiffs] shall construct and maintain such crossings and guard the same
by gates.
1
The Detroit, Monroe & Toledo Railroad Company (“DMT”) and the Toledo, Canada
Southern & Detroit Railroad Company (“TCSD”) are Consolidated Rail Corporation’s
predecessors-in-interest. DMT and TCSD were in operation in 1873. For ease of
reference, all predecessors-in-interest of Plaintiffs or Defendant will be referred to as
“Plaintiffs” or “Defendant” respectively.
2
The interlocking system that Defendant put in pursuant to this agreement became
known as the “FN Interlocking” and still exists in the same location. (Def.’s Mot. for
Summ. J. 3; Pls.’ Mot. for Summ. J. 4.)
2
This agreement shall bind the successors and assigns of the respective
parties thereto.
The 1897 Agreement allowed Defendant to cross Plaintiffs’ lines and extend its railway
toward Detroit as Defendant desired. The 1897 Agreement also gave Plaintiffs the right
to cross Defendant’s new line, preventing Plaintiffs’ lines from being walled in. The
southern point of this “wall” began at Trenton Station, an established railroad stop at the
time of the 1897 Agreement, where one of Plaintiffs’ lines intersected with an
independent and unrelated railroad company’s tracks. (Pls.’ Mot. for Summ. J. 4.)
Between 1901 and 1903, another predecessor of Defendant reached a series of
similar crossing agreements with Plaintiffs regarding the Trenton area. (Def.’s Mot. for
Summ. J. 3.) These agreements allowed another set of mainline tracks to be built,
heading northward through the Trenton area and on to Detroit, on the opposite side of
Plaintiffs’ tracks from Defendant’s new tracks contemplated by the 1897 Agreement.
(Id.) By the early 1900s, except for Plaintiffs’ crossing agreements with the other
railroads, Plaintiffs’ tracks were “walled in,” as shown below.
(Def.’s Mot. for Summ. J. 3.)
3
B.
Arbitration and Tracking Rights Agreements
On June 7, 1993, Plaintiffs sent Defendant a letter, notifying Defendant that
Plaintiffs intended to exercise their right, under the 1897 Agreement, to cross
Defendant’s tracks. (Def.’s Mot. for Summ. J. 6.) The letter stated:
[Plaintiffs are] notifying [Defendant] that they intend to exercise the right to
access Trenton Steel Storage located just north of Harrison Street and east
of your tracks in Trenton, MI, adjacent to “FN” interlocking. [Plaintiffs] intend[]
to apply the right by installing a diamond to cross your tracks and sidetrack
to access Trenton Steel Storage.
(Id.) The letter mistakenly identifies Trenton Steel Storage as being located to the east
of Defendant’s tracks, when it is actually located to the west. (Id.) Defendant did not
agree to Plaintiffs’ plan to cross, maintaining that the 1897 Agreement allows Plaintiffs
to cross Defendant’s tracks to service industries only to the east of the FN Interlocking,
not to the west of it. (Id. at 7-8.) After failing to come to an agreement, Plaintiffs and
Defendant decided to submit the dispute to arbitration. (Id. at 8.) Prior to the
arbitration, on June 23, 1994, the parties agreed that if the arbitrators ruled in Plaintiffs’
favor, then Defendant would grant Plaintiffs access to Trenton Steel Warehouse by a
trackage rights agreement.
On July 13, 1994, the parties submitted a narrow question to the arbitrator. They
asked:
Do [Plaintiffs] have the right, pursuant to the [1897 Agreement and two of the
1900s crossing] Agreements, to cross the tracks, facilities, right-of-way, and
other property of [Defendant] in or near Trenton, Michigan for the purpose of
providing [Plaintiffs] access to and the ability to provide rail freight
transportation service to the Trenton Steel Warehouse.
(Id.) On January 21, 1996, the arbitration panel issued its decision, deciding in the
affirmative, that Plaintiffs have the right to cross Defendant’s tracks to access the
4
Trenton Steel Warehouse (“TSW”), west of the FN Interlocking. (Id. at 8-9.) Following
the arbitration award and pursuant to the June 23, 1994 agreement letter, Plaintiffs
formed an agreement with Defendant to use Defendant’s tracks for a limited purpose.
On May 1, 1996, Plaintiffs and Defendant entered into the “Trackage Rights
Agreement Between [Defendant] & [Plaintiffs] to Service Trenton Steel Warehouse”
(“1996 TRA”). The 1996 TRA states, “[Plaintiffs] wish to effectuate the Arbitration award
by reaching agreement on terms to use the certain portions of the aforesaid line of
railway of [Defendant] and [Defendant] is willing to grant such use on the following
terms and conditions . . . .” Section 1 of the 1996 TRA explicitly states that Plaintiffs
have the right to use certain segments of Defendant’s railroad “for the sole purpose of
serving Trenton Steel Warehouse or its successor.” Section 6 of the 1996 Agreement
delineates restrictions on use. This section states:
The Trackage Rights herein granted are subject to the following restrictions:
(a) [Plaintiffs] shall use the Trackage for the sole purpose of delivering or
picking up rail cars to and from (including the switching of such cars) [TSW]
located adjacent to “FN.” . . .
(c) Except as provided in above subparagraph (a) [Plaintiffs] shall not move
any rail cars of any kind, other than those cars moving to or from [TSW] or
perform any local freight or switching service of any kind whatsoever, and
shall not serve any other rail customers along the Trackage.
Additionally, the 1996 Agreement provided that Plaintiffs must pay Defendant a monthly
retainer fee as well as certain rates “for each rail car loaded or empty delivered to or
spotted” at TSW.
C.
Plaintiffs’ Service to Korneffel
On December 1, 2006, Plaintiffs entered into an agreement with Korneffel, a
private corporation engaged in the construction business to establish the terms on
5
which Plaintiffs would deliver steel to Korneffel. Plaintiffs would deliver the steel by
using Defendant’s tracks to reach a sidetrack owned by Huron Valley Steel Corporation
(“HVS”), near the fence separating the HVS property from Korneffel’s property. (Id. at
11-12.) Defendant was unaware of this agreement. (Id. at 12.)
On May 14, 2008, after Defendant found out that Plaintiffs were delivering
railcars to Korneffel, Defendant commenced a lockout and physically prevented
Plaintiffs from using its railroad tracks. (Id. at 13.) This resulted in 26 railcars of steel
en route to Korneffel to be held up because Plaintiffs could not deliver them. (Id.)
Defendant maintains that it has never interfered with Plaintiffs’ use of its tracks to
service TSW, as provided for in the 1996 TRA, but that Plaintiffs violated that
agreement when they used Defendant’s tracks to provide service to Korneffel.
D.
Property
In 1974, Dana Corporation (“Dana”) transferred to the Huron Valley Steel
Corporation (“HVS”) a parcel of land, which consisted of approximately 85.09 acres on
the east side of Fort Street between King Road and Harrison Avenue (“Original HVS
Parcel”). (Condon Report 4.) At the time of this transfer, the original parcel was largely
vacant and contained only the Trenton Steel Warehouse building and some industrial
trackage. (Id.) On January 7, 1987, the Original HVS Parcel was split into 3 separate
parcels of land: (1) 23.29 acres, making up the existing Trenton Steel Warehouse
Parcel; (2) 58.60 acres east and south of the Trenton Steel Warehouse Parcel (“Vacant
Parcel”); and (3) 3.76 acres north and west of the Trenton Steel Warehouse Parcel
(“Corner Parcel”). (Id.)
6
On December 11, 1987, the 58.60-acre Vacant Parcel was split into three
additional separate parcels of land: (1) 20.60 acres of Trenton Commerce Park
consisting of 16 separate lots; (2) 36.66 acres south of Trenton Commerce Park
(“Remaining Vacant Parcel”); and (3) 1.34 acres of a Mini Parcel. (Id. at 4-5).
In 2002, HVS sold the southern portion of the Remaining Vacant Parcel, which
consisted of 17.41 acres, to Erie Development LLC (“Erie Parcel”). The Erie Parcel
spans the southern boundary of the Original HVS Parcel and it touches the southern
border of the Trenton Steel Warehouse Parcel. (Id. at 5.)
Before the parties entered into the 1996 TRA, the Trenton Steel Warehouse
Parcel's physical characteristics reflected that it was not intended to be a part of the Erie
Parcel. It was and is gated and fenced and both the Vacant Parcel and Erie Parcel are
and have been separated from the Trenton Steel Warehouse Parcel by a storm-water
detention area, ditches and tall grass; and there are and have been no roads or foot
paths existing between the Trenton Steel Warehouse Parcel and the Vacant Parcel
and/or the Erie Parcel. (Id. at 5.)
David Wilson, while employed for Defendant, went to the Trenton Steel
Warehouse parcel at least twice in the early 1990s, before the dispute arose in 1993.
(Wilson Dep. 56:16-59:17, Dec. 9, 2009.) Paul Carey, while employed by Plaintiffs,
visited the Trenton Steel Warehouse while the arbitration was going on. (Carey Dep.
29:22-30:6, March 7, 2011.)
The central issue in dispute between the parties is whether the 1996 TRA gives
Plaintiffs the right to access the entire property owned by Huron Valley Steel on
Defendant’s sidetrack, as Plaintiffs contend, or just the specific warehouse facility, as
7
Defendant maintains.
II.
Standard
Summary judgment is appropriate only when there is “no genuine issue as to any
material fact and the moving party is entitled to judgment as a matter of law.” Fed. R.
Civ. P. 56(c). The central inquiry is “whether the evidence presents a sufficient
disagreement to require submission to a jury or whether it is so one-sided that one party
must prevail as a matter of law.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 251-52
(1986). Rule 56(c) mandates summary judgment against a party who fails to establish
the existence of an element essential to the party’s case and on which that party bears
the burden of proof at trial. Celotex Corp. v. Catrett, 477 U.S. 317, 322-23 (1986).
The moving party bears the initial burden of showing the absence of a genuine
issue of material fact. Celotex, 477 U.S. at 323. Once the moving party meets this
burden, the non-movant must come forward with specific facts showing that there is a
genuine issue for trial. Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574,
587 (1986). In evaluating a motion for summary judgment, the evidence must be
viewed in the light most favorable to the non-moving party. Adickes v. S.H. Kress &
Co., 398 U.S. 144, 157 (1970).
The non-moving party may not rest upon its mere allegations, however, but
rather “must set forth specific facts showing that there is a genuine issue for trial.” Fed.
R. Civ. P. 56(e). The mere existence of a scintilla of evidence in support of the nonmoving party’s position will not suffice. Rather, there must be evidence on which the
jury could reasonably find for the non-moving party. Hopson v. DaimlerChrysler Corp.,
306 F.3d 427, 432 (6th Cir. 2002).
8
III.
Analysis
Plaintiffs seek summary judgment in their favor on Counts I, II, and IV of the
Second Amended Complaint and all remaining counts of Defendant’s Amended
Counterclaim, Counts I, II, III, IV, V, VI, VII, and XI. Defendant seeks summary
judgment on Counts II, III, IV, V, VI, VII, and XI of its Amended Counterclaim and all four
counts of Plaintiffs’ Second Amended Complaint. The Court will address these claims
one at a time.
A.
Breach of the 1897 Agreement
Both Plaintiffs and Defendant seek summary judgment on Plaintiffs’ claim that
Defendant breached the 1897 Agreement. Plaintiffs allege that, in violation of the 1897
Agreement, Defendant blocked Plaintiffs from crossing Defendant’s tracks, preventing
Plaintiffs from providing freight transportation services to Korneffel. Plaintiff also argues
that they should be granted summary judgment on this count because Defendant’s
arguments are barred by res judicata and collateral estoppel.
Defendant claims, however, that res judicata and collateral estoppel do not apply
and that the 1897 Agreement does not require Defendant to allow Plaintiffs to utilize its
tracks, so Defendant did not breach the 1897 Agreement by preventing Plaintiffs from
using Defendant’s tracks to service Korneffel.
Under res judicata, a final judgment on the merits bars further claims by parties
or their privies based on the same cause of action. Montana v. United States, 440 U.S.
147, 153 (1979). This means that a prior judgment has the effect of foreclosing a
subsequent claim that has never been litigated because of a determination that it should
have been advanced in an earlier action. Mitchell v. Chapman, 343 F.3d 811, 818 fn. 5
9
(6th Cir. 2003). Res judicata arises only where: (1) the prior decision was a final
decision on the merits; (2) the present action is between the same parties or their
privies as those to the prior action; (3) the claim in a present action should have been
litigated in the prior action; and (4) an identity exists between the prior and present
actions. Mitchell, 343 F.3d at 819. Michigan courts apply the doctrine of res judicata
broadly and have barred not only claims already litigated, but also every claim arising
from the same transaction that the parties, exercising reasonable diligence, could have
raised but did not. SHR Ltd. Part. v. Swepi LP, 173 Fed. Appx. 433, 435 (6th Cir. 2006)
(internal citations omitted); see also Adair v. State of Michigan, 680 N.W.2d 386, 396
(Mich. 2004). Res judicata is an affirmative defense and the burden of proof is on the
party urging such defense. E&G Finance Co. v. Simms, 362 Mich. 592, 596-97 (1961).
Plaintiffs assert that in the arbitration, the parties litigated Plaintiffs right to cross
Defendant’s tracks and Plaintiffs should therefore be granted summary judgment on this
claim. Defendant argues that res judicata does not apply because the arbitration dealt
exclusively with Plaintiffs’ right to build tracks across Defendant to service Trenton Steel
Warehouse, whereas this lawsuit deals with Plaintiffs’ right to utilize Defendant’s tracks.
In this case, it is undisputed that the same parties have previously gone to
arbitration over a similar and related dispute. In the arbitration, the parties agreed to
submit a narrowly tailored question to the arbitrators. The June 23, 1994 Letter
Agreement states, “If you can agree to the provisions set forth here, [Plaintiffs] will
agree that the questions submitted to the arbitrators will not include a request to set the
precise terms and conditions of the crossing and access to the Trenton Steel
Warehouse, but only [Plaintiffs’] right to such access.” With both parties in agreement,
10
the question submitted to the arbitrator was, “Do[] [Plaintiffs] have to right, pursuant to
the Agreements, to cross the tracks, facilities, right-of-way, and other property of
[Defendant] in or near Trenton, Michigan for the purpose of providing Conrail access to
and the ability to provide rail freight transportation service to the Trenton Steel
Warehouse?”
Although Michigan courts apply the doctrine of res judicata broadly, the
requirement that the claim in a present action should have been litigated in the prior
action cannot be met here. Both parties agreed to submit a narrow question to the
arbitrators and effectuate the arbitration award in the 1996 TRA. Neither party had an
opportunity to litigate the 1996 TRA because it did not exist at the time of the arbitration.
Under collateral estoppel, once an issue is actually and necessarily determined
by a court of competent jurisdiction, that determination is conclusive in subsequent suits
based on a different cause of action involving a party to the prior litigation. Montana,
440 U.S. at 153. Collateral estoppel applies only if: (1) the precise issue raised in the
present case was raised and actually litigated in the prior proceeding; (2) determination
of the issue was necessary to the outcome of the prior proceeding; (3) the prior
proceeding resulted in a final judgment on the merits; and (4) the party against whom
[issue preclusion] is sought had a full and fair opportunity to litigate the issue in the prior
proceeding. Smith v. Securities & Exch. Comm’n, 129 F.3d 356, 362 (6th Cir. 1997);
Ditmore v. Michalik, 244 Mich. App. 569, 577 (2001).
In this case, the parties disagree on whether the second requirement has been
met. Defendant argues that while the arbitrators returned with an answer in favor of
11
Plaintiffs, that the answer was not necessarily based on the 1897 Agreement. Plaintiffs
argue, however, that the only way the arbitrators could have answered the question in
the affirmative would be based on the 1897 Agreement.
The question presented to the arbitrators was whether, pursuant to “the
Agreements,” Plaintiffs had the right to cross Defendant’s tracks in order to access the
Trenton Steel Warehouse. The agreements referenced in the July 13, 1994 letter to the
arbitrators include the 1897 Agreement as well as two similar agreements, giving
Plaintiffs crossing rights over other tracks, from June 25, 1901 and June 1, 1903.
In the opening argument to the arbitrators, Plaintiffs focused mostly on the 1897
Agreement, but they also argued that in the alternative, Plaintiff may cross Defendant’s
tracks at the location of a former siding crossing, pursuant to a 1903 Agreement.
Plaintiffs represent that this 1903 Agreement is different from the one mentioned in the
direct question to the arbitrators. In issuing their decision, the arbitrators stated, “After
consideration of all written submission, the Stipulations of Fact, and the testimony and
argument presented at the hearing, the Arbitrator’s response to the Question Presented
for Arbitration is ‘YES.’”
Plaintiffs argue that the crossing rights under the 1897 Agreement was “the core
issue submitted” to the arbitration panel. In the arbitration, however, the parties
presented two other agreements to the arbitrators with the 1897 Agreement, as well as
Plaintiffs’ separate crossing scheme based on yet another 1903 agreement. None of
those other agreements were presented to this Court, so this Court cannot with
determine that the arbitrators did not rely on any of them or that the determination of
Plaintiffs’ crossing rights given under the 1897 Agreement was necessary to the
12
outcome of that proceeding. Plaintiffs have failed to meet their burden and collateral
estoppel does not apply.
Additionally, the current dispute is centered on Plaintiffs’ right to use Defendant’s
tracks to access Korneffel, via the Trenton Steel Warehouse property, which is a
different issue than that presented to the arbitrators and beyond the scope of the 1897
Agreement.
The 1897 Agreement reads, in relevant part:
[Plaintiffs] shall . . . have the right at any time hereafter to construct additional
tracks crossing [Defendant’s] track at said point and connect such additional
tracks . . . with said interlocking system . . . . [Defendant] shall put in and
maintain at its own expense crossings of all the spur tracks of [Plaintiffs]
which run eastward from the main line of [Plaintiffs] toward Detroit River and
protect the same by gates . . . . Plaintiffs shall [] have the right at any time
or times hereafter to cross with spur tracks any portion of [Defendant’s]
tracks and right of way between Trenton and the Wabash Railway near
Delray without cost or payment of compensation therefor to [Defendant].
[Plaintiffs] shall construct and maintain such crossings and guard the same
by gates.
(Pls.’ Mot Summ J. Ex. 8.)
The 1897 Agreement is a crossing agreement, allowing Plaintiffs to cross over
Defendant’s tracks in the event that Plaintiffs desire to build tracks and want to provide
rail service to property or customers on the other side of Defendant’s tracks. In this
case, though, Plaintiffs did not build any tracks that they needed to cross Defendant’s
tracks to reach. Instead, pursuant to the 1996 TRA, Plaintiffs were using Defendant’s
tracks. The TRA is a separate and distinct agreement between the parties that contains
different rights and obligations than the 1897 Agreement. This is easily illustrated by
the fact that Plaintiffs, pursuant to the TRA, were required to pay to Defendant a fixed
amount for each rail car loaded or empty delivered to or spotted at the Trenton Steel
13
Warehouse and a monthly retainer fee. According to the 1897 Agreement, however,
Plaintiffs were given the right at any time to cross Defendant’s tracks and right of way
“without cost or payment of compensation therefor to [Defendant].” Plaintiffs do not
allege that Defendant breached the 1897 Agreement by charging Plaintiffs to cross
Defendant’s tracks because Plaintiffs were not solely crossing, but actually using
Defendant’s tracks.
The 1897 Agreement, which contemplated Plaintiffs needing to cross
Defendant’s tracks at specific locations in order to reach additional tracks owned by
Plaintiffs, is not applicable to the current dispute between the parties regarding Plaintiffs’
use of Defendant’s tracks. The 1897 Agreement does not address and did not
contemplate that Plaintiffs would operate on Defendant’s tracks, but merely gave the
right to cross them.3
Plaintiffs argue that the June 23, 1994 letter (“Pre-Arbitration Agreement”) and
the May 1, 1996 Trackage Rights Agreement together represented an agreement
between the parties that Plaintiffs would exercise their crossing rights under the 1897
Agreement through the use of Defendant’s tracks, rather than constructing a crossing of
their own. Therefore, by preventing Plaintiffs from using Defendant’s tracks, Defendant
deprived Plaintiffs of its crossing rights. The Pre-Arbitration Agreement states, “If you
can agree to the provisions set forth here, [Plaintiffs] will agree that the questions
submitted to the arbitrators will not include a request to set the precise terms and
3
While the Court agrees with Plaintiffs that the 1897 Agreement and subsequent
arbitration give Plaintiffs the right to cross Defendant’s tracks, that is not the dispute
currently before the Court.
14
conditions of the crossing and access to the Trenton Steel Warehouse, but only
[Plaintiffs’] right to such access.” The letter continues:
In the event the arbitrators decide that [Plaintiffs] may cross [Defendant] to
serve Trenton Steel Warehouse, [Defendant] will permit [Plaintiffs] immediate
access to Trenton Steel Warehouse. [Defendant] agrees that [Plaintiffs] will
effect the crossing and access to Trenton Steel Warehouse by operating over
[Defendant’s] trackage to the extent necessary to cross from [Plaintiffs’] rightof-way to the premises of Trenton Steel Warehouse in an operationally
practicable and efficient way that is consonant with [Plaintiffs’] desire to
provide rail service.
This letter, then, does not anticipate that the arbitrators will determine the full
crossing rights that Plaintiffs have; rather, it is specifically and intentionally limited to
allowing Plaintiffs to use Defendant’s tracks “to the extent necessary to cross from
[Plaintiffs’] right-of-way to the premises of Trenton Steel Warehouse.”
Similarly, the 1996 TRA is specifically limited to Defendant granting Plaintiffs “the
right to operate its trains, locomotives, cars and equipment with its own crews . . . in
either direction over the following segments of [Defendant]’s railroad for the sole
purpose of serving Trenton Steel Warehouse or its successor.” The rights that
Defendant granted Plaintiffs in the TRA are not the same rights that Plaintiffs acquired
in the 1897 Agreement. The 1897 Agreement did not afford Plaintiffs the right to utilize
Defendant’s tracks, and while the parties entered into the TRA to effectuate Plaintiffs’
ability to access the Trenton Steel Warehouse, this does not mean that it represented
the rights and obligations of the 1897 Agreement.
Viewing the evidence in the light most favorable to Defendant, Plaintiffs’ motion
for summary judgment for breach of the 1897 Agreement is DENIED. Viewing the
evidence in the light most favorable to Plaintiffs, Defendant’s motion for summary
15
judgment against Plaintiffs’ claim for breach of the 1897 Agreement is GRANTED.
B.
Declaratory Judgment of Parties’ Rights under 1897 Agreement
Plaintiffs seek declaratory judgment that they have the right to cross Defendant’s
tracks to serve Korneffel and other locations pursuant to the 1897 Agreement.
Defendant sought declaratory judgment of the same in its Amended Counterclaim, but
in its motion for summary judgment, Defendant argues that there is no “case or
controversy” for this Court to decide and the issue is not ripe for determination because
Plaintiffs have never built tracks to cross onto or proposed a specific crossing scheme.
According to 28 U.S.C. § 2201(a), “In a case of actual controversy within its
jurisdiction . . . any court of the United States . . . may declare the rights and other legal
relations of any interested party seeking such declaration, whether or not further relief is
or could be sought. Any such declaration shall have the force and effect of a final
judgment or decree and shall be reviewable as such.” Federal courts’ constitutional
authority extends only to actual cases or controversies. Iron Arrow Honor Soc’y v.
Heckler, 464 U.S. 67, 70 (1983). To satisfy the Article III case or controversy
requirement, a litigant must have suffered some actual injury that can be redressed by a
favorable judicial decision; otherwise the case is moot. Id. The requirements of case or
controversy are no less strict under the Declaratory Judgment Act than in any other
suits. Alvatar v. Freeman, 319 U.S. 359, 363 (1945). The Supreme Court established
that in order to be ripe for adjudication, “it must be a real and substantial controversy
admitting of specific relief through a decree of a conclusive character, as distinguished
from an opinion advising what the law would be upon a hypothetical state of facts.”
Aetna Life Ins. Co. v. Haworth, 300 U.S. 227, 241 (1937).
16
Plaintiffs argue that Defendant’s Count I of its counterclaim, asking for
declaratory judgment of the parties’ rights under the 1897 Agreement, precludes its
present argument that it is not ripe for adjudication. While the Court recognizes that
Defendant has flip-flopped on this issue, the Court ultimately determines whether an
issue is ripe and constitutes a present case or controversy.
Both parties have spent a significant amount of space in the record on the 1897
Agreement and the rights that it does or does not confer. However, the dispute as it
actually exists between the parties is not about the 1897 Agreement or the exact
crossing rights that Plaintiffs have over Defendant’s tracks. The dispute between the
parties is completely centered around the trackage rights that Plaintiffs do or do not
have to use, not merely cross, Defendant’s tracks to access the “Trenton Steel
Warehouse.”4 Defendant did not lock out Plaintiffs because the parties disagreed about
the rights established in the 1897 Agreement; Defendant locked out Plaintiffs because
the parties disagreed about the rights established in the May 1, 1996 Trackage Rights
Agreement.
As stated above, the 1897 Agreement gave Plaintiffs the right to cross
Defendant’s tracks, contemplating that Plaintiffs would use their rights as stated in the
1897 Agreement to “at any time hereafter to construct additional tracks crossing
[Defendant’s] track at said point and connect such additional tracks . . . with said
interlocking system.” Because Plaintiffs have not constructed any tracks that need such
a crossing, the 1897 Agreement is not at issue in the current dispute between the
4
When Plaintiffs construct their own tracks and seek to cross over Defendant’s tracks to
access the “Trenton Steel Warehouse” or other properties, then the 1897 Agreement
will be directly at issue.
17
parties. There is no actual injury that can be redressed by a declaration of the rights of
the parties under the 1897 Agreement. Even if the Court were to declare the rights of
the parties under the 1897 Agreement, it would not affect the current dispute about
Plaintiffs’ right to use Defendant’s tracks to access the Korneffel property.
Plaintiffs’ motion for a declaration of the rights of the parties under the 1897
Agreement is DENIED.
C.
Breach of the July 1994 Arbitration Agreement
Both Plaintiffs and Defendant seek summary judgment on Plaintiffs’ claim that
Defendant breached the July 13, 1994 letter to the American Arbitration Association
(“Arbitration Agreement”). The Arbitration Agreement, signed by both parties, states:
[Plaintiffs and Defendant] seek to have the arbitrator decide the following
question:
Do[] [Plaintiffs] have the right, pursuant to the Agreements,5 to
cross the tracks, facilities, right-of-way, and other property of
[Defendant] in or near Trenton, Michigan for the purpose of
providing Conrail access to and the ability to provide rail freight
transportation service to the Trenton Steel Warehouse?
[Plaintiffs and Defendant] agree to be bound by the arbitrator’s determination
of the above issue and to abide by such order as the arbitrator may enter
pursuant to that determination.
Plaintiffs argue that Defendant breached its agreement to be bound by the
arbitrator’s decision when Defendant prevented Plaintiffs from crossing its tracks to
service customers at that location in May 2008. Defendant argues that it did not agree
to be bound by the arbitrator’s determination that Plaintiffs could use Defendant’s tracks
to service Korneffel.
5
As stated above, the agreements included the 1897 Agreement, as well as 1901 and
1903 agreements that purportedly gave Plaintiffs crossing rights over other railroad
tracks. Neither the 1901 or 1903 agreements are at issue in this case and have not
been attached to any of the filings.
18
The Arbitration Agreement clearly states the question to the arbitrators as
whether Plaintiffs have the right to cross Defendant’s property and tracks. There is
nothing in the question posed or the explanation of the dispute that suggests Plaintiffs
have any rights to use or were seeking from the arbitrators any determination about
Plaintiffs’ use of Defendant’s tracks. Like the 1897 Agreement, the Arbitration
Agreement specifically addresses Plaintiffs’ right to cross Defendant’s tracks, but does
not refer to, decide, or grant any rights to use Defendant’s tracks.
Plaintiffs’ motion for summary judgment for breach of the Arbitration Agreement
is DENIED. Defendant’s motion for summary judgment for breach of the Arbitration
Agreement is GRANTED.
D.
Breach of 1996 Trackage Rights Agreement
Both Plaintiffs and Defendant seek summary judgment on Defendant’s claim that
Plaintiffs breached the Trackage Rights Agreement (“TRA”). Defendant argues that the
TRA gave Plaintiffs the right to service only the Trenton Steel Warehouse, which is the
actual warehouse building adjacent to the FN Crossing. Plaintiffs argue that “Trenton
Steel Warehouse” was the name for the property as a whole that had been owned by
Huron Valley Steel Corporation (“HVS”), or that Trenton Steel Warehouse was another
name for HVS, thereby giving Plaintiffs’ access to Korneffel outside the scope of the
TRA once on the private property of HVS.
The heart of the issue between the parties is the meaning of “Trenton Steel
Warehouse” in the 1996 Trackage Rights Agreement (“TRA”). The Court must
determine whether “Trenton Steel Warehouse” is an ambiguous term.
19
It is well-settled that if the language of a contract is clear and unambiguous, it is
to be construed according to its plain sense and meaning, but if it is ambiguous,
extrinsic evidence can be offered to explain the ambiguity. New Amsterdam Cas. Co. v.
Sokolowski, 374 Mich. 340, 342 (1965); see also Frankenmuth Mut. Ins. Co. v. Masters,
460 Mich. 105, 111 (1999). The court should not create ambiguity where the terms of
the contract are clear. New Amsterdam, 374 Mich. at 342. Consideration of extrinsic
evidence generally depends on some finding of contractual ambiguity. City of Grosse
Pointe Park v. Michigan Mun. Liab. and Prop. Pool, 702 N.W.2d 106, 113 (Mich. 2005).
This reflects the principle of freedom of contract and the assumption that the parties
intentionally agreed to what is presented in a contract. Id.
There are two types of ambiguities in a contract: patent and latent. A patent
ambiguity is one “that clearly appears on the face of a document, arising from the
language itself.” Black's Law Dictionary (8th ed. 2004). A latent ambiguity, however, is
one “that does not readily appear in the language of a document, but instead arises
from a collateral matter when the document's terms are applied or executed.” Black's
Law Dictionary (8th ed. 2004). “Because the detection of a latent ambiguity requires a
consideration of factors outside the instrument itself, extrinsic evidence is obviously
admissible to prove the existence of the ambiguity, as well as to resolve any ambiguity
proven to exist.” Grosse Point Park, 702 N.W.2d at 113 (quotation omitted). Where a
latent ambiguity exists, “extrinsic evidence is admissible to indicate the actual intent of
the parties as an aid to the construction of the contract.” Id.; McCarty v. Mercury
Metalcraft Co., 372 Mich. 567, 575 (1964).
20
In contract interpretation, the cardinal rule is to ascertain the intention of the
parties and “to this rule all others are subordinate.” McIntosh v. Groomes, 227 Mich.
215, 218 (1924).
The role of the court is to ascertain, and effectuate the intent of the parties
at the time of contract formation. It is the expressed, and not secret intent
which is operative. Where the language of the contract is clear on its face,
the court looks to it to ascertain the parties' intent. Where . . . a party claims
that an ambiguity exists in the language the court then looks to see if there
is extrinsic evidence which supports this contention. However, one party's
uncommunicated understanding concerning the specialized meaning of
contract language is not binding on the other party.
Turner Holdings, Inc. v. Howard Miller Clock Co., 657 F. Supp. 1370, 1379-80 (W.D.
Mich. 1987); see also Various Markets, Inc. v. Chase Manhattan Bank, N.A., 908 F.
Supp. 459, 472 (E.D. Mich. 1995) (“Whether the terms of a contract are clear or
ambiguous is a question of law for the court to decide. Where there is clear and
unambiguous language in an agreement, the intent of the parties is to be determined
from those terms, without reference to extrinsic evidence.”).
The fact that the parties may disagree as to the meaning of contract terms does
not necessarily establish the existence of an ambiguity, even if one party asserts that a
result different from that embodied in the terms was intended. Steinmetz Elec.
Contractors v. Int’l Bhd. of Elec. Workers, 517 F. Supp. 428, 432 (E.D. Mich.1981)
(granting the defendants' motion for summary judgment because the contract was
unambiguous).
Looking at the contract itself, “Trenton Steel Warehouse” appears four times in
the TRA. It first appears twice in titles of the TRA itself, which read “Trackage Rights
Agreement Between [Defendant] & [Plaintiffs] to Service Trenton Steel Warehouse” and
21
"General Conditions to Trackage Rights Agreement Dated as of May 1, 1996, Between
[Defendant] and [Plaintiffs] Relating to Trackage Rights for [Plaintiffs] to Service Trenton
Steel Warehouse at Trenton, Michigan.”
Third, in Section 1, the TRA states:
[Defendant] hereby grants to [Plaintiffs] the right to operate . . . in either
direction over the following segments of [Defendant]’s railroad for the sole
purpose of serving Trenton Steel Warehouse or its successor (hereinafter
referred to as ‘Industry’), shown on the plan attached hereto, made a part
hereof and marked ‘Exhibit A’ (hereinafter referred to as the ‘Trackage’).
The reference to a successor seems to suggest that “Trenton Steel Warehouse” may be
a company or entity doing business.
The final place “Trenton Steel Warehouse” appears in the TRA is in the map
attached as Exhibit A. This map shows a simplified depiction of the Trackage, over
which Defendant would grant Plaintiffs access pursuant to the TRA. On the map, the
words “Trenton Steel Warehouse” are boxed in, and beyond Defendant’s property line,
to the East. The fact that “Trenton Steel Warehouse” is boxed in on Exhibit A indicates
that in the TRA, Trenton Steel Warehouse is meant to describe the actual physical
warehouse on that property.
The map itself, however, is not a completely accurate depiction of the area. The
TRA indicates that the Trackage includes the tracks “up to but not extending beyond . . .
[Defendant] property line.” The line that extends from Defendant’s property line to the
boxed in “Trenton Steel Warehouse” is not part of the Trackage. On the map, however,
that line is depicted in the same thick, solid black line that the key indicates shows the
Trackage. Additionally, if the boxed in “Trenton Steel Warehouse” is the building on that
property, the map incorrectly depicts that the railroad tracks run east-west, running
22
directly into the east side of the building. In fact, the tracks curve around and enter the
warehouse building on the south side.
The TRA as a whole, then, does not appear to give a clear, unambiguous
meaning to Trenton Steel Warehouse. The two most plausible meanings that the TRA
suggests for Trenton Steel Warehouse are the actual warehouse building and the
company doing business on that property.
Looking outside the TRA, the ambiguity remains. Despite Defendant’s claims
that Trenton Steel Warehouse is unambiguously the warehouse structure, its witness,
Paul Ladue admits that Trenton Steel Warehouse is used in different ways. In his
deposition, Ladue states:
Q.
And you mentioned two names, Trenton Steel Warehouse and
Trenton Steel Processing. What is the difference, if any?
A.
The company has gone by a couple of different names, some of which
I believe were DBAs and some of which were generally how they referred to
themselves or how folks referred to the company. They've gone by Trenton
Steel Processing, Trenton Steel Warehouse, Huron Valley Steel, and there's
probably a couple of others that they either have become known as or had
been referred to as.
Q.
And when you think of any of at least those three you think of the
same entity?
A.
Yes. Or I think of the same facility.
Q.
And when you say "facility," what do you mean?
A.
The specific location, the building and the structure that the GTW
predecessor companies actually built into in 1963.
(Ladue Dep. 17:4-24.) Later in the deposition, Ladue states that it is Defendant’s
position that Trenton Steel Warehouse is “a specific customer known as Trenton Steel
Warehouse, Trenton Steel Processing, Huron Valley Steel, and it is a specific facility,
specific building at a specific location.” (Ladue Dep. 168:4-10.)
In the July 13, 1994 letter to the arbitrators (“Arbitration Agreement”), the parties
23
define “Trenton Steel Warehouse” as “the facility of Trenton Steel Processing and
Storage, d/b/a Huron Valley Steel Corporation (and its successors and assigns)
(‘Trenton Steel Warehouse’), located in the Trenton Commercial Industrial Park.” This
is the definition of Trenton Steel Warehouse that the parties submitted to the arbitrators
with the question the parties asked the arbitrators to decide about Plaintiffs’ crossing
rights to access Trenton Steel Warehouse. This definition appears to support
Defendant’s argument that it is the actual building.
David Wilson, who worked for Defendant at the time of this dispute, used Trenton
Steel Warehouse to refer to a corporate entity throughout his deposition. He states,
“Trenton Steel Warehouse was in the process of bidding on a contract . . . I met one or
two times with the Trenton Steel personnel to discuss service into their facility.” (Wilson
Dep. 57:6-14.) Wilson knew of Huron Valley Steel Corporation, but he called them
Trenton Steel Warehouse. (Wilson Dep. 30:25-31:4.)6
During the lockout, when Defendant prevented Plaintiffs from delivering to
Korneffel, Defendant referred to “Trenton Steel” as a customer, stating, “[Plaintiffs are]
not switching Trenton Steel it is still closed this is a new customer [Plaintiffs are] using
our leads to switch.” Additionally, Paul Ladue wrote an email to Plaintiffs stating, “As
you are aware, the customer that [Plaintiffs have] been servicing on [Defendant] tracks
has no relationship to Trenton Steel Warehouse, is not located at the same facility and
is NOT a successor to Trenton Steel Warehouse.”
Paul Carey, who worked for Plaintiffs at the time of the dispute, is consistent that
6
Later in the deposition, Wilson testified that he could not recall whether, at that time,
he equated Huron Valley Steel Corporation to the Trenton Steel Warehouse facility.
(Wilson Dep. 169:9-171:8.)
24
throughout this time period, his "understanding is that the customer who tendered traffic
there was Huron Valley Steel Corporation. And that Trenton Steel Warehouse, as I've
previously stated, is a description of any area of property." (Carey Dep. 231:19-22.)
Carey states that Plaintiffs’ position is that "the entire area was identified to us as
Trenton Steel Warehouse, and [Defendant's] interest and control under this agreement
governs the subject trackage. And GTW's rights to dictate terms end when [Plaintffs]
pass into the Trenton Steel Warehouse property, and what happens there is no
business of [Defendant's]." (Carey Dep. 233:14-19.)
At different times, Plaintiffs and Defendant both refer to Trenton Steel
Warehouse as another name for HVS, for the actual warehouse structure, and to the
property in general.
Defendant argues that even if Trenton Steel Warehouse is another name for
HVS, Korneffel is not a successor of Huron Valley Steel Corporation and that the facility
referred to in the Arbitration Agreement does not encompass the land and business that
Korneffel is using. Plaintiffs contend that they did not breach the TRA because they
used Defendant’s trackage to access the sidetrack owned by HVS, as contemplated by
the TRA. The fact that the steel was ultimately delivered to Korneffel, Plaintiffs argue, is
something that happened on HVS private property, is outside the Trackage, and is not
covered by the TRA.
In viewing the evidence in the light most favorable to the non-moving party, there
are genuine issues of fact as to whether Plaintiffs violated the TRA when it delivered
steel to Korneffel, via HVS' property. Plaintiffs’ and Defendant’s motions for summary
judgment that Plaintiffs breached the TRA are DENIED.
25
E.
Declaratory Judgment of Parties’ Rights under Trackage Rights
Agreement
Based on the facts and reasoning from Section D, above, there are genuine
issues of fact and Plaintiffs’ and Defendant's motions for summary judgment to grant
declaratory judgment of the parties’ rights under the TRA are DENIED.
F.
Intentional Interference with Prospective Economic Relations
Under Michigan law,
The elements of tortious interference with a business relationship are the
existence of a valid business relationship or expectancy, knowledge of the
relationship or expectancy on the part of the defendant, an intentional
interference by the defendant inducing or causing a breach or termination of
the relationship or expectancy, and resultant damage to the plaintiff. To
establish that a lawful act was done with malice and without justification, the
plaintiff must demonstrate, with specificity, affirmative acts by the defendant
that corroborate the improper motive of the interference. Where the
defendant's actions were motivated by legitimate business reasons, its
actions would not constitute improper motive or interference.
Mino v. Clio Sch. Dist., 661 N.W.2d 586, 597 (Mich. Ct. App. 2003) (internal citations
omitted). In order to establish a claim for tortious interference with a contractual or
business relationship, the party “must allege the intentional doing of a per se wrongful
act or the doing of a lawful act with malice and unjustified in law for the purpose of
invading the contractual rights or business relationship of another.” Feldman v. Green,
360 N.W.2d 881, 891 (Mich. Ct. App. 1984).
A malicious motive will be inferred from a wrongful act, done intentionally, without
just cause or excuse. Feldman, 360 N.W.2d at 887 (ruling “this does not necessarily
mean actual malice or ill will, but the intentional doing of a wrongful act without legal or
social justification”). If the interference is an incident of competition, or the exercise of
like rights by others, “it is damnum absque injuria, unless some superior right by
26
contract or otherwise is interfered with. But if it comes from the merely wanton or
malicious acts of others, without the justification of competition or the service of any
interest or lawful purpose, it then stands upon a different footing.” Id. at 887.
a.
Defendant
Both parties seek summary judgment on Plaintiffs’ allegation that Defendant
intentionally interfered with Plaintiffs’ prospective economic relations. Plaintiffs argue
that they had a valid contract with SDI to ship freight to and from SDI’s plant in Indiana,
including to and from Korneffel and that they had access to Korneffel’s property
pursuant to the 1897 Agreement and the Arbitration Award. Plaintiffs allege that
Defendant intentionally; (1) prevented Plaintiffs from continuing its business relations
with SDI for delivery of freight to Korneffel, (2) required Plaintiffs to use Defendant’s
railcars to deliver freight to Korneffel, acquiring delivery revenues and making Plaintiffs’
services too expensive to be competetive, and then (3) actively solicited and entered
into contractual relationships for the delivery of freight to Korneffel. Defendant argues
that Plaintiffs had no right to use Defendant’s tracks to service the Korneffel property
and, as such, the separate agreements that Plaintiffs may have made with third parties
were made “at the obvious peril of not being able to fulfill such commitments.”
Plaintiffs argue that Defendant’s action of literally placing a padlock on a track
and intentionally preventing Plaintiffs from being able to make its freight delivery was
done with malicious intent. James Binder, Defendant’s manager of business
development and real estate, and Richard Long, Defendant’s account manager, both
stated that they had never heard of another occasion in which a railroad locked out
another rail carrier from a facility. (Pls.’ Mot. Summ. J. Ex. 36 at 46:10-15; Pls.’ Resp.
27
Ex. 44 at 78:7-14). James Binder stated that he was the sole person for Defendant
responsible for the SDI account and prior to May of 2008, he had never made a sales
pitch to SDI to deliver freight to Korneffel. (Binder Dep. 49:1-7.)
Defendant claims, however, that it prevented Plaintiffs from crossing its tracks,
not to induce Korneffel to break its contract with Plaintiffs, but because Defendant
believed Plaintiffs were using Defendant’s tracks beyond the scope of the agreed upon
terms in the TRA.
Paul Ladue, Region Director of Contracts and Administration for Defendant,
stated that in early May, 2008, Defendant experienced substantial train delays on its
mainline tracks through the Trenton area due to Plaintiffs use of the FN Interlocking and
Defendant’s tracks to deliver steel to Korneffel. (Ladue Aff. ¶ 27, June 29, 2011.)
When Defendant sent someone to see why there were delays, Defendant learned that
Plaintiffs were delivering steel to Korneffel. On May 14, 2008, the day that Defendant
initiated the lockout, Defendant emailed Plaintiffs, forwarding an internal email chain
that stated:
[Plaintiffs are] not switching trenton steel it is still closed this is a new
customer [Plaintiffs are] using our leads to switch. We have spoke[n] with this
customer in the past about the new business but we never heard anything
back from him. The agreement is only for trenton steel not for any new or old
business that may come aboard. The agreement of May 1st 1996 states this.
The track is locked out and [Defendant] dispatchers have been advised by
me to not allow [Plaintiffs] to enter this track.
(Def.’s Mot. Summ. J. Ex. 26.)
Additionally, when Plaintiffs sent Defendant the rail car count, as required by the
TRA, they indicated that the delivered cars to “ECKORNEFF” (the railroad term for E.C.
Korneffel Company) were included in the car count to “Trenton Steel Warehouse or its
28
successor.” (Pls.’ Mot. Summ. J. Ex. 37.) Defendant’s employee Paul Ladue
responded:
[Defendant] disagrees with your reference to a ‘successor’ of Trenton Steel
Warehouse. As you are aware, the customer that [Plaintiffs have] been
servicing on [Defendant] tracks has no relationship to Trenton Steel
Warehouse, is not located at the same facility and is NOT a successor to
Trenton Steel Warehouse. [Plaintiffs have] no rights over [Defendant] tracks
to serve E.C. Korneffel Company.
(Id.) These emails support Defendant’s argument that it initiated the lockout because
Defendant thought Plaintiffs were violating the terms of the May 1, 1996 Trackage
Rights Agreement by servicing a new and different business or location than the
Trenton Steel Warehouse.
Defendant has consistently argued that Plaintiffs violated the TRA by using
Defendant’s tracks to provide rail service to Korneffel, not only because it was a new
industry specifically disallowed by the TRA, but also because Plaintiffs failed to pay
Defendant for each rail car loaded or empty delivered to or spotted at Trenton Steel
Warehouse, as required by the TRA. Defendant maintains that Plaintiffs’ blatant
violation of the TRA was the reason Defendant initiated the lockout.
This justification or excuse, if taken to be true, negates Plaintiffs’ claim of malice.
Taking the evidence in the light most favorable to Defendant, Plaintiff is not entitled to
summary judgment for intentional interference with prospective economic relations
because there was no malicious intent. Defendant justified the lockout by claiming
Plaintiffs breached the 1996 TRA. This indicates that the lockout was motivated by
legitimate business reasons. Even if the Court determines that Defendant is incorrect
that the TRA prohibited Plaintiffs’ use of Defendant’s tracks to provide rail service to
29
Korneffel, there is no evidence in the record that suggests that Defendant did not have
the honest belief that Plaintiffs violated the TRA.
Plaintiffs point to Defendant’s actions after the lockout as evidence of its
inappropriate intent, indicating that Defendant sought out Korneffel’s rail business. Paul
Ladue admits that since the lockout, Defendant “has provided rail service to Korneffel
using its own tracks and Korneffel’s new private track.” (Ladue Aff. ¶ 28.) Plaintiffs
argue that Defendant used the lockout to market its services to Korneffel and cites to a
series of internal emails to and from various employees of Defendant. In the first
mention of obtaining Korneffel’s business, William Albritton writes:
Who is the account manager for this customer or is there one? The owner
has contacted me about service and we are still waiting on [Plaintiffs] to
deliver to cars. He is looking for some rate information and needs it asap.
Could someone let me know who will be contacting him at 734-676-2131, he
is not happy with the other railroads due to lack of communication and I don’t
want him to have that perception at all about us.
(Pls.’ Resp. Ex. 48.) This email indicates that Korneffel contacted Defendant about
obtaining services and not the other way around.
Even if Defendant sought out Korneffel’s business, there is nothing in the record
to suggest that Defendant acted maliciously in initiating the lockout. All of the evidence
supports Defendant’s argument that it had (and continues to have) the belief that
Plaintiffs violated the TRA and were locked out because of that contract violation.
Viewing all the evidence in the light most favorable to Plaintiffs, the Court
GRANTS Defendant’s motion for summary judgment on Plaintiff’s claim for intentional
interference with prospective economic relations.
b.
Plaintiffs
30
Defendant argues that Plaintiffs’ use of Defendant’s tracks to service Korneffel
constituted tortious interference with Defendant’s prospective business relationship. As
above, Defendant “must allege the intentional doing of a per se wrongful act or the
doing of a lawful act with malice and unjustified in law for the purpose of invading the
contractual rights or business relationship of another.” Feldman, 360 N.W.2d at 891.
Defendant alleges Plaintiffs used Defendant’s tracks illicitly to compete against it for a
customer that Plaintiffs would not have been able to service and that Plaintiffs could not
have a reasonable belief that they had the right to service Korneffel because the
language of the TRA is clear.
These are the only facts that Defendant puts forth to establish Plaintiffs’
intentional interference. Defendant failed to allege any facts to support its allegation of
malicious intent other than the contract language of the TRA. Additionally, Plaintiffs
argue that Defendant’s claim fails because nothing precluded Defendant from
contracting with Korneffel, as Plaintiffs never had an exclusive relationship with
Korneffel. Curtis Korneffel confirmed in his deposition that he did not consider his
company to be primarily Plaintiffs’ customer. (Korneffel Dep. 134:6-135:11, Sept. 15,
2009.)
The fact that Defendant thinks the TRA’s terms are clear is insufficient to
establish Plaintiffs’ malicious intent. Defendant attempts to rest upon its allegations and
fails to set forth specific facts showing that there is a genuine issue for trial.
Defendant’s motion for summary judgment alleging Plaintiffs intentionally interfered with
Defendant’s prospective business relations is DENIED and Plaintiffs’ motion for
summary judgment against Defendant’s claim of intentional interference with a
31
prospective business relation is GRANTED.
G.
Unfair Competition
Defendant argues that Plaintiffs engaged in unfair competition when they entered
into the Sidetrack Agreement with Korneffel. Michigan law applies unfair competition
claims to “any conduct that is fraudulent or deceptive and tends to mislead the public.”
ATCO Indus., Inc. v. Sentek Corp., 2003 WL 21582962, at *3 (Mich. Ct. App. July 10,
2003) (internal citations omitted). Unfair and unethical trade practices that are harmful
to one’s competitors or to the general public are prohibited. Id. The Michigan Supreme
Court established:
Each case must depend upon its own facts, but where it is clearly established
that an attempt is being made by one person to get the business of another
by any means that involves fraud or deceit, a court of equity will protect an
honest trader and restrain a dishonest one from carrying out his scheme.
Clipper Belt Lacer Co. v. Detroit Belt Lacer Co., 194 N.W. 125, 128 (Mich. 1923).
Defendant argues that Plaintiffs engaged in unfair competition by representing to
Korneffel, in the “Sidetrack Agreement” that Plaintiffs signed with Korneffel, that
Plaintiffs had the right to use Defendant’s tracks to provide service to Korneffel. Section
2.2 of the Sidetrack Agreement states, “Under rights granted by [Defendant], operate
over [Defendant] as necessary in order to access the industrial lead track of [Defendant]
that connects to the Sidetrack.” (Def.’s Mot. Summ. J. Ex 23.) Defendant alleges that
Plaintiffs could not have a reasonable belief that they actually had the rights they
represented in the Sidetrack Agreement.
When Plaintiffs first began shipping steel to Korneffel, they used
“TRESTREPRO” (meaning Trenton Steel Warehouse) to designate the shipping
32
location. By June 2007, however, Plaintiffs began using “ECKORNEFF” as the shipping
location. Defendant alleges that this indicates that Plaintiffs had “dropped even the
pretense that it was legitimately operating within the limits of the TRA.” (Def.’s Mot.
Summ. J. 12.) The fact that Plaintiffs were not hiding the shipping location, however,
could also indicate that Plaintiffs honestly and reasonably believed that they were
operating within their rights. In fact, Plaintiffs have consistently alleged that they believe
they have the right to provide service to Korneffel.
Other than bare assertions, Defendant has failed to present any facts of Plaintiffs’
deceit, fraud, or bad faith. There is nothing in the record that indicates that Plaintiffs
engaged in fraud or deceit. Defendant’s motion for summary judgment on its claim of
unfair competition is DENIED. Plaintiffs’ motion for summary judgment on Defendant’s
claim of unfair competition is GRANTED.
H.
Unjust Enrichment
Defendant argues that Plaintiffs were unjustly enriched because they used
Defendant’s tracks without authorization and retained profits from their unauthorized
use. Plaintiffs maintain that Defendant’s claim should be dismissed because unjust
enrichment cannot be brought if there is a contract covering the matter.
In order to sustain a claim of unjust enrichment, a plaintiff must establish (1) the
receipt of a benefit by the defendant from the plaintiff and (2) an inequity resulting to the
plaintiff because of the retention of the benefit by the defendant. Barber v. SMH (US),
Inc., 202 Mich. App. 366, 375 (1993); Michigan Ed. Employees Mut. Ins. Co. v.
Morris, 460 Mich. 180, 198 (1999). The law will imply a contract to prevent unjust
enrichment only if the defendant has been unjustly or inequitably enriched at the
33
plaintiff's expense. Michigan law allows courts to imply a contract in order to prevent
unjust enrichment, but “a contract will be implied only if there is no express contract
covering the same subject matter.” Barber, 202 Mich. App. At 375; see also Johnson
Controls, Inc. v. Jay Indus., Inc., 459 F.3d 717, 730 (6th Cir. 2006) (holding that
because the contract covered the subject matter of the litigation, it was impermissible to
imply a contract between the parties).
In this case, Defendant claims that Plaintiffs were unjustly enriched when
Plaintiffs retained profits from using Defendant’s tracks without authorization. There is
no dispute that the parties entered into the May 1, 1996 Trackage Rights Agreement.
The scope of the rights conferred by that agreement is directly at issue in this litigation
and squarely covers the issue of Plaintiffs’ right to use Defendant’s tracks to service
Korneffel. There is no reason for an unjust enrichment claim where there is a contract
and any damages or restitution will be covered by the breach of contract claim.
Defendant’s motion for summary judgment on the unjust enrichment claim is
DENIED. Plaintiffs’ motion for summary judgment on Defendant's unjust enrichment
claim is GRANTED.
IV.
Conclusion
For the foregoing reasons, the motions for summary judgment are GRANTED in
part and DENIED in part.
s/Nancy G. Edmunds
Nancy G. Edmunds
United States District Judge
Dated: January 6, 2012
34
I hereby certify that a copy of the foregoing document was served upon counsel of
record on January 6, 2012, by electronic and/or ordinary mail.
s/Carol A. Hemeyer
Case Manager
35
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?