Jensen et al v. Minnesota Department of Human Services et al
Filing
638
ORDER. 1. Defendants' objection to the Court's continuing jurisdiction is OVERRULED. 2. Absent further order of the Court, all reporting obligations previously imposed shall remain in place. 3. The Court will convene a bi-annual status con ference in this matter in December 2017. Prior to this status conference, the parties shall meet and confer to discuss the essential steps that remain in Defendants' implementation of the Agreement before the Court can equitably terminate its jurisdiction over this matter. (Written Opinion). Signed by Judge Donovan W. Frank on 6/28/2017. (BJS)
UNITED STATES DISTRICT COURT
DISTRICT OF MINNESOTA
James and Lorie Jensen, as parents, guardians,
and next friends of Bradley J. Jensen; James
Brinker and Darren Allen, as parents,
guardians, and next friends of Thomas M.
Allbrink; Elizabeth Jacobs, as parent, guardian,
and next friend of Jason R. Jacobs; and others
similarly situated,
Civil No. 09-1775 (DWF/BRT)
Plaintiffs,
v.
ORDER
Minnesota Department of Human Services,
an agency of the State of Minnesota; Director,
Minnesota Extended Treatment Options, a
program of the Minnesota Department of
Human Services, an agency of the State of
Minnesota; Clinical Director, the Minnesota
Extended Treatment Options, a program of
the Minnesota Department of Human Services,
an agency of the State of Minnesota; Douglas
Bratvold, individually and as Director of the
Minnesota Extended Treatment Options, a
program of the Minnesota Department of Human
Services, an agency of the State of Minnesota;
Scott TenNapel, individually and as Clinical
Director of the Minnesota Extended Treatment
Options, a program of the Minnesota Department
of Human Services, an agency of the State of
Minnesota; and the State of Minnesota,
Defendants.
Shamus P. O’Meara, Esq., and Mark R. Azman, Esq., O’Meara Leer Wagner & Kohl,
PA, counsel for Plaintiffs.
Scott H. Ikeda, Aaron Winter, and Anthony R. Noss, Assistant Attorneys General,
Minnesota Attorney General’s Office, counsel for State Defendants.
INTRODUCTION
This matter is before the Court on Defendants’ objection to the Court’s continuing
jurisdiction over this matter. On April 5, 2017, the Court directed the parties to brief this
issue and to submit a proposed briefing schedule for the Court’s approval. (Doc.
No. 626.) On April 18, 2017, the Court imposed a briefing schedule. (Doc. No. 630.)
The parties have fully briefed the issue. (See Doc. Nos. 631, 634, 635, 637.) For the
reasons set forth below, the Court overrules Defendants’ objection.
BACKGROUND
This case began nearly eight years ago, on July 10, 2009, when Plaintiffs filed a
Complaint against Defendants asserting multiple violations of federal and state law
arising out of allegations of “abusive, inhumane, cruel and improper use of seclusion and
mechanical restraints routinely imposed upon patients of the Minnesota Extended
Treatment Options program (METO).” 1 (Doc. No. 1 at 2.) Following extensive
negotiations, the parties entered into a Stipulated Class Action Settlement Agreement
(“Agreement”) which was approved by the Court on December 5, 2011. (See Doc.
Nos. 104, 136.)
The Agreement provides for the closure of the METO facility, establishes
requirements regarding restraint and seclusion at successor facilities, and establishes
1
On July 30, 2009, Plaintiffs filed an Amended Complaint arising out of these same
allegations. (See Doc. No. 3 at 3.)
2
requirements for the Department of Human Services (“DHS”) to internally and externally
monitor restraint use. (See Doc. No. 136-1 (“Agreement”) at 6-13.) The Agreement also
provides that the State shall exercise “best efforts” for appropriate discharge of residents
to the most integrated setting through transition planning. (Id. at 13-14.) In addition, the
Agreement imposes requirements relating to other practices at METO and its successor
facilities such as staff training. (Id. at 14-16.)
Beyond the provisions applicable to METO and its successors, the Agreement also
includes a section entitled “System Wide Improvements.” (See id. at 16-21.) This
section identifies goals and objectives in the areas of long-term monitoring, crisis
management, and training. (Id. at 16-17.) In addition, this section imposes requirements
related to the creation of an Olmstead Plan which was agreed to be developed and
implemented within eighteen months of the Agreement’s approval. (Id. at 18.) The
Agreement also establishes requirements relating to two other state facilities, the
modernization of state administrative rules relating to positive behavioral supports
(“Rule 40”), and the substitution of offensive terminology in DHS publications. (Id. at
19-21.)
In its December 1, 2011 Fairness Hearing regarding the Agreement, the Court
stated:
I find it to be fair, reasonable and adequate and will also serve the public
interest, as well as the interests of the Class Members. Of course that
carries with it . . . a responsibility on the parties and the public has a right to
hold the Court to its responsibility to follow its oath and to make this
Agreement mean something with the jurisdiction of the Court.
3
And obviously, enough people have spoken today, so it is not surprising
that, obviously, many of you will have a watchful eye and careful scrutiny
to see to it that this does what it says it is going to do, and what it is
intended to do, and just isn’t words on a legal document.
And of course, by the agreement, the Court, by an agreement of all of the
parties, the Court does reserve continuing jurisdiction for a minimum of a
two-year period to enforce compliance with the provisions of the
Agreement and the Judgment . . . .
(Doc. No. 146 at 75.)
On March 24, 2017, the Court held a status conference relating to Defendants’
implementation of the Olmstead Plan which was developed by Defendants and approved
by the Court in the intervening years following the Court’s approval of the Agreement.
(See Doc. No. 620.) At this status conference, Defendants’ Counsel raised an objection
to the Court’s continuing jurisdiction over this case. Specifically, Defendants’ Counsel
argued that the Court has been without jurisdiction since December 2014. Counsel for
Plaintiffs argued that the Court presently has jurisdiction. In light of Defendants’
objection, the Court ordered briefing and now issues this order to resolve the dispute.
DISCUSSION
I.
Legal Standard
“Subject-matter jurisdiction is a threshold requirement which must be assured in
every federal case.” Kronholm v. Fed. Deposit Ins. Corp., 915 F.2d 1171, 1174 (8th Cir.
1990). A court is required to dismiss an action if “at any time” it concludes it has no
subject-matter jurisdiction. See Fed. R. Civ. P. 12(h)(3). “Jurisdictional issues, whether
they involve questions of law or of fact, are for the court to decide.” Osborn v.
United States, 918 F.2d 724, 729 (8th Cir. 1990). “Because jurisdiction is a threshold
4
issue for the court, the district court has ‘broader power to decide its own right to hear the
case than it has when the merits of the case are reached.’” Wessels, Arnold & Henderson
v. Nat’l Med. Waste, Inc., 65 F.3d 1427, 1431 (8th Cir. 1995) (quoting Bellecourt v.
United States, 994 F.2d 427, 430 (8th Cir. 1993), cert. denied, 510 U.S. 1109 (1994)). In
particular, a court may “weigh the evidence and satisfy itself as to the existence of its
power to hear the case.” Osborn, 918 F.2d at 730 (quoting Mortenson v. First Fed. Sav.
& Loan Ass’n, 549 F.2d 884, 891 (3d. Cir. 1977)). To evaluate whether it has
jurisdiction, “a district court may make findings of fact.” Appley Bros. v. United States,
164 F.3d 1164, 1170 (8th Cir. 1999). “As no statute or rule prescribes a format for
evidentiary hearings on jurisdiction, ‘any rational mode of inquiry will do.’” Osborn,
918 F.2d at 730 (quoting Crawford v. United States, 796 F.2d 924, 929 (7th Cir. 1986)).
The burden of establishing subject-matter jurisdiction rests with the plaintiff.2 V S Ltd.
P’ship v. Dep’t of Hous. & Urban Dev., 235 F.3d 1109, 1112 (8th Cir. 2000).
II.
Federal Court Jurisdiction to Enforce Settlement Agreements
“Federal courts do not have automatic ancillary jurisdiction to enforce a settlement
agreement arising from federal litigation.” Gilbert v. Monsanto Co., 216 F.3d 695, 699
2
The Eighth Circuit has explained that “[i]f the defendant thinks the court lacks
jurisdiction, the proper course is to request an evidentiary hearing on the issue.” Osborn
v. United States, 918 F.2d 724, 730 (8th Cir. 1990). In the typical circumstance, this
would be accomplished through the filing of a motion which “may be supported with
affidavits or other documents.” See id. A testimonial hearing involving witnesses may
also be conducted if needed. Id.; see also Fed. R. Civ. P. 43(c) (“When a motion relies
on facts outside the record, the court may hear the matter on affidavits or may hear it
wholly or partly on oral testimony or on depositions.”). Although no motion has been
filed on this issue, the Court reviews Defendants’ argument under the standard that would
apply had a motion to dismiss been formally filed.
5
(8th Cir. 2000). Rather, a federal court has jurisdiction to enforce a settlement agreement
only where “the parties’ obligation to comply with the terms of the settlement ha[s] been
made part of the order of dismissal—either by separate provision (such as a provision
‘retaining jurisdiction’ over the settlement agreement) or by incorporating the terms of
the settlement agreement in the order.” Kokkonen v. Guardian Life Ins. Co. of Am., 511
U.S. 375, 381 (1994). The Eighth Circuit has consistently acknowledged this
“well-established rule.” See W. Thrift & Loan Corp. v. Rucci, 812 F.3d 722, 724 (8th Cir.
2016); see also Roberts v. Ocwen Loan Servicing, LLC, 617 F. App’x 613, 614 (8th Cir.
2015); Jenkins v. Kan. City Mo. Sch. Dist., 516 F.3d 1074, 1080-82 (8th Cir. 2008). As
the Supreme Court’s opinion in Kokkonen suggests, courts applying this rule must look at
the terms of the court’s dismissal order to evaluate the scope of the court’s ancillary
jurisdiction. See 4:20 Commc’ns, Inc. v. Paradigm Co., 336 F.3d 775, 778 (8th Cir.
2003) (“The issue of subject matter jurisdiction under Kokkonen turns on the language of
the dismissal order, not on events prior to the dismissal.”).
Where a court retains jurisdiction for a specified period of time, the court no
longer has ancillary jurisdiction after that period ends. Id. During a period of retained
jurisdiction, however, “the parties [are] at liberty . . . to request the [c]ourt for assistance
in effecting the settlement, or in further extending its retention of jurisdiction.” Buettner
v. Kunard, Barnett, Kakeldey & Gates, Ltd., Civ. No. 4-95-720, 1998 WL 668035, at *1
n.1 (D. Minn. Aug. 10, 1998); see also Stewart v. O’Neill, 225 F. Supp. 2d 6, 8-9 (D.D.C.
2002). Even where the parties agree to the court’s retention of jurisdiction, a court is not
6
obligated to exercise continuing jurisdiction and may terminate its jurisdiction in its
discretion. See Arata v. Nu Skin Int’l., Inc., 96 F.3d 1265, 1269 (9th Cir. 1996).
Here, the Court’s December 5, 2011 Final Approval Order for Stipulated Class
Action Settlement Agreement, (Doc. No. 136), governs the scope of the Court’s ancillary
jurisdiction to enforce the settlement agreement. In this order, the Court granted
Plaintiffs’ Petition for Final Approval of Stipulated Class Action Settlement Agreement
and dismissed the action with prejudice. (Id. at 2-3.) The Court also retained jurisdiction
to enforce the Agreement in two ways. First, the Court provided that the Agreement was
“expressly incorporated herein” and attached the Agreement to the order. (Id. at 2.)
Second, the Court expressly retained jurisdiction over the Agreement as follows:
[I]t is hereby ordered that the parties are directed to consummate the
Agreement in accordance with its terms, and this Court hereby reserves
continuing jurisdiction for the time period set forth in the Agreement to
enforce compliance with the provisions of the Agreement and the
Judgment, as well as ensuring proper distribution of Settlement payments.
(Id.) Under Kokkonen and relevant Eighth Circuit caselaw, the Court plainly retained
ancillary jurisdiction to enforce the Agreement through this order. See Kokkonen, 511
U.S. at 381; W. Thrift & Loan Corp., 812 F.3d at 724. The parties do not appear to
dispute this conclusion. However, the parties dispute the scope of the Court’s retained
jurisdiction. Because the Court’s order both incorporated the Agreement by reference
and specifically reserved jurisdiction “for the time period set forth in the Agreement,”
(Doc. No. 136 at 2), the scope and duration of the Court’s jurisdiction in this case
depends upon the proper construction of the Agreement itself.
7
III.
The Agreement’s Jurisdictional Provision
The Agreement provides that it “shall be construed and enforced in accordance
with applicable federal and Minnesota laws.” (Agreement § XXI.) Settlement
agreements are contracts to which ordinary principles of contract interpretation apply.
See Sheng v. Starkey Labs., Inc., 53 F.3d 192, 194 (8th Cir. 1995); Dykes v. Sukup Mfg.
Co., 781 N.W.2d 578, 581-82 (Minn. 2010). Federal courts evaluating settlement
agreements apply the forum state’s law. See Am. Prairie Const. Co. v. Hoich, 594 F.3d
1015, 1023 (8th Cir. 2010). Neither party disputes that Minnesota law applies.
“Under Minnesota law, ‘the primary goal of contract interpretation is to determine
and enforce the intent of the parties.’” Loftness Specialized Farm Equip., Inc. v.
Twiestmeyer, 818 F.3d 356, 361 (8th Cir. 2016) (citation omitted). “Where the parties
express their intent in unambiguous words, those words are to be given their plain and
ordinary meaning.” Id. (citation omitted). Therefore, a court “must first make a legal
determination whether the contract is ambiguous—i.e., ‘whether the language used is
reasonably susceptible of more than one meaning.’” Swift & Co. v. Elias Farms, Inc.,
539 F.3d 849, 851 (8th Cir. 2008) (quoting Blattner v. Forster, 322 N.W.2d 319, 321
(Minn. 1982)). A court should “construe a contract as a whole and attempt to harmonize
all of its clauses.” Storms, Inc. v. Mathy Const. Co., 883 N.W.2d 772, 776 (Minn. 2016).
In addition, unambiguous provisions should not be given “a strained construction.” Id.
(quoting Valspar Refinish, Inc. v. Gaylord’s, Inc., 764 N.W.2d 359, 364-65 (Minn.
2009)). The presence or absence of ambiguity in a contract “depends, not upon words or
phrases read in isolation, but rather upon the meaning assigned to the words or phrases in
8
accordance with the apparent purpose of the contract as a whole.” Art Goebel, Inc. v. N.
Suburban Agencies, Inc., 567 N.W.2d 511, 515 (Minn. 1997).
The Agreement provides the following regarding the Court’s jurisdiction:
The Court shall retain jurisdiction over this matter for two (2) years from its
approval of this Agreement for the purposes of receiving reports and information
required by this Agreement, or resolving disputes between the parties to this
Agreement, or as the Court deems just and equitable.
(Agreement § XVIII.B.) This section continues with the following provision regarding
Plaintiffs’ right to extend reporting requirements:
Should Plaintiffs believe a pattern and practice of substantial non-compliance with
Attachment A exists, the State and Plaintiffs shall meet and confer in an effort to
resolve any such concerns. The meet and confer shall be held no later than sixty
(60) days prior to the two year anniversary of the Court’s approval. Should
Plaintiffs continue to believe a pattern and practice of substantial non-compliance
with Attachment A exists, Plaintiffs may, within thirty (30) days thereafter, file a
motion with the Court to extend the reporting requirements to the Court under this
Agreement for an additional one (1) year.
(Id.) The Agreement also provides that “This Agreement shall terminate at the same time
as the court’s jurisdiction ends under paragraph B above . . . .” 3 (Id. § XVIII.E.) The
parties offer competing interpretations of the Agreement’s jurisdictional provisions.
Defendants argue that the Agreement provides for court jurisdiction no later than
December 4, 2014—two years following the Agreement’s approval plus a one-year
3
This sentence states in full: “This Agreement shall terminate at the same time as
the court’s jurisdiction ends under paragraph B above, provided that the Department shall
continue to fund the fifteen (15) Community Support Services positions, the External
(OHFC) Reviewer and the Third Party Experts through Fiscal Year 2015 (ending
June 30, 2015) and provided further that the releases contained herein shall remain in
effect, except to the extent any party’s participation is voided by the court pursuant to a
defendant’s Motion to Void Participation under either Section XVII. F. 2 or XVII. G., or
a plaintiff’s Motion to render null and void all provisions of the Settlement Agreement
under Section XVII. G.” (Doc. No. 136-1 (“Agreement”) § XVIII.E.)
9
potential extension of reporting requirements following a motion by Plaintiffs.
Specifically, Defendants argue that the first sentence of § XVIII.B clearly and
unambiguously provides for a two-year period of retained jurisdiction. In Defendants’
view, “[a]fter authorizing the initial two-year retention of jurisdiction, this sentence sets
forth three categories of ‘purposes’ of the Court’s jurisdiction retention: (1) receiving
reports; (2) resolving disputes; and (3) purposes the Court deems ‘just and equitable.’”
(Doc. No. 631 at 18.)
Plaintiffs, on the other hand, argue that the Agreement authorizes continuing court
jurisdiction beyond a two-year period. Construing the first sentence of § XVIII.B,
Plaintiffs argue that “[t]he parties’ intentional use of a comma followed by the disjunctive
‘or’ in the clause: ‘, or as the court deems just and equitable’ clearly authorizes the
Court’s retention of jurisdiction over the settlement ‘as it deems just and equitable,’ not
just for a [sic] two years.” (Doc. No. 634 at 27.) Plaintiffs also note that the Court has
previously construed this term consistent with Plaintiffs’ interpretation and argue that the
law of the case thus applies to this issue. 4
Defendants argue that Plaintiffs’ (and the Court’s) interpretation of the “just and
equitable” clause is contrary to the Agreement’s plain language and renders the
Agreement’s specific jurisdiction retention provisions meaningless. Defendants assert
that “[i]f the parties wanted jurisdiction to continue indefinitely at the Court’s discretion,
it does not make sense that they would have provided for a definite initial jurisdiction
4
The Court declines to apply law of the case principles to this issue as it has not
been squarely addressed by the parties until this point in the litigation.
10
period of two years, or outlined a detailed motion procedure upon which Plaintiffs might
receive another definite period of an additional year.” (Doc. No. 631 at 19.) Defendants
also point out that the possible third year of jurisdiction was limited to reporting
requirements. Construed as a whole, Defendants argue, the Agreement must be
interpreted as they propose. Any other reading, they suggest, would not harmonize the
clauses of the contract and would improperly dissect the contract’s terms. Finally,
Defendants’ argue that Plaintiffs’ reliance on the word “or” does not contradict
Defendants’ view that “the pertinent language is part of a list of three ‘purposes.’” (Doc.
No. 637 at 6.) Instead, Defendants contend, Plaintiffs’ reading is an attempt to rewrite
the Agreement’s terms.
The Court concludes that the Agreement is ambiguous because the provision
governing jurisdiction is “reasonably susceptible of more than one meaning.” Swift
& Co., 539 F.3d at 851 (quoting Blattner, 322 N.W.2d at 321). Specifically, the Court
determines that the Agreement can reasonably be read as Defendant proposes:
The Court shall retain jurisdiction over this matter for two (2) years from its
approval of this Agreement for the purposes of
• receiving reports and information required by this Agreement,
• or resolving disputes between the parties to this Agreement,
• or as the Court deems just and equitable.
(Agreement § XVIII.B.) However, the Court also concludes that Plaintiffs’ suggested
reading is a reasonable one:
The Court shall retain jurisdiction over this matter
• for two (2) years from its approval of this Agreement for the purposes of
receiving reports and information required by this Agreement, or
resolving disputes between the parties to this Agreement,
• or as the Court deems just and equitable.
11
(Id.) The plain language of this provision could reasonably be interpreted according to
either meaning.
At the same time, however, the Court acknowledges that neither party’s
interpretation makes complete grammatical sense. Specifically, Defendants’ proposed
interpretation results in the following construction of the “just and equitable” language:
“The Court shall retain jurisdiction over this matter for two (2) years from its approval of
this Agreement for the purposes of . . . as the Court deems just and equitable.” To
sensibly construe this language as Defendants suggest, the Court must ignore the words
“of” and “as” or instead read in additional language to clarify that this clause refers to
“purposes the Court deems just and equitable.” Plaintiffs’ proposed reading also requires
the Court to conclude that the parties used a comma before the “just and equitable” clause
where a semicolon would have more clearly conveyed the meaning Plaintiffs suggest.
See The Chicago Manual of Style Online § 6.58 (16th ed. 2010) (“When items in a series
themselves contain internal punctuation, separating the items with semicolons can aid
clarity. If ambiguity seems unlikely, commas may be used instead.” (internal
cross-references omitted)).
Further, the Court finds that the Agreement as a whole does not foreclose either
party’s interpretation. In particular, the Court disagrees with Defendants that Plaintiffs’
interpretation renders other portions of the Agreement meaningless. In light of the
“apparent purpose of the contract as a whole,” the Court finds it reasonable that the
parties would have adopted Plaintiffs’ proposed interpretation. See Art Goebel, Inc., 567
12
N.W.2d at 515. Specifically, the Agreement had the apparent purposes of not only
eliminating the usage of restraints at the METO facility but also implementing multiple
system-wide remedies to improve the lives of individuals with disabilities statewide. As
a result, the Court concludes that the Agreement’s provisions providing for a two-year
retention of jurisdiction and the possibility of a third year of reporting requirements can
coexist alongside a broader grant of jurisdiction “as the Court deems just and equitable.”
The more specific provisions are not rendered meaningless as they dictated the parties’
expectations regarding the scope of jurisdiction at the time the Agreement was adopted.
However, the “just and equitable” clause can reasonably be construed as a fallback
provision intended to apply as the circumstances warranted going forward.
In short, “[e]ach argument tends to support the interpretation favored by the party
that advances it, but neither is conclusive.” Swift & Co., 539 F.3d at 852. In other words,
“[t]he parties simply have signed an agreement that is not clear on its face.” Id. Thus,
the Court concludes it is proper to consider extrinsic evidence to interpret the Agreement
and determine the parties’ intent.
IV.
Extrinsic Evidence to Discern the Parties’ Intent
Once a court has concluded that a contract is ambiguous, it may then attempt to
discern the parties’ intent by considering extrinsic evidence. See Winthrop Res. Corp. v.
Eaton Hydraulics, Inc., 361 F.3d 465, 470 (8th Cir. 2004). Specifically, a court may
“look[] at surrounding circumstances and the parties’ own subsequent conduct.”
Loftness, 818 F.3d at 362 (quoting Fredrich v. Indep. Sch. Dist. No. 720, 465 N.W.2d
692, 695 (Minn. Ct. App. 1991)). The parties’ subsequent conduct is highly probative in
13
conducting this inquiry. See id. (“The most probative evidence is the actions of the
parties afterwards.”) (quoting Fredrich, 465 N.W.2d at 695)); see also Fredrich, 465
N.W.2d at 696 (“[T]he interpretation the parties themselves place on the contract is
entitled to great, perhaps controlling, weight in ascertaining the terms of the contract.”).
“The terms of an ambiguous contract, which is not a contract of adhesion, are construed
against the drafter only after the evidence fails to reveal the mutual intent of the parties.”
Staffing Specifix, Inc. v. TempWorks Mgmt. Servs., Inc., No. A16-1146, 2017 WL
1316142, --- N.W.2d ---, at *10 (Minn. Ct. App. Apr. 10, 2017).
To aid the Court’s interpretation of the “just and equitable” clause, Plaintiffs
provide evidence in the form of a declaration by Plaintiffs’ counsel and attached exhibits.
Plaintiffs also direct the Court to the procedural history in this matter to support their
view that the Court presently has jurisdiction. Citing numerous examples in the record,
Plaintiffs point out that Defendants have repeatedly “asked the Court to exercise its
authority over the settlement for their benefit.” (Doc. No. 634 at 3 n.5.) Plaintiffs also
reference Defendants’ routine failure to appeal or challenge the Court’s orders, including
those extending jurisdiction. In light of the long history of settlement implementation
between the parties, Plaintiffs argue that “[D]efendants’ new claim that the Court lacks
authority over the settlement is incredulous, misleading, and meritless.” 5 (Id.)
5
Plaintiffs also focus much of their briefing on the history of Defendants’
non-compliance, and the Court’s extension of jurisdiction as a sanction against
Defendants. The Court will not recount this procedural history here as it does not
materially impact the Court’s analysis of Defendants’ jurisdictional objection.
14
Defendants primarily argue that the Agreement unambiguously favors their
interpretation and put forward no specific extrinsic evidence to aid in resolving any
ambiguity. However, Defendants ask the Court to adopt an interpretive canon to resolve
any ambiguity that exists: “To the extent the Court concludes the [Agreement] is
ambiguous and considers Plaintiffs’ counsel’s affidavit, . . . the meaning of the ‘just and
equitable’ language must be construed against Plaintiffs because Plaintiffs’ counsel
asserts that Plaintiffs included that language in the [Agreement].” (Doc. No. 637 at 8
n.5.) Defendants do not otherwise rebut or question the veracity of Plaintiffs’ counsel’s
affidavit and associated exhibits.
The Court concludes that the extrinsic evidence, including the evidence regarding
the purpose of the “just and equitable” clause and the parties’ post-agreement conduct,
establishes that the parties agreed that “[t]he Court shall retain jurisdiction over this
matter . . . as the Court deems just and equitable.” (Agreement § XVIII.B.)
First, Plaintiffs’ counsel offers an unchallenged declaration regarding the inclusion
of the language at issue in the Agreement. According to Plaintiffs’ counsel:
I negotiated the Settlement Agreement on behalf of the Settlement Class. I
included the retention of jurisdiction language in the agreement, at
section XVIII.B, which states ‘, or as the Court deems just and equitable’
because I was concerned that the Court retain authority to address potential
non-compliance and delay beyond the implementation dates in the
settlement, mindful of the complexities involved in the coordination of
multiple state agencies and counties for the development and
implementation of a statewide Olmstead Plan and the modification of
Rule 40 and related administrative rulemaking needed for these settlement
areas. The parties agreed to the settlement with this language and
defendants never raised any concern about it.
(Doc. No. 635 (“O’Meara Decl.”) ¶ 1.) Absent contrary evidence regarding the meaning
15
of this language, the Court is persuaded that this evidence supports Plaintiffs’
interpretation of the Court’s retention of jurisdiction under the Agreement.
Second, the parties’ conduct throughout this litigation in implementing the
Agreement provides strong evidence of the parties’ mutual intent regarding the scope of
the Court’s jurisdiction and the meaning of § XVIII.B’s “just and equitable” clause. 6 As
Plaintiffs’ counsel indicates in his declaration, Defendants repeatedly invoked Court
authority and were actively engaged in reporting, mediation, planning, and dialog “for
many years following the settlement’s approval, never indicating they believed the Court
had no jurisdiction,” except for one limited circumstance. (Id. ¶ 2.)
Plaintiffs also identify specific instances in which Defendants acknowledged or
agreed to the Court’s jurisdiction. On August 6, 2013, for example, Plaintiffs’ counsel
e-mailed Defendants’ counsel and the Court Monitor to support the position that the
Court should extend its jurisdiction “no less than one year.” (Id. ¶ 8, Ex. D.) In this
same e-mail, Plaintiffs’ counsel wrote, “We believe the Court should determine the
length of the extension based upon its review of the ongoing issues regarding settlement
implementation, non-compliance and any other information the Court believes is
6
Importantly, the Court does not rely upon the parties’ conduct to support that
Defendants have waived an objection to subject-matter jurisdiction or that Defendants
consented to the Court’s jurisdiction where it did not otherwise exist. See 4:20
Commc’ns, Inc. v. Paradigm Co., 336 F.3d 775, 778 (8th Cir. 2003) (“[P]arties may not
expand the limited jurisdiction of the federal courts by waiver or consent.”). Rather, the
Court relies on the parties’ conduct as extrinsic evidence to aid in clarifying the
ambiguity in the Agreement regarding the meaning of § XVIII.B. See Fredrich v. Indep.
Sch. Dist. No. 720, 465 N.W.2d 692, 696 (Minn. Ct. App.1991) (“[T]he interpretation the
parties themselves place on the contract is entitled to great, perhaps controlling, weight in
ascertaining the terms of the contract.”).
16
important to consider in making its determination.” (Id.) Two days later, on
August 8, 2013, Defendants’ counsel wrote to the Court Monitor and Plaintiffs’ counsel
that “The Department will agree that the Court’s jurisdiction over the settlement
agreement may be extended from December 31, 2013 to December 31, 2014.” (O’Meara
Decl. ¶ 7, Ex. C.) In addition, Plaintiffs provided a copy of a proposed order submitted
on behalf of the Court Monitor and DHS on January 26, 2015 which states that “The
Court has jurisdiction over the subject matter of this action, the parties, and the class.”
(O’Meara Decl. ¶ 6, Ex. B.)
The Court’s own review of the record and the history of the parties’ actions in this
matter also reveals probative evidence of the parties’ intent regarding the Court’s
retention of jurisdiction under the Agreement. On July 17, 2012, the Court issued an
order appointing the Court Monitor in response to concerns over Defendants’
noncompliance with the Agreement and explained that “[t]he Approval Order provides
that the ‘Court shall retain jurisdiction over this matter for two (2) years from approval of
this Agreement’ both to receive reports and information and also ‘as the Court deems just
and equitable.’” 7 (Doc. No. 159 at 4 (quoting Agreement § XVIII.B).)
On August 27, 2013, the Court extended its jurisdiction to December 4, 2014,
consistent with the parties’ agreement described above. (See Doc. No. 223 at 3; see also
Doc. No. 224 at 3.) The Court specifically stated that it did so “pursuant to
7
The Court notes that its explanation of the Agreement’s jurisdictional provision in
this order could be read to support Defendants’ proposed interpretation of § XVIII.B.
However, in subsequent orders, the Court clearly adopted the interpretation Plaintiffs
propose. The Court finds that this only further supports that § XVIII.B is reasonably
susceptible to multiple interpretations and is therefore ambiguous.
17
Section XVIII.B. of the Settlement Agreement.” (Id.) Notably, the Court also stated that
it “expressly reserves the authority and jurisdiction to order an additional extension of
jurisdiction, depending upon the status of compliance by the Defendants with the specific
provisions of the Settlement Agreement, absent stipulation of the parties.” (Id.) On
January 22, 2014, in an order addressing the development of an Implementation Plan, the
Court again “reserve[d] the right to extend the jurisdiction of this Court beyond
December 2014.” (Doc. No. 266 at 6.)
On July 24, 2014, Plaintiffs submitted a letter to the Court in response to the Court
Monitor’s June 20, 2014 Community Compliance Review and Defendants’ proposed
Olmstead Plan. (Doc. No. 332; see also Doc. No. 313.) In this letter, Plaintiffs’ counsel
stated “[w]e respectfully suggest that the Court consider extending its jurisdiction over
the Settlement by a sufficient time period to ensure sufficient compliance.” (Id. at 8.) On
August 22, 2014, Defendants responded to Plaintiffs’ letter, stating: “Given the
Department’s substantial compliance efforts on the JSA/CPA and the impending closure
of the Cambridge facility, the Department respectfully suggests that further discussion
takes place before any decisions are made to extend the Court’s jurisdiction in this
matter.” (Doc. No. 338 at 4.)
On September 3, 2014, the Court issued an order addressing these letters, among
other submissions. (See Doc. No. 340.) The Court determined that it was “obligated to
take some action with the objective of increasing the Court Monitor’s responsibilities to:
(1) oversee Defendants and ensure their accountability; and (2) expedite prompt and
meaningful compliance.” (Id. at 9.) As a result, the Court explained that it would
18
“extend its jurisdiction for a period of at least two additional years.” (Id.) The Court
went on to explain that “[t]he Settlement Agreement provides that the Court’s jurisdiction
would be determined ‘as the Court deems just and equitable.’” (Id. (quoting Doc.
No. 104 at 39).) The Court referenced its previous extension of jurisdiction to
December 4, 2014 and its reservation of authority to further extend jurisdiction absent the
parties’ agreement. (Id.) The Court explained:
Extending the term of the Court’s jurisdiction is clearly necessary based on
the significant delays in implementation as well as the non-compliance with
the Settlement Agreement. The Court concludes that at least a two-year
extension is necessary in order for the Court to oversee and direct DHS to
accelerate its efforts to comply with the Settlement Agreement and to fulfill
the promises and proclamations made by DHS at the time of the fairness
hearing when the Settlement Agreement was approved by the Court.
(Id. at 9-10.) Thus, the Court ordered the following:
The Court Monitor shall serve for as long as necessary for Defendants to
achieve substantial compliance. However, it is expected that Defendants
will substantially comply with the Court’s Orders by December 4, 2016.
Pursuant to the Settlement Agreement § XVIII.B and § XVIII.E, and the
Court’s August 28, 2013 Order, the Court’s jurisdiction is extended to
December 4, 2016, and the Court expressly reserves the authority and
jurisdiction to order an additional extension of jurisdiction, depending upon
the status of the Defendants’ compliance and absent stipulation of the
parties.
(Id. at 14.)
Between February 10, 2016 and February 18, 2016, the parties filed proposals
regarding a revised reporting schedule to facilitate Defendants’ reporting to the Court on
the Olmstead Plan and the implementation of the Agreement. (See Doc. Nos. 537-43.)
Defendants’ proposal for reporting on the Agreement provided for semi-annual reporting
to be due on August 31 and February 28. (See Doc. No. 539 at 4.) In addition, this
19
proposal provided for annual reports to cover the period of January 1 to December 31
which would be due on March 31. (Id.) With respect to Olmstead Plan reporting,
Defendants proposed quarterly status reports to be due on May 31, August 31,
November 30, and February 28, with the first such report to be due on February 29, 2016.
(Doc. No. 540-1 at 6-7.) Defendants also proposed submitting annual reports covering an
October 1 through September 30 period due each year on December 31. (Id. at 7; see
also Doc. No. 543.) On February 22, 2016, the Court issued orders establishing a
reporting schedule for both the Olmstead Plan and the Agreement. (Doc. Nos. 544, 545.)
Both orders included the following provision extending the Court’s jurisdiction:
Based on all of the above and the current status of this matter, and pursuant
to the Settlement Agreement § XVIII.B and the Court’s September 3, 2014
Order (Doc. No. 340), the Court’s jurisdiction is extended to
December 4, 2019. The Court expressly reserves the authority and
jurisdiction to order an additional extension of jurisdiction, depending upon
the status of Defendants’ compliance and absent stipulation of the parties.
(Doc. No. 544 at 8; Doc. No. 545 at 6.)
On March 18, 2016, the Court imposed verification and reporting requirements
upon Defendants and identified specific verification duties for the Court Monitor. (Doc.
No. 551.) In this order, the Court stated the following regarding its jurisdiction:
On December 5, 2011, the Court approved the parties’ Stipulated Class
Action Settlement Agreement . . . and reserved jurisdiction over this matter
‘to enforce compliance with the provisions of the Agreement.’ The Jensen
Settlement Agreement provided that the Court would retain jurisdiction for
two years ‘or as the Court deems just and equitable.’ The Court has since
extended its jurisdiction on three occasions, most recently extending its
jurisdiction to December 4, 2019. The Court is hopeful that substantial
compliance with the Jensen Settlement Agreement will be achieved by this
date.
20
(Id. at 2 (citations omitted).)
In light of this procedural history and the parties’ actions throughout this litigation,
the Court finds that the parties intended the Court to retain authority to exercise
jurisdiction as it deems just and equitable. In particular, neither Plaintiffs nor Defendants
objected to the Court’s continuing jurisdiction after the Court issued orders extending its
jurisdiction pursuant to § XVIII.B. Similarly, neither party objected when the Court
repeatedly “reserve[d] the authority and jurisdiction to order an additional extension of
jurisdiction, depending upon the status of Defendants’ compliance and absent stipulation
of the parties.” (See, e.g., Doc. No. 544 at 8.) No objections were raised concerning the
Court’s orders that indicated an interpretation of the “just and equitable clause” consistent
with Plaintiffs’ proposed interpretation. Further, notwithstanding Defendants’ current
argument that § XVIII.B plainly contemplates jurisdiction ending no later than
December 4, 2014, the parties have acted for many months—in fact, years—since this
date as if the Court had jurisdiction. Indeed, in February 2016, Plaintiffs and Defendants
each proposed detailed reporting schedules contemplating periodic and annual reporting
obligations into the future when jurisdiction had at that time been extended to only
December 4, 2016.
In short, the parties’ actions demonstrate their mutual intent regarding the Court’s
continuing jurisdiction over this case. The parties’ consistent recognition of the Court’s
jurisdiction throughout the extensive and complex procedural history of this matter since
December 4, 2014 cannot be reconciled with the narrow interpretation of § XVIII.B
Defendants now propose. As the Court previously concluded, the Agreement’s
21
jurisdictional provision is reasonably susceptible to both meanings proposed by the
parties. In light of the extrinsic evidence, and particularly the parties’ post-agreement
conduct, however, the Court finds that Plaintiffs’ proposed interpretation reflects the
parties’ intent. 8
CONCLUSION
On December 5, 2011, the Court approved the Agreement and dismissed the
claims against Defendants, “reserv[ing] continuing jurisdiction for the time period set
forth in the Agreement.” (Doc. No. 136 at 2.) Because § XVIII.B. of the Agreement
contemplated the Court’s retention of jurisdiction for a two-year period or “as the Court
deems just and equitable,” the Court concludes that its previous extensions of jurisdiction
in this matter were proper exercises of the Court’s authority. Thus, the Court presently
retains jurisdiction over this matter, and Defendants’ objection to the Court’s jurisdiction
is overruled.
Although the Court concludes that it presently has jurisdiction, it acknowledges
that the protracted nature of this litigation and the long history of settlement
implementation has resulted in continued judicial oversight well beyond the initial
minimum two-year period contemplated by the parties. The Court must also observe,
however, that the extensions of jurisdiction in this matter have largely been attributable to
Defendants’ own admitted non-compliance and delays in implementing the Agreement.
8
Because the evidence and the record reveals the parties’ intent, the Court need not
apply the interpretive canon that requires construing ambiguity against the drafting party.
See Swift & Co. v. Elias Farms, Inc., 539 F.3d 849, 854 (8th Cir. 2008) (“[T]his rule
applies only as a last resort, after all other evidence fails to demonstrate the intent of the
parties.”).
22
Without revisiting such non-compliance and focusing instead on the significant progress
that has been achieved in recent years, the Court believes that the time has come to see
this litigation to its end.
As the Court explained in its March 18, 2016 order, Defendants have implemented
numerous internal mechanisms to oversee the implementation of the Agreement and
improve the lives of individuals with disabilities in this state. (See Doc. No. 551 at 4-6.)
The Court noted its hope that such measures could ultimately serve as a replacement for
continuing Court oversight, stating “[w]hen the Court no longer exercises jurisdiction
over the Jensen Settlement Agreement, quality oversight measures such as these will
ensure that Jensen’s legacy is not left an empty promise.” (Id. at 6.) With this aim in
mind, the Court urges the parties to come together to evaluate what essential steps remain
in the implementation of the Agreement before the Court terminates its jurisdiction over
this matter.
ORDER
Based upon the foregoing, IT IS HEREBY ORDERED that:
1.
Defendants’ objection to the Court’s continuing jurisdiction is
OVERRULED.
2.
Absent further order of the Court, all reporting obligations previously
imposed shall remain in place.
3.
The Court will convene a bi-annual status conference in this matter in
December 2017. Prior to this status conference, the parties shall meet and confer to
23
discuss the essential steps that remain in Defendants’ implementation of the Agreement
before the Court can equitably terminate its jurisdiction over this matter.
Dated: June 28, 2017
s/Donovan W. Frank
DONOVAN W. FRANK
United States District Judge
24