ORDER denying 16 Motion for Summary Judgment; granting 23 Motion for Summary Judgment. Signed by Chief Judge Dana L. Christensen on 7/30/2015. (dle)
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF MONTANA
MISSOULA DIVISION
NATIVE ECOSYSTEMS COUNCIL;
ALLIANCE FOR THE WILD ROCKIES,
Plaintiffs,
CV 14–229–M–DLC
ORDER
vs.
UNITED STATES FOREST SERVICE,
an agency of the U.S. Department of
Agriculture, FAYE KRUEGER, in her
official capacity,
Defendants.
Before the Court are the parties’ cross motions for summary judgment. For
the reasons explained, the Court grants Defendants’ motion for summary
judgment.
Background
Plaintiffs Native Ecosystems Council and Alliance for the Wild Rockies
challenge the United States Forest Service’s decision to authorize the
Environmental Assessment (EA), Decision Notice, and Finding of No Significant
Impact (FONSI) for the South Bridger Interface Project (the Project).
The Project involves approximately 250 acres of commercial thinning in
1
insect-infested forest located approximately 15 miles northeast of Bozeman,
Montana in the Gallatin National Forest. The Project Area is within and
immediately south of Bridger Bowl Ski Area and within the wildland urban
interface. Forest vegetation in the area consists of primarily mature and overmature densely stocked stands of Douglas-fir and lodgepole pine that have
recently experienced epidemic levels of mortality due to western spruce bud-worm
and mountain pine beetle infestation. Forest Service scientists have concluded
that silvicultural treatments that reduce stocking density are “the only long-term
solution to budworm management.” FS 5513. The purpose of the thinning Project
is to reduce tree mortality from ongoing insect infestations and improve forest
health, productivity, and resiliency. The Forest Supervisor approved the Project
on August 8, 2014, following the issuance of a Final Environmental Assessment
and a pre-decisional objection process.
Plaintiffs’ claims arise under the National Environmental Policy Act
(“NEPA”), the National Forest Management Act (“NFMA”), and the
Administrative Procedures Act (“APA”). Plaintiffs assert that Defendants failed to
adequately analyze and disclose the cumulative effects associated with the Project,
failed to take a hard look at the effects of the Project, and that the Project violates
the Gallatin Forest Plan (“Forest Plan”).
2
Legal Standards
I.
National Environmental Policy Act
“NEPA is a procedural statute that does not ‘mandate particular results but
simply provides the necessary process to insure that federal agencies take a hard
look at the environmental consequences of their actions.’” High Sierra Hikers
Ass’n v. Blackwell, 390 F.3d 630, 639-40 (9th Cir. 2004) (internal citations
omitted.); Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 351
(1989)(NEPA “prohibits uninformed–rather than unwise–agency action.”) NEPA
requires government agencies to “consider every significant aspect of the
environmental impact of a proposed action.” Baltimore Gas & Elec. Co. v. NRDC,
462 U.S. 87, 97 (1983). NEPA also requires that relevant information be made
available to the public so that they “may also play a role in both the
decisionmaking process and the implementation of that decision.” Robertson, 490
U.S. at 349.
Before undertaking any “major Federal action significantly affecting the
quality of the human environment,” an agency must prepare a detailed
environmental impact statement (“EIS”). 42 U.S.C. § 4332(2)(C); 40 C.F.R.
§ 1508.11. In order to decide whether an EIS is necessary, an agency may prepare
3
an environmental assessment (“EA”). 40 C.F.R. § 1508.9. An EA is a “concise
public document” that must “briefly provide sufficient evidence and analysis for
determining whether to prepare an environmental impact statement.” Id.; see also
Native Ecosystems Council v. Weldon, 697 F.3d 1043, 1053 (9th Cir. 2012).
“NEPA documents must concentrate on the issues that are truly significant to the
action in question, rather than amassing needless detail.” 40 C.F.R. § 1500.1(b) If
the EA concludes that the proposed action will not have a significant effect on the
environment, the agency may issue a Finding of No Significant Impact and may
then proceed with the action. 40 C.F.R. § 1508.13.
Courts apply a “rule of reason” in reviewing the adequacy of an EA.
Klamath-Siskiyou Wildlands Center v. Bureau of Land Management, 387 F.3d
989, 992 (9th Cir. 2004). This requires the court to make a “pragmatic judgment”
as to whether an EA adequately discusses the environmental consequences of a
project and fosters informed public participation. California v. Block, 690 F.2d
753 (9th Cir. 1982). While courts must “strictly interpret the procedural
requirements in NEPA and the CEQ regulations,” Churchill County v. Norton, 276
F.3d 1060, 1071 (9th Cir. 2001), courts must “be mindful to defer to agency
expertise, particularly with respect to scientific matters within the purview of the
agency,” Klamath-Siskiyou Wildlands Center, 387 F.3d at 993 (internal citations
4
omitted.) “[T]he ultimate standard of review is a narrow one,” and a court may not
“substitute its judgment for that of the agency.” Citizens to Preserve Overton
Park, Inc. v. Volpe, 401 U.S. 402, 416 (1971).
II.
National Forest Management Act
NFMA requires forest planning of National Forests at two levels: the forest
level and the individual project level. 16 U.S.C. §§ 1600-1687. At the Forest
level, NFMA directs the Department of Agriculture to “develop, maintain, and, as
appropriate, revise [forest plans] for units of the National Forest System.” 16
U.S.C. § 1604(a). A Forest Plan sets broad guidelines for forest management and
serves as a programmatic statement of intent to guide future site-specific decisions
within a forest unit. Citizens for Better Forestry v. U.S. Dept of Agriculture, 341
F.3d 961, 966 (9th Cir. 2003); Ohio Forestry Ass’n, Inc. v. Sierra Club, 523 U.S.
726, 729 (1998). Forest Plans must “provide for multiple use and sustained yield
of the products and services” derived from the National Forests, including
“outdoor recreation, range, timber, watershed, wildlife and fish, and wilderness.”
16 U.S.C. § 1604(e)(1).
At the individual project level, NFMA requires that each individual project
be consistent with the governing Forest Plan. Great Old Broads for Wilderness v.
Kimbrell, 709 F.3d 836, 851 (9th Cir. 2013).
5
The Forest Service’s interpretation and implementation of its own Forest
Plan is entitled to substantial deference. Siskiyou Regional Educ. Project v. USFS,
565 F.3d 545 (9th Cir. 2009); Forest Guardians v. USFS, 329 F.3d 1089, 1099
(9th Cir. 2003).
III.
The Administrative Procedure Act
Under the APA, a federal court “shall . . . hold unlawful and set aside
agency action, findings, and conclusions found to be arbitrary, capricious, an
abuse of discretion, or otherwise not in accordance with law; [or] without
observance of procedures required by law.” 5 U.S.C. § 706(2). As recently
articulated by the Ninth Circuit:
Under this standard of review, an “agency must examine the relevant
data and articulate a satisfactory explanation for its action.” Motor
Vehicle Mfrs. Ass'n of United States, Inc. v. State Farm Mut. Auto.
Ins. Co., 463 U.S. 29, 43 (1983). An agency's action is arbitrary and
capricious if the agency fails to consider an important aspect of a
problem, if the agency offers an explanation for the decision that is
contrary to the evidence, if the agency's decision is so implausible
that it could not be ascribed to a difference in view or be the product
of agency expertise, or if the agency's decision is contrary to the
governing law. Id.
Organized Village of Kake v. U.S. Dept of Agriculture, 746 F.3d 970, 974 (9th Cir.
2014). Though a review of agency action under the APA must be “thorough,
probing, [and] in-depth,” Citizens to Preserve Overton Park, Inc. v. Volpe, 401
6
U.S. 402, 415 (1971), the standard of review is “highly deferential,” Northwest
Ecosystem Alliance v. U.S. Fish and Wildlife Service, 475 F.3d 1136, 1140 (9th
Cir. 2007). The court must presume the agency action is valid and affirm it if a
reasonable basis exists for the decision. Id.
IV.
Summary Judgment
Under Rule 56 of the Federal Rules of Civil Procedure a party is entitled
to summary judgment if it can show that there is no genuine dispute of material
fact and the movant is entitled to judgment as a matter of law. Fed.R.Civ.P. 56.
Generally, cases involving review of final agency action under the APA do not
involve fact finding but only a review of the administrative record. Northwest
Motorcycles Ass’n v. U.S. Dept of Agriculture, 18 F.3d 1468, 1472 (9th Cir. 1994).
Accordingly, summary judgment is the appropriate process to resolve this case.
Discussion
I.
NEPA claims
Plaintiffs claim that Defendants violated NEPA in two respects: by failing
to adequately analyze and disclose the cumulative effects associated with the
Project and by failing to take a hard look at the effects of the Project.
A.
Cumulative Effects Analysis
Plaintiffs assert that the cumulative effects analysis disclosed in the EA for
7
the Project is inadequate. Plaintiffs specifically complain that more information
should have been provided about past timber projects in the Project area, and that
the lack of information about timber projects led to an inadequate cumulative
effects analysis with respect to Canada lynx and pine marten.
In assessing the significance of a particular agency action, NEPA requires
that agencies consider the cumulative impacts of a project. 40 C.F.R. §
1508.27(7). NEPA defines a cumulative impact as:
the impact on the environment which results from the incremental
impact of the action when added to other past, present, and
reasonably foreseeable future actions regardless of what agency
(Federal or non-Federal) or person undertakes such other actions.
Cumulative impacts can result from individually minor but
collectively significant actions taking place over a period of time.
“Consideration of cumulative impacts requires some quantified or detailed
information that results in a useful analysis, even when the agency is preparing an
EA and not an EIS.” Center for Environmental Law and Policy v. U.S. Bureau of
Reclamation, 655 F.3d 1000, 1007 (9th Cir. 2011)(internal quotation and citation
omitted). While an agency “may characterize the cumulative effects of past
actions in the aggregate without enumerating every past project that has affected
an area,” “[g]eneral statements about ‘possible effects’ and ‘some risk’ do not
constitute a hard look absent a justification regarding why more definitive
8
information could not be provided.” Id. “Superficial analysis” and “vague
generalities” are insufficient to satisfy the Forest Service’s obligation to assess
cumulative impacts under NEPA. Id. at 1008. Without some specific information
and analysis of cumulative effects, “neither the courts nor the public, in reviewing
[the agency’s] decisions, can be assured that the agency provided the hard look”
required by NEPA. Neighbors of Cuddy Mountain v. U.S. Forest Serv., 137 F.3d
1372, 1380 (9th Cir. 1998).
The Ninth Circuit, see League of Wilderness Defenders–Blue Mountains
Biodiversity Project v. U.S. Forest Service, 549 F.3d 1211, 1217 (9th Cir. 2008),
and the parties in this case, in looking for guidance on cumulative effects analysis,
have referred to and relied on a June 24, 2005 memorandum issued by the
Chairman of the Council on Environmental Quality (CEQ), entitled “Guidance on
Consideration of Past Actions in Cumulative Effects Analysis” (CEQ Memo). The
CEQ is charged with interpreting NEPA. The CEQ Memo presents the agency’s
interpretation of its own regulations with regard to cumulative effects analysis. It
is not plainly erroneous or inconsistent with the language of the regulations, and is
therefore entitled to Auer deference. Id. at 1218 (citing Auer v. Robbins, 519 U.S.
452 (1997)). The Court therefore turns to this document for analysis of the instant
claims.
9
The CEQ Memo interprets NEPA’s cumulative effects regulations as
requiring “analysis and a concise description of the identifiable present effects of
past actions to the extent that they are relevant and useful in analyzing whether the
reasonably foreseeable effects of the [proposed action] and its alternatives may
have a continuing, additive and significant relationship to those effects.” (Doc.
20-1 at 1.) It directs agencies to use scoping “to focus on the extent to which
information is relevant,” and declares that “agencies have discretion to determine
whether, and to what extent, information about the specific nature, design, or
present effects of a past action is useful for the agency’s analysis.” Id.
The CEQ Memo explains that “[a]gencies are not required to list or analyze
the effects of individual past actions unless such information is necessary to
describe the cumulative effect of all past actions combined.” Id. at 2. The CEQ
Memo directs agencies to focus only on those issues that are significant to the
environmental analysis, and advises agencies to reduce the “accumulation of
extraneous background data” in favor of “emphasizing real environmental issues
and alternatives” associated with past actions. Id. (quoting 40 C.F.R. 1500.2(b).)
The CEQ Memo also endorses narrowing the scope of a cumulative effects
analysis based on “practical considerations.” Id. (citing Kleppe v. Sierra Club,
427 U.S. 390, 414 (1976)). The CEQ Memo also asserts that “[a]gencies retain
10
substantial discretion as to the extent of such inquiry and the appropriate level of
explanation.” Id. (citing Marsh v. Oregon Natural Resources Council, 490 U.S.
360, 376-377 (1989)). Finally, the CEQ Memo states that the “scope of the
cumulative impacts analysis is related to the magnitude of the environmental
impacts of the proposed action” and that “[p]roposed actions of limited scope
typically do not require as comprehensive an assessment of cumulative impacts as
proposed actions that have significant impacts over a large area.” Id. at 3.
Plaintiffs’ chief complaint about the cumulative effects analysis performed
by the Forest Service for the Project is with respect to the detail provided
regarding past timber projects. Plaintiffs contend that more detail about the
nature, size, and location of past timber projects needed to be included in the EA
to comport with NEPA. Plaintiffs specifically contend that more information
about the location and nature of past timber projects is needed to adequately
inform the public about the Project’s effects on lynx and pine marten. The Court
disagrees with Plaintiffs’ contentions.
The Project involves approximately 250-acres of commercial thinning in
eighteen treatment units of various sizes dispersed across the 1,847-acre project
area. The EA provides a general discussion of cumulative effects, including
cumulative effects from past forest management activities and private land
11
harvests, in Chapter Two. FS-473-477. In Chapter Three, the EA separately
addresses direct, indirect, and cumulative effects, including cumulative effects
from past timber projects and private land harvests, for each resource managed in
the National Forest. This includes a separate discussion of cumulative effects with
respect to (1) Forest Vegetation; (2) Fire– Fuels; (3) Economics; (4) Hydrology;
(5) Aquatic Species; (6) Soils; (7) Range; (8) Weeds; (9) Sensitive Plants; (10)
Recreation; (11) Roadless; (12) Scenery; (13) Heritage Resources; (14) Wildlife,
including separate discussions of grizzly bear, Canada lynx, wolverine, bald
eagles, elk and big game, northern goshawk, and American marten; and (15)
Migratory Bird Species. The direct, indirect, and cumulative effects associated
with each resource are then analyzed within the confines of a resource-specific
“analysis area.”1 For each resource, the EA contains a section entitled “Affected
Environment,” in which the existing condition of the analysis area relative to the
resource at issue is described. In the Affected Environment section, the effects of
past actions and natural processes are aggregated to produce a resource-specific
description of the affected environment. The cumulative effects analysis for each
1
The size of each “analysis area” varies and is tailored to the Project’s possible effects
on the resource. For instance, the analysis area utilized for analysis of effects on Canada lynx is
roughly 150,846 acres while the analysis area with respect to Vegetation is approximately 7,750
acres.
12
resource then references and incorporates the affected environment section in
analyzing cumulative effects. Thus, consistent with the methodology approved in
Center for Environmental Law and Policy, 665 F.3d at 1007, and the CEQ Memo,
the Forest Service here used an aggregated assessment of past actions when
performing its cumulative effects analysis.
Plaintiffs’ criticism of the EA’s discussion of cumulative effects focuses on
past timber harvest projects discussed in the section addressing Forest Vegetation.
Plaintiffs contend that a table contained within the affected environment section of
the chapter on Forest Vegetation, Table 3.8 at FS-503, constitutes “the sum total of
the disclosure of past actions for the Project.” (Doc. 17 at 19.)
This assertion is off the mark as it ignores the EA’s discussion of relevant
past actions, including timber projects, that appears in each of the fifteen resourcespecific subchapters – all of which contain a description and discussion of past
timber projects. Each resource-specific sub-chapter provides information about
past forest management activities and timber harvests and how these actions have
affected the environment relative to the resource at issue.
Undoubtedly, the EA’s discussion of past timber projects could have been
more specific, but NEPA does not require more specificity than was provided. A
complete review of each resource-specific discussion of cumulative effects, and
13
specifically the discussion of past timber harvests, demonstrates that the Forest
Service took a hard look at this small project’s effects on the environment and the
relationship between this Project and past actions, including past timber harvests.
Indeed, even focusing exclusively on Table 3.8 demonstrates that the Forest
Service properly exercised its “substantial discretion” in limiting the extent of the
discussion of past timber harvests. (CEQ Memo, Doc. 20-1 at 2.) Table 3.8
reveals, among other things, that in the entire 7,750-acre analysis area established
for analysis of Forest Vegetation there have been no timber harvests in the past
fifteen years. The Table further reveals that within the analysis area there was a
total of 685 acres of timber harvest (292 acres of regeneration harvest and 393
acres of intermediate harvest) in the 1990s, 634 acres of timber harvest in the
1980s, and a grand total of 4 acres of timber harvest in the 1970s. The EA also
clarifies that “by design, this project, does not include previously harvested sites
within treatment units.” FS-581. Additionally, the Administrative Record
provides a map disclosing the location of past management activities and their
proximity to the treatment units for the Project. FS-1540.
Plaintiffs make no compelling argument why these fairly dated and
relatively small past timber harvests needed to be further detailed in order for the
Forest Service to adequately assess these past timber harvests’ relationship to the
14
Project, or otherwise comply with NEPA. The EA establishes that “defoliators
and bark beetles have been the most significant recent disturbance agent within the
analysis area,” FS-500, and “[f]ire, insects, and disease have been the most
influential historic disturbances within the analysis area,” FS-492. Thus, that the
EA provides a somewhat truncated and arguably generalized description of past
timber harvest projects was not arbitrary or capricious. Rather, it was consistent
with the directive of the CEQ Memo that an EA should reduce “the accumulation
of extraneous background data,” focus on “emphasizing real environmental
issues” associated with past impacts in a cumulative effects analysis, and tailor the
“scope of the cumulative impact analysis” in relation to the “magnitude of the
environmental impacts of the proposed action.” (CEQ Memo, Doc. 20-1 at 2, 3.)
Further detail about these past projects was not necessary to comply with NEPA.
Likewise, no more detail about past timber projects was required for
adequate cumulative effects analysis for lynx or pine marten. The Forest Service
utilized the 150,846-acre Bridger/Bangtail Lynx Analysis Unit (LAU) to analyze
the Project’s effects on lynx. The Affected Environment section for lynx identifies
the Bridger/Bangtail LAU as “secondary habitat” for lynx, defined as areas “that
may have historical records of lynx, but no documentation of lynx reproductions.”
FS-634. Despite numerous surveys, no lynx detections have resulted in the
15
Bridger/Bangtail LAU, and the Forest Service has concluded that the LAU “does
not likely have sufficient lynx habitat to support resident lynx, or provide habitat
suitable for successful rearing of lynx kittens.” FS-635. Nonetheless, the Forest
Service has concluded that the LAU “does provide a potential travel corridor for
lynx to move through when dispersing between core areas.” Id. Ultimately,
however, lynx habitat in this LAU is “patchily distributed with only 26% (39,628
out of 150, 846 acres) meeting the criteria for boreal forest conditions.” Id. The
remainder of the LAU “is made up of warmer, drier, montane forest types, noforest vegetation and rocky areas devoid of vegetation.” Id. Thus, “[g]iven the
naturally fragmented distribution of boreal forest types within the Bridger/Bangtail
LAU,” it is no surprise that with respect to past timber harvests the EA concludes
that “past events (natural or man caused) have not likely changed the overall
nature of this area for lynx use.” FS-639. Under these circumstances, more detail
about past timber projects would only constitute extraneous accumulation of
background data and the Forest Service properly limited its discussion of past
timber projects to the level of detail provided.
The cumulative effects analysis with respect to pine marten also withstands
scrutiny. As described in the affected environment section for pine marten, only
1% of the 7,750-acre analysis area utilized for pine marten contains the spruce/fir
16
dominated stands preferred by marten. FS-670. Moreover, pine marten occur at
“much lower densities” in the Bridger Range (where the Project is located) than
elsewhere on the Gallatin Forest. FS-669. The cumulative effects analysis for
pine marten specifically references the Forest Vegetation section of the EA. FS672. While the EA acknowledges that “commercial timber harvest is associated
with declines in marten occupancy,” FS-671, and that past timber management
projects, among other influences, have resulted in lower canopy cover in the
analysis area, the Forest Service logically concluded that continued decline in
canopy cover will occur regardless of Project implementation due to ongoing
insect infestation, and that “in the long run, [the Project] would maintain habitat
suitability for [pine marten] to a greater degree than would the no action
alternative.” FS-672. The Forest Service adequately detailed past timber projects
for purposes of its cumulative effects analysis with respect to pine marten.
Defendants are entitled to summary judgment on this claim.
B.
Pine Marten
Plaintiffs assert that the EA fails to take a hard look at the Project’s effects
on pine marten. Plaintiffs are concerned that the Project will remove too much
coarse woody debris from the Project Area to the detriment of the pine marten.
Plaintiffs assert that the EA erroneously relies on an inapposite study, the
17
Thompson study, to justify the Project and its impacts on pine marten.
Outside of the criticism of the EA’s reliance on the Thompson study,
Plaintiffs do not actually criticize the sufficiency of the Forest Service’s analysis
with respect to pine marten. Rather, Plaintiffs merely voice disagreement with the
Forest Service’s ultimate determination regarding the Project’s effects on pine
marten. In this regard, Plaintiffs’ claim fails because NEPA “does not mandate
particular results,” but simply ensures that the Forest Service comply with certain
procedures. High Sierra Hikers Ass’n v. Blackwell, 390 F.3d 630, 639-40 (9th Cir.
2004) (internal citations omitted.) In any event, while dead and down trees do
provide coarse woody debris, the Forest Service determined that “dead and dying
trees are not a limiting habitat component” in the Project Area. FS-674. The EA
contains a sufficiently thorough discussion of the Project’s effects on pine marten.
This leaves only the issue of the Forest Service’s reliance on the Thompson
study. In assessing the no action alternative, the EA concludes that no action
would continue to contribute to heavy fuel buildup and the risk of stand-replacing
fire, which would be detrimental to pine marten habitat because stand-initiation
stage forest are generally unsuitable for pine marten for 40+ years. FS-672. For
the proposition that stand-initiation forest are unsuitable for pine marten for a long
time, the EA cites to the Thompson study.
18
Plaintiffs contend that the Thompson study is concerned only with forest
regeneration after clearcut logging, rather than wildfire. However, while the
Thompson study is specifically focused on forest regeneration after clearcut
logging, it is more generally concerned with pine marten success in “regenerating
habitats.” FS-12860. The Thompson study also specifically concludes that pine
marten density declines are similar when habitat is lost through “wildfire or forest
management.” FS-12862 (emphasis added). The EA similarly notes that “[a]cross
North America, studies show wildfire and timber harvest have similar effects.”
FS-671. Accordingly, the Forest Service appropriately relied on the Thompson
study for the conclusion that a stand-initiation stage forest in the Project Area,
resulting from wildfire, would create unsuitable habitat for pine marten for many
years. Defendants are entitled to summary judgment on this claim.
II.
NFMA claims
Plaintiffs contend that the Project is inconsistent with the Forest Plan’s
direction that the Forest Service “[m]aintain at least two thirds of the hiding cover
associated with key habitat components over time,” FS-1684, and manage big
game winter range “to meet the forage and cover needs for deer, elk, moose, and
other big game species in coordination with other uses.” FS-1683. Plaintiffs also
contend that because the Project is inconsistent with the Forest Plan, the Forest
19
Service was required to issue a forest plan amendment.
A.
Hiding Cover
Plaintiffs contend that by implementing the Project the Forest Service failed
to maintain at least two thirds hiding cover associated with key habitat
components over time. Hiding cover is defined as “vegetation capable of
concealing 90% of a standing adult big game animal from view of a human at a
distance equal to or less than 200 feet.” FS-1849. Plaintiffs criticize the Forest
Service for utilizing a big game hiding cover assessment model which equates
hiding cover with coniferous stands with a 40% or greater level of canopy cover.
Plaintiffs contend that this method for measuring hiding cover is inaccurate and
not supported by science. Plaintiffs point to a study performed in the Lewis and
Clark National Forest which yielded, apparently, different determinations about
the amount of hiding cover associated with stands having 40% or more canopy
cover. It is clear, however, that the big game hiding cover assessment model
utilized by the Forest Service for the Project is supported by numerous scientific
studies.
The hiding cover assessment model utilized by the Forest Service for the
Project, and to establish compliance with the Forest Plan, is based on several
Forest Service field studies conducted in the Gallatin National Forest and three
20
other National Forests in Montana. These studies conclude that
“spring/summer/fall hiding cover is provided by tree species or species mixes
(occurring on these four national forests) that are naturally capable of having
relatively dense (>=40%) canopy cover.” FS-13093. Field studies within the
Project Area confirm this model for mapping hiding cover. FS-660. Forest
Service mapping based on these studies of the Elk Analysis Unit in which the
Project lies reveals that 72% of the forested areas capable of providing hiding
cover will continue to do so after implementation of the Project.
In arriving at this figure, and the determination that the Project complies
with the Forest Plan standard, the Forest Service reasonably relied on the
numerous scientific studies performed by Forest Service biologists. See Earth
Island Inst. v. Carlton, 626 F.3d 462, 470 (9th Cir. 2010). Plaintiffs’ criticism that
a study conducted in a different national forest conflicts with the one relied on by
the Forest Service for this Project is insufficient to overcome the deference owed
to the agency in making scientific determinations and also fails to demonstrate that
the Forest Service made a clear error in judgment in concluding that the Project
complies with the Forest Plan. Id; Nat'l Wildlife Fed'n v. U.S. Army Corps of
Eng'rs, 384 F.3d 1163, 1174 (9th Cir.2004). Moreover, Plaintiffs ignore the
Forest Service’s determination that implementing the Project, as opposed to the no
21
action alternative, will help maintain higher levels of hiding cover in the Project
Area over time, as no action would likely result in greater tree mortality from
continued insect infestation. Plaintiffs’ claim accordingly fails.
B.
Big game winter range
Plaintiffs contend that the Project is inconsistent with the Forest Plan’s
requirement that “big game winter range will be managed to meet the forage and
cover needs [of] deer, elk, moose, and other big game species.” FS-1683.
Plaintiffs contend that because the Project will result in short term reductions in
canopy and thermal cover, the Project is inconsistent with the Forest Plan, despite
the fact that the Forest Service has determined that implementing the Project is the
best way to “maintain some degree of mature trees in the canopy, as opposed to
potentially losing the entire canopy to mortality from insects.” FS-674-675.
Plaintiffs apparently believe that the Forest Plan prohibits the Forest Service from
implementing projects that trade some short term pain for long term gain. Such an
argument is clearly without merit. The Forest Plan is a prospective document that
sets broad guidelines for forest management. Indeed, the standard at issue is
prospective in nature, and provides for management direction over time. The
Forest Service’s decision to achieve compliance with the Forest Plan standard for
big game cover by acting to curb epidemic insect infestation (and resulting loss of
22
cover for big game) is entirely consistent with the Forest Plan. Just as the Forest
Service concluded, the Project properly implements the Plan by managing the
Forest to meet the cover needs of big game by seeking to avoid further
catastrophic levels of tree mortality from insects. Plaintiffs’ contrary
interpretation of the Forest Plan is irrational, and ignores the substantial deference
owed to the Forest Service in its interpretation of its own forest plans. Native
Ecosystems Council v. Weldon, 697 F.3d 1043, 1057 (9th Cir. 2012). Defendants
are entitled to summary judgment on this claim.
Because the Project is consistent with the Forest Plan, Plaintiffs’ follow-on
claim that the Forest Service needed to amend the Forest Plan also fails.
IT IS ORDERED that:
1)
Defendants’ motion for summary judgment (Doc. 23) is GRANTED.
2)
Plaintiffs’ motion for summary judgment (Doc. 16) is DENIED.
The Clerk of Court is directed to enter judgment in favor of Defendants and
against Plaintiffs. This case is CLOSED.
Dated this 30th day of July, 2015.
23
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?