First American Title Insurance Company v. Commerce Associates, LLC et al
Filing
164
ORDER granting in part and denying in part 90 Motion for Partial Summary Judgment. Evidentiary Hearing to be scheduled at the status hearing in this action on July 14, 2020 at 11:00 AM. Signed by Judge Richard F. Boulware, II on 6/8/2020. (Copies have been distributed pursuant to the NEF - JM)
1
2
3
4
UNITED STATES DISTRICT COURT
5
DISTRICT OF NEVADA
6
***
7
First American Title Insurance Company,
8
Plaintiff,
9
10
Case No. 2:15-cv-00832-RFB-VCF
ORDER
v.
Commerce Associates, LLC et al,
11
Defendants.
12
13
I.
14
Before the Court is Plaintiff’s renewed Motion for Partial Summary Judgment (ECF No.
15
INTRODUCTION
90).
16
17
II.
18
On May 4, 2015, Plaintiff filed the current suit against Commerce Associates, LLC; TG
19
PROCEDURAL BACKGROUND
Investments, LLC; and Does 1 through 10. EFC No. 1.
20
On August 26, 2015, Defendants filed a Motion to Dismiss, for failure to state a claim.
21
EFC No. 27. On February 18, 2016, the Court granted in part and denied in part the Motion to
22
Dismiss; the Court allowed all causes of action to proceed with the exception of the unjust
23
enrichment claim, which was dismissed without prejudice. ECF No. 50.
24
Plaintiff filed a First Amended Complaint on May 5, 2016. ECF No. 56. A scheduling order
25
issued on May 20, 2016. ECF No. 63. The discovery cut-off date was set for October 11, 2016.
26
Plaintiff filed a Second Amended Complaint on August 15, 2016. ECF No. 72.
27
Plaintiff filed the instant Motion for Partial Summary Judgment on November 9, 2016,
28
seeking summary judgment on Plaintiff’s third and fourth counts, unjust enrichment and breach of
1
1
contract, respectively. ECF No. 90. Defendants filed a Response on December 9, 2016, and
2
Plaintiff replied on December 23, 2016. ECF Nos. 93, 96. A hearing on the motion was held on
3
August 28, 2017 at which the Court deferred ruling on the motion. ECF No. 104. The Court denied
4
the motion without prejudice on September 29, 2017, permitting Plaintiff to re-file after trial. ECF
5
No. 105.
6
The parties filed a joint proposed pretrial order on November 17, 2017 (ECF No. 108) and
7
trial was subsequently scheduled and postponed several times. In preparation for trial, the parties
8
filed motions in limine. ECF Nos. 121, 131, 132, 139. Further, on July 1, 2019, Plaintiff filed a
9
Motion for Leave to File a Renewed Motion for Partial Summary Judgment, seeking to renew its
10
Motion for Summary Judgment and representing that if granted leave and if its motion for
11
summary judgment were granted, it would voluntarily dismiss its remaining claims against
12
Defendants. ECF No. 144 at 3-4.
13
The Court held a pretrial conference on February 18, 2020, to discuss the Motions in
14
Limine as well as Plaintiff’s Motion for Leave to File a Renewed Motion for Partial Summary
15
Judgment, vacated the trial set for February 24, 2020, and took the motion to renew under
16
submission. ECF No. 155. At the hearing, the Court denied Plaintiff’s claim, pertinent to the instant
17
motion, as to fraudulent transfer. ECF No. 157 at 5-7. On March 3, 2020, the Court denied the
18
Motions in Limine without prejudice and granted in part the Motion for Leave to File a Renewed
19
Motion for Partial Summary Judgment. ECF No. 156. The Court permitted the parties to each file
20
a supplement to the briefing on the original Motion for Partial Summary Judgment (ECF No. 90)
21
and set a pretrial conference for April 15, 2020. Id. The Court stated that it would not consider
22
subsequent arguments that could have been brought in the initial briefing. ECF No. 157 at 77-78.
23
Both parties filed supplemental briefs on March 10, 2019. ECF Nos. 159, 160. On April 7,
24
2020, the Court vacated the pretrial conference and jury trial in light of the global pandemic and
25
set a status conference for June 2020. ECF No. 161. The status conference was again vacated and
26
scheduled for July 14, 2020. ECF No. 163.
27
...
28
...
2
1
III.
2
The following facts are undisputed:
3
FACTUAL BACKGROUND
a. Undisputed Facts
4
In 2004, Commerce was the master developer of a mixed use planned community in
5
Henderson, Nevada known as “Tuscany.” ECF No. 90-1 at 2 (citing ECF No. 76, ¶ 9; ECF No.
6
82, ¶ 9). In December 2004, Commerce entered into a written agreement with the City of
7
Henderson (the “City”) which required Commerce to complete the third phase of a water drainage
8
facility commonly known as the “C-1 Channel” which carried storm water runoff from Tuscany
9
and other properties (the “C-1 Channel Phase 3 Agreement”). Id. (citing ECF No. 72-1, ¶ B; ECF
10
No. 76, ¶¶ 9-10; ECF No. 82, ¶¶ 9-10) (noting ECF No. 72-1 is the C-1 Channel Phase 3
11
Agreement). The C-1 Channel Phase 3 Agreement also required Commerce to pay the City the
12
sum of $934,000 (the “C-1 Impact Fee”). Id. (citing ECF No. 72-1, ¶¶ 3.1, 3.3; ECF No. 76, ¶ 10;
13
ECF No. 82, ¶ 10).
14
Article III of the Agreement, laying out the obligation to the City, reads as follows:
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3.1 Commerce Phase 3 Monetary Obligations: The Parties acknowledge that they
have discussed the impact, attributable to Tuscany, that water drainage from the C1 Channel will have on the Las Vegas Wash. Based on those discussions and having
due regard for the impact of Tuscany drainage on the Las Vegas Wash as well as
the overall health, safety and management of the Las Vegas Wash, the Parties have
agreed that the sum of $934,000 (the “C-1 Impact Fee”) is an appropriate
contribution to be made by Commerce, on behalf of Tuscany, to the City for Las
Vegas Wash improvements related to the effect, at the C-1 Channel “Confluence”
or “Convergence”, of Tuscany’s use of the C-1 Channel and its impact on the Las
Vegas Wash.
3.2 Interlocal Agreement. The City represents that it has discussed, with SNWA
[Southern Nevada Water Authority], the impact of the C-1 Channel on the Las
Vegas Wash and the amounts to be contributed by Commerce on behalf of Tuscany,
and that SNWA and the City have approved the amount of the C-1 Impact Fee.
Promptly following the approval of this Agreement, the City agrees to enter into an
Interlocal Agreement with SNWA for the purpose of approving the provisions of
this Agreement insofar as they affect the Las Vegas Wash in order to establish any
and all construction, financial or other obligations of Commerce and any other
owners within Tuscany with respect to the Las Vegas Wash, including
improvements or costs related thereto at the C-1 Channel “Confluence” or
3
1
“Convergence”.
2
3.3 Payment of the C-1 Impact Fee. Commerce shall pay the C-1 Impact Fee to the
City, or as the City may direct in accordance with the Interlocal Agreement, in two
installments of $467,000. The first installment shall be due and payable on May 31,
2005 and the final installment shall be due and payable on November 30, 2005.
3
4
5
3.4 Limitation. The Commerce Phase 3 Obligations shall be limited to the
obligations set forth in Section 2.2 and 3.3. Without limiting the foregoing, other
than the payment of the C-1 Impact Fee, neither Commerce nor any other property
owner within Tuscany shall be obligated to make or pay for any improvement to
the Las Vegas Wash or to make or pay any amount on account of the development
of Tuscany in accordance with the Tuscany Land Use approval.
6
7
8
9
10
ECF No. 90-10 at 6-7. Article II stated in pertinent part:
11
2.2. Construction of Phase 3. Following the approval of the Phase 3 Plans by the
City of Henderson and payment by Commerce of fees and placement of bonds, as
described in Paragraph 2.3 below for Phase 3, Commerce shall cause Phase 3 to be
constructed in a good and workmanlike condition, lien free and in accordance with
the approved Phase 3 Plans. Commerce shall use commercially reasonable efforts
to construct Phase 3 in a prompt time period. For purposes of clarification, the
construction obligations of Commerce with respect to Phase 3 do not proceed
beyond the “sheet piling” at the end of the cut off wall, as set forth on the Phase 3
Plans, it being the intention of the Parties that the Commerce Phase 3 Obligations
with respect to construction not include any work or improvements to or within the
Las Vegas Wash itself.
12
13
14
15
16
17
18
19
20
Id. at 6. Commerce did not pay this C-1 Impact Fee. ECF No. 90-1 at 2 (citing Jankowiak Dep.
21
14:17-15:7; Fullmer Dep. 28:25-29:9; Commerce Response to Interrogatory No. 7).
22
In December 2012, Commerce sold a portion of the Tuscany project to non-party
23
Greystone Nevada, LLC (“Greystone”) pursuant to the terms of a written purchase and sale
24
agreement (the “Purchase Agreement”). Id. at 3 (citing ECF No. 72-5; ECF No. 76, ¶¶ 12, 37; ECF
25
No. 82, ¶¶ 12, 37; Dep. Ex. 1) (footnote omitted). Commerce did not disclose to Greystone that it
26
had failed to pay the C-1 Impact Fee. Id. (citing Bennett Dep. 170:9-22; Parness Dep. 156:7-
27
157:11).
28
...
4
1
2
3
The “Close of Escrow” occurred on December 21, 2012. Id. (citing Bennett Dep. 43:2224; Rice Dep. 119:12-14).
In relevant parts, the Purchase Agreement provides as follows:
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
6.01 Preliminary Title Report.
(a) Seller, at its sole expense, and within three (3) Business Days after the
Effective Date, shall cause Escrow Holder to deliver to Buyer a preliminary title
report for the Property, contemplating an ALTA Extended Coverage Owner's
Policy of title insurance, with a survey exception, together with a legible copy of
listed title exceptions in connection with the preliminary title report (collectively,
the "Title Report"). Upon Buyer's approval of its Feasibility Review Buyer shall be
deemed to have approved those covenants, conditions, restrictions, rights of way,
easements, reservations and other matters of record, as disclosed in the Title Report
(the "Permitted Title Exceptions "); provided, however, that the Permitted Title
Exceptions shall not include, and Seller shall remove at its sole expense, at or before
the Close of Escrow, and shall cause the Property to be delivered and conveyed free
and clear of, any and all: deeds of trusts, mortgages, mechanics' liens, notices of lis
pendens, and /or other monetary liens (except only for non -delinquent taxes and
assessments) whatsoever. Additionally, the Permitted Title Exceptions shall not
include the matters addressed in Schedule B, Section 1 to the Title Report labeled
"requirements ", and Seller shall be required to satisfy all such requirements on or
before the Close of Escrow at its sole expense (to the extent reasonably applicable
to Seller and not otherwise inconsistent with this Agreement), except that Seller
shall not be required to obtain or provide an ALTA survey for the Property (and
neither shall Buyer) or to satisfy any "requirements" that are obligations of Buyer
according to the terms of this Agreement.
7.01 Conditions for the Benefit of the Buyer. Buyer’s obligation to acquire
the Property and to perform other obligations associated with the Close of Escrow
shall be conditional and contingent upon the satisfaction, or waiver by Buyer, as
and when required below, of each of the following conditions (collectively, the
“Buyer Conditions”):
(a) Initial Feasibility Review.
(i) On or before 5:009 P.M. Nevada time on the date that is thirty (30) days
after the Effective Date (the period until such date and time, the “Initial Feasibility
Period”), Buyer shall have the right to review and approve the feasibility of Buyer’s
acquisition of the Property based on Buyer’s inspection, review and analysis of the
Property and Property Documents, including, without limitation, the following . . .
(iv) any existing agreements or title matters related to the Property . . . and (vi) any
28
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
other matters related to or affecting the Property desired to be reviewed and
approved by Buyer[.]
(ii) If Buyer approves of the Initial Feasibility Review, Buyer shall provide
written notice of such approval to Seller on or before the expiration of the
Feasibility Period. In the event Buyer fails to approve the feasibility of Buyer's
acquisition of the Property by written notice to Seller on or before the expiration of
the Initial Feasibility Period, Buyer shall be deemed to have disapproved the initial
Feasibility Review, in which event this Agreement shall automatically terminate,
the Deposit shall be returned to Buyer, and neither Party shall have any further
rights, duties or obligations under this Agreement, except those that by their express
terms survive the termination of this Agreement. In the event Buyer delivers written
notice of approval to Seller on or before the expiration of the Initial Feasibility
Period, this Buyer Condition dealing with the Initial Feasibility Period shall be
deemed satisfied.
(b) Representations and Warranties. As of the pertinent Close of Escrow,
the representations and warranties of Seller set forth in this Agreement, including
without limitation those set forth in Article IX below, shall be true and correct.
...
(d) Title Insurance. Escrow Holder shall be committed to issue to Buyer a
CLTA Standard Owner’s Policy of Title Insurance, with liability limits equal to the
Purchase Price, insuring fee title to the Property as being vested in Buyer, subject
only to the Permitted Title Exceptions (the “Title Policy”). Notwithstanding the
foregoing, Buyer shall have the right to obtain an ALTA Extended Coverage
Owner’s Policy of Title Insurance in lieu of the CLTA Standard Owner’s Policy of
Title Insurance, or any required title endorsement, provided Buyer shall pay all
excess costs in connection therewith and the costs of obtaining any necessary
survey.
19
...
20
21
22
23
24
25
26
27
28
8.09 Costs and Prorations. The following shall apply: . . . (b) Property Taxes and
Assessments. All non-delinquent general and special real property taxes, bonds and
assessments, SID’s LID’s [Special/Local Improvement Districts – obligations of
developer to pay for city installation of infrastructure, e.g. plumbing] (each as
applicable) with respect to the Property, including, without limitation, any and all
assessments with respect to any applicable association, landscape maintenance
districts or assessment districts, shall be paid current at Closing by Seller and
prorated through Escrow between Buyer and Seller as of the pertinent Close of
Escrow based upon the latest available tax bills using customary escrow
procedures. Further, if the regular tax bill or bills for the Property for the fiscal year
in which the Escrow closes are not available as of the Close of Escrow, Buyer and
Seller shall re-prorate all such general and special real property taxes, bonds and
assessments for the Property between themselves outside of Escrow based upon the
6
1
2
3
4
5
6
then current fiscal year’s regular tax bill or bills within (30) days following the date
such regular tax bill or bills are actually received by the parties. This Section shall
be interpreted broadly toward the end that any taxes, assessments, bond obligations,
or other payment obligations accruing prior to Close of Escrow shall be the
responsibility of Seller and any taxes, assessments, bond obligations, or other
payment obligations accruing after the Close of Escrow shall be the responsibility
of the Buyer. The provisions set forth in this Section 8.09 shall survive Close of
Escrow for all purposes.
...
7
10
16.08 Entire Agreement. This Agreement and its exhibits constitute the final and
complete expression of agreement between the Parties hereto pertaining to the
subject matter hereof. All prior agreements, representations, negotiations and
understandings of the parties hereto, oral or written, express or implied, are hereby
superseded and merged herein.
11
...
8
9
12
13
14
16.13 Amendments. No addition to or modification of any provision contained in
this Agreement shall be effective unless fully set forth in writing executed by both
Buyer and Seller.
15
16
17
18
ECF No. 90-8 at 5-20.
Greystone received an ALTA Extended Coverage Owner’s Policy of Title
Insurance from Plaintiff. ECF No. 90-1 at 5 (citing ECF No. 72-2).
19
In 2013, the City notified Greystone (the new owner of Tuscany) that it would not
20
issue Greystone any additional building permits for the Tuscany project unless and until
21
someone paid the C-1 Impact Fee. Id. at 4 (citing Bennett Dep. 44:17-21; Jankowiak Dep.
22
44:7-19; Dep. Ex. 45, ¶ 1). Greystone made a demand to Commerce that Commerce honor
23
its obligation arising under section 8.09(b) of the Purchase Agreement by immediately
24
paying the C-1 Impact Fee. Id. (citing ECF No. 72-3; ECF No. 76, ¶ 14; ECF No. 82, ¶
25
14). Commerce did not respond. Id. (citing ECF No. 76, ¶ 14; ECF No. 82, ¶ 14.)
26
Greystone tendered a claim to its title insurer, First American, claiming that any
27
loss associated with the C-1 Impact Fee was covered by the policy of title insurance issued
28
by First American to Greystone (the “Policy”). Id. (citing ECF No. 72-2; ECF No. 76, ¶
7
1
13; ECF No. 82, ¶ 13; Bennett Dep. 54:2-23; Dep. Ex. 17.) The City demanded Greystone
2
pay the full, $934,000 C-1 Impact Fee. Id. (citing Bennett Dep. 44:22-24; Parness Dep.
3
157:16-19). The parties ultimately made an agreement whereby the City would accept
4
$300,000 in full satisfaction of any obligation that Greystone might have to pay the C-1
5
Impact Fee. Id. (citing ECF No. 72-4; ECF No. 76, ¶ 15; ECF No. 82, ¶ 15; Bennett Dep.
6
165:2-13; Fullmer Dep. 23:20-24:20; Parness Dep. 157:20-158:20). First American
7
accepted Greystone’s title insurance claim, and ultimately paid the sum of $300,000 to
8
fully resolve and settle the matter with the City. Id. at 4-5 (citing Bennett Dep. 54:21-23,
9
72:1-17, 91:3-13; Fullmer Dep. 23:20-24:20; Dep. Ex. 33) (noting Deposition Exhibit 33
10
11
is the City’s receipt for $300,000 tendered by First American).
Condition 13 of the Policy recites as follows:
12
13
14
15
16
17
18
19
20
21
22
13. RIGHTS OF RECOVERY UPON PAYMENT OR SETTLEMENT
(a) Whenever the Company shall have settled and paid a claim under this policy, it
shall be subrogated and entitled to the rights of the Insured Claimant in the Title
and all other rights and remedies in respect to the claim that the Insured Claimant
has against any person or property, to the extent of the amount of any loss, costs,
attorneys’ fees, and expenses paid by the Company. If requested by the Company,
the Insured Claimant shall execute documents to evidence the transfer to the
Company of these rights and remedies. The Insured Claimant shall permit the
Company to sue, compromise, or settle in the name of the Insured Claimant and to
use the name of the Insured Claimant in any transaction or litigation involving these
rights and remedies.
If a payment on account of a claim does not fully cover the loss of the Insured
Claimant, the Company shall defer the exercise of its right to recover until after the
Insured Claimant shall have recovered its loss.
(b) the Company’s right of subrogation includes the right of the Insured to
indemnities, guaranties, other policies or insurance, or bonds, notwithstanding any
terms or conditions contained in those instruments that address subrogation rights.
23
24
Id. at 5 (citing ECF No. 72-2 at 4-5).
25
Defendant Gonzales is presently the sole member of Commerce. ECF No. 90-1
26
(citing ECF No. 76, ¶ 4; ECF No. 82, ¶ 4). Commerce’s sole business was the development
27
of the Tuscany project. Id. at 5-6. (citing Gonzales Dep. 23:6-14, 25:7-16; 125:9-13). After
28
Commerce sold its stake in Tuscany to Greystone, Commerce distributed its remaining
8
1
assets. Id. at 6 (citing ECF No. 76, ¶ 19; ECF No. 82, ¶ 19). Commerce instructed First
2
American to wire the $9,248,734.07 it was to receive from Greystone through the close of
3
escrow to its attorney’s trust account. Id. Commerce’s counsel retained $30,734.07 for
4
legal fees. Id.
5
On December 24, 2012, Commerce’s counsel then distributed $5,500,000 of the
6
sales proceeds to a Florida-based escrow company, Capstone Title Partners. Id. The
7
purpose of this wire was to fund a settlement between Gonzales and a lender to exonerate
8
Gonzales from a $5.5 million personal guaranty of a loan which was unrelated to
9
Commerce. Id. at 6 (citing Gonzales Dep. 133:22-134:8, 136:12-138:7; Dep. Ex. 68)
10
(noting Dep. Ex. 68 is a settlement agreement and release between Gonzales and the lender
11
which made the loan guaranteed by Gonzales).
On January 22, 2013, Commerce’s counsel distributed $1,725,000 of the sales
12
13
proceeds to Bridge Financial, LLC. Id. (citing ECF No. 76, ¶ 19; ECF No. 82, ¶ 19).
14
On February 8, 2013, Commerce’s counsel wired $1,893,000 of the sales proceeds
15
to Woods & Associates Yacht Brokerage, Inc. Id. The wire to Woods & Associates Yacht
16
Brokerage, Inc. was not made by Commerce. Id. at 6 (citing Gonzales Dep. 122:7-123:5).
17
On March 11, 2013, Commerce’s counsel wired the last $100,000 of its assets to a
18
Merrill Lynch account owned and controlled by Defendant TG Investments, LLC. Id.
19
(citing ECF No. 76, ¶ 19; ECF No. 82, ¶ 19).
20
On January 9, 2013, the City contacted Commerce to inquire regarding the status
21
of the C-1 Impact Fee, as it could not find any evidence that the C-1 Impact Fee had been
22
paid. Id. (citing Jankowiak Dep. 31:8-12; Dep. Ex. 42). Commerce did not respond to the
23
City’s inquiry. Id. (citing Jankowiak Dep. 34:22-35:14; Dep. Ex. 43.) Commerce presently
24
has less than $934,000 in assets Id. (citing Commerce Response to Request for Admission
25
No. 5).
26
27
IV.
LEGAL STANDARD
28
Summary judgment is appropriate when the pleadings, depositions, answers to
9
1
interrogatories, and admissions on file, together with the affidavits, if any, show “that there is no
2
genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.”
3
Fed. R. Civ. P. 56(a); accord Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986). When considering
4
the propriety of summary judgment, the court views all facts and draws all inferences in the light
5
most favorable to the nonmoving party. Gonzalez v. City of Anaheim, 747 F.3d 789, 793 (9th Cir.
6
2014). If the movant has carried its burden, the non-moving party “must do more than simply show
7
that there is some metaphysical doubt as to the material facts.... Where the record taken as a whole
8
could not lead a rational trier of fact to find for the nonmoving party, there is no genuine issue for
9
trial.” Scott v. Harris, 550 U.S. 372, 380 (2007) (alteration in original) (internal quotation marks
10
omitted). It is improper for the Court to resolve genuine factual disputes or make credibility
11
determinations at the summary judgment stage. Zetwick v. Cty. of Yolo, 850 F.3d 436, 441 (9th
12
Cir. 2017) (citations omitted).
13
14
V.
DISCUSSION
15
Plaintiff moves for summary judgment on its breach of contract claim, and in the alternative
16
on a claim of unjust enrichment. While in the initial briefing the parties argued the issue as to
17
whether Plaintiff as insurer was the subrogee of the insured Greystone’s rights under the Purchase
18
Agreement, at the hearing in February, Defendants stated they were “not arguing there’s no
19
subrogation.” ECF No. 157 at 80. Therefore, in deciding the instant motion and for the duration of
20
this action, the Court considers Defendants’ prior argument withdrawn and assumes Plaintiff has
21
subrogated to non-party Greystone’s rights against Commerce. Further, the Court reiterates its
22
ruling from the bench at the February hearing that Plaintiff has failed to adequately plead a claim
23
for fraudulent transfer and therefore does not consider that argument as made in the original
24
briefing. Therefore, the instant discussion considers Plaintiff’s breach of contract and unjust
25
enrichment claims, as well as Plaintiff’s claim that Defendants Gonzales and TG Investments, LLC
26
are joint and severally liable for Commerce’s alleged debts pursuant to a theory of alter ego
27
liability.
28
10
1
A. Breach of Contract
2
Beginning with the breach of contract claim, Plaintiff asserts that Commerce violated the
3
terms of the Purchase Agreement by refusing to pay the C-1 Impact Fee, which was a debt arising
4
before the Close of Escrow. Defendants’ opposition focuses on the negotiations of the title
5
commitment insurance policy between Plaintiff and Greystone, and the Purchase Agreement
6
between Greystone and Defendant Commerce. Specifically, Defendants discuss testimony
7
illustrating that First American initially refused to remove Exception 37, an exception for the C-1
8
Impact Fee, but ultimately did so right before finalizing the insurance agreement because it
9
believed that the obligation was no longer valid/operative. Defendants also discuss testimony
10
showing a dispute as to whether Greystone requested, and Defendant Commerce refused, to
11
indemnify Greystone for any losses associated with Exception 37. Plaintiff does not dispute this
12
testimony but argues it is irrelevant to its breach of contract claim under a contract with a whole
13
agreement/integration clause, where the plain language obligates Commerce for a kind of debt that
14
would include the C-1 Agreement.
15
“Basic contract principles require, for an enforceable contract, an offer and acceptance,
16
meeting of the minds, and consideration.” May v. Anderson, 119 P.3d 1254, 1257 (Nev. 2005)
17
(citation omitted). Breach of contract is “a material failure of performance of a duty arising under
18
or imposed by agreement.” Bernard v. Rockhill Dev. Co., 734 P.2d 1238, 1240 (Nev. 1987)
19
(citation omitted) . A breach of contract claim under Nevada law requires (1) the existence of a
20
valid contract, (2) a breach by the defendant, and (3) damage as a result of the breach. Rivera v.
21
Peri & Sons Farms, Inc., 735 F.3d 892, 899 (9th Cir. 2013) (quoting Saini v. Int'l Game Tech., 434
22
F. Supp. 2d 913, 919–20 (D. Nev. 2006) (citing Richardson v. Jones, 1 Nev. 405, 409 (1865)).
23
Where “a written contract is clear and unambiguous on its face, extraneous evidence cannot be
24
introduced to explain its meaning. Extrinsic or parol evidence is not admissible to contradict or
25
vary the terms of an unambiguous written instrument, since all prior negotiations and agreements
26
are deemed to have been merged therein.” Klabacka v. Nelson, 394 P.3d 940, 949 (Nev. 2017)
27
(internal citations and quotation marks omitted).
28
11
1
Plaintiff argues that the plain language of section 8.09(b) of the Purchase Agreement,
2
making any “payment obligations” accruing prior to the Close of Escrow the “responsibility of
3
[Commerce],” which were to be “paid current at Closing by [Commerce],” meant that Commerce
4
was obliged to pay the C-1 Impact Fee, of which the City of Henderson demanded payment prior
5
to granting additional construction permits to Greystone. Pursuant to the C-1 agreement, payment
6
was due in two installments in 2005. Therefore, the agreement was breached at closing of the sale
7
of Tuscany from Commerce to Greystone and remained breached when the City withheld the
8
permits pending payment, and Commerce ignored Greystone’s demand to pay the fee.
9
Defendants make several arguments in opposition. In the original briefing, Defendants
10
argued that the C-1 Impact Fee does not fall within the scope of section 8.09(b), as “impact fees”
11
are nowhere mentioned in the section, and that “other payment obligations” should not be
12
construed to include the fee. Defendants contest the relevance of the testimony of Stephen Rice
13
(Defendant Commerce’s counsel for the Purchase Agreement), admitting that Commerce was
14
obligated to pay the C-1 Impact Fee through an agreement made prior to the sale, reciting
15
testimony in which he argues that section 8.09 is titled, “Costs and Prorations,” and 8.09(b) is titled
16
“Taxes and Assessments,” and that an “impact fee” owed to the City would not fall within these
17
categories. Moreover, because of the request and refusal regarding the indemnity mentioned supra,
18
Defendant Commerce did not intend to obligate itself to pay the Impact Fee.
19
The Court finds that any obligation to pay the C-1 impact fee—arguments as to
20
Defendants’ assertion that the non-existence or expiration of the obligation will be addressed
21
infra—falls squarely within the plain language of section 8.09(b). In light of the plain language of
22
the section which defines its terms in detail, the section titles cannot be used to argue that the C-1
23
Impact Fee falls outside the provision’s scope. Indeed, the section includes language cautioning
24
against such an interpretive approach; it states that the section “shall be interpreted broadly toward
25
the end that any taxes, assessments, bond obligations, or other payment obligations accruing prior
26
to the Close of Escrow,” are the responsibility of the buyer to be paid prior to closing. ECF No.
27
90-8 at 11. The unambiguous intent is to require that any debts owed and attached to the property
28
that accrued prior to the sale, were to be paid by Commerce. Moreover, the section explicitly
12
1
references SIDs and LIDs, analogous obligations whereby a developer is obligated to pay for
2
infrastructure improvements made by the city. In light of the lack of ambiguity in the section, the
3
parol evidence rule bars consideration of the context of negotiation, including any offer or refusal
4
regarding an indemnity agreement. Klabacka v. Nelson, 394 P.3d at 949. The Court therefore
5
finds that Defendants’ reliance in opposition on facts surrounding the negotiation of the Purchase
6
Agreement and the title insurance policy is not only inapposite, but that those facts are barred from
7
consideration as extraneous evidence, given the “clear and unambiguous” terms of section 8.09(b).
8
Regarding whether the obligation to pay the C-1 Impact Fee remained, Defendants argue
9
that the Impact Fee was unenforceable because of the contract statute of limitations, and therefore
10
does not fall within section 8.09(b).
11
The statute of limitations for an action upon a contract is six years. NRS 11.190(1)(b). “The
12
defense of limitations, as we all know, is one which it is the privilege of the debtor to make or not,
13
as he pleases. The law does not make it for him, nor does the law pronounce any debt extinguished
14
by virtue, merely, of the lapse of the statutory period. The debt continues the same, and may be
15
collected or reduced to judgment, unless the defense of the statute of limitations be interposed.”
16
Blair v. Silver Peak Mines, 84 F. 737 (Circuit Court, D. Nev. 1898).
17
Defendants argue that the six-year statute of limitations began to run when the payment
18
was owed, in two payments due on May 31, and November 30, 2005. Therefore, after November
19
29, 2011, the City’s cause of action against Commerce for nonpayment was barred. Plaintiffs note
20
that the Court, in denying Defendant’s Motion to Dismiss, already raised the possibility that the
21
obligation might, like a lien, run with the land, or could otherwise exist, or be enforced, outside of
22
the contract action that might bar enforcement in a contract cause of action in a court. Plaintiff
23
notes that it is undisputed that the City of Henderson did in fact seek to enforce the obligation, by
24
requiring payment of the fee prior to issuing Greystone building permits to complete the project.
25
The underlying agreement between Commerce and the City of Henderson made clear that
26
the C-1 Impact Fee was meant to offset the impact of the development on water draining. See ECF
27
No. 90-10 at 6 (discussing in section 3.1 of the agreement the impact of water drainage from the
28
Tuscany on the Las Vegas Wash and describing the sum of $934,000 as an “appropriate
13
1
contribution” to offset this effect). Moreover, the agreement conditioned the completion of
2
construction on “the approval of the Phase 3 Plans by the City of Henderson and the payment by
3
Commerce of fees and placement of bonds.” Id. at 6. While the amount of the fee may have been
4
determined by the contract between Commerce and the City, the authority to impose and enforce
5
the fee for development did not derive from the contract. Rather, the City has the regulatory
6
authority as a municipality to impose such obligations consistent with the development of land
7
within its jurisdiction. See generally, Lucas v. S.C. Coastal Council, 505 U.S. 1003, 1027 (1992)
8
(Recognizing the state’s authority to impose regulations with respect to property and commercial
9
dealings). Such authority is not subject to a statute of limitations on a contract claim as it does not
10
arise from a contract but from the traditional regulatory power of the municipality. Id. Defendants’
11
focus on the statute of limitations related to a contract action is misplaced and irrelevant. The City
12
maintained that an obligation existed associated with the land and had the authority to impose and
13
enforce such an obligation. It was therefore an obligation that Commerce was bound to pay
14
pursuant to section 8.09(b).
15
Defendants also argue that “the evidence shows that the risk of loss associated with
16
nonpayment of the impact fee should be allocated to Greystone or First American. Defendants
17
argue that the evidence regarding the last-day removal of the C-1 Impact Fee exception from the
18
title insurance contract, and the offer and decline for indemnity for the fee, may be considered with
19
reference to section 7.01 of the Purchase Agreement, “Conditions for the Benefit of the Buyer”
20
(cited in section III, supra).
21
Defendants assert that the feasibility review implies that where there is evidence of
22
knowledge of and failure to explicitly contract to indemnify an obligation, the Buyer has “assumed
23
the risk,” which somehow negates Plaintiff’s claim. Conversely, Plaintiff relies on the explicit
24
language of section 8.09(b), which makes clear that any prior-accrued obligation “shall survive
25
Close of Escrow for all purposes.” The Court does not find that section 7.01 was intended to
26
supplant any obligation to pay arising under section 8.09(b). Rather, section 7.01 serves as an
27
added opportunity for the Buyer to be able to review all of the documents and details of the
28
agreement and decide to withdraw from the agreement. As such, section 7.01, clearly intended to
14
1
provide for a probationary period and a mechanism for the Buyer to withdraw, does not affect the
2
debt or override the clear intention of section 8.09(b) that Seller retains the responsibility for all
3
prior-accrued debts, even after the Close of Escrow. The Court is not persuaded by Defendants’
4
argument in their supplemental brief that such a plain reading of section 8.09(b) “renders nugatory
5
the Initial Feasibility Review and the approval or waiver of title matters provisions found in §6.01
6
and §7.01.” ECF No. 160 at 10. Indeed, the opposite is true; the Defendants’ proffered
7
interpretation would render nugatory section 8.09(b). Nor, as discussed supra, does the Court find
8
persuasive Defendants’ contention that “other payment obligations accruing prior to the Close of
9
Escrow” must be limited to “those items that may be similar in nature to taxes, assessments and
10
bond obligations” merely because the provision is entitled “Property Taxes and Assessments.” Id.
11
at 11.
12
The Court therefore finds that there is no genuine dispute of material fact that Commerce
13
violated section 8.09(b) of the Purchase Agreement by failing to pay the C-1 Impact Fee, which
14
constituted a “payment obligation[] accruing prior to the Close of Escrow,” and therefore that
15
summary judgment is warranted on Plaintiff’s breach of contract claim. The Court therefore grants
16
Plaintiff’s summary judgment motion with respect to its breach of contract claim.
17
Furthermore, as an action based on a theory of unjust enrichment is not available when
18
there is an express, written contract, because no agreement can be implied when there is express
19
agreement, Leasepartners Corp. v. Robert L. Brooks Trust Dated Nov. 12, 1975, 942 P.2d 182,
20
187 (Nev. 1997), the Court denies the motion without prejudice as to Plaintiff’s alternative unjust
21
enrichment claim.
22
Regarding the amount of damages, while Plaintiff asserted in the original motion that the
23
Collateral Source Rule permitted Plaintiff to recover $934,000, the amount of the C-1 Impact Fee
24
originally owed by Commerce to the City pursuant to the prior agreement (rather than the $300,000
25
actually paid by Plaintiff to satisfy this obligation), in its supplemental brief, Plaintiff waives this
26
argument and seeks only $300,000, subject to its right to bring a motion for contractual attorneys’
27
fees and related expenses. ECF No. 159 at 6. The Court is not persuaded by Defendants’ argument
28
that Plaintiff failed to mitigate damages because the negotiation with the City of Henderson
15
1
permitted Greystone to either pay a one-time lump sum payment of $300,000, or $341,000 at the
2
rate of $1,000 per residence at closing, effectively passing off the cost to each home buyer. This
3
argument is inapposite, since First American was obligated pursuant to its insurance contract with
4
Greystone to pay the impact fee. That it chose to pay $300,000 instead of $341,000 is evidently
5
fatal to Defendants’ contention that Plaintiff did not mitigate its damages.
6
7
B. Alter Ego Liability
8
The remaining issue concerns liability for Plaintiff’s damages incurred as a consequence
9
of Commerce’s breach. Plaintiff seeks summary judgment as to its alter-ego liability claim against
10
Defendants TG Investments, LLC and Gonzalez.
11
“Nevada has long recognized that although corporations are generally to be treated as
12
separate legal entities, the equitable remedy of ‘piercing the corporate veil’ may be available to a
13
plaintiff in circumstances where it appears that the corporation is acting as the alter ego of a
14
controlling individual.” LFC Marketing Group, Inc. v. Loomis, 8 P.3d 841, 845 (Nev. 2000)
15
(citation omitted). “Indeed, the ‘essence’ of the alter ego doctrine is to ‘do justice’ whenever it
16
appears that the protections provided by the corporate form are being abused.” Id. at 845-46
17
(citation omitted).
18
The Supreme Court of Nevada has outlined the contours of alter ego liability:
19
20
21
22
23
The elements for finding an alter ego, which must be established by a
preponderance of the evidence are: (1) the corporation must be influenced and
governed by the person asserted to be the alter ego; (2) there must be such unity of
interest and ownership that one is inseparable from the other; and (3) the facts must
be such that adherence to the corporate fiction of a separate entity would, under the
circumstances, sanction [a] fraud or promote injustice.
24
25
Id. at 846-47 (citations and internal quotations omitted).
26
“Further, the following factors, though not conclusive, may indicate the existence of an
27
alter ego relationship: (1) commingling of funds; (2) undercapitalization; (3) unauthorized
28
diversion of funds; (4) treatment of corporate assets as the individual's own; and (5) failure to
16
1
observe corporate formalities.” Id. at 847 (citations omitted). The Supreme Court of Nevada has
2
“emphasized, however, that [t]here is no litmus test for determining when the corporate fiction
3
should be disregarded; the result depends on the circumstances of each case.” Id. (citations and
4
internal quotations omitted).
5
Plaintiff argues the undisputed facts as to events occurring after the sale of Tuscany by
6
Commerce to Greystone establish alter ego liability. Defendants do not contest the asserted facts
7
as to the wire transfers but argue that “disbursements to the owners of a business” do not establish
8
alter ego liability. Defendants argue that Gonzalez invested at least $60 million into the project
9
and had a “right” to recoup some of that investment back. Defendants further argue that Gonzalez
10
never had a managerial role in Commerce; and that the managers of Commerce, not Gonzalez,
11
signed the C-1 Channel Phase 3 Agreement.
12
The Court finds that there is a genuine dispute of material fact as to alter ego liability.
13
These facts show numerous transfers personally benefiting Gonzalez, the sole member of
14
Commerce, in the months following the sale, in spite of a potential debt of which all Defendants
15
would have been aware. However, these facts are not inconsistent with the winding down of a
16
closely held corporation that no longer has a productive purpose. Therefore, the Court will deny
17
summary judgment as to alter ego liability for Gonzalez and TG Investments, LLC and schedule
18
an evidentiary hearing to determine whether they may be held joint and severally liable for
19
Commerce’s breach.
20
...
21
...
22
...
23
24
25
26
27
28
17
1
VI.
CONCLUSION
2
IT IS THEREFORE ORDERED that summary judgment in favor of Plaintiff on its
3
breach of contract claim is GRANTED as discussed in this order. Summary judgment is DENIED
4
without prejudice as to Plaintiff’s unjust enrichment claim.
5
IT IS FURTHER ORDERED that the Court will hold an evidentiary hearing to determine
6
alter ego liability for Defendants Gonzales and TG Investments, LLC, to be scheduled at the status
7
hearing in this action on July 14, 2020 at 11:00 AM.
8
9
DATED: June 8, 2020.
10
__________________________________
RICHARD F. BOULWARE, II
UNITED STATES DISTRICT JUDGE
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
18
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?