Kreiser et al v. VS2R Engineering, Inc. et al

Filing 106

ORDER that Kiewit's motion for summary judgement (ECF No. 89 ) is granted. Plaintiffs and K&B must submit their joint pretrial order by April 30, 2020. Signed by Chief Judge Miranda M. Du on 4/7/2020. (Copies have been distributed pursuant to the NEF - LW)

Download PDF
1 2 3 UNITED STATES DISTRICT COURT 4 DISTRICT OF NEVADA 5 *** 6 CHAD KREISER, et al., 7 Plaintiffs, ORDER 8 9 10 Case No. 2:16-cv-01361-MMD-CWH v. K&B STEEL, A DIVISION OF WABB INDUSTRIES, INC., ON BEHALF OF WABB INDUSTRIES, INC, et al., 11 Defendants. 12 13 I. SUMMARY 14 Plaintiff Chad Kreiser was injured on the job when a ladder he was climbing down 15 to inspect a water pipeline broke away from the wall. Before the Court is Defendant Kiewit 16 Infrastructure West Company’s (“Kiewit”) motion for summary judgment on Plaintiffs’1 17 claims against it arising from Mr. Kreiser’s injuries (the “Motion”). (ECF No. 89.) Despite 18 being granted two extensions of time (ECF Nos. 97, 105), Plaintiffs never responded to 19 the Motion.2 As explained below, the Court will grant Kiewit’s Motion. More specifically, 20 the Court will grant Kiewit’s motion on the alternative bases that Plaintiffs’ claims against 21 Kiewit fall outside the limitations period created by the applicable Nevada statute of 22 repose, and because Plaintiffs did not file the affidavit required by NRS § 11.258 23 concurrently with their Complaint. The Court will then direct Plaintiffs and K&B to submit 24 their joint pretrial order so this case may proceed to trial. 25 26 27 28 1Mr. Kreiser’s wife, Christina Lou Kreiser, is also a named plaintiff in this case—on a loss of consortium theory. (ECF No. 41 at 8-9.) 2Neither did the other Defendant in the case, K&B Steel. a Division of Wabb Industries, Inc., on behalf of Wabb Industries, Inc. (“K&B”). 1 II. BACKGROUND 2 The facts recited in this paragraph are mostly taken from the First Amended 3 Complaint (“FAC”), and are undisputed, unless otherwise noted. (ECF No. 41.) Mr. Kreiser 4 was employed by the Las Vegas Valley Water District to perform maintenance on an 5 underground water pipeline. (Id. at 3.) To access the pipeline, he would have to climb 6 down ladders, under manhole covers, into vaults. On December 31, 2013, he was climbing 7 down a ladder to inspect a component of the pipeline when the ladder suddenly pulled 8 away from the wall—causing him to swing to the left, striking his head, neck, and back 9 (the “Accident”). (Id.) Mr. Kreiser was injured. (Id. at 6.) 10 As relevant to the Motion, Kiewit allegedly “engineered, designed, and constructed 11 the subject vault and fixed, repaired, maintained, modified and/or serviced the subject 12 ladder.” (Id. at 4.) Said otherwise, Plaintiffs’ case involves nonresidential construction, and 13 Plaintiffs’ claims against Kiewit implicate Kiewit’s professional engineering. (Id. at 2-4; see 14 also ECF No. 89 at 46-51 (Kiewit’s Nevada engineering licenses).) Plaintiffs filed their 15 original state-court complaint in this case on December 15, 2015. (ECF No. 89 at 33-44.) 16 No expert reports or affidavits were filed with Plaintiffs’ original complaint. (Id.) Similarly, 17 no expert reports or affidavits were filed with Plaintiffs’ operative FAC. (ECF No. 41.) 18 Kiewit completed the project that included the vault where Mr. Kreiser was injured 19 on October 14, 1998. (ECF No. 89 at 4, 17, 19.) Kiewit has since not been involved with 20 the project, including the vault where Mr. Kreiser was injured. (Id. at 5, 19.) 21 III. LEGAL STANDARD 22 “The purpose of summary judgment is to avoid unnecessary trials when there is no 23 dispute as to the facts before the court.” Nw. Motorcycle Ass’n v. U.S. Dep’t of Agric., 18 24 F.3d 1468, 1471 (9th Cir. 1994). Summary judgment is appropriate when the pleadings, 25 the discovery and disclosure materials on file, and any affidavits “show there is no genuine 26 issue as to any material fact and that the movant is entitled to judgment as a matter of 27 law.” Celotex Corp. v. Catrett, 477 U.S. 317, 330 (1986). An issue is “genuine” if there is 28 2 1 a sufficient evidentiary basis on which a reasonable fact-finder could find for the 2 nonmoving party, and a dispute is “material” if it could affect the outcome of the suit under 3 the governing law. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248-49 (1986). Where 4 reasonable minds could differ on the material facts at issue, however, summary judgment 5 is not appropriate. See id. at 250-51. “The amount of evidence necessary to raise a 6 genuine issue of material fact is enough ‘to require a jury or judge to resolve the parties’ 7 differing versions of the truth at trial.’” Aydin Corp. v. Loral Corp., 718 F.2d 897, 902 (9th 8 Cir. 1983) (quoting First Nat’l Bank v. Cities Service Co., 391 U.S. 253, 288-89 (1968)). In 9 evaluating a summary judgment motion, a court views all facts and draws all inferences in 10 the light most favorable to the nonmoving party. See Kaiser Cement Corp. v. Fishbach & 11 Moore, Inc., 793 F.2d 1100, 1103 (9th Cir. 1986). 12 The moving party bears the burden of showing that there are no genuine issues of 13 material fact. See Zoslaw v. MCA Distrib. Corp., 693 F.2d 870, 883 (9th Cir. 1982). Once 14 the moving party satisfies Rule 56’s requirements, the burden shifts to the party resisting 15 the motion to “set forth specific facts showing that there is a genuine issue for trial.” 16 Anderson, 477 U.S. at 256. The nonmoving party “may not rely on denials in the pleadings 17 but must produce specific evidence, through affidavits or admissible discovery material, to 18 show that the dispute exists,” Bhan v. NME Hosps., Inc., 929 F.2d 1404, 1409 (9th Cir. 19 1991), and “must do more than simply show that there is some metaphysical doubt as to 20 the material facts.” Orr v. Bank of Am., 285 F.3d 764, 783 (9th Cir. 2002) (quoting 21 Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586 (1986)). “The mere 22 existence of a scintilla of evidence in support of the plaintiff's position will be insufficient.” 23 Anderson, 477 U.S. at 252. 24 IV. DISCUSSION 25 Kiewit makes several arguments in its Motion, but the Court will only address the 26 first two because the Court finds Kiewit is entitled to summary judgment based on either 27 28 3 1 argument. The Court first addresses Kiewit’s Motion, below, and then discusses the next 2 steps in this case for Plaintiffs and K&B. Kiewit’s Motion 3 A. 4 Kiewit first argues that applicable statute of repose bars Plaintiffs’ claims. (ECF No. 5 89 at 8-9.) The Court agrees.3 The applicable statute of repose in effect at the time of the 6 Accident provided that claims could be brought no later than 12 years from substantial 7 completion of a project, subject to some exceptions that do not apply here. See NRS § 8 11.203(2), repealed by laws 2015, c. 2, § 22, eff. Feb. 24, 2015. Kiewit completed the 9 project that included the vault where Mr. Kreiser was injured on October 14, 1998. (ECF 10 No. 89 at 4, 17, 19.) Kiewit has since not been involved with the project, including the vault 11 where Mr. Kreiser was injured. (Id. at 5, 19.) Plaintiffs filed their original state-court 12 complaint in this case on December 15, 2015. (Id. at 33-44.) Thus, more than 17 years 13 elapsed between the time Kiewit completed the project and Plaintiffs filed suit. Plaintiffs’ 14 claims against Kiewit are therefore barred by the applicable statute of repose, NRS § 15 11.203(2), repealed by laws 2015, c. 2, § 22, eff. Feb. 24, 2015. 16 Kiewit next argues Plaintiffs’ claims against it are barred because Plaintiffs did not 17 attach the affidavit required by NRS § 11.258(1) to their original complaint or FAC. (ECF 18 No. 89 at 9-12.) The Court again agrees with Kiewit. Plaintiffs’ case involves nonresidential 19 construction, and Plaintiffs’ claims against Kiewit implicate Kiewit’s professional 20 engineering. (ECF No. 41 at 2-4; see also ECF No. 89 at 46-51 (Kiewit’s Nevada 21 engineering licenses).) Plaintiffs were thus required to submit an affidavit reflecting that 22 their attorney had solicited the opinion of an engineering expert. See NRS § 11.258(1). 23 No expert reports or affidavits were filed with Plaintiffs’ original complaint. (ECF No. 89 at 24 33-44.) Similarly, no expert reports or affidavits were filed with Plaintiffs’ operative FAC. 25 26 27 28 3The Court notes, as Kiewit does in its Motion (ECF No. 89 at 8), that the Court rejected Kiewit’s statute of repose argument in an order on an earlier motion to dismiss (ECF No. 66 at 8-10). However, as explained infra, the Court finds Kiewit has now supported this argument with sufficient evidence, and the Court can consider this evidence at this stage, while it was reluctant to do so at the motion to dismiss stage. (Id. at 9-10.) 4 1 (ECF No. 41.) For this additional, alternative reason, Plaintiffs’ claims against Kiewit are 2 barred. See NRS § 11.259(1)(a) (providing that the “court shall dismiss an action” under 3 these circumstances when the party fails to attach the required affidavit to their complaint); 4 see also In re CityCenter Constr. & Lien Master Litig., 310 P.3d 574, 581 (Nev. 2013) (“the 5 district court must dismiss [parties’] amended pleadings that pertain to [another party] 6 because their initial pleadings against [that party] were void ab initio and of no legal effect 7 for the lack of the attorney affidavit and expert report required by NRS 11.258.”). In sum, the Court finds Kiewit is entitled to summary judgment on all of Plaintiffs’ 8 9 claims against it. 10 B. 11 Because the Court will grant Kiewit’s Motion, Kiewit is no longer a party to this case. 12 That leaves only Plaintiffs and K&B. (ECF No. 41 (naming K&B as a Defendant).) The 13 parties were supposed to file their joint pretrial order by tomorrow, April 8, 2020. (ECF No. 14 95.) However, Plaintiffs and K&B do not appear to have taken any action in this case since 15 December 2019. (ECF No. 105.) Moreover, the Court’s grant of summary judgment to 16 Kiewit may change the content of the joint pretrial order. The Court will therefore give 17 Plaintiffs and K&B until April 30, 2020 to file their joint pretrial order. 18 V. Next Steps CONCLUSION 19 The Court notes that the parties made several arguments and cited to several cases 20 not discussed above. The Court has reviewed these arguments and cases and determines 21 that they do not warrant discussion as they do not affect the outcome of Kewit’s Motion. It is therefore ordered that Kiewit’s motion for summary judgement (ECF No. 89) is 22 23 granted. Kiewit is entitled to summary judgment on all of Plaintiffs’ claims against it. 24 /// 25 /// 26 /// 27 /// 28 5 1 2 3 It is further ordered that Plaintiffs and K&B must submit their joint pretrial order by April 30, 2020. DATED THIS 7th day of April 2020. 4 5 6 MIRANDA M. DU CHIEF UNITED STATES DISTRICT JUDGE 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 6

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?