ORDERED that the State Engineer's # 3 Motion to Dismiss is GRANTED in part as to Plaintiff's eighth cause of action, but STAYED as to the remaining claims pending the outcome of the petition for judicial review filed in state court. Signed by Chief Judge Robert C. Jones on 7/26/2011. (Copies have been distributed pursuant to the NEF - DRM)

Download PDF
1 2 3 4 5 6 UNITED STATES DISTRICT COURT 7 DISTRICT OF NEVADA 8 9 10 11 12 13 14 15 16 17 18 SIERRA NEVADA SW ENTERPRISES, LTD., a Nevada limited company, ) ) ) Plaintiff, ) ) v. ) ) ) JASON KING, P.E., individually and in his ) official capacity as the NEVADA STATE ) ENGINEER, ) ) Defendants. ) ) ___________________________________ ) 3:10-cv-579-RCJ-RAM ORDER Currently before the Court is Defendant Jason King, P.E.’s (“Defendant” or “State Engineer”) Motion to Dismiss (#3). The Court heard oral argument on July 19, 2011. BACKGROUND 19 In September 2010, Plaintiff filed a complaint in this Court against Defendant, in both 20 his official and individual capacities. (Compl. (#1) at 1-2). Plaintiff alleged that it was bringing 21 the case pursuant to 42 U.S.C. § 1983. (Id. at 2). 22 The complaint alleged the following. (Id.). Plaintiff owned 309.28 acres of land in 23 Douglas County and 1,237.12 acre feet of groundwater appurtenant to that land. (Id. at 4). 24 On June 30, 2009, Plaintiff filed an application with the State Engineer for change of place and 25 use and point of diversion with respect to that land and water rights. (Id.). On February 24, 26 2010, Plaintiff filed a second application with respect to the same land and water rights to 27 change the manner of use from irrigation and domestic purposes to quasi municipal and 28 domestic purposes. (Id. at 4-5). On September 10, 2010, the State Engineer approved the application to change the place and use and point of diversion with the condition that the water 1 be used only to irrigate lands already benefitted by surface-water rights. (Id. at 2, 5). On 2 September 16, 2010, the State Engineer denied the application for a change in the manner 3 of use to quasi-municipal and domestic purposes. (Id.). The State Engineer based its 4 decisions on the “long-standing policy that supplemental water rights [were] not allowed to be 5 stripped and stand alone independently from the surface-water right and be considered a 6 stand-alone water right for any duty, much less the full duty.” (Id. at 5). The State Engineer’s 7 decision resulted in Plaintiff losing “property interest in approximately 1,237 acre feet of 8 groundwater worth $10,000.00 per acre foot for a total of $12,370,000.00” because the 9 decision extinguished Plaintiff’s groundwater rights because it already had conveyed its 10 appurtenant surface water rights to others on July 17, 2008. (Id. at 3,6). 11 Plaintiff alleged that the groundwater at issue had been acquired by an application filed 12 with the State Engineer by Stoddard and Jewel Jacobsen (“Jacobsen”) on July 5, 1960. (Id. 13 at 5). Plaintiff was the successor in interest to Jacobsen with respect to the land, groundwater, 14 and surface water rights. 15 ownership of the groundwater right as “supplemental” in the Certificate of Appropriation of 16 Water. 17 groundwater “to supplement the natural river flow to irrigate these lands, under the Carson 18 River Decree.” (Id.). In 1960, the State Engineer did not engage in rulemaking pursuant to 19 NRS Chapters 532, 533, or 534 to establish the meaning of the word “supplement” or 20 “supplemental” and did not establish that water from an underground source could only be 21 used in any given year if the appropriator had exhausted its surface water rights in that year. 22 (Id. at 10). The 1960 Certificate of Appropriation for the groundwater obtained by Jacobsen 23 did not state that the water was “supplemental.” (Id.). (Id.). (Id.).1 The State Engineer did not characterize Jacobsen’s Jacobsen’s application stated that he planned to use the appropriated 24 Plaintiff alleged that, at some time between issuing the certificate to Jacobsen and the 25 present, the State Engineer, without engaging in the rulemaking process or notice and an 26 27 28 1 Jacobsen conveyed the land, groundwater, and surface water rights to Rivertree Ranch, LLC on January 15, 1999. (Compl. (#1) at 5). Rivertree Ranch conveyed the land, groundwater, and surface rights to Plaintiff on July 20, 2004. (Id. at 6). 2 1 opportunity to be heard, made a de facto determination that all groundwater rights which 2 coexisted with surface water rights could not be used until the surface water rights were 3 exhausted in any given year. (Id.). The State Engineer ascribed a legal meaning to the word 4 “supplemental” to all groundwater rights such that supplemental groundwater rights could only 5 be used in conjunction with surface water rights and only after the surface water rights had 6 been exhausted in any given year. (Id. at 11). As a consequence of the rulemaking, “if a 7 holder of both the surface water rights and groundwater rights divest[ed] itself of its surface 8 water rights, the groundwater rights [were] extinguished.” (Id.). Because the office of the 9 State Engineer was exempt from Nevada’s Administrative Procedure Act, pursuant to NRS § 10 233B.039(1)(j), the State Engineer’s power to make rules was not constrained by any statute 11 or regulation requiring that such rulemaking comply with due process of law. (Id. at 12). The 12 State Engineer had unfettered discretion to make and enforce rules as a lack of rulemaking 13 procedures for the State Engineer. (Id.). 14 Plaintiff alleged eight causes of action. (Id. at 12-17). In the first cause of action, 15 Plaintiff alleged a Fifth and Fourteenth Amendment procedural due process violation. (Id.). 16 Specifically, Plaintiff alleged that the State Engineer acted under color of law and denied 17 Plaintiff its right to procedural due process because he afforded “Plaintiff no meaningful 18 opportunity to be heard with respect to the decision to deem groundwater supplemental” 19 thereby denying Plaintiff its right to use or alienate its groundwater rights. (Id.). Plaintiff 20 sought damages to be proven at trial. (Id. at 13). 21 In the second cause of action, Plaintiff alleged a Fifth and Fourteenth Amendment 22 substantive due process violation. (Id.). Specifically, Plaintiff asserted that the State 23 Engineer’s conduct was “so outrageously arbitrary as to constitute a gross abuse of 24 governmental authority” and that such “malicious, irrational, and plainly arbitrary action” was 25 not within “the legitimate purview of police power vested” in the State Engineer. (Id.). Plaintiff 26 alleged that the State Engineer had a “custom and/or policy of violating the substantive due 27 process rights of appropriators of groundwater” as demonstrated by his arbitrary and 28 capricious actions with respect to Plaintiff. (Id.). 3 1 In the third cause of action, Plaintiff alleged a violation of substantive due process. (Id. 2 at 14). Specifically, Plaintiff alleged that the State Engineer had and continues to violate its 3 substantive due process rights because the State Engineer failed to enact regulations affecting 4 Nevada’s groundwater rights. (Id.). Plaintiff asserted that the State Engineer was arbitrarily 5 denying it the use of appropriated groundwater rights by the arbitrary and capricious use of 6 government authority and the unfettered discretion granted to him by the Nevada statutes. 7 (Id.). Plaintiff alleged that the Nevada statutes were facially unconstitutional as applied to 8 Plaintiff and those similarly situated. (Id.). 9 In the fourth cause of action, Plaintiff alleged a violation of substantive due process. 10 (Id.). Specifically, Plaintiff asserted that the State Engineer deprived Plaintiff of its statutorily 11 perfected right by failing and refusing to honor the prior approval of Plaintiff’s “non- 12 supplemental” groundwater rights. (Id.). 13 In the fifth cause of action, Plaintiff alleged a Fourteenth Amendment equal protection 14 violation. (Id. at 15). Specifically, Plaintiff alleged that the State Engineer deprived it of its 15 right to equal protection by denying Plaintiff its appropriated groundwater rights while 16 approving other applications for non-supplemental appropriations of groundwater under 17 substantially similar circumstances without a rational basis for treating Plaintiff differently. (Id.). 18 In the sixth cause of action, Plaintiff sought declaratory and injunctive relief. (Id.). 19 Specifically, Plaintiff sought a declaration that NRS Chapters 532, 533, 534 were 20 unconstitutional on their face because they granted the State Engineer unfettered discretion 21 to make regulations and enact policies in the absence of any criteria to properly enact those 22 regulations. (Id. at 15-16). Plaintiff also argued that the statutes were unconstitutional as 23 applied to Plaintiff because they denied Plaintiff due process and equal protection. (Id. at 16). 24 Plaintiff sought an injunction barring the State Engineer from deeming groundwater rights in 25 Nevada “supplemental” such that they could not be used in the absence of surface water 26 rights. (Id.). 27 In the seventh cause of action, Plaintiff sought declaratory and injunctive relief. (Id.). 28 Specifically, Plaintiff sought an order enjoining the State Engineer from denying the validity of 4 1 the 1960s Certificate of Appropriation for “non-supplemental” groundwater. (Id. at 16-17). 2 Plaintiff argued that when the State Engineer issued a Certificate of Appropriation of Water 3 from an underground source to Jacobsen on February 1966, the appropriation was not 4 “supplemental” to a surface water right and the use was not constrained by the presence of 5 surface water. (Id. at 16). 6 In the eighth cause of action, Plaintiff alleged a Fifth Amendment takings violation. (Id. 7 at 17). Specifically, Plaintiff alleged that it had a property interest in the groundwater subject 8 to the Certificate of Appropriation and that the State Engineer could not take its certified 9 appropriation of water without just compensation. (Id.). Plaintiff alleged that it suffered 10 damages in an amount that would be proven at trial. (Id.). For all causes of action, Plaintiff 11 sought attorneys’ fees and costs pursuant to 42 U.S.C. § 1988. (Id. at 12-17). 12 The State Engineer attached several exhibits to its motion to dismiss and reply to 13 motion to dismiss, including Jacobsen’s amended 1960 application to appropriate public 14 waters, the 1960 Certificate of Appropriation of Water, the State Engineer’s Ruling #6053, and 15 the State Engineer’s Ruling #5829. (See Mot. to Dismiss (#3) at 29-32; Reply to Mot. to 16 Dismiss (#13) at 19-31). The amended application for permit to appropriate the public waters 17 of the State of Nevada filed by Jacobsen stated the following. (Mot. to Dismiss (#3) at 29). 18 Jacobsen had filed the original application on July 5, 1960 with the State Engineer’s office and 19 the corrected application on August 5, 1960. (Id.). The source of the proposed appropriation 20 was an underground source to be used to irrigate 370 acres and for domestic purposes. (Id.). 21 The water was going to be “used to supplement the natural river flow to irrigate [the] lands 22 under the Carson River Decree.” (Id. at 30). The amount of water to be appropriated was 23 limited to a yearly duty of 4.0 acre-feet per acre of land irrigated from all sources. (Id.). The 24 State retained the right to regulate the use of the water herein granted at any and all times. 25 (Id.). 26 The Certificate of Appropriation of Water, recorded in February 1966, and signed by 27 the State Engineer stated the following. (Id. at 32). Jacobsen had the right to water from an 28 underground source at a specified point of diversion for irrigation and domestic purposes. 5 1 (Id.). The total duty for water under the land under the certificate could not exceed 4.0 acre- 2 feet per acre annually from all sources. (Id.). The appropriation could not exceed 1,478.64 3 acre-feet. (Id.). The certificate referenced the application number. (Id.). 4 State Engineer Ruling #6053, dated September 16, 2010, stated the following in 5 response to Plaintiff’s application filed on February 24, 2010. (Reply to Mot. to Dismiss (#13) 6 at 19, 24). The State Engineer determined that a hearing was not required given the 7 information before him. (Id. at 20). Plaintiff sought to change the existing manner of use for 8 the groundwater from irrigation and domestic purposes to quasi-municipal and domestic 9 purposes. (Id. at 19). The Gardnerville Town Water Company protested the application on 10 grounds that, inter alia, a change in the manner of use from supplemental ground water rights 11 to quasi-municipal and domestic would set a precedent toward other supplemental ground 12 water rights that existed throughout the Carson Valley. (Id. at 19-20). The original application 13 specified that Jacobsen was “filing for a supplemental water right” and the permit issued 14 reflected the supplemental nature of the water right granted by the language that the amount 15 of water to be appropriated was limited to “a yearly duty of 4.0 acre-feet per acre of land 16 irrigated from all sources.” (Id. at 20). The original application specified that “this water [was] 17 supplemental to decreed water from the Carson River.” (Id. at 20-21). The State Engineer 18 found that while the certificate reflected a full 4.0 acre-feet per acre total annual duty of 19 1,478.64, it also very clearly indicated that it was a supplemental water source. (Id. at 21). 20 “Supplemental irrigation water rights [were] rights that ha[d] a place of use appurtenant to the 21 same place of use as an existing water right and [were] only available for use when the 22 underlying base water right [was] inadequate to meet irrigation demands.” (Id.). 23 The ruling further stated the following. The State Engineer previously addressed the 24 nature of supplemental water rights in State Engineer Ruling #5823, dated March 18, 2008. 25 (Id.). In that ruling, the State Engineer addressed protest issues that “asserted that a 26 supplemental groundwater right to Carson river surface-water rights should not be allowed to 27 be stripped and become a stand-alone right and also that if the water sought to be changed 28 [was] supplemental to a surface-water right, granting the application would in effect amount 6 1 to granting a new water right in an over-appropriated basin thereby conflicting with existing 2 rights.” (Id.). In that ruling, the State Engineer found that the protest claim warranted the 3 consideration of the actual use of the water in relation to the actual amount of water committed 4 for use in the groundwater basin, reflecting “the long-standing policy that supplemental water 5 rights [were] not allowed to be stripped and stand alone independently from the surface-water 6 right and be considered a stand-alone water right for any duty, much less full duty.” (Id.). 7 There was “no change in the policy that supplemental water rights [could not] be converted to 8 a stand-alone water right; they must be tied to the surface-water right.” (Id. at 22). 9 With respect to the current application, the State Engineer found that the water sought 10 to be changed in the application was a supplemental water right and “as such were not 11 granted as stand-alone water rights.” (Id. at 23). The groundwater rights were tied to the 12 relevant surface-water rights and were not allowed to be changed to a stand-alone water right 13 because to do so would in effect be issuing a new appropriation in a quantity greater than the 14 use of water under the supplemental water right. (Id.). The State Engineer found that to allow 15 the supplemental groundwater right to be converted to a stand-alone groundwater right would 16 be in contradiction to many “rulings denying other water right applications.” (Id.). The State 17 Engineer denied the application “on the grounds that the use of water as proposed as a stand- 18 alone groundwater right [would] conflict with existing rights and thereby threaten to prove 19 detrimental to the public interest.” (Id. at 24). 20 State Engineer Ruling #5823, dated March 18, 2008, stated the following. (Id. at 26, 21 31). On May 9, 2006, Lyon County filed an application to, inter alia, change the place and 22 manner of use of a portion of the underground water previously appropriated from irrigation 23 purposes to quasi-judicial purposes. (Id. at 26). Lyon County recognized that it was the policy 24 of the State Engineer to “not allow supplemental irrigation rights to be converted to municipal 25 use.” (Id. at 28). “Supplemental irrigation water rights, as discussed in this ruling, [were] 26 ground-water rights which [had] a place of use appurtenant to the same place of use as an 27 existing surface-water right and [were] available for use when the surface-water flow [was] 28 inadequate to meet irrigation demands.” (Id.). Generally, supplemental water rights would not 7 1 be allowed to be transferred to become stand alone water rights because of their supplemental 2 nature that tied them to a primary surface-water right. (Id. at 29). LEGAL STANDARD 3 4 When considering a Rule 12(b)(6) motion to dismiss for failure to state a claim, the 5 court must accept as true all factual allegations in the complaint as well as all reasonable 6 inferences that may be drawn from such allegations. LSO, Ltd. v. Stroh, 205 F.3d 1146, 1150 7 n.2 (9th Cir. 2000). Such allegations must be construed in the light most favorable to the 8 nonmoving party. Shwarz v. United States, 234 F.3d 428, 435 (9th Cir. 2000). In general, the 9 court should only look to the contents of the complaint during its review of a Rule 12(b)(6) 10 motion to dismiss. However, the court may consider documents attached to the complaint or 11 referred to in the complaint whose authenticity no party questions. Id.; see Durning v. First 12 Boston Corp., 815 F.2d 1265, 1267 (9th Cir. 1987). 13 The analysis and purpose of a Rule 12(b)(6) motion to dismiss for failure to state a 14 claim is to test the legal sufficiency of a complaint. Navarro v. Block, 250 F.3d 729, 732 (9th 15 Cir. 2001). The issue is not whether a plaintiff will ultimately prevail but whether the claimant 16 is entitled to offer evidence to support the claims. Gilligan v. Jamco Dev. Corp., 108 F.3d 246, 17 249 (9th Cir. 1997) (quotations omitted). To avoid a Rule 12(b)(6) dismissal, a complaint does 18 not need detailed factual allegations; rather, it must plead “enough facts to state a claim to 19 relief that is plausible on its face.” Clemens v. Daimler Chrysler Corp., 534 F.3d 1017, 1022 20 (9th Cir. 2008) (quoting Bell Atlantic Corp. v. Twombly, 550 U.S. 544, 555, 127 S.Ct. 1955, 21 1964, 167 L.Ed.2d 929 (2007)); Ashcroft v. Iqbal, ___ U.S. ___, 129 S.Ct. 1937, 1949, 173 22 L.Ed.2d 868 (2009) (stating that a “claim has facial plausibility when the plaintiff pleads factual 23 content that allows the court to draw the reasonable inference that the defendant is liable for 24 the misconduct alleged”). 25 allegations” to pass muster under 12(b)(6) consideration, the factual allegations “must be 26 enough to raise a right to relief above the speculative level . . . on the assumption that all the 27 allegations in the complaint are true (even if doubtful in fact).” Twombly, 550 U.S. at 555, 127 28 S.Ct. at 1965. “A pleading that offers ‘labels and conclusions’ or ‘a formulaic recitation of the Even though a complaint does not need “detailed factual 8 1 elements of a cause of action will not do.” Iqbal, ___ U.S. at ___, 129 S.Ct. at 1949. “Nor 2 does a complaint suffice if it tenders ‘naked assertion[s]’ devoid of ‘further factual 3 enhancements.’” Id. (quoting Twombly, 550 U.S. at 557, 127 S.Ct. at 1966). DISCUSSION 4 5 The State Engineer filed a motion to dismiss all causes of action under Rule 12(b)(6). 6 (Mot. to Dismiss (#3). The State Engineer argues that he is entitled to absolute judicial 7 immunity because he was acting in a quasi-judicial manner in addressing Plaintiff’s change 8 applications. (Id. at 5-9). The State Engineer asserts that he is entitled to qualified immunity 9 for the actions alleged to have been taken in his individual capacity. (Id. at 9-13). He asserts 10 that he may not be sued in his official capacity because of Eleventh Amendment immunity. 11 (Id. at 13-14). He argues that Plaintiff is not entitled to injunctive relief because Plaintiff does 12 not seek to enjoin the State Engineer from taking some future action but instead seeks to have 13 the Court review the factual basis for the State Engineer’s decision and reverse it using the 14 standard for injunctive relief rather than judicial review. (Id. at 15-16). The State Engineer 15 asserts that there is no ongoing violation of federal law. (Id. at 16). The State Engineer 16 argues that shortly after filing the complaint in this Court, Plaintiff filed a petition for judicial 17 review in Nevada’s Ninth Judicial District Court challenging Ruling No. 6053 on substantially 18 the same grounds that are the basis of its § 1983 action here. (Id.).2 The State Engineer 19 argues that the Court should dismiss or stay the case based on Colorado River abstention. 20 (Id. at 16-22). The State Engineer argues that Plaintiff cannot claim a property interest in a 21 specific outcome for its water right change applications because it has no entitlement to use 22 its water rights in a place or manner other than provided by its permit and there is no property 23 interest in a new proposed use of its water right. (Id. at 22-23). The State Engineer argues 24 that because Plaintiff has no property interest, it fails to state a claim for procedural and 25 substantive due process. (Id. at 23). The State Engineer contends that Plaintiff may not 26 pursue an action for taking because a taking of property must be raised in a separate action 27 28 2 Although the State Engineer states that the Petition for Judicial Review is attached as Exhibit 3, Exhibit 3 is not attached. (Mot. to Dismiss (#3) at 16). 9 1 because, in a taking action, the taking is presumed proper and the issue is compensation. (Id. 2 at 24). 3 In response, Plaintiff argues that the State Engineer misunderstood the gravamen of 4 the complaint because it was challenging the State Engineer’s characterization of groundwater 5 rights. (Opp’n to Mot. to Dismiss (#10) at 2). Plaintiff asserts that the State Engineer’s 6 characterization of groundwater rights was unsupported by any valid rulemaking or by any rule, 7 regulation, or statute and therefore was an arbitrary and capricious basis for denying the 8 application. (Id.). Plaintiff was not challenging the denial of the decision on due process 9 grounds but was challenging the “way in which the State Engineer determined that as a matter 10 of rule (law) that all groundwater [could] only be used in conjunction with surface water and 11 not as a stand-alone right.” (Id. at 3). Plaintiff alleged that it was challenging an act of 12 rulemaking/policymaking taken without due process of law and, therefore, absolute judicial 13 immunity did not apply. (Id. at 3, 5-6). Plaintiff contends that it was entitled to due process 14 at whatever time and place the State Engineer reached a final determination about 15 groundwater rights. (Id. at 8). Plaintiff argues that the certificate of appropriation does not 16 describe the groundwater right as supplemental. (Id. at 9). Plaintiff asserts that because the 17 State Engineer does not argue that the challenged rule was constitutionally adopted he cannot 18 argue that he is entitled to qualified immunity. (Id.). Plaintiff argues that it may seek injunctive 19 relief against the State Engineer his official capacity because it seeks prospective relief that 20 its groundwater right is not constrained by the long-standing policy relied upon by the State 21 Engineer. (Id. at 10). Plaintiff contends that Colorado River abstention does not apply to this 22 case. (Id. at 12-14). 23 In reply, the State Engineer argues that the ruling did not find that all groundwater rights 24 were supplemental but that Plaintiff’s groundwater rights were supplemental. (Reply to Mot. 25 to Dismiss (#13) at 2). The State Engineer asserts that his actions in addressing the change 26 application was judicial in nature and he is entitled to absolute judicial immunity. (Id. at 4). 27 He further argues that an administrative agency is not required to promulgate a regulation 28 where regulatory action is taken to enforce or implement the necessary requirements of an 10 1 existing statute. (Id. at 5). The State Engineer reasserts that he is entitled to qualified 2 immunity even if he erred in addressing the change application by adjudication rather than by 3 rulemaking. (Id. at 7). 4 As an initial matter, it appears that Plaintiff is actually challenging the denial of his 5 change application and not any alleged rulemaking by the State Engineer. State Engineer 6 Ruling #6053 clearly states that the State Engineer interpreted Jacobsen’s 1960s application 7 and certificate as a permit for a supplemental water right for groundwater. (See Reply to Mot. 8 to Dismiss (#13) at 20). As such, the State Engineer found that, based on the long-standing 9 policy regarding supplemental water rights, a supplemental water right could not be stripped 10 to stand-alone from the surface-water right. (See id. at 21). Based on that policy, the State 11 Engineer found that because Plaintiff had a supplemental groundwater right, it could not be 12 converted to a stand-alone water right. (See id. at 23). The ruling does not state anywhere 13 that “all ground water can only be used in conjunction with surface water and not as a stand- 14 alone right.” (See Opp’n to Mot. to Dismiss (#10) at 3). Moreover, Plaintiff repeats in its 15 opposition that the certificate does not describe its groundwater right as supplemental. (See 16 id. at 9, 15-16). Thus, essentially Plaintiff’s argument is that the State Engineer interpreted 17 Jacobsen’s 1960s application and certificate incorrectly. The Nevada Revised Statutes 18 provide for judicial review of orders and decisions of the State Engineer for any person feeling 19 aggrieved. See NRS § 533.450(1). The aggrieved person must initiate a proceeding “in the 20 proper court of the county in which the matters affected or a portion thereof situated.” Id. 21 Therefore, Plaintiff’s real complaint is that the State Engineer incorrectly found that the 1960s 22 certificate of appropriation was for supplemental water rights and, as such, Plaintiff must file 23 a petition for judicial review in Douglas County. 24 The Court takes judicial notice that Plaintiff has filed a petition for judicial review in the 25 Ninth Judicial District in and for Douglas County. The Court finds that Plaintiff bases most of 26 his claims on the statement that the State Engineer ruled that all groundwater could only be 27 used in conjunction with surface water and not as a stand-alone right. 28 statement is false, as demonstrated by the State Engineer’s actual ruling. Because the Court 11 However, this 1 finds that Plaintiff’s true grievance is with the State Engineer’s interpretation of the 1960s 2 application and certificate, the Court will stay this case in abeyance, pursuant to the principles 3 outlined in Colorado River Water Conservation Dist. v. United States, 424 U.S. 800, 96 S.Ct. 4 1236, 47 L.Ed.2d 483 (1976), pending the outcome of the petition for judicial review. The 5 Court orders Plaintiff to raise its federal claims before that court. 6 Under the Colorado River doctrine, a court may stay federal proceedings pending the 7 resolution of a concurrent state court proceeding involving the same matter based on 8 considerations of “wise judicial administration, giving regard to conservation of judicial 9 resources and comprehensive disposition of litigation.” Holder v. Holder, 305 F.3d 854, 867 10 (9th Cir. 2002) (quoting Colorado River, 424 U.S. at 817, 96 S.Ct. at 1246); see also Moses 11 H. Cone Mem’l Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 16, 103 S.Ct. 927, 937, 74 L.Ed.2d 12 765 (1983). The Ninth Circuit has held that “exact parallelism . . . is not required” and that it 13 is “enough if the two proceedings are ‘substantially similar.’” Nakash v. Marciano, 882 F.2d 14 1411, 1416 (9th Cir. 1989). “Suits are parallel if substantially the same parties litigate 15 substantially the same issues in different forums.” Commercial Cas. Ins. v. Swarts, Manning 16 & Assoc., 616 F.Supp.2d 1027, 1032-33 (D. Nev. 2007). Because “[a]bstention from the 17 exercise of federal jurisdiction is the exception, not the rule,” a district court may dismiss or 18 stay an action only in “exceptional circumstances.” Colorado River, 424 U.S. at 813, 96 S.Ct. 19 at 1244. 20 Under the exceptional-circumstances test, a court considers the following factors: (1) 21 whether either court has assumed jurisdiction over a res or property; (2) the relative 22 convenience of the forums; (3) the desirability of avoiding piecemeal litigation; (4) the order 23 in which the forums obtained jurisdiction; (5) whether state or federal law controls, and (6) 24 whether the state proceeding is adequate to protect the parties’ rights. Nakash, 882 F.2d at 25 1415. A court may also consider whether a party is forum shopping in order to avoid adverse 26 rulings by the state court. Id. at 1417. These “factors are to be applied in a pragmatic and 27 flexible way, as part of a balancing process rather than as a ‘mechanical checklist.’” Am. Int’l 28 Underwriters (Phillipines), Inc. v. Cont’l Ins. Co., 843 F.2d 1253, 1257 (9th Cir. 1988) (quoting 12 1 Moses H. Cone, 460 U.S. at 16, 103 S.Ct. at 937). 2 Here, the Court finds that the state court has in rem jurisdiction over the water rights 3 issue based on the fact that Plaintiff’s true dispute is over the State Engineer’s determination 4 that Plaintiff possessed supplemental water rights and the fact that NRS § 533.450 requires 5 Plaintiff to challenge that decision in state court. See United States v. Alpine Land & Reservoir 6 Co., 174 F.3d 1007, 1014 (9th Cir. 1999) (reiterating that water rights adjudications are more 7 in the nature of in rem proceedings). The Court finds that, by staying the case, the Court will 8 avoid piecemeal litigation because the state court will interpret whether Plaintiff had a 9 “supplemental water right,” the true basis for Plaintiff’s federal claims. Accordingly, this Court 10 will stay this case pending the outcome of the petition for judicial review. 11 That being said, the Court does find that the State Engineer is immune from civil 12 damages liability under the doctrine of judicial immunity. See Ryan v. Bilby, 764 F.2d 1325, 13 1328 n.4 (9th Cir. 1985) (holding that judicial immunity applies to all those who perform judge- 14 like functions). In Butz v. Economou, 438 U.S. 478, 512-13, 98 S.Ct. 2894, 2914, 57 L.Ed.2d 15 895 (1978), the Supreme Court held that when adjudication within an agency shares enough 16 of the characteristics of the judicial process those who participate in such adjudication are 17 immune from suits for damages. To determine whether the agency participant is entitled to 18 immunity, the Court considers: (a) the need to assure that the individual can perform his 19 functions without harassment or intimidation; (b) the presence of safeguards that reduce the 20 need for private damages actions as a means of controlling unconstitutional conduct; (c) 21 insulation from political influence; (d) the importance of precedent; (e) the adversary nature 22 of the process; and (f) the correctability of error on appeal. Cleavinger v. Saxner, 474 U.S. 23 193, 202, 106 S.Ct. 496, 501, 88 L.Ed.2d 507 (1985). 24 In this case, the State Engineer was acting in a quasi-judicial manner when addressing 25 Plaintiff’s change applications. First, the State Engineer is responsible for adjudicating vested 26 water rights and deciding whether to grant or deny applications to appropriate water. See NRS 27 §§ 533.090-533.435. The Court finds that there is a need to assure that the State Engineer 28 can perform his functions without harassment or intimidation because water rights in this State 13 1 are highly contentious and extremely valuable. Second, the Nevada Revised Statutes have 2 set forth safeguards as means of controlling unconstitutional conduct including specifying the 3 information needed to apply for an application to appropriate water, the requirements for the 4 development of water rights, a hearing process, and the ability to seek judicial review of the 5 State Engineer’s decision. See NRS §§ 533.325-533.370, 533.380, 533.450, 533.455. Third, 6 the State Engineer’s actions are insulated from political activity based on the statutory scheme 7 provided by the Nevada Legislature, including an aggrieved party’s ability to seek judicial 8 review of the State Engineer’s decision. Fourth, although the State Engineer is not bound by 9 stare decisis, the State Engineer’s decision in this case was based on its prior treatment of 10 supplemental water rights. See Desert Irrigation, Ltd. v. State of Nevada, 944 P.2d 835, 841 11 (Nev. 1997) (holding that Nevada administrative agencies are not bound by stare decisis). 12 Fifth, the Nevada Revised Statutes and the Nevada Administrative Code provide procedures 13 for protests against the granting of an application, including hearings, discovery, witnesses, 14 and evidence. See NRS § 533.365; NAC §§ 533.100-533.380. Finally, any error on the part 15 of the State Engineer is correctable on appeal because Plaintiff may seek judicial review from 16 the state district court and may appeal to the Nevada Supreme Court. See NRS § 533.450, 17 533.455. Therefore, the Court finds that the State Engineer’s decision-making process on 18 whether to grant or deny appropriation applications share enough characteristics with the 19 judicial process and, thus, warrants immunity from civil damages liability. 20 Despite the State Engineer’s immunity from monetary liability, the Court finds that 21 Plaintiff may bring a suit for injunctive relief against the State Engineer in his official capacity. 22 See Wolfe v. Strankman, 392 F.3d 358, 365 (9th Cir. 2004) (holding that a state official is a 23 person under 42 U.S.C. § 1983 and may be sued in his or her official capacity for injunctive 24 relief because official capacity actions for prospective relief are not treated as actions against 25 the State) (citing Ex Parte Young, 209 U.S. 123, 28 S.Ct. 441, 52 L.Ed. 714 (1908)). 26 Additionally, this Court recognizes that Plaintiff does have a property right in his appropriated 27 water rights. See Application of Filippini, 202 P.2d 535, 537 (Nev. 1949) (holding that, in 28 Nevada, a water right that has become fixed by appropriation according to the manner 14 1 provided by the water law is "a right which is regarded and protected as property"). However, 2 the Court dismisses Plaintiff’s takings claim because there is no taking for the denial of a 3 permit for the approval of stand-alone water rights where such approval would be in derogation 4 of other prior appropriated rights. Accordingly, the Court grants the motion to dismiss 5 Plaintiff’s eighth claim for takings and stays the case pending the outcome of the petition for 6 judicial review filed in state court. 7 CONCLUSION 8 For the foregoing reasons, IT IS ORDERED that the State Engineer’s Motion to Dismiss 9 is GRANTED in part as to Plaintiff’s eighth cause of action, but STAYED as to the remaining 10 claims pending the outcome of the petition for judicial review filed in state court. 11 12 DATED: This _____ day of July, 2011. 26th 13 14 _________________________________ United States District Judge 15 16 17 18 19 20 21 22 23 24 25 26 27 28 15

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?