Pentecostal Church of God et al v. Douglas County et al

Filing 36

ORDER that the Board's denial should be, and hereby is, AFFIRMED. Petitioners' challenges under RLUIPA, and upon grounds of equal protection and due process, are DENIED. Signed by Judge Larry R. Hicks on 4/2/2018. (Copies have been distributed pursuant to the NEF - KW)

Download PDF
1 2 3 4 5 6 UNITED STATES DISTRICT COURT 7 DISTRICT OF NEVADA 8 9 10 PENTECOSTAL CHURCH OF GOD, a California entity, d/b/a GREAT LIFE CHURCH, and PASTOR LARRY SPIVEY, 11 14 ORDER Petitioners/Plaintiffs, 12 13 *** Case No. 3:16-cv-00400-LRH-WGC v. DOUGLAS COUNTY AND ITS BOARD OF COUNTY COMMISSIONERS, Respondents/Defendants. 15 16 17 This matter comes before the court on Pentecostal Church of God d/b/a Great Life 18 Church and Pastor Larry Spivey’s (collectively, “Petitioners”) petition for judicial review of the 19 denial of a special use permit application. ECF No. 27. Douglas County and the Board of 20 Commissioners’ (collectively, “Respondents”) filed an opposing brief, and Petitioners replied. 21 ECF Nos. 28, 31. The court has fully considered the parties’ briefs as well as their oral 22 arguments on March 19, 2018. ECF No. 35. The court has now completed its judicial review of 23 the denial of the special use permit by Respondents and affirms the Respondents’ decision 24 denying the permit. 25 I. 26 27 BACKGROUND This matter arises from the denial of a special use-permit application. See ECF No. 1. The Church applied for the permit, seeking to build a church at 990 Riverview Drive in Douglas 28 1 1 County, Nevada. AR1 3. The Church required a special use permit because the property sits in a 2 SFR-1 zone.2 AR 3, 18. The property is located in the Gardnerville Ranchos community plan and 3 is surrounded by four existing streets. AR 3, 223. Two public hearings were held regarding the application and the related project. First, the 4 5 Douglas County Planning Commission (“the Planning Commission”) held a public hearing in 6 March 2016. See AR 53, 57. Then, the Douglas County Board of Commissioners (“the Board”) 7 held a public hearing in May 2016. AR 73. The court summarizes the testimony and the evidence 8 presented at each hearing in turn. A. March 2016 Hearing Before the Planning Commission 9 At the March 2016 hearing, the Planning Commission staff recommended approving the 10 11 Church’s application based on staff members’ findings that the project satisfied the relevant 12 Douglas County Codes (“DCC”). 3 AR 5, 11–15. But the Planning Commission staff 13 recommended approving the project only if certain conditions were imposed, including limiting 14 lighting to ensure compatibility with the “dark sky” neighborhood and prohibiting on-street 15 16 17 18 19 20 21 22 23 24 25 26 27 28 “AR” refers to the administrative record for this matter. A SFR-1 Zone is designated for single family residential properties with a minimum of one-acre parcel size. 3 DCC § 20.604.060 requires a finding of the following eight factors: A. The proposed use at the specified location is consistent with the policies embodied in the adopted master plan and the general purpose and intent of the applicable district regulations; B. The proposed use is compatible with and preserves the character and integrity of adjacent development and neighborhoods and includes improvements or modifications either on-site or within the public rights-of-way to mitigate development related adverse impacts, such as traffic, noise, odors, visual nuisances, or other similar adverse effects to adjacent development and neighborhoods. These improvements or modifications may include, but shall not be limited to the placement or orientation of buildings and entryways, parking areas, buffer yards, and the addition of landscaping, walls, or both, to mitigate such impacts; C. The proposed use will not generate pedestrian or vehicular traffic which will be hazardous or conflict with the existing and anticipated traffic in the neighborhood; D. The proposed use incorporates roadway improvements, traffic control devices or mechanisms, or access restrictions to control traffic flow or divert traffic as needed to reduce or eliminate development impacts on surrounding neighborhood streets; E. The proposed use incorporates features to minimize adverse effects, including visual impacts and noise, of the proposed special use on adjacent properties; F. The project is not located within an identified archeological or cultural study area, as recognized by the county. If the project is located in a study area, an archeological resource reconnaissance has been performed on the site by a qualified archeologist and any identified resources have been avoided or mitigated to the extent possible per the findings in the report; G. The proposed special use complies with all additional standards imposed on it by the particular provisions of this chapter and all other requirements of this title applicable to the proposed special use and uses within the applicable base zoning district, including but not limited to, the adequate public facility policies of this title; and H. The proposed special use will not be materially detrimental to the public health, safety, convenience and welfare, and will not result in material damage or prejudice to other property in the vicinity. 1 2 2 1 parking. AR 57. Hope Sullivan, a Planning Commission staff member, explained the project. AR 2 57–58. She stated, in part, that any increased traffic would not negatively impact the 3 neighborhood. AR 57. 4 Keith Shaffer testified after Sullivan. AR 57. Shaffer, a senior project manager with 5 Manhard Consulting, assisted the Church in preparing its application. See AR 16–17. At the 6 March 2016 hearing, he explained the traffic impact would be minimal, meaning a detailed 7 traffic study was not required.4 AR 57. He also testified that the Church was willing to comply 8 with the conditions suggested by the Planning Commission. Id. Pastor Spivey testified after Shaffer and agreed that any increase in traffic would be 9 10 minimal. AR 58. He also stated that he had no intentions to expand the building in the future 11 even though he anticipated the congregation would grow. Id. Pastor Spivey testified that he was 12 willing to accept the conditions suggested by the Planning Commission. Id. He also agreed that 13 the Church would not hold late-night services if necessary to comply with the conditions. Id. The Planning Commission then opened the hearing for public comment. Id. Charlie 14 15 Fecteau and Mary Ellen Padgett testified in opposition to the project, stating on-street parking 16 would negatively impact their businesses. AR 59. Janine Hamilton also opposed the project, 17 stating it conflicted with the master plan of the community which prioritizes the development of 18 land for community purposes. Id. She stated that the project violated a master plan policy, which 19 serves “to protect the residential neighborhoods from encroachment.” Id. The remaining three 20 public commenters—Heather Bodily, Jim Slade, and Christine Hendrickson—voiced their 21 concern over increased traffic. Id. After the Planning Commission closed public commenting, Sullivan spoke on behalf of 22 23 the Planning Commission staff again. Id. She explained that a traffic study was not required 24 because less than 80 peak-hour trips and less than 500 daily trips were projected as a result of the 25 project. Id. She also discussed the project design, stating that a ten-foot-wide buffer would be 26 placed on at least three sides of the property. AR 60. And she testified that the building would be 27 28 4 Shaffer testified he determined the traffic would be minimal under the guidelines of the Institute of Transportation Technologies. AR at 57. 3 1 limited to church activities. Id. After Sullivan’s testimony, Shaffer offered to conduct a detailed 2 traffic study and to place “No Parking” signs on the street. Id. He also opined that the project’s 3 landscaping would improve the property. Id. 4 Commissioner Frank Godecke and Commissioner James Beattie moved to grant the 5 Church a special use permit but the motion failed. Id. Commissioner Bryan Davis and 6 Commissioner James Madsen then moved to deny the Church’s application for failure to meet 7 two criteria under DCC § 20.604.060: (1) the project would not be “compatible with and 8 preserve[] the character and integrity of adjacent development and neighborhoods” despite the 9 “improvements or modifications [that would] mitigate development related adverse impacts[,]” 10 DCC § 20.604.060(B); and (2) the project would “generate pedestrian or vehicular traffic which 11 will be hazardous or conflict with the existing and anticipated traffic in the neighborhood,” DCC 12 § 20.604.060(C). Id. The motion carried, resulting in the denial of the Church’s application. Id. 13 The Church appealed the Planning Commission’s decision to the Board. See AR 65, 72. 14 B. May 2016 Hearing Before the Board 15 The Board held a public hearing in May 2016. AR 73. In addition to the testimony and 16 the evidence obtained during the March 2016 hearing, the Board was provided with petitions in 17 favor of the project, petitions in opposition to the project, public correspondence received after 18 the March 2016 hearing, and a complete traffic study conducted after the March 2016 hearing. 19 AR 73, 168–94, 223. The public correspondence included: (1) an email from Tom and Judy 20 Doherty, opposing the project based on concerns regarding traffic and the nature of the 21 neighborhood, AR 170; (2) an email from Christine Mills, opposing the project based on traffic 22 concerns, AR 118; and (3) an email from Christine Hendrickson, also opposing the project based 23 on the existing traffic and the increase in traffic that would result from the project, AR 120. The 24 authors of the emails all lived near the at-issue property. AR 170, 118, 120. 25 Mimi Moss, the Community Development Director, spoke first. AR 216, 223–28. Moss 26 began by describing the location and the design of the project. AR 223–24. She stated that the 27 Gardnerville Ranchos General Improvement District did not recommend approval of the project. 28 4 1 AR 224. She also stated that seventy-six residents demonstrated opposition to the project by 2 signing a petition. AR 224. But 250 people signed a petition in favor of the project. AR 225. 3 Moss summarized the concerns with the project as the following: (1) increased traffic; (2) 4 additional noise and lighting problems; (3) issues resulting from on-street parking; (4) a decrease 5 in property values; and (5) negative impacts on views from existing properties. AR 224–25. 6 Moss then addressed different aspects of the project. AR 225. She first explained the 7 traffic study, which found that 183 daily trips would occur on average on Sundays and that 46 8 daily trips would occur on average during weekdays. AR 225. She then described the planned 9 landscaping, which would provide a buffer to the parking lots and would decrease the noise and 10 visual impacts to the area. AR 225. She also stated that the parking lot would contain 65 parking 11 spaces, which met the code requirements for a church and prevented the need for on-street 12 parking. AR 225–26. She explained that a photometric survey for lighting would be required and 13 would ensure that the project did not create lighting issues. AR 226. And she finally described 14 the design as one with “residential character.” AR 226. 15 After summarizing the information contained in the appeal, Moss detailed the Planning 16 Commission staff’s earlier recommendation to grant the permit, the Planning Commission’s 17 reasons for denying the permit, and the Planning Commission staff’s current recommendation to 18 uphold the Planning Commission’s decision to deny the permit. AR 227–28. 19 After Moss finished, Commissioner Steve Thayler explained that the particular location 20 of the project caused him concern, citing to the “very[,] very busy intersection” and the increase 21 in traffic. AR 231 (emphasizing his “big concern is traffic” and “not … the church” itself). And 22 although the Board had not finished hearing testimony, he concluded then that the Planning 23 Commission correctly determined the project would fail to preserve the character of the 24 neighborhood and would result in increased traffic that would negatively impact the 25 neighborhood. AR 231–32. 26 Shaffer testified next. AR 232. He first addressed the project’s impact on the character 27 and integrity of the neighborhood. AR 232–37. He stated that the property would be difficult to 28 build upon due to being bounded by four streets and requiring a substantial investment. AR 232– 5 1 34. But the Church could improve the property through the proposed project, which would result 2 in the property being more consistent with the neighborhood than it was at the time of the 3 hearing based on the residential-nature of the project’s design. AR 232–34. Shaffer also stated 4 that the parking lot would give the Church sixty-five parking spaces—fifty more than what the 5 Church currently used. AR 234. Accordingly, on-street parking would not be needed. AR 234. 6 Shaffer also highlighted that the building would not be the first church in the neighborhood— 7 seven other churches existed in a two-mile radius from the property. AR 237. Shaffer then turned to the traffic issue. AR 237–41. He explained that a complete traffic 8 9 study was not required for the project. AR 239. But after the Planning Commission denied the 10 Church a permit, a full traffic study was completed. AR 240. The study concluded that the 11 project would result in a level A or level B service5 and would result in a 0.6 second delay to the 12 current time a person waits at the nearby intersection. AR 240. Shaffer also stated that signage 13 and road markings would help prevent on-street parking and negative traffic impact. AR 241. After Shaffer finished his presentation, Commissioner Nancy McDermid asked Moss if 14 15 the Planning Commission’s concerns had been addressed. AR 242. Moss answered in the 16 affirmative. Id. Commissioner Thayler again renewed his concerns over traffic and voiced his concerns 17 18 that on-street parking would occur despite the suggested conditions to prevent it. AR 244–46. 19 Commissioner Greg Lynn spoke next. AR 246. Commissioner Lynn explained that the 20 people opposing the project by way of the petition lived near the property. AR 247. But the 21 people supporting the project by way of petition did not. AR 247. He also questioned whether the 22 parking lot would suffice in the future. AR 247. Commissioner Lynn emphasized he was 23 primarily concerned with neighborhood compatibility. AR 248. He worried that placing a church 24 on the property would alter the nature of the community and negatively affect the investments of 25 existing homeowners. AR 248. 26 27 28 5 The levels of service range from A to F, with A being the best and F being the worst. AR 240. The levels correspond to the number of seconds a person must wait at an intersection before making a movement. Id. 6 1 Commissioner McDermid spoke after Commissioner Lynn. AR 248. She had no concerns 2 over the neighborhood compatibility—emphasizing that the Planning Commission’s concerns 3 had been “adequately addressed” during the hearing. AR 248–50. 4 In response to the Commissioner’s comments, Sheffer requested the Board to allow the 5 traffic engineer to speak about the results of the traffic study. AR 250. But Sheffer’s request was 6 denied, and the Board instead opened the hearing to public comment. AR 250–52. 7 During the public-comment section of the hearing, Leslie Burns, David Burns, 8 Christopher Lee King, Karen King, Susan Berger, George Berger, Mary Lent, and Rob Anderson 9 supported the project. AR 252–54, 259–62, 267–77, AR 279–80, AR 282–84. Many of those in 10 support of the project were members of the Church. AR 252, 259, 272–77, 279. Janine Hamilton, 11 Eric Warren, Tony Fleckdale, Robert Cook, Joanna Awana, Loraine Cooke, and Caleb Worth 12 opposed the project, citing concerns over the impact on traffic or the impact on the nature of the 13 community. AR 255–59, AR 262–63, AR 265–67, AR 278–79, AR 285, AR 286–87. Brad 14 Bennett neither opposed nor supported the project explicitly. AR 277. He instead lamented over 15 the current traffic and the dangerous nature of the intersection. AR 277–78. 16 Pastor Spivey voiced his support for the project during public comments. AR 285. Paul 17 Saladey—the engineer who conducted the traffic study—also supported the project during public 18 comments. AR 280–82. He first explained how he conducted the study and then opined that the 19 property had the capacity to serve as a church. AR 280–82. 20 After closing the hearing to public comments, the Commissioners discussed the 21 inevitable need to address the intersection, assured the project would not impact the dark-sky 22 nature of the neighborhood, and clarified the type of landscaping that would be used. AR 287– 23 90. Commissioner Thayler then reiterated his concern regarding the traffic impact, which he 24 relied in part on personal experiences with the intersection and surrounding roads. AR 290–93. 25 Commissioner Barry Penzel then voiced his concern over the traffic impact but stated the Church 26 would be compatible with the neighborhood. AR 293–96. Commissioner Doug Johnson spoke 27 last, stating the Church’s presentation led him to believe traffic would not be an issue. AR 298. 28 7 1 But regardless, Commissioner Johnson supported the Planning Commission’s decision based on 2 the project’s incompatibility with the neighborhood. AR 299. Commissioner Thayler and Commissioner Lynn moved to uphold denial of the permit 3 4 application. AR 299–300. The motion carried, and the Church’s appeal was denied. AR 301–03. 5 The Church now petitions this court for judicial review of the Board’s decision pursuant to NRS 6 233B.135. ECF No. 27. NRS 233B.135 provides for the judicial review of a final decision from an administrative 7 8 agency. Nev. Rev. Stat. § 233B.135(1). The review must be conducted by a court without a jury 9 and must be confined to the administrative record. Id. And while the court may not reweigh the 10 evidence, it may set aside an agency decision under certain circumstances including if the 11 decision: (1) violates constitutional provisions; (2) is clearly erroneous in view of reliable, 12 probative, and substantial evidence; or (3) is arbitrary, capricious, or an abuse of discretion. Nev. 13 Rev. Stat. § 233B.135(2)–(3). 14 II. 15 DISCUSSION The Church argues for the reversal of the Board’s decision on four grounds: (1) no 16 substantial evidence supports the denial of the Church’s application; (2) the denial results in a 17 violation of the Religious Land Use and Institutionalized Persons Act (“RLUIPA”); (3) the 18 denial results in a violation of equal protection; and (4) the denial results in a violation of due 19 process. The court considers each ground in turn. 20 A. Substantial Evidence 21 The court first turns to the Church’s argument that no substantial evidence supports the 22 Board’s decision. Under Nevada law, a court reviews an administrative decision for abuse of 23 discretion. Stratosphere Gaming Corp. v. Las Vegas, 96 P.3d 756, 760 (Nev. 2004). The court 24 must not substitute its judgment for that of the administrative agency. City of Reno v. Citizens for 25 Cold Springs, 236 P.3d 10, 15–16 (Nev. 2010). The court therefore may not reweigh the 26 evidence. See id; see also Transportation Servs. Auth. of Nevada v. Garijo, 281 P.3d 1225 (Nev. 27 2009). Further, the court’s review is limited to the administrative record. City of Las Vegas v. 28 Laughlin, 893 P.2d 383, 384 (Nev. 1995). 8 A discretionary decision includes the grant or the denial of an application for a special 1 2 use permit. City Council of Reno v. Travelers Hotel, 683 P.2d 960, 961 – 62 (Nev. 1984). If 3 substantial evidence supports a discretionary decision, “there is no abuse of discretion.” Laughlin 4 893 P.2d at 384. “Substantial evidence is that which a reasonable mind might accept as adequate 5 to support a conclusion.” Id. (internal quotation marks and citations omitted). Public testimony 6 may constitute substantial evidence that a public agency may rely upon to deny an application 7 for a special use permit. Redrock Valley Ranch, LLC v. Washoe Cnty., 254 P.3d 641, 648 (Nev. 8 2011). 9 The public testimony that opposed the project constitutes substantial evidence on which 10 the Board properly relied when denying the Church a special use permit. The Board denied the 11 Church a permit, citing the project’s failure to meet two considerations under DCC § 20.604.060: 12 (1) the required compatibility with the character and integrity of the neighborhood despite 13 mitigating project modifications and (2) the resulting traffic impact would not be hazardous or 14 conflicting with the existing traffic. The Board made its decision based, in part, on public 15 testimony, which supported the Board’s decision. The public testimony demonstrated concerns 16 over the project’s impact on traffic at the particular intersection immediately adjacent to the 17 property; public comments included personal experience with what was repeatedly described as 18 an already dangerous, busy intersection. The public testimony also demonstrated concerns over 19 the project’s impact on the nature of the particular neighborhood in which the property sits; 20 public comments described the negative impacts on business, residential values, and the quiet- 21 nature of the community. Further, as Commissioner Lynn highlighted, many of the people 22 opposing the project were residents of the neighborhood. They were therefore familiar with the 23 area by way of personal experience. While the Board was also presented with evidence favoring 24 the granting of the permit, the court must not reweigh the evidence. The court therefore affirms 25 the Board’s decision, finding the public testimony from residents of the community constitutes 26 substantial evidence that supports the Board’s decision. 27 /// 28 /// 9 1 B. RLUIPA 2 The court now turns to the Church’s argument that the Board’s decision violates 3 RLUIPA. RLUIPA prohibits a government entity from imposing a substantial burden on a 4 person, an assembly, or an institution’s religious exercise by way of a land-use regulation unless 5 imposing the substantial burden meets two criteria: (1) it furthers a compelling government 6 interest and (2) it is the least restrictive means. 42 U.S.C. § 2000cc(a)(1). RLUIPA applies when 7 the government entity uses formal or informal procedures resulting in “individualized 8 assessments of the proposed uses for the property involved.” Id. § 2000cc(a)(2)(C). 9 Under RLUIPA, the plaintiff must first demonstrate the government entity substantially 10 burdened the plaintiff’s religious exercise. Int’l Church of Foursquare Gospel v. City of San 11 Leandro, 673 F.3d 1059, 1067 (9th Cir. 2011). RLUIPA defines broadly religious activity; 12 religious activity includes “any exercise or religion, whether or not compelled by, or central to, a 13 system of religious belief” as well as “[t]he use, building, or conversion of real property for the 14 purpose of religious exercise….” 42 U.S.C. § 2000cc-5. But RLUIPA does not define substantial 15 burden. See id. In the context of land-use regulation, the Ninth Circuit requires a burden to “be 16 oppressive to a significantly great extent” to constitute a substantial burden. Guru Nanak Sikh 17 Soc. of Yuba City v. Cty. of Sutter, 456 F.3d 978, 988–89 (9th Cir. 2006) (internal citations 18 omitted). The burden “must impose a significantly great restriction or onus” on religious 19 exercise. Id. (internal citations omitted). The burden “must place more than inconvenience on 20 religious exercise.” Foursquare Gospel, 673 F.3d at 1067. But the burden need not be 21 insurmountable. Id. at 1068. “[W]hen the religious institution has no ready alternatives, or where 22 the alternatives require substantial delay, uncertainty, and expense, a complete denial of the 23 religious institution’s application might be indicative of a substantial burden.” Id. [internal 24 citations and punctuation omitted]. 25 If the plaintiff meets the initial burden under RLUIPA, the burden shifts to the 26 government. Int’l Church of Foursquare Gospel, 673 F.3d at 1067. The government must prove 27 that its conduct furthers a compelling government interest in the least restrictive means. Id.; see 28 also 42 U.S.C. § 2000cc(a)(1)(A)–(B). 10 1 The parties do not dispute the applicability of RLUIPA to this matter. Accordingly, the 2 court first considers whether Petitioners demonstrated a substantial burden on their religious 3 activity. 4 5 1. Substantial Burden on Religious Activity Petitioners argue that the denial of the special use permit resulted in a substantial burden 6 on their religious exercise because it prevents Petitioners from using their property in a manner 7 that is “compatible [with the county code] when necessary steps are taken and conditions [are] 8 imposed to mitigate any legitimate adverse effects…” ECF No. 27 at 19. The court disagrees. 9 Petitioners fail to demonstrate a substantial burden. The record demonstrates that in 10 denying the Church’s application for a special use permit the Board found the property to be 11 inappropriate for the proposed use based on substantial evidence of negative impacts on traffic 12 and on the nature of the neighborhood. The decision focused on the particular location of the 13 property—its nexus to a particular intersection and its location in a particular neighborhood. The 14 evidence does not suggest that other sites would be unsuitable; the record does not indicate that 15 the Church would be denied a permit to build on a property that was not located near the at-issue 16 intersection; and nothing in the record suggests that the permit was denied based on the proposed 17 use of the land for religious purposes. See Mesquite Grove Chapel v. DeBonis, 633 F. App’x 18 906, 908 (9th Cir. 2015) (“The primary burdens presented here—relocating or submitting a 19 modified application—were not substantial, especially because [the petitioner] presented no 20 evidence that other sites were unsuitable … [and] the Inspector’s decision was not arbitrary or 21 made in bad faith.”); see also San Jose Christian Coll. v. City of Morgan Hill, 360 F.3d 1024, 22 1035 (9th Cir. 2004) (“[T]here is no evidence in the record demonstrating that College was 23 precluded from using other sites within the city. Nor is there any evidence that the City would 24 not impose the same requirements on any other entity seeking to build something other than [the 25 intended buildings under the zoning ordinance] on the property.”). Because the Board’s decision 26 focused on the particular property, intersection, traffic, and neighborhood and prevents the 27 project from occurring only at the particular property, the court finds that the burden imposed 28 11 1 upon Petitioners does not rise to the level of a substantial burden upon Petitioners’ religious 2 exercise as prohibited by RLUIPA. 3 Petitioners rely heavily on two Ninth Circuit decisions when attempting to demonstrate a 4 substantial burden: International Church of Foursquare Gospel v. City of San Leadro, 673 F.3d 5 1059 (9th Cir. 2011), and Guru Nanak Sikh Society of Yuba City v. County of Sutter, 450 F.3d 6 978 (9th Cir. 2006). Neither case persuades the court to find for Petitioners. 7 In Foursquare Gospel, the religious institution signed a purchase and sale agreement for 8 a property in the industrial park zone. 673 F.3d at 1061–62. To use the property as a church, the 9 city instructed that the institution needed to secure two amendments: (1) an amendment in the 10 zoning code to make assembly a conditionally permitted use in industrial limited zones and (2) 11 an amendment to the zoning map to designate the property as industrial limited. Id. at 1062. The 12 institution applied for the amendments based on the city’s instructions. Id. But after 13 approximately one year of deliberation and public hearings—and after the institution paid a 14 $50,000 nonrefundable fee and closed escrow on the property—the city denied the institution’s 15 application to include the property in the industrial-limited zone. Id. at 1063–65. The institution 16 sued. Id. at 1065. At the summary judgment phase, the institution offered evidence that “no other 17 suitable sites exist in the City to house the Church’s expanded operations.” Id. at 1067. The 18 institution’s realtor concluded no other properties would suit the project based on the 19 examination of 196 properties zoned for assembly use. Id.at 1068. Based on this evidence, the 20 Ninth Circuit held that a triable issue of fact existed and reversed the district court’s award of 21 summary judgment in favor of the city. Id. at 1070. 22 The Foursquare decision does not affect the court’s judgment here. First, this matter does 23 not involve comparable time delays or expenses to that in Foursquare. Rather than a year-long 24 process, the Board denied the Church’s application within three months. The record is also void 25 of any significant financial losses such as the loss of the $50,000 non-refundable payment made 26 in Foursquare in reliance on the city’s instructions. And here, unlike the Foursquare plaintiffs, 27 the Church has presented no evidence that other properties in Douglas County are unavailable or 28 unsuitable for its project. Additionally, this matter does not come before the court on a motion 12 1 for summary judgment. Here the plaintiffs’ petition is for judicial review of the final decision of 2 the Board. The court has considered the evidence before the Board and has found (1) that there is 3 substantial evidence which supports the Board’s decision, (2) that a substantial burden on the 4 Petitioners’ religious exercise has not been shown, and (3) that no religious discrimination 5 occurred. The facts and history before the court fall far short of those found in Foursquare. 6 Guru Nanak also does not affect the court’s decision. In Guru Nanak, the religious 7 institution was first denied a conditional use permit for a property located in a residential zone 8 based on citizens’ fears of noise and traffic impacts on the existing neighborhood. 456 F.3d at 9 982. To avoid concerns over traffic and noise impacts, the institution purchased a piece of land in 10 an agricultural zone that was located away from high-density neighborhoods. Id. at 982–83. But 11 the county denied the permit again, citing concerns over leapfrog development; the property was 12 located too far from the city. Id. at 983–84. The Ninth Circuit stated that it “[could not] view the 13 denial of the second [conditional use permit] in isolation, rather it must be viewed in the context 14 of [the religious institution’s] permit process history.” Id. at 991 (internal quotations and 15 punctuation marks omitted). In viewing the two denials together, the Ninth Circuit held that 16 “[t]he net effect of the County’s two denials … is to shrink the large amount of land theoretically 17 available to the [religious institution] under the Zoning Code to several scattered parcels that the 18 County may or may not ultimately approve.” Id. at 991–92. The denials therefore amounted to a 19 substantial burden on the institution’s religious exercise because “the reasons for denying [the 20 two applications] to a significantly great extent lessened the possibility that future [conditional 21 use permits] would be successful.” Id. at 989. The “County could use its concern with leapfrog 22 development effectively to deny churches access to all [properties located farther away from the 23 city].” Id. at 990. 24 The concerns in Guru Nanak are not present here. The Board did not cite general 25 concerns, e.g. leapfrog development. The Board instead denied the permit based on substantial 26 evidence of reasons specifically applicable to the particular property. The Board found the 27 property unsuitable based on its proximity to an already busy, and possibly dangerous, 28 intersection as well as its location in a particular neighborhood. Consequently, the denial did not 13 1 limit the Church’s opportunity or ability to seek out other available properties and did not 2 suggest an application related to a more suitable property would be denied. Further, the Church’s 3 permit-process history shows the Board previously approved a requested variance for the Church 4 at another location in the area. The approval indicates the Board would not rely on the reasons 5 for the at-issue denial to deny the Church access to other properties suitable for the project. As a 6 result, Guru Nanak does not impact the court’s decision. 7 Because the court finds Petitioners failed to demonstrate a substantial burden on the 8 institution’s religious exercise, the court does not reach the question of whether the Board’s 9 actions furthered a compelling state interest in the least restrictive means. The court denies the 10 RUILPA claim based on Petitioners’ failure to demonstrate a substantial burden on their 11 religious exercise. 12 C. Equal Protection 13 The court now considers Petitioners’ argument that the Board’s decision denied the 14 Church equal protection guaranteed under the Constitution. Petitioners assert a class-of-one 15 theory, arguing the Board intentionally, and without a rational basis, treated the Church different 16 than the other religious institutions that obtained permission to build churches nearby the at-issue 17 property. ECF No. 27 at 20–23. The court again disagrees. 18 To bring a successful claim-of-one challenge under the Equal Protection Clause, a 19 plaintiff must show a government entity intentionally treated the plaintiff differently from others 20 similarly situated without a rational basis justifying the differential treatment. Village of 21 Willowbrook v. Olech, 528 U.S. 562, 564 (2000). Despite the existence of several other churches 22 within the area, the administrative record does not indicate that the existing churches sit at the 23 same intersection—or even a similar intersection—as the at-issue property. The traffic concerns 24 regarding the busy intersection instead appear unique to the property on which the Church sought 25 to construct its building. The court therefore denies the equal protection claim. 26 D. Due Process 27 The court finally considers Petitioners’ claim that the Board violated Petitioners’ 28 Constitutional due process rights because the Board’s “arbitrary and irrational denial of [the] 14 1 special use permit, effectively denying [the Church] the protections of RLUIPA[.]” ECF No. 31 2 at 19. But as described above, RLUIPA was not violated by the Board’s decision. The Board’s 3 decision was also not arbitrary or irrational; it was based on substantial evidence of the project’s 4 impact on traffic and its impact on the nature of the particular neighborhood. Petitioners’ basis 5 for their due process claim fails as a result. 6 III. 7 CONCLUSION In conclusion, the court has conducted its judicial review of the final decision of the 8 Douglas County Board of Commissioners’ denial of the special use permit application sought by 9 Plaintiffs and concludes that it is compliant with all constitutional and statutory provisions based 10 upon substantial evidence presented to the Board. The Board’s denial should be, and hereby is, 11 AFFIRMED. 12 13 Petitioners’ challenges under RLUIPA, and upon grounds of equal protection and due process, are DENIED. 14 IT IS SO ORDERED. 15 DATED this 2nd day of April, 2018. 16 17 LARRY R. HICKS UNITED STATES DISTRICT JUDGE 18 19 20 21 22 23 24 25 26 27 28 15

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?