CZYZYKOWSKI et al v. F/V OCEAN VIEW INC. et al
Filing
136
OPINION filed. Signed by Judge Brian R. Martinotti on 10/31/2019. (jem)
NOT FOR PUBLICATION
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF NEW JERSEY
____________________________________
:
KRZYSZTOS CZYZYKOWSKI, et al.
:
:
Plaintiffs,
:
:
Case No.: 3:15-cv-02018-BRM-LHG
v.
:
:
OPINION
F/V OCEAN VIEW, INC., et al.,
:
:
Defendants.
:
:
MARTINOTTI, DISTRICT JUDGE
Before this Court are Motions for Summary Judgment (ECF Nos. 117 & 118) filed by
Defendants Satellite Crane, LLC (“Satellite Crane”) and Sea Watch International, Ltd. (“Sea Watch”),
respectively.
Plaintiffs Krzysztos Czyzykowski (“Czyzykowski”) and Marzena Czyzykowski
(“Czyzykowski’s Wife”), as well as Defendants Jeffrey Simmons t/a Star-Link Services (“Simmons”),
F/V Ocean View, Inc. (“F/V Ocean View”) and TMT Clam Dredgers, Inc. (“TMT Clam Dredgers”)
oppose both motions. (ECF No. 120, 121-1, 122, 124.) Satellite Crane opposes Sea Watch’s motion.
(ECF No. 123.) Having reviewed the parties’ submissions filed in connection with the motions and
having heard oral argument on August 20, 2019 pursuant to Federal Rule of Civil Procedure 78(a), for
the reasons set forth below and for good cause having been shown, both Satellite Crane’s and Sea
Watch’s Motions for Summary Judgment are GRANTED IN PART and DENIED IN PART.
I.
FACTUAL AND PROCEDURAL BACKGROUND
This case arises out of a night-time, dock-side crane accident in which Czyzykowski, a seaman,
was injured while he assisted with the unloading of large cages of clams from the fishing vessel E.S.S.
Pursuit. (ECF No. 118-18 ¶ 1.) F/V Ocean View owns the Pursuit. (ECF No. 123-4 ¶ 3.) F/V Ocean
View and TMT Clam Dredgers operate the Pursuit pursuant to a bareboat charter agreement. TMT
Clam Dredgers employed Czyzykowski as a crew member on the Pursuit. (ECF No. 123-4 ¶ 6.) Sea
Watch, a Maryland-based seafood company, operates the dock on which Czyzykowski’s injury
occurred, as well as an adjacent seafood processing plant. (ECF No. 118-10 ¶¶ 2-4.) Sea Watch
undertakes certain “responsibilit[ies] with regard to unloading of clams at the facility”—namely, “to
make sure the clams are unloaded in a timely fashion, and that they are moved into the facility in a
timely fashion, and to ensure that company guidelines with regard to the proper handling of seafood are
followed.” (ECF No. 118-10 ¶ 7.) Most Sea Watch employees work only inside the processing plant,
but Sea Watch employs forklift operators who move clam cages from the dock into the processing
plant. (ECF No. 118-10 ¶ 6.)
Sea Watch uses Satellite Crane to operate the cranes when fishing vessels come to the dock to
unload cargo. (ECF No. 118-10 ¶¶ 9-11.) According to their contract, Sea Watch required Satellite
Crane to provide crane operation service for one crane on 30-minutes notice and operation for a second
crane on 60-minutes notice. (ECF No. 118-12, at 2.) While Satellite Crane provided the crane
operators, Sea Watch owned and provided the cranes on site; Satellite Crane did not use its own cranes.
(ECF No. 118-10 ¶ 8; ECF No. 118-14, at 106:14-23.) Sea Watch prohibited Satellite Crane from using
its cranes for Satellite Crane’s own use and required Satellite Crane to use Sea Watch’s cranes “as
directed.” (ECF No. 118-14, at 107:11-23.) Notwithstanding Sea Watch’s control over its cranes, Sea
Watch required Satellite Crane both to conduct maintenance on the cranes, including greasing,
lubricating, and maintaining fuel engine oil levels, and to provide other, ancillary crane services “at the
instructions of Sea Watch.” (ECF No. 118-14, at 108:4-17, 175:21-25.) Sea Watch, however, provided
the hooks used by the cranes for lifting the clam cages—hooks that one expert testified had an
unreasonable, dangerous design that contributed to Czyzykowski’s injury, when reasonable, less
dangerous hooks were commercially available. (ECF No. 120-4, Ex. W, at 6-7.) Satellite Crane is
entitled to an office on Sea Watch’s premises, but Sea Watch exercises dominion and control over that
office space. (ECF No. 118-14, at 113:20-114:23.)
Satellite Crane, in turn, uses Simmons to cover crane operation services when Satellite Crane is
unable to do so. (ECF No. 118-13, at 1.) A licensed crane operator, Simmons earned the appropriate
state-issued licenses by passing multiple tests after taking classes with both a classroom component, a
hands-on, crane-operation component, and a safety education component. (ECF No. 117-9, at 15:7-22,
21:19-23:3.) In addition to his licensing training, Simmons spent an additional 40 hours—including 4
hours of supervised training for working at night—over the course of a month to train to use the
specific crane at the Sea Watch dock. (ECF No. 117-9, at 90:2-91:14.)
Following his training, Satellite Crane required Simmons to provide crane operations services
“in an on-call manner.” (ECF No. 118-13, at 1.) Simmons’s “minimum” hours requirement was to be
“on call” for three 12-hour shifts and two 6-hour shifts every week, and “[a]dditional service hours may
be requested.” (ECF No. 118-13, at 1.) Satellite Crane required Simmons to be available on 30minutes notice. (ECF No. 118-13, at 1.) When working, Simmons was responsible for completing
certain required paperwork. (ECF No. 118-13, at 1.) Satellite Crane required Simmons to insure both
Satellite Crane and Sea Watch (at Simmons’s expense), with Satellite Crane dictating the types of
insurance as well as the acceptable liability limits and deductibles, and retaining veto power over
Simmons’s choice of insurers. (ECF No. 118-13, at 3.) If Simmons sought to obtain replacement
coverage for his crane operation services, Satellite Crane and Sea Watch both could exercise veto
power over any replacement crane operator. (ECF No. 118-13, at 3.) Satellite Crane restricted
Simmons’s movements while at work, prohibiting Simmons from entering Sea Watch’s processing
plant for any purpose except to use the restroom. (ECF No. 118-13, at 3.)
Simmons operated the crane at the time of Czyzykowski’s injury. (ECF No. 118-18 ¶ 1.)
Although Czyzykowski suffered his injury from the crane, testimony in the record indicates that one of
Sea Watch’s forklift operators may have contributed to Czyzykowski’s injury. Simmons testified that a
Sea Watch forklift operator was out on the dock at the time of the injury and “spooked” Czyzykowski,
causing Czyzykowski to react in a way that inadvertently mimicked the signal for Simmons to lift the
crane boom—which Simmons did, injuring Czyzykowski’s hand in the process. (ECF No. 123-12, at
11:9-20, 42:17-43:5, 54:3-15.) Czyzykowski’s crew mate Ivanov Pavel testified that in the immediate
aftermath of the injury, Czyzykowski explained that the injury occurred when Sea Watch’s forklift
driver came too close to Czyzykowski. (ECF No. 123-13, at 11:18-12:2.) Czyzykowski testified he
had never seen so many clam cages accumulate on the dock without having been removed to the
processing plant by the forklift—a situation Czyzykowski described as dangerous both because there
was insufficient room between cages for Czyzykowski to maneuver and because some cages would
contact other cages, causing the cages to lose their balance and risk tipping over. (ECF No. 121-2, Ex.
CC, at 55:15-19.)
Czyzykowski brought suit against his employer under the Jones Act, 46 U.S.C. § 30104,1 and
against a host of other entities under general maritime law, as well as a claim for maintenance and cure.
(ECF No. 46 ¶¶ 16, 21.) Czyzykowski’s Wife brought a claim “for loss of consortium and for past,
present, and future financial losses” resulting from her husband’s injury. (ECF No. 46 ¶ 19.) Satellite
Crane and Sea Watch each moved for summary judgment. (ECF Nos. 117 & 118.)
II.
LEGAL STANDARD
Summary judgment is appropriate “if the pleadings, depositions, answers to interrogatories, and
admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any
material fact and that the moving party is entitled to a judgment as a matter of law.” Fed. R. Civ. P.
56(c). A factual dispute is genuine only if there is “a sufficient evidentiary basis on which a reasonable
jury could find for the non-moving party,” and it is material only if it has the ability to “affect the
outcome of the suit under governing law.” Kaucher v. Cty. of Bucks, 455 F.3d 418, 423 (3d Cir. 2006);
see also Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). Disputes over irrelevant or
unnecessary facts will not preclude a grant of summary judgment. Id. at 248. “In considering a motion
1
This Court has jurisdiction over Jones Act claims under both the general grant of federal question
jurisdiction and the specific grant of admiralty and maritime jurisdiction. See Horizon Lines, LLC
v. United States, 414 F. Supp. 2d 46, 52 (D.D.C. 2006).
for summary judgment, a district court may not make credibility determinations or engage in any
weighing of the evidence; instead, the non-moving party’s evidence ‘is to be believed and all justifiable
inferences are to be drawn in his favor.’” Marino v. Indus. Crating Co., 358 F.3d 241, 247 (3d Cir.
2004) (quoting Anderson, 477 U.S. at 255)); see also Matsushita Elec. Indus. Co. v. Zenith Radio
Corp., 475 U.S. 574, 587, (1986); Curley v. Klem, 298 F.3d 271, 276-77 (3d Cir. 2002). “Summary
judgment may not be granted . . . if there is a disagreement over what inferences can be reasonably
drawn from the facts even if the facts are undisputed.” Nathanson v. Med. Coll. of Pa., 926 F.2d 1368,
1380 (3rd Cir. 1991) (citing Gans v. Mundy, 762 F.2d 338, 340 (3d Cir.); Ideal Dairy Farms, Inc. v.
John Labatt, Ltd., 90 F.3d 737, 744 (3d Cir. 1996).
The party moving for summary judgment has the initial burden of showing the basis for its
motion. Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986). If the moving party bears the burden of
persuasion at trial, summary judgment is appropriate only if the evidence is not susceptible to different
interpretations or inferences by the trier of fact. Hunt v. Cromartie, 526 U.S. 541, 553 (1999). On the
other hand, if the burden of persuasion at trial would be on the nonmoving party, the party moving for
summary judgment may satisfy Rule 56’s burden of production by either (1) “submit[ting] affirmative
evidence that negates an essential element of the nonmoving party’s claim” or (2) demonstrating “that
the nonmoving party’s evidence is insufficient to establish an essential element of the nonmoving
party’s claim.” Celotex, 477 U.S. at 330 (Brennan, J., dissenting). Once the movant adequately
supports its motion pursuant to Rule 56(c), the burden shifts to the nonmoving party to “go beyond the
pleadings and by her own affidavits, or by the depositions, answers to interrogatories, and admissions
on file, designate specific facts showing that there is a genuine issue for trial.” Id. at 324; see also
Matsushita, 475 U.S. at 586; Ridgewood Bd. of Ed. v. Stokley, 172 F.3d 238, 252 (3d Cir. 1999). In
deciding the merits of a party’s motion for summary judgment, the court’s role is not to evaluate the
evidence and decide the truth of the matter, but to determine whether there is a genuine issue for trial.
Anderson, 477 U.S. at 249. Credibility determinations are the province of the factfinder. Big Apple
BMW, Inc. v. BMW of N. Am., Inc., 974 F.2d 1358, 1363 (3d Cir. 1992).
There can be “no genuine issue as to any material fact,” however, if a party fails “to make a
showing sufficient to establish the existence of an element essential to that party’s case, and on which
that party will bear the burden of proof at trial.” Celotex, 477 U.S. at 322-23. “[A] complete failure of
proof concerning an essential element of the nonmoving party’s case necessarily renders all other facts
immaterial.” Id. at 323; Katz v. Aetna Cas. & Sur. Co., 972 F.2d 53, 55 (3d Cir. 1992).
III.
DECISION
A.
Maritime Jurisdiction
The parties disagree concerning whether federal maritime law or state law applies to
Czyzykowski’s claims. Several parties argue that Czyzykowski’s claims are non-maritime because his
injury occurred on land, making them state law claims covered by state law—notwithstanding that the
injury occurred during the unloading of a commercial fishing vessel at a dock, an activity properly
characterized as involving maritime matters. The Court disagrees, and concludes Czyzykowski’s
claims are maritime claims2 governed by federal law.
Generally speaking, claims under maritime law will be governed by federal common law, not
state law. See, e.g., Sosa v. Alvarez-Machain, 542 U.S. 692, 741 (2004). A claim constitutes a maritime
claim if, and only if, the claim falls within the district court’s admiralty jurisdiction. See Norfolk S. Ry.
v. Kirby, 543 U.S. 14, 23 (2004).
Congress has authorized district courts to exercise original
jurisdiction over “[a]ny civil case of admiralty or maritime jurisdiction.” 28 U.S.C. § 1333(1). Unless
a statute provides otherwise, “a party seeking to invoke federal admiralty jurisdiction pursuant to 28
U.S.C. § 1331(1) over a tort claim must satisfy conditions both of location and of connection with
maritime activity.” Jerome B. Grubart, Inc. v. Great Lakes Dredge & Dock Co., 513 U.S. 527, 534
2
Czyzykowski does not plead any state law claims. The Amended Complaint explicitly provides that
“[t]he defendants are liable to the plaintiffs for negligence under the Jones Act and the general
maritime law,” not state law. (ECF No. 46 ¶ 16.) Likewise, the Amended Complaint’s
jurisdictional allegations suggest jurisdiction only federal maritime jurisdiction, with no mention of
supplemental jurisdiction over any state law claims. (ECF No. 46 ¶ 2.)
(1995). The location test requires “that the tort occurred on navigable water or [that] injury suffered on
land was caused by a vessel on navigable water.” Id. Satellite Crane and Czyzykowski argue that there
can be no admiralty jurisdiction here—and therefore, federal law cannot govern Czyzykowski’s claims
—because this case fails the location test3: at the time of the incident, both the crane and Czyzykowski
were located on land, not on a vessel in navigable water.
The location test does not apply to this case because Czyzykowski is a seaman and therefore
covered by the Jones Act. As amended, the Jones Act provides as follows: “A seaman injured in the
course of employment . . . may elect to bring a civil action at law, with the right of trial by jury, against
the employer.” 46 U.S.C. § 30104. Admiralty jurisdiction over a Jones Act claim, then, “depends ‘not
on the place where the injury is inflicted . . . but on the nature of the seaman’s service, his status as a
member of the vessel, and his relationship as such to the vessel and its operation in navigable waters.’”
Chandris, Inc. v. Latsis, 515 U.S. 347, 359-60 (1995) (quoting Swanson v. Marra Bros., 328 U.S. 1, 4
(1946)); see also Victory Carriers, Inc. v. Law, 404 U.S. 202, 209 n.8 (1971) (noting that the Jones
“Act covered crewmen injured ashore as well as aboard”). No party contests that Czyzykowski
qualifies as a seaman under the Jones Act. Accordingly, the Court has admiralty jurisdiction over
Czyzykowski’s claims,4 which are therefore governed by federal law, not state law.5
B.
Vicarious Liability
Both Satellite Crane and Sea Watch make arguments concerning whether Czyzykowski can
hold them vicariously liable for the acts of their independent contractors: Satellite Crane argues that it
3 No party argues that this case fails the test for connection with maritime activity.
4
The seaman test of Chandris, rather than the location/connection test of Grubart, also governs
“jurisdiction of admiralty over causes of action for maintenance and cure for injuries received in the
course of a seaman’s employment.” Chandris, 515 U.S. at 359.
5
Although Czyzykowski’s claims are covered by maritime law and not state law, this is a mere
formality in this case, because federal maritime law incorporates principles of state law where the
two do not conflict. See, e.g., DiNenno v. Lucky Fin Water Sports, LLC, 837 F. Supp. 2d 419, 427
(D.N.J. 2011). Here, the maritime law cited below is consistent with the only other bodies of law
(New Jersey state law and Massachusetts state law) that any party suggests may control. Even if
the Court were to apply Massachusetts law or New Jersey law, the result would be the same.
cannot be liable for the negligence of its independent contractor Simmons, while Sea Watch argues that
it cannot be liable for the negligence of its independent contractor Satellite Crane. Neither party’s
argument entitles it to summary judgment because a genuine issue of material fact exists concerning the
degree of control that Sea Watch exercised over Satellite Crane, as well as the degree of control that
Satellite Crane exercised over Simmons.
For claims under the Jones Act, an employer is liable for the actions of its independent
contractor so long as that contractor is acting in furtherance of the employer’s enterprise. See Hopson
v. Texaco, Inc., 383 U.S. 262, 264 (1966); see also Sinkler v. Mo. Pac. R.R. Co., 356 U.S. 326, 329-32
(1958) (issuing a similar holding in a decision under the Federal Employers’ Liability Act 6). For claims
under general maritime law, a defendant generally cannot be held liable for the actions of its
independent contractors unless the defendant exercises sufficient control over the independent
contractor or negligently selects the independent contractor. See In re Dann Ocean Towing, Inc., Civ.
No. 15-1610, 2018 WL 901716, at *5 (D.N.J. Feb. 15, 2018) (collecting cases). The issue of the degree
of a defendant’s control over its independent contractor is question of fact for the jury. See Costlow v.
United States, 552 F.2d 560, 563 (3d Cir. 1977).
In light of the evidence in this record, a genuine issue of material fact remains concerning the
level of control Sea Watch exercised over Satellite Crane and that Satellite Crane exercised over
Simmons.7 For instance, Sea Watch required Satellite Crane it to provide crane operation service for
one crane on 30-minutes notice and operation for a second crane on 60-minutes notice. (ECF No. 11812, at 2.) Sea Watch provided the crane which Satellite Crane was required to operate; Satellite Crane
did not use its own crane. (ECF No. 118-14, at 106:14-23.) In fact, Sea Watch prohibits Satellite
6
“The Jones Act incorporates the standards of the Federal Employers’ Liability Act, as amended,
which renders an employer liable for the injuries negligently inflicted on its employees by its
‘officers, agents, or employees.’” Hopson, 383 U.S. at 263 (footnotes omitted).
7
Accordingly, the Court need not reach the issue of whether Sea Watch and Satellite Crane may be
liable for the actions of their independent contractors on the ground that unloading clam cages is an
inherently dangerous activity. (ECF No. 120, at 22-24.)
Crane from using the crane for Satellite Crane’s own use; Sea Watch required Satellite Crane to use the
crane “as directed.” (ECF No. 118-14, at 107:11-23.) Notwithstanding Sea Watch’s control over the
crane, Sea Watch requires Satellite Crane to conduct maintenance on the crane, including greasing,
lubricating, and maintaining fuel engine oil levels. (ECF No. 118-14, at 108:4-17.) Sea Watch
provides an office on its premises for Satellite Crane, but Sea Watch exercises dominion and control
over that office space. (ECF No. 118-14, at 113:20-114:23.) In addition to its primary crane operation
services, Satellite Crane also had to provide other, ancillary crane services “at the instruction of Sea
Watch.” (ECF No. 118-14, at 175:21-25.) While Sea Watch puts forth other evidence suggesting it
lacked control over Satellite Crane, the record demonstrates a genuine dispute of material fact over the
degree of control, such that the Court cannot say as a matter of law that Sea Watch is insulated from
liability to Czyzykowski in light of its insufficient control over Satellite Crane. See Anderson, 477 U.S.
at 249.
A genuine dispute of material fact likewise exists over the degree of control that Satellite Crane
exercised significant control over Simmons.
Satellite Crane required Simmons to provide crane
operations services “in an on-call manner.” (ECF No. 118-13, at 1.) Simmons’s “minimum” hours
requirement was to be “on call” for three 12-hour shifts and two 6-hour shifts every week, and
“[a]dditional service hours may be requested.” (ECF No. 118-13, at 1.) Satellite Crane required
Simmons to be available on 30-minutes notice. (ECF No. 118-13, at 1.) When Simmons worked,
Satellite Crane made Simmons responsible for completing certain required paperwork. (ECF No. 11813, at 1.)
Satellite Crane required Simmons to insure both Satellite Crane and Sea Watch (at
Simmons’s expense), with Satellite Crane dictating the types of insurance as well as the acceptable
liability limits and deductibles, and retaining veto power over Simmons’s choice of insurers. (ECF No.
118-13, at 3.) If Simmons sought to obtain replacement coverage for his crane operation services,
Satellite Crane and Sea Watch both could exercise veto power over any replacement crane operator.
(ECF No. 118-13, at 3.) Satellite Crane restricted Simmons’s movements while at work, prohibiting
Simmons from entering the seafood processing plant attached to the Sea Watch dock for any purpose
except to use the restroom. (ECF No. 118-13, at 3.) While Satellite Crane puts forth other evidence
suggesting it lacked control over Simmons, the record demonstrates a genuine dispute of material fact
over the degree of control, such that the Court cannot say as a matter of law that Satellite Crane (and
therefore Sea Watch) is insulated from liability to Czyzykowski in light of Satellite Crane’s (and
therefore Sea Watch’s) insufficient control over Simmons. See Anderson, 477 U.S. at 249.
C.
Negligence Claim Against Sea Watch
1.
Duty
Sea Watch also argues that, as a dock owner, it owes no duty to seamen like Czyzykowski
engaged in stevedoring operations at its dock. The Court rejects this argument because Sea Watch is
more than a passive owner of the dock on which Czyzykowski’s injury took place.
The “general maritime negligence standard” is “the duty of exercising reasonable care under the
circumstances of each case.” Kermarec v. Compagnie Generale Transatlantique, 358 U.S. 625, 632
(1959). Under maritime law, a defendant owes a duty to a plaintiff regarding foreseeable risks, but not
regarding unforeseeable risks. See In re: Asbestos Prods. Liab. Litig. (No. VI), 873 F.3d 232, 236 (3d
Cir. 2017). A dock owner generally owes no duty, by virtue of its mere ownership, to those operating
on the dock with no relationship to the dock owner. See Goldsmith v. Swan Reefer A.S., 173 F. App’x
983, 989 (3d Cir. 2006). However, a duty will arise if the dock owner takes part in the activities on the
dock.8 See id. at 989-90 (citing Mullen v. Del Monte Fresh Produce N.A., Inc., No. Civ. A. 02-6722,
2004 WL 2203723 (E.D. Pa. Sept. 29, 2004)).
As a dock owner and operator, Sea Watch owed Czyzykowski a duty of exercising reasonable
care under the circumstances because of Sea Watch’s active participation in activities on the dock. For
instance, Sea Watch provided the crane which injured Czyzykowski.
8
(ECF No. 118-10 ¶ 8.)
The parties’ frame the issue as whether or not Sea Watch is a “stevedore.” The Court declines to
adopt this framing because the duty analysis focuses on the activity in which the dock owner
engages at the dock, not on the dock owner itself and its characterization.
Additionally, Sea Watch’s forklift operators work on the dock, transporting clams from the dock into
the processing facility. (ECF No. 118-10 ¶ 6.) Sea Watch also undertakes certain “responsibilit[ies]
with regard to unloading of clams at the facility”—namely, “to make sure the clams are unloaded in a
timely fashion, and that they are moved into the facility in a timely fashion, and to ensure that company
guidelines with regard to the proper handling of seafood are followed.” (ECF No. 118-10 ¶ 7.) As
previously discussed, Sea Watch exercises a substantive level of control over the dock’s crane operation
services. See part III.B., supra. Given Sea Watch’s significant involvement in the activities on the
dock—and given that Sea Watch could reasonably foresee that these activities could contribute to an
injury of the type Czyzykowski suffered—Sea Watch owed to Czyzykowski a duty of exercising
reasonable care under the circumstances.
2.
Causation
Sea Watch also argues that the record contains no evidence that Sea Watch caused
Czyzykowski’s injury. In light of the conflicting evidence, the Court disagrees.
Under maritime negligence law, a plaintiff must prove causation by showing that a defendant’s
actions were “a substantial factor in causing plaintiff’s injury.” Conner v. Alfa Laval, Inc., 842 F. Supp.
2d 791, 797 (E.D. Pa. 2012). “In establishing causation, a plaintiff may rely upon direct evidence . . .
or circumstantial evidence [to] support an inference” that the defendant’s actions constituted a
substantial factor. Charlevoix v. Caterpillar, Inc., 239 F. Supp. 3d 814, 819-20 (D. Del. 2017) (quoting
Lindstrom v. A-C Prod. Liab. Trust, 424 F.3d 488, 492 (6th Cir. 2005)). This is normally a question for
the jury. See Redland Soccer Club, Inc. v. U.S. Dep’t of the Army, 55 F.3d 827, 851 (3d Cir. 1995)
(applying Pennsylvania state tort law in a non-maritime case under the Federal Tort Claims Act).
A genuine dispute of material fact exists concerning whether Sea Watch caused Czyzykowski’s
injuries—that is, whether Sea Watch was a substantial factor. First, there is evidence suggesting that
Sea Watch’s forklift driver was a substantial factor in the accident. Simmons testified that Sea Watch’s
forklift driver was out on the dock at the time of the injury and “spooked” Czyzykowski, causing
Czyzykowski to react in a way that inadvertently mimicked the signal for Simmons to lift the crane
boom—which Simmons did, injuring Czyzykowski’s hand in the process. (ECF No. 123-12, at 11:920, 42:17-43:5, 54:3-15.) Czyzykowski’s crew mate Ivanov Pavel testified that in the immediate
aftermath of the injury,9 Czyzykowski explained that the injury occurred when Sea Watch’s forklift
driver came too close to Czyzykowski. (ECF No. 123-13, at 11:18-12:2.) Czyzykowski himself stated
that he’d never seen so many clam cages accumulate on the dock without having been removed to the
processing plant by the forklift—a situation Czyzykowski described as dangerous both because there
was insufficient room between cages for Czyzykowski to maneuver and because some cages would
contact other cages, causing the cages to lose their balance and risk tipping over. (ECF No. 121-2, Ex.
CC, at 55:15-19.)
Sea Watch points to evidence that its forklift driver was not on the dock—but rather, in the
processing plant—at the time of Czyzykowski’s injury. But at the summary judgment stage, this Court
cannot simply weigh Sea Watch’s competing evidence more favorably than the evidence from the
opposing parties.
See Big Apple BMW, 974 F.2d at 1363. The existence of competing evidence
merely demonstrates the existence of a genuine issue of material fact concerning whether the forklift
operator was present and therefore could have been a substantial factor in Czyzykowski’s injury. See
Anderson, 477 U.S. at 249.
Sea Watch also argues that its forklift driver bore no responsibility for the buildup of clam cages
at the dock; rather, the crane operator (Simmons) bore full responsibility for the buildup and should
have stopped the unloading process if the dock became dangerously crowded. This argument does not
9 Pavel testified that Czyzykowski made this statement while several people were treating
Czyzykowski’s injury and just before Czyzykowski was taken to the hospital. (ECF No. 123-13, at
11:9-17.) Accordingly, Czyzykowski’s hearsay statement likely qualifies as an excited utterance.
See Fed. R. Evid. 803(2); Peterson v. Warren, Civ. No. 13-4250, 2018 WL 3054680, at *7 (D.N.J.
June 20, 2018) (holding that a statement likely qualifies as an excited utterance when made in the
immediate aftermath of a physical injury prior to transport to the hospital). The Court may
therefore consider it when reviewing a motion for summary judgment. Cf. Fed. R. Civ. P. 56(c)(2)
(“A party may object that the material cited to support or dispute a fact cannot be presented in a
form that would be admissible in evidence.”). The Court makes this determination without
prejudice to any subsequent motion in limine.
entitle Sea Watch to summary judgment because questions of causation like this are to be resolved by
the jury at trial, not by the Court on summary judgment. See Redland Soccer Club, 55 F.3d at 851.
Second, there is evidence showing that the J-hooks provided by Sea Watch were a substantial
factor in Czyzykowski’s injuries. According to Czyzykowski’s expert Stephen Barry, the hooks that
Sea Watch provided for use in lifting the clam cages had an unreasonable, dangerous design that
contributed to Czyzykowski’s injury, when other reasonable, less dangerous hooks were commercially
available. (ECF No. 120-4, Ex. W, at 6-7.) Sea Watch argues that these hooks were reasonable under
the circumstances and that the evidence does not show that the hooks contributed to Czyzykowski’s
injury. In other words, the parties have a genuine dispute of material fact that a jury must resolve at
trial, but that this Court may not resolve on summary judgment. See Anderson, 477 U.S. at 249.
3.
Condition of the Dock
Sea Watch’s last argument contends that Sea Watch is entitled to summary judgment on any
negligence claim concerning the physical condition of the dock, such as inadequate lighting. (ECF No.
118-3, at 18; ECF No. 126, at 14.) No party contests this argument. Accordingly, Sea Watch is entitled
to summary judgment to the extent this argument is unopposed. See Bradley v. Kuntz, 655 F. App’x 56,
59 (3d Cir. 2016) (“As an initial matter, [plaintiff] did not respond to the Motion for Summary
Judgment as to his Fifth Amendment claim and the District Court granted that part of the motion as
unopposed. That was acceptable.”).
Additionally, the Court has independently reviewed the record and determined that there is
insufficient evidence for a reasonable jury to find that the physical condition of the dock was a
substantial factor in Czyzykowski’s injury. See Carbonaro v. Lutz, Civ. No. 08-4928, 2010 WL
3040036, at *3 (D.N.J. Aug. 3, 2010) (suggesting that a district court must independently review the
record before granting an unopposed portion of a motion for summary judgment). Accordingly, Sea
Watch is entitled to summary judgment.
D.
Inadequate Training Claim Against Satellite Crane
Finally, Satellite Crane argues that there is no genuine dispute of material fact concerning
whether Satellite Crane adequately trained Simmons. The Court agrees.10
A claim for failure to train under maritime law is a type of maritime negligence claim. See, e.g.,
Gross v. Tonomo Marine, Inc., No. 2:02-CV-1317, 2006 WL 1437321, at *6 (W.D. Pa. Mar. 9, 2006).
Among the maritime duties owed by a defendant is a duty to properly and adequately train subordinates
both to safely operate equipment in the normal course and in specific safety procedures. See, e.g.,
Nikiforow v. Rittenhouse, 319 F. Supp. 697, 702 (E.D. Pa. 1970). A defendant must “exercise due
diligence” when training subordinates. See Gateway Clipper, Inc. v. Hill, Civ. No. 05-984, 2007 WL
2692248, at *8 (W.D. Pa. Sept. 12, 2007).
Satellite Crane is entitled to summary judgment on this claim because the undisputed facts in
the record demonstrate that Satellite Crane exercised due diligence in ensuring Simmons was
adequately trained on the safe operation of the crane. Simmons testified that Massachusetts issued him
the appropriate crane operation licenses, which he earned by passing multiple tests after taking classes
with both a classroom component, a hands-on, crane-operation component, and a safety education
component. (ECF No. 117-9, at 15:7-22, 21:19-23:3.) When he began working at the Sea Watch dock,
Simmons spent an additional 40 hours—including 4 hours of supervised training for working at night—
over the course of a month to train to use the specific crane at the Sea Watch dock. (ECF No. 117-9, at
90:2-91:14.)
Czyzykowski points out that Simmons did not receive this training directly from Satellite Crane
(ECF No. 117-4, at 32:23-33:7), but the record contains no evidence to show that this training—from
whatever source Simmons obtained it—was insufficient under the circumstances. The record contains
10
Satellite Crane also contends that Czyzykowski’s failure-to-train argument is “disingenuous” and
made in “bad faith.” (ECF No. 125, at 6-7.) While the Court disagrees with Czyzykowski’s failureto-train argument, the Court finds that his argument is “not being presented for any improper
purpose,” is “warranted by existing law,” and has “evidentiary support.” Fed. R. Civ. P. 11(b).
Accordingly, the Court will impose no sanctions. See Fed. R. Civ. P. 11(c).
evidence that neither Satellite Crane nor Simmons documented this training (ECF No. 117-16, at 56:319), but Czyzykowski offers no reason to believe that this failure to document the training casts doubt
on Simmons’ testimony that he in fact underwent the training. For instance, Czyzykowski points to no
legal requirement that crane operators document their training; nor does Czyzykowski produce any
evidence that individuals in the crane operation industry customarily document their training. On this
record, there is no genuine dispute of material fact concerning Simmons’s training, and Satellite Crane
is therefore entitled to judgment as a matter of law on Czyzykowski’s claim that Satellite Crane failed
to adequately train Simmons.
IV.
CONCLUSION11
For the reasons set forth above, Satellite Crane’s Motion for Summary Judgment (ECF No. 117)
is GRANTED IN PART as to Czyzykowski’s claim that Satellite Crane’s inadequate training of
Simmons caused Czyzykowski’s injury and DENIED IN PART as to all other claims, and Sea Watch’s
Motion for Summary Judgment (ECF No. 118) is GRANTED IN PART as to Czyzykowski’s
negligence claim that the physical condition of the dock (such as inadequate lighting) caused
Czyzykowski’s injury and DENIED IN PART as to all other claims. An appropriate order will follow.
/s/ Brian R. Martinotti
HON. BRIAN R. MARTINOTTI
UNITED STATES DISTRICT JUDGE
Dated: October 31, 2019
11
The parties put forward multiple other arguments concerning why the Court should deny the
pending motions for summary judgment. In light of the Court’s disposition of the motions, the
Court need not consider those arguments.