MEMORANDUM AND ORDER: The parties shall, by June 15, 2018, submit a joint letter outlining all issues--including the four mentioned in this memorandum and order--which would need to be resolved for the Court to enter a partial final judgment bringing stage one to a conclusion. The letter shall, with respect to each issue identified, set forth the parties positions as to whether there are any disputed issues of fact requiring an evidentiary hearing. Finally, the letter should propose a schedule and page limits for a single round of briefing on the issues identified. Ordered by Judge Frederic Block on 6/1/2018. (Innelli, Michael)
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF NEW YORK
-----------------------------------------------x
CERTAIN UNDERWRITERS AT
LLOYD’S, LONDON; ACCIDENT &
CASUALTY CO.; ACCIDENT
& CASUALTY INSURANCE
COMPANY OF WINTERTHUR;
ACCIDENT & CASUALTY
INSURANCE COMPANY OF
WINTERTHUR (NO. 2A/C);
ACCIDENT & CASUALTY
INSURANCE COMPANY OF
WINTERTHUR (NO. 3 A/C);
AEGON NV FORMERLY AGO
SCHADEVEZEKERING
MAATSCHAPPIJ NV; AG DE 1830
COMPAGNIE BELGE
D’ASSURANCES GENERALES
INCENDIE ACCIDENTS ET
RISQUES DIVERS SA; AMERICAN
HOME INSURANCE COMPANY;
AMSTERDAM - LONDON
VERZEKERING MAATSCHAPPIJ
NV; ANCON INSURANCE
COMPANY (UK) LIMITED;
ARGONAUT NORTHWEST
INSURANCE COMPANY;
ASSICURAZIONI GENERALI SPA
(UK BRANCH); BISHOPSGATE
INSURANCE COMPANY LIMITED;
BRITAMCO POOL; CNA
REINSURANCE COMPANY; CNA
REINSURANCE COMPANY
LIMITED; CORNHILL INSURANCE
COMPANY LIMITED; CREDIT DE
NAMUR; DELTA-LLOYD NON-LIFE
INSURANCE COMPANY LIMITED;
MEMORANDUM AND ORDER
Case No. 14-CV-4717-FB-RLM
DELTA-LLOYD SCHADEVERZEKERING NV; DILIGENTIA;
EUROPEESCHE VERZEKERING
MAATSCHAPPIJ NV; EXCESS
INSURANCE COMPANY LIMITED;
GRESHAM FIRE & ACCIDENT
INSURANCE SOCIETY LIMITED;
GRESHAM INSURANCE SOCIETY
LIMITED; HELVETIA-ACCIDENT
SWISS INSURANCE COMPANY (AS
PART OF GIBBON “E” GROUP);
HARPER INSURANCE LTD F/K/A/
TUREGUM INS CO.; INSTITUTO DE
REASSEGUROS DO BRASIL (IRG) LONDON BRANCH; INTERLLOYD
VERZEKERING MAASTSCHAPPIJ
NV; KONING & BOEKE VAN 1819;
LA BELGIQUE; L’ASSICURAZIONI
D’ITALIA; LE ASSICURAZIONI
D’ITALIA SPA; LES ASSURANCES
GENERALES DE FRANCE; LES
PROPRIETAIRES REUNIS S.A. D.
ASSURANCES I.A.R.D.; L’ETOILE;
LONDON & EDINBURGH GENERAL
INSURANCE COMPANY, LONDON
AND EDINBURGH GENERAL
INSURANCE COMPANY LIMITED;
MAAS LLOYD NV SCHADEVERZEKERINGSMAATSCHAPPIJ;
MERCATOR ALGEMENE VERZEKERINGS MAATSCHAPPIJ NV;
N.V. ROTTERDAMSE ASSURANTIEKAS, N.V. VERZ MIJ DE
NOODERN; NAMUR ASSURANCES
DU CREDIT; NATIONAL
CASUALTY COMPANY; NATIONAL
CASUALTY COMPANY OF
AMERICA LIMITED;
2
NISSAN FIRE & MARINE
INSURANCE COMPANY;
NOORHOLLAND BRANDW;
NORWICH UNION FIRE
INSURANCE SOCIETY LIMITED;
PROVIDENTIAL INSURANCE
COMPANY; RHEINLAND
VERSICHERUNGS AG; ROYAL
NEDERLAND SCHADEVERZEKERING NV; ROYALE BELGE
SA; ROYALE BELGE INCENDIE
REASSURANCE S.A.; SIMCOE &
ERIE GENERAL INSURANCE
COMPANY; ST KATHERINE
INSURANCE COMPANY PLC;
TAISHO MARINE & FIRE
INSURANCE COMPANY LIMITED;
TERRA NOVA INSURANCE
COMPANY; THE SUMITOMO
MARINE AND FIRE INSURANCE
COMPANY LIMITED; UNION
AMERICA INSURANCE COMPANY
LIMITED; WINTERTHUR SWISS
INSURANCE COMPANY;
WURTTEMBERGISCH
FEUERVERSICHERRUNG AG;
YASUDA FIRE & MARINE
INSURANCE COMPANY (UK)
LIMITED,
Plaintiffs,
-againstNATIONAL RAILROAD
PASSENGER CORPORATION;
ALLIANZ INSURANCE COMPANY;
ALLSTATE INSURANCE
COMPANY; AMERICAN HOME
3
ASSURANCE COMPANY;
AMERICAN INSURANCE
COMPANY; AMERICAN
REINSURANCE COMPANY;
ARGONAUT INSURANCE
COMPANY; ASSUBEL ACCIDENTS
ET DOMMAGES SA; ASTRA S.A.
INSURANCE AND REINSURANCE
COMPANY AS SUCCESSOR TO
ADAS STATE INSURANCE
INSTITUTE; ATLANTICA
INSURANCE COMPANY; BANCO
DE SEGUROS DEL ESTADO;
BANDEIRANTE; BELLEFONTE
INSURANCE COMPANY (US);
BISON INSURANCE COMPANY
LIMITED; BRITTANY INSURANCE
COMPANY LIMITED; CALIFORNIA
UNION INSURANCE COMPANY;
CIGNA; COMPAGNIE BELGE
D’ASSURANCES CREDIT S.A.;
COMPANHIA DE SEGUROS
IMPERIO; COMPANIA DE SEGUROS
LA REPUBLICA S.A.;
CONTINENTAL INSURANCE
COMPANY AS SUCCESSOR IN
INTEREST TO HARBOR
INSURANCE COMPANY AND
PACIFIC INSURANCE COMPANY;
THE DOMINION INSURANCE
COMPANY LIMITED; EURINCO
ALLGEMEINE VERSICHERUNGS
AKTIENGESELLSCHAFT;
EVANSTON INSURANCE
COMPANY; FIRST STATE
INSURANCE COMPANY;
FIREMAN’S FUND INSURANCE
COMPANY; GESB-GRUPO
4
EMPRESAS SEGURADORAS;
GRANITE STATE INSURANCE
COMPANY; THE HARTFORD
ACCIDENT AND INDEMNITY
COMPANY; HASSNEH INSURANCE
COMPANY OF ISRAEL LIMITED;
INSTITUTO NACIONALI DE
REASEGUROS; INSURANCE
COMPANY OF NORTH AMERICA;
INSURANCE COMPANY OF THE
STATE OF PENNSYLVANIA;
INTERSTATE REINSURANCE
CORPORATION; INTERNATIONAL
SURPLUS LINES INSURANCE
COMPANY; KOREAN
REINSURANCE COMPANY;
LANDMARK INSURANCE
COMPANY; LEXINGTON
INSURANCE COMPANY;
NATIONAL MUTUAL INSURANCE
COMPANY; NATIONAL UNION
FIRE INSURANCE COMPANY OF
PITTSBURGH, PENNSYLVANIA;
NORTHBROOK INSURANCE
COMPANY; THE PEOPLE’S
INSURANCE COMPANY OF CHINA;
RAILROAD ASSOCIATION
INSURANCE LIMITED;
REAFIANZADORA Y
REASEGURADORA DE AMERICA;
ROBERTO FEVRE; SHAND
MORAHAN & CO.; STRONGHOLD
INSURANCE COMPANY LIMITED;
VERA CRUZ INSURANCE
COMPANY; WAUSAU
INTERNATIONAL
UNDERWRITERS;
YOSEMITE INSURANCE
5
COMPANY; and DOES 1-40,
Defendants.
-----------------------------------------------x
BLOCK, Senior District Judge:
Having previously addressed the parties’ lengthy motions for summary
judgment and presided over a ten-day trial, the Court’s current goal is to bring the
first stage of this extraordinarily contentious case to a close. To that end, the Court
solicited the parties’ views as to how to proceed. Although those views predictably
diverged, the parties apparently agree that rulings from the Court on two related
issues of law will assist them in their settlement discussions.
The Court has consistently urged the parties to work toward a negotiated
resolution. In any event, molding the jury’s verdict into a judgment would require
the Court to resolve the same issues. Therefore, the requested rulings follow.
I
Addressing the parties’ motions for summary judgment, the Court adopted a
“pro rata” approach to the allocation of total loss across multiple policies: “[T]he
Court will ask the jury to determine the total amount of covered damage and
apportion that amount across triggered policies based on the time each policy was
in effect, as a percentage of the total time over which covered damage occurred.”
Certain Underwriters v. Nat’l R.R. Passenger Corp., 2017 WL 3575242, at *7
6
(E.D.N.Y. Aug. 17, 2017). It further held that “Amtrak's SIRs [self-insured
retentions] will be included in the apportionment.” Id. (citing Mayor & City
Council of Baltimore v. Utica Mut. Ins. Co., 802 A.2d 1070, 1101-02 (Md. Ct.
Spec. App. 2002)). The jury subsequently found that Amtrak incurred $14.3
million in costs to remediate third-party property damage occurring between 1972
and 1986.
II
There is no dispute as to the amount of Amtrak’s SIRs. Amtrak had an SIR
of $1 million between 1972 and 1974, SIRs of $2 million between 1974 and 1985,
and an SIR of $5 million between 1985 and 1986. However, the parties advocate
different ways of applying the Court’s allocation ruling.
The LMI say that the Court should prorate the jury’s award over 14 years,
for an allocated loss of $1.02 million per year. The Court should then subtract
Amtrak’s total SIR for each policy period. $2.04 million would be allocated to the
first policy period, which ran from 1972 to 1974. Subtracting Amtrak’s $1 million
SIR for that period would trigger the $1 million primary layer of coverage and
$40,000 of the first layer of excess coverage. $3.06 million would be allocated to
the second policy period, which ran from 1974 to 1977. Subtracting Amtrak’s $2
million SIR for that period would trigger $1.06 million of the primary layer of
coverage. Amtrak’s SIR in each remaining policy period exceeded the allocated
7
loss, triggering no coverage. The net result would be a judgment of roughly $2.1
million in Amtrak’s favor.
Amtrak, meanwhile, says the period of proration should be only 13 years, for
an allocated loss of $1.1 million per year. In addition, it argues that the Court
should prorate both the jury’s award and its SIRs. Finally, it argues that the twoyear policy in effect from 1972 to 1974 and the three-year policy in effect from
1974 to 1977 should be treated as multiple, single-year policies with multiple
policy limits and SIRs. The result would be covered losses of $1.023 million per
year for two years, and of $946,000 per year for 11 years, for a total judgment of
roughly $12.45 million.
Thus, the parties dispute (A) the period of proration, (B) the inclusion of
Amtrak’s SIRs in the proration, and (C) the effect of multi-year policy periods.
The Court defers consideration of the third issue because the LMI have not yet
responded to Amtrak’s argument, which, in any event, is too cursory to allow the
Court to make an informed ruling. The other two issues are addressed in turn.
A. Period of Proration
In its prior decision, the Court stated that it would ask the jury to determine
“the total time over which covered damage occurred.” Certain Underwriters, 2017
WL 3575242, at *7. The jury determined that period to be 14 years.
Amtrak persuasively argues, however, that the 1985-1986 policy year should be
8
excluded from the denominator because those policies contain absolute pollution
exclusions. Courts in both New York and Maryland have held that pro rata
apportionment should not include periods when coverage is not available.
In Stonewall Insurance Co. v. Asbestos Claims Management Corp., 73 F.3d
1178 (2d Cir. 1995), the district court reasoned that the insured’s acceptance of an
asbestos exclusion was akin to a decision not to obtain coverage. See id. at 1203.
The Second Circuit disagreed, holding that the insured was required only “to
accept a proportionate share of a risk that it elected to assume.” Id. at 1204
(emphasis added). Citing Stonewall, the Maryland Court of Special Appeals held
that “losses will be prorated to the insured, unless a gap in coverage is due to the
insured's inability to obtain insurance.” Mayor & City Council of Baltimore, 802
A.2d at 1104.
The Court has previously explained why decisions from New York and
Maryland deserve special consideration in this case. See Certain Underwriters,
2017 WL 3575242, at *1, *3. Since the pollution exclusions in the 1985-1986
policies do not reflect a voluntary election by Amtrak to forego coverage, that
policy year will be excluded from the period of proration; the jury’s damages
calculation will instead be prorated over the 13-year period from 1972 to 1985.
9
B. SIRs
“In Amtrak's view, 1/13th of the [self insured] retention applies in each year,
just as 1/13th of the loss applies in each year.” Letter from Rhonda D. Orin (Dec.
22, 2017) 2. But that is a false comparison. The proper comparison is between an
SIR and an insurance policy. See Stonewall Ins. Co., 73 F.3d at 1204 (adopting
apportionment that “better comports with the principle of treating [the insured] as a
self-insurer for the one year when insurance was available.”). A $1 million dollar
policy provides that amount of coverage for a particular period (typically one year)
of the damages period, not the entire period. Similarly, a $1 million SIR for a
particular year represents a decision by the insured to bear that amount of loss for
that year. Therefore, Amtrak’s per-year SIRs will not be apportioned.
III
Apportioned over 13 years, the jury’s finding of total covered damage is
$1.1 million per year. Amtrak’s total SIR for each year will be applied to that
amount.
Although the Court takes seriously the representation that those rulings will
assist the parties in their settlement negotiations, it must still proceed with the
litigation. Having considered the parties’ input, it adheres to its own previously
expressed view that prompt appellate review of its rulings of law during the first
stage of the litigation—in particular, its holding that total loss would be
10
apportioned across all triggered policies and Amtrak’s SIRs—is of paramount
importance because those same rulings will apply to the remaining stages. It
would waste considerable time, money and effort to litigate the remaining
environmental damage claims at two other sites—as well as the bodily injury
claims—based on the Court’s rulings, only to have the Second Circuit determine
on appeal of a judgment resolving all claims that one or more of those rulings was
incorrect.
The Court initially raised the possibility of certification pursuant to 28
U.S.C. § 1292(b), which authorizes an interlocutory appeal when a district court is
“of the opinion that [its] order involves a controlling question of law as to which
there is substantial ground for difference of opinion and that an immediate appeal
from the order may materially advance the ultimate termination of the litigation.”
However, “[t]he district court’s order, not the certified question, is brought before
the court on a § 1292(b) appeal.” J.S. ex rel. N.S. v. Attica Cent. Schs., 386 F.3d
107, 115 (2d Cir. 2004) (quoting Moore v. Liberty Nat’l Life Ins. Co., 267 F.3d
1209, 1219-20 (11th Cir. 2001)). Thus, the central idea of a § 1292(b) appeal is
that a different resolution of the controlling issue would lead to a different order.
See, e.g., SEC v. Credit Bancorp, Ltd., 103 F. Supp. 2d 223, 227 (S.D.N.Y. 2000)
(“In determining whether a controlling question of law exists the district court
should consider whether: reversal of the district court’s opinion could result in
11
dismissal of the action; reversal of the district court’s opinion, even though not
resulting in dismissal, could significantly affect the conduct of the action, or; the
certified issue has precedential value for a large number of cases.”).
The Court’s rulings are embodied in a memorandum and order denying, with
one exception, various motions for summary judgment.1 Although those rulings
later played a key part in the jury instructions and the Court’s current effort to
apply the jury’s verdict, none of them was “controlling” in the sense that a
different conclusion would have led the Court to grant the motions. In addition,
while the rulings have continuing application in the litigation, the order itself has
no further impact in light of the trial. Since an immediate appeal cannot forestall a
trial that has already taken place, the Court is not inclined to make the necessary
certification.
Federal Rule of Civil Procedure 54(b) provides another avenue for early
appellate review:
When an action presents more than one claim for relief . . . or when
multiple parties are involved, the court may direct entry of a final
judgment as to one or more, but fewer than all, claims or parties only
if the court expressly determines that there is no just reason for delay.
1
The Court granted, in part, the motion of four excess insurers, dismissing
Amtrak’s breach of contract claims against them on the ground that “there is no
reasonable prospect that Amtrak's damages would reach the necessary limits” on
those insurers’ policies. Certain Underwriters v. Nat’l R.R. Passenger Corp., 2017
WL 4221066, at *3 (E.D.N.Y. Sept. 21, 2017).
12
“Rule 54(b) permits certification of a final judgment where (1) there are multiple
claims or parties, (2) at least one of the claims or the rights and liabilities of at least
one party has been finally determined, and (3) ‘there is no just reason for delay.’”
Grand River Enters. Six Nations, Ltd. v. Pryor, 425 F.3d 158, 164-65 (2d Cir.
2005) (quoting the rule).
Resolution of stage one—that is, coverage for property damage at Sunnyside
Yards—will satisfy the first requirement for certification. The Second Circuit
defines a “claim” as “the aggregate of operative facts which give rise to a right
enforceable in the courts.” Gottesman v. Gen. Motors Corp., 401 F.2d 510, 512
(2d Cir. 1968). A case presents multiple claims when each claim relies on
“separate and distinct” operative facts. Hudson River Sloop Clearwater, Inc. v.
Dep’t of Navy, 891 F.2d 414, 418 (2d Cir. 1989). Therefore, “the existence of
multiple claims turns on ‘whether the underlying factual bases for recovery state a
number of different claims which could have been separately enforced.’” Acumen
Re Mgmt. Corp. v. Gen. Sec. Nat’l Ins. Co., 769 F.3d 135, 141 (2d Cir. 2014)
(quoting Rieser v. Baltimore & Ohio R.R., 224 F.2d 198, 199 (2d Cir. 1955)).
Though the policies at issue are the same, coverage for property damage at other
sites and for bodily injuries will present separate and distinct sets of operative facts
as to, among other things, the cause and extent of the damage. Moreover, while the
decision to litigate coverage for different types of damages at different sites in a
13
single case was reasonable, a claim of coverage for a particular type of damage at a
particular site could undoubtedly have been separately enforced.
The third requirement is also satisfied. There is no reason to hold a
determination of coverage for property damage at Sunnyside Yards in abeyance
while coverage for other damages and at other sites is litigated. If Amtrak is
entitled to coverage for Sunnyside Yards, it is entitled to it regardless of what
happens later in the litigation. And, as previously explained, waiting until the end
of the case to enter judgment runs the risk of multiple retrials. In the Court’s
judgment, those factors warrant a prompt resolution of stage one. See L.B. Foster
Co. v. America Piles, Inc., 138 F.3d 81, 86 (2d Cir. 1998) (“The determination of
whether there is no just reason to delay entry of a final judgment is a matter
committed to the sound discretion of the district court.”).
Unfortunately, the second requirement for certification is not satisfied
because the parties’ respective rights and liabilities with respect to property
damages at Sunnyside Yards cannot yet be finally determined. Although this
memorandum and order resolves two outstanding issues, others remain. As noted,
the parties disagree as to the treatment of multi-year policies. In addition, the LMI
allude to unresolved issues which might further reduce their liability, including the
number of occurrences causing the damage, the applicability of the policies’
various pollution exclusions and possible collateral-source payments to Amtrak.
14
Therefore, the parties shall, by June 15, 2018, submit a joint letter outlining
all issues—including the four mentioned in this memorandum and order—which
would need to be resolved for the Court to enter a partial final judgment bringing
stage one to a conclusion. The letter shall, with respect to each issue identified, set
forth the parties’ positions as to whether there are any disputed issues of fact
requiring an evidentiary hearing. Finally, the letter should propose a schedule and
page limits for a single round of briefing on the issues identified.
SO ORDERED.
/S/ Frederic Block____________
Frederic Block
Senior United States District Judge
Brooklyn, New York
June 1, 2018