Cayemittes v. The City of New York Department of Housing Preservation and Development et al
Filing
65
OPINION AND ORDER re: 50 MOTION for Summary Judgment filed by The City of New York Department of Housing Preservation and Development: For the reasons set forth above, HPD's motion for summary judgment is granted. The Clerk of Court is respectfully directed to terminate item number fifty (50) on the docket and to close this case. (Signed by Judge Ronnie Abrams on 9/30/2013) (tn)
1. Plaintiff’s Rule 56.1 Statements
Pursuant to Local Civil Rule 56.2 (requiring “Notice to Pro Se Litigant Who Opposes a
Summary Judgment”) Defendant timely advised Plaintiff of the procedures governing summary
judgment submissions, including that Plaintiff “may [not] oppose summary judgment simply by
relying upon the allegations in [his] amended complaint” and that “[a]ny witness statements must
be in the form of affidavits . . . [and] based on personal knowledge stating facts that would be
admissible in evidence at trial.” (Dkt. 51.) Defendant also timely provided Plaintiff with copies
of the text of Federal Rule of Civil Procedure 56 and Local Civil Rule 56.1. Plaintiff was
therefore adequately notified that “[e]ach statement by the . . . opponent pursuant to Rule
56.1([b]), including each statement controverting any statement of material fact, must be
followed by citation to evidence which would be admissible, set forth as required by Federal
Rule of Civil Procedure 56(c).” Local Civ. R. 56.1(d).
Plaintiff has filed two 56.1 Statements that do not comply with these rules. 1
The first of these submissions, which responds to Defendant’s 56.1 Statement, is properly
comprised of a list of numbered paragraphs each of which “concede[s]” or “dispute[s],” as the
case may be, the fact contained in the corresponding numbered paragraph in Defendant’s
submission. Regardless of whether a fact is conceded or disputed, however, Plaintiff proceeds to
add, in a majority of these paragraphs, a supply of additional facts that are unsupported by
admissible record evidence. See, e.g., Pl.’s 56.1 ¶¶ 18, 21, 30-33, 57. Additionally, many of
these “facts” are, inter alia: speculative, see, e.g., id. ¶ 58 (“Neither Carbine [n]or Hendrickson
understood [P]laintiff’s job as director of TPT/TLS.”); conclusory, see, e.g., id. ¶ 47 (“By late
February 2008, [P]laintiff had already been subjected to several retaliatory actions by Carbine for
1
For convenience, the Court will refer to these documents collectively as “Plaintiff’s 56.1 Statement” and
cite to them collectively as “Pl.’s 56.1.”
2
his complaints.”); and/or argumentative, see, e.g., id. ¶ 82 (“At best this sounds like a glib take
on the role of DAMP . . .”).
Plaintiff’s second 56.1 Statement consists, according to Plaintiff, of additional “material
facts [that] are not in dispute.” (Pl.’s 56.1 p. 1.) This submission, which runs a full sixty-eight
pages, is not “short and concise” and is not organized into numbered paragraphs, as the Local
Rule requires. More fundamentally, it does not contain, for the most part, facts corroborated by
admissible evidence, but rather, statements that are, inter alia: vague, see, e.g., Pl.’s 56.1 p. 52
(Carbine “made vague disparaging comments to others about [P]laintiff’s job performance but
[has] always been careful not to ever give specifics or provide any proof.”); conclusory, see, e.g.,
id. p. 7 (“Aragon decided to evaluate [P]laintiff . . . in order to retaliate against plaintiff . . .”);
speculative, see, e.g., id. p. 5 (“Carbine was not interested in learning the TPT or TLS
programs”); relevant only to claims that (as explained below) have been dismissed as timebarred or otherwise legally insufficient, see, e.g., id. p. 51 (“In 2002 Aragon summoned plaintiff
into his office and reprimanded him in error for something that plaintiff did not do.”); and/or
personal attacks see, e.g., id. p. 50 (“Since about 2005 HPD has had a cadre of morally corrupt
managers who [are] shameless liars and cared only about their ego.”).
Despite these various infirmities, acknowledging that the various procedural rules
attendant to opposing summary judgment may be challenging or confusing for a pro se litigant,
the Court has reviewed Plaintiff’s submissions in their entirety and has done its best to separate
the wheat from the chaff. Holtz v. Rockefeller & Co., 258 F.3d 62, 73 (2d Cir. 2001) (“A district
court has broad discretion to determine whether to overlook a party’s failure to comply with
local court rules.”). Specifically, although Plaintiff has not submitted a declaration or other
sworn statement in opposition to Defendant’s motion, the Court will consider the unsworn
3
content in Plaintiff’s 56.1 Statement, to the extent it is otherwise admissible. In so doing, the
Court relies on the assumption that Plaintiff would have testified to such content had he
complied with the governing rules. See Geldzahler v. New York Med. Coll., 746 F. Supp. 2d
618, 620 n.1 (S.D.N.Y. 2010) (“[D]espite [plaintiff] having received the 56.2 Notice, we take
into account his status as a pro se litigant and will consider the unsworn statements in his 56.1
Response on the assumption that he would have testified to these statements in his
Declaration.”); Shah v. Kuwait Airways Corp., 653 F. Supp. 2d 499, 506 (S.D.N.Y. 2009)
(Lynch, J.) (“[T]he Court will consider [plaintiff’s] declaration, even though it is unsworn, on the
assumption that, if its allegations were sufficient to raise an issue of fact, Shah would be given an
opportunity to submit an affidavit in the proper form attesting to those allegations.”). By the
same token, the Court has disregarded the content of Plaintiff’s 56.1 Statements that it deems
conclusory, speculative, irrelevant, argumentative, unsupported or otherwise inappropriate for
consideration. See Shortt v. Congregation KTI, No. 10 Civ. 2237 (ER), 2013 WL 142010, at *1
n.2 (S.D.N.Y. Jan. 9, 2013) (“[I]n analyzing the instant motion, the Court has disregarded
averments in Plaintiff’s 56.1 Response that are . . . not supported by citations to admissible
evidence in the record . . . or that are improper legal arguments.”).
2. Plaintiff’s Exhibits
Plaintiff has submitted over one thousand pages of emails, other contemporaneous
documentation, transcripts of depositions he took and personal notes he apparently prepared in
connection with this litigation.
The Court has reviewed and considered all of these materials. It notes, however, that it
has not always been able to link them to the portions of Plaintiff’s 56.1 Statements they are
ostensibly intended to support. First, these materials have not been presented to the Court in any
4
logical or convenient manner. Plaintiff has merely grouped together as “exhibits” documents
that are only loosely thematically related, see, e.g., Pl.’s Ex. J (“Some Green Project [sic] that
[P]laintiff worked on intermittently from about November 2007 to April 2008”), or have no
substantive relationship to one another at all, see, e,g., Pl.’s Ex. L (“Various discovery items
under heading of ‘PL’ for Plaintiff in Numerical Order”). Second, as noted above, Plaintiff’s
56.1 Statement only intermittently cites to this documentation.
Third, where Plaintiff has
included a citation, it is with few exceptions not a citation to the exhibit itself, but rather to a
Bates number, to a unique numbering system Plaintiff has applied to certain documents or to a
vague description of the document. See, e.g., Pl.’s 56.1 ¶ 19 (citing to “Mackie ESCF”); id. ¶ 35
(citing to “outreach to Personnel in Nov. 2007”); id. p. 6 (citing to “notes to self”); id. p. 51
(citing to “John Spinelli letter where Aragon accused plaintiff of sabotaging his hiring of
Spinelli”); id. p. 56 (citing to “Loans”). Finally, Plaintiff occasionally appears to have intended
to cite to submitted material, but, perhaps inadvertently, has failed to include any cite at all. See,
e.g., id. p. 30 (citing to “See . . .”).
In summary, in light of Plaintiff’s pro se status, the Court has considered “the totality of
the parties’ submissions in identifying disputed material facts and will construe those disputed
facts in plaintiff’s favor as is appropriate on summary judgment.” Shah, 653 F. Supp. 2d at 501
n.1 (citing Merritt v. Shuttle, Inc., 245 F.3d 182, 186 (2d Cir. 2001)).
B. Factual Background
Plaintiff began working at HPD in September 1986 as a budget analyst responsible for
communicating HPD’s funding needs to the Office of Management and Budget (“OMB”),
formulating written requests to OMB and obtaining ultimate approval for HPD’s funding
proposals. (Def.’s 56.1 ¶¶ 1-2.) In November 1999, Plaintiff became a “financial analyst”
5
assigned to the Third-Party Transfer Unit in the HPD division then known as the Division of
Anti-Abandonment, which was subsequently renamed the Division of Neighborhood
Preservation (“DNP”). 2 (Id. ¶ 3; Cayemittes Tr. 55.)
Also in November 1999, Plaintiff settled a race discrimination dispute with HPD arising
from Plaintiff’s removal from HPD’s budget office. (Rizvi Decl. Ex. P.) Pursuant to a term of
the settlement agreement (the “1999 Settlement”), Plaintiff was promoted to Director of the
Third-Party Transfer Unit (“TPT”), which he agreed to because “it fit [his] plans for [his]
career.” (Id.; Cayemittes Tr. 41.) In that capacity, he “was responsible for running the [TPT]
program [and] implementing the law that authorized the program.” (Id. 42.)
As of July 2001, in addition to his role as Director of TPT, Plaintiff became Director of
the Tax Lien Sale Unit (“TLS” or, with TPT, “TPT/TLS”) 3 (Def.’s 56.1 ¶ 12.) As Director of
2
For convenience, the Court also use the abbreviation “DNP” to refer to the Division of Anti-Abandonment.
As Plaintiff testified, DNP was “geared to preventing abandonment, the whole history of abandonment that existed
in the city by taking properties of nonpayment of taxes.” (Cayemittes Tr. 31-32.)
For the reader’s benefit, the Court notes that, according to the DNP website, “[DNP] conducts site
assessments of thousands of buildings each year through four borough offices to determine whether they are at risk,
develop individual treatment plans for the buildings, and coordinate the implementation of the treatment plans.
DNP[’]s activities encourage owners to pay their taxes, refer owners to education and support programs including
anti-abandonment training and provide assistance with rehabilitation loan financing, refer buildings for targeted
code enforcement when necessary, and review distressed properties for exclusion from Department of Finance tax
lien sales. DNP also coordinates several stages of the third party transfer process to convey distressed tax delinquent
buildings to new responsible owners using an in rem foreclosure mechanism. Finally, DNP oversees the work of
Neighborhood Preservation Consultants who extend DNP[’]s reach into communities throughout New York City by
providing a variety of housing services.”
See http://www.nyc.gov/html/hpd/html/about/neighborhoodpreservation.shtml.
3
During the 1970’s, New York City developed a substantial abandonment and vacancy problem. Both
national and local economic trends made it more difficult for property owners to pay taxes. In 1976, the City
responded to this crisis by assuming ownership of properties with one year of delinquent taxes through in rem
foreclosure actions. The objective was to quickly prevent housing stock from further deteriorating under landlords
who maintained poor conditions for their tenants. By the early 1990s, however, HPD had become the City’s largest
landlord, spending $2.2 million to manage, repair, and sell each building. In 1996, the City enacted a local law that
enabled it to collect tax revenue upfront by selling liens on unpaid property taxes and related charges. (Pl.’s Ex. C
(The New York City Tax Lien Sale: History and Impact (May 2012).)
As Plaintiff testified, “[t]he tax lien sale is basically where we sell the lien against the property usually for
nonpayment of taxes and then whoever the lien holder [is] can foreclose and ultimately take away the property.”
(Cayemittes Tr. 46.)
6
TPT/TLS, Plaintiff, inter alia, “managed HPD’s tax lien sale work in coordination with [other
City agencies],” worked with these agencies to “initiate several program improvements and
innovations” and fielded “calls from City elected officials . . . in affected districts,” and
“represented HPD in negotiations with owner representatives in [c]ourt.”
(Pl.’s 56.1 pp. 2-3.)
During the relevant period, he “report[ed] directly” to the Assistant Commissioner of DNP,
William Carbine. (Rizvi Aff. Ex. D; Pl.’s 56.1 p. 2; Carbine Tr. 10-11.)
As Director of TPT/TLS, Plaintiff did not receive any complaints about his “job
performance, lack of cooperation or teamwork” and Carbine “never formally or informally
complained to [Plaintiff] about any aspect of his job performance.” (Pl.’s 56.1 pp. 4, 9.) Rather,
Plaintiff received positive feedback for his management of TPT/TLS from “[m]ore than one
Commissioner” and “other tax enforcement and anti-abandonment stakeholders” who
“complimented [P]laintiff about the program intelligence he . . . provided.” (Id. pp. 4-5.)
Indeed, Carbine “often profusely praised [P]laintiff’s work, especially before meetings with
senior officials” and “told [P]laintiff that he was an outstanding administrator and a highly
professional and excellent manager.” (Id. pp. 9, 10.)
DNP Reorganizes and Plaintiff Becomes Director of Special Projects
In fall 2007, DNP underwent a “reassignment process” to address numerous
“[p]ersonnel” and “supervisory issues” throughout the “whole division,” including certain issues
relating to Plaintiff. (Carbine Tr. 62-66, 103.) As a result of the reassignment process, five of
the six DNP directors, including Plaintiff, were rotated to different units “[t]o give a new fresh
start to DNP”; “[n]obody was being singled out.” (Id. 63-71, 101-2.) Plaintiff describes this
process as a “reshuffling.” (Pl.’s 56.1 ¶ 13.)
In an October 1, 2007 meeting, Carbine informed Plaintiff that, due to the reassignment,
7
he would be removed from his position as Director of TPT/TLS and would become DNP’s
Director of Special Projects. (Rizvi Decl. Ex. H.) Later that day, Plaintiff reacted to this news in
an email to Carbine, stating:
I wanted to be clear about what you discussed w/me this afternoon: Due to a
divisional reorganization, you said, there will be a “Round-Robbin” [sic] type setup where “everybody gets moved around” to perform different jobs. Under this
arrangement, within three weeks, I will no longer be in my current position.
Instead I am being reassigned as the new Director of Special Projects, which, I
learned at the meeting, is the title currently occupied by Harriet Martin.
My new responsibilities will entail working on the new, upcoming Neighborhood
Consultants RFP . . . I will also be assigned to work on the “Green Project” where
“everything has to be green” and . . . on “other smaller projects.”
For now, I have these questions: How long is this “Round Robbin” [sic] to last?
Why am I being taken from a position I have been effective performing over the
years and quite happy doing? You mentioned that there are problems in my unit.
Other than [one issue] that we have discussed over the past year, I have not been
aware of any problems, especially anything else that impacts the unit’s
production. My group has worked productively and harmoniously as a team since
2000. Will I be informed what these “problems” are as well be given an
opportunity to fairly address? What does this mean to me and my career?
As I explained, given a choice I would prefer a position where the job and its
responsibilities are more clearly defined and in line w/[]my career goals.
(Id.)
As part of his reassignment to Director of Special Projects, Plaintiff “lost [his]
supervisory role.” (Cayemittes Tr. 53; Carbine 96-97.) 4 He also believed the reassignment
signified a loss of “status” and constituted a “demotion.” (Cayemittes Tr. 53; Pl.’s 56.1 p. 14.)
He went from an “administrative, managerial, supervisory and high prestige position to one that
was less desirable.” (Pl.’s 56.1 p. 16.)
On October 1, 2007, Carbine told Plaintiff that his “removal from TPT/TLS would
4
As Carbine noted, and as discussed in detail below, Plaintiff was offered, but declined to accept, other
director-level supervisory positions. (Carbine Tr. 98.)
8
continue as planned” but would be “postponed another few weeks.” (Id. p. 14.) Plaintiff
responded by telling Carbine that he intended to “complain about his removal up the City
hierarchy.” (Id. p. 16.) 5
HPD’s Search for Positions of Interest for Plaintiff
On October 11, 2007, Plaintiff met with Carbine and David Schmid, DNP’s Director of
Operations, (Cayemittes Tr. 56), to discuss Plaintiff’s new role as Director of Special Projects.
(Pl.’s Ex. O D002793.) Schmid documented the meeting as follows:
[Plaintiff] stated that he did not want to appear unreasonable by dismissing the
offer [for the position of Director of Special Projects], but did not want to work in
OPS [Office of Preservation Services] if given a choice. He was told that the
other directors who are being switched have not been given a choice on
placement, but [Plaintiff] was granted time to make a decision on whether he
would willingly accept the position. In the meantime, [Carbine] offered to reach
out to help [Plaintiff] find another position, if [Plaintiff] would tell him what he
was interested in. [Plaintiff] stated that he was unsure, but that he had previously
mentioned working in Development.
(Pl. Ex. O. at D002793.) This conversation is consistent with other extensive record evidence
indicating that, following Plaintiff’s reassignment to the Director of Special Projects position,
Carbine and others sought to find Plaintiff other positions at HPD:
•
On October 12, 2007, Carbine offered Plaintiff the directorship position of the DNP
Queens Borough Office. (Rizvi Decl. Ex. K.) In an email of the same date, Plaintiff
responded to the offer, stating: “Thank you Bill for this offer. While I am appreciative
and remain grateful for this and everything else that you have done, I have to decline.
This is just not t[h]e direction I want to go at this point in my career.” (Id.; Pl.’s 56.1 p.
19.)
Plaintiff emailed a colleague the same day, advising her that “[Carbine] . . . offered me
the job running the Queens Office . . . I didn’t want to appear difficult by dismissing that
5
Plaintiff testified that he recalled saying at the time, “wow this is what they must mean by
[g]errymandering, just to get rid of me which they have wanted to do for years,” apparently referring to various past
supervisors and their reactions to the 1999 Settlement and a number of other incidents that, for reasons explained
below, are irrelevant to the instant motion. (Cayemittes Tr. 51-52.) Shortly after his reassignment, Plaintiff also
“complained to HPD’s internal [Equal Employment Opportunity] officer, Stanley Whing . . . about officials’ plan to
remove him from his TPT and TLS programs, claiming retaliation” stemming from those same past incidents. (Pl.’s
56.1 p. 19.)
9
outright, especially since I believe that it would be a demotion.” (Pl. Ex. L P#21/1.) He
later testified that the Queens offer was “almost insulting” and that he had been “warned
that [it] was not legitimate and a possible set up, that he was being set up to fail and
blame for the office’s failings” and that “the decision had already been made to
eventually close that office.” (Cayemittes Tr. 101; Pl.’s 56.1 ¶ 40, p. 37.) Although
Plaintiff does not state who “warned” him or how he learned of this alleged decision, he
claims to have “been in Senior staff meetings where the lack of a workload in the
[Queens] office was a recurring theme.” (Cayemittes Tr. 112-113; Pl.’s 56.1 ¶ 40.)
Plaintiff therefore viewed the Queens offer as an attempt to “get rid of him” because he
was “a problem” and he hadn’t “accepted fully their plan” to reorganize. (Cayemittes Tr.
101, 113.)
•
On October 15, 2007, Carbine urged Plaintiff to contact Elaine Calos, the “Assistant
Commissioner in charge of the of Preservation Finance . . . division within the Office of
Development about a job in her area that was comparable to the TPT/TLS position.”
(Pl.’s 56.1 ¶ 47, p. 19.) Calos met with Plaintiff the same day and told him she would
“see what position she could fashion in Finance for [P]laintiff, given his background and
experience.” (Id. p. 20.) In November 2007, however, Calos advised Plaintiff that “she
could not find him the right position that was appropriate for him in Finance at the time.”
(Id. p. 22.)
•
On October 23, 2007, Schmid recorded in an email another meeting he had that day with
Carbine and Plaintiff, stating in part that they: “again met . . . to discuss [Plaintiff’s] new
projects and assisting with a transition phase. [Carbine] explained to Plaintiff that
Preservation Finance was working to create a position for him, but that for the time being
he was expected to start working on his new DNP projects [i.e., as Director of Special
Projects] and provide transition assistance to the new TPT director when required. . . .
[Plaintiff stated] that he was insulted by the job offer and . . . stated he would go to
disciplinary.” (Pl. Ex. O. at D002793.)
Plaintiff also memorialized the October 23, 2007 meeting in an email, stating: “Had a
transitional meeting put on my calendar w/Bill.[] He began reading off a list [of] projects
I will be assigned to.[] As of the latest, he said that he spoke w/DEV[elopment], ‘they
think they can find something for me but that it would [take] time to work something
out[] a possible Dev job.’ In the meantime I will be expected to cooperate w/the
transition. I mentioned that my major concern at this point is my next job and my career,
which is why I have been asking for this in writing [i.e., a description of Plaintiff’s
Director of Special Projects position] is s[o] that I can begin to have an appreciation of
duties, expectations, etc. Bill said that I was approaching this all wrong and that people
were trying to help me but that I was acting like a victim. He said that I was not making
any sense that these jobs are legitimate assignments that will open up avenues for my
career. I told him that one of the reasons I wish to have this in writing is so that I can
make an analysis of how helpful this all really is to my career. He said that he was
insulted!, that he was angry now and that this meeting was over, adding that ‘you will see
10
these meetings . . . on your calendar.’” (Pl. Ex. P. D001946.) 6
Despite these exchanges, Plaintiff maintains that he “in fact was not given any choice” as
to DNP’s late-2007 reorganization. (Pl.’s 56.1 p. 19.)
Plaintiff’s E-mail to HPD Commissioner Shaun Donovan
On December 3, 2007, Plaintiff sent a lengthy email to HPD Commissioner Shaun
Donovan (“Donovan Email”) regarding his reassignment. The Donovan Email stated in part:
I was relieved of my position in the Third Party Transfer and Tax Lien Sale
programs and relegated to a junior-level Director of Special Projects. The offered
reason was “a big reorganization of the division’s field offices to address the
improprieties.” Problems with communications are thrown in when explaining
my removal. The available information though is that it was a coordinated taking
away of a strategic job. My work is not field-based, and I am the only one who
without cause is losing supervisory, managerial and administrative position and
whose new role remains unclear . . . I believe the action . . . was retaliatory, racebased and because of my national origin.
(Rizvi Decl. Ex. N.) On January 13, 2008, Donovan responded, stating that he had “discussed
this with a number of people and believe[d] it [wa]s something [Plaintiff] need[ed] to resolve
directly with [his] supervisor.” (Id.)
Plaintiff’s Work as Director of Special Projects
On October 24, 2007, Carbine met with Plaintiff to “continue a discussion about
transition to his new responsibilities” as Director of Special Projects. (Pl. Ex. P D002632.) As
6
The record reflects that Plaintiff was also offered at least one other position elsewhere in HPD prior to his
reassignment to Director of Special Projects. “In June 2007, Carbine offered [P]laintiff a position to run a field
office in Brooklyn.” (Pl.’s 56.1 p. 12.) Carbine recorded the offer in an email to himself, stating: “I offered a
position as director of a new East Brooklyn Office for Neighborhood Services . . . to [Plaintiff]. The position would
. . . involve setting up a new operation for implementing the new ideas we have for our field services and would
involve a salary increase for [Plaintiff]. Unfortunately, he declined the offer.” (Pl. Ex. P D002618.) Plaintiff
explained that he declined the Brooklyn offer because he considered it “a demotion as it would have involved
removing [him] as director of TPT/TLS with a net result of reduction of responsibility, jurisdiction, and authority.”
(Pl.’s 56.1 p. 12.) Plaintiff also viewed the Brooklyn offer as a “threat” that he “would be punished and sent
somewhere to the North Pole if he did not leave his TPT/TLS work.” (Id. p. 35.) He alleges that Carbine “offered
the position to [Plaintiff] despite [his] having no interest or experience in doing that work because officials wanted
to ease [him] out of his TPT/TLS position in favor of their friends.” (Id. p. 12.) Plaintiff does not explain, as best
the Court can discern, the basis for his statement as to these unnamed officials’ motives.
11
Carbine recorded in an email, Plaintiff “mentioned that he would rather be transferred to some
outpost of OPS, where he wouldn’t have to do anything, but that he was a soldier and would do
his new assignment under protest.” (Id.)
Following another meeting with Plaintiff on October 30, 2007, Carbine emailed Schmid
to report that:
at our new regular one on one with Claudel, he said the following: Wouldn’t it be
easier to transfer out somebody as difficult as me . . . I’m too dense to understand
what you’re asking me to do so put it in writing . . . This is not anything I’m
interested in and I’m not as smart as you think I am, I don’t understand, etc.
We are reviewing his progress on several projects that I had previously explained
to him in detail. They are all important to the future of the division and, in my
opinion, very interesting.
(Pl. Ex. P D002628.)
The record reflects that Plaintiff was indeed tasked with several projects after he was
reassigned.
The following summarizes the evidence relating to these projects, including
Carbine’s and Plaintiff’s views as to Plaintiff’s performance of them:
•
“Loan Project”: Plaintiff’s first project in his new role was the so-called “Loan Project.”
(Pl.’s 56.1 p. 22), for which Plaintiff was required to “find out what’s going on with the
loan portfolios throughout the city at the different site offices and work with the
development part of the agency and then try to come up with a loan product.”
(Cayemittes Tr. 74-75.) 7 Carbine described the Loan Project as an “important,” “tough”
project, and he hoped Plaintiff “would be would be able to give it the attention it needed
to bring it to the next level.” (Carbine Tr. 114.) Plaintiff largely confirmed this
sentiment, testifying that he was told that “no one has been able to do anything about
loans for several years” and that “[i]f [he could] do something about loans . . . [he would]
be a hero.” (Cayemittes Tr. 74.)
7
As Carbine explained: “At the time the field offices that were under DNP had loan coordinators to each
office. They worked with the office of Development which had to underwrite and enclose the loans they worked
together with them to try to get these loans to the finish line for the owner so they could do the repairs that were
necessary. It requires a lot of coordination and creativity, and you know pushing . . . Our loans are not necessarily
the top priority for the development staff for a number of reasons, so we have to keep pushing them about them.
Also, our clients aren’t that sophisticated so they need a lot of help to get the paperwork together and help them to
understand how the loans are done. Somebody really needs to pull all that together and you know . . . make sure it
keeps moving and deal with everybody and meet regularly to get the loans done, and also be creative . . . the agency
products don’t really meet the needs of all the types of owners that we deal with, and so we like to think that we
advocate for those owners and for those buildings and we need centrally to do that.” (Carbine Tr. 110-11.)
12
Plaintiff and Carbine disagree as to Plaintiff’s performance on the Loan Project.
Plaintiff’s submissions detail extensively the work he did on the Project, discussing “key”
“accomplishment[s]” and “milestone[s],” and attaching “samplings” of work he did in
connection with it. (Pl.’s 56.1 pp. 25-28.) Plaintiff claims that Carbine told him he was
“happy with the direction of the [P]roject” and that Plaintiff was “doing fine” with it, but
then “began to ignore [P]laintiff’s updates about the . . . project.” (Id. pp. 24, 26, 28.)
Carbine, however, believed that Plaintiff “didn’t really take [the Loan Project] on
enthusiastically, which really meant you couldn’t do what was required” and that Plaintiff
“could have done more to produce the loan project.” (Carbine Tr. 112, 222.) Carbine
removed Plaintiff from the Loan Project in March 2008. (Pl.’s 56.1 p. 29.)
•
“Green Project”: During the third week of November 2007, Plaintiff also began working
on the “Green Project,” an environmental initiative whereby Plaintiff was to make
“everything . . . green” and to “come up with ways that [DNP] could promote energy
efficiency, water savings, clean burning, et cetera. (Cayemittes Tr. 82-84; Pl.’s 56.1 p.
22; Carbine Tr. 82.)
Carbine testified that Plaintiff did not “embrace[]” the Green Project. (Carbine Tr. 108.)
Plaintiff maintains that the Green Project was a “‘concept project’ that was yet to be
defined” and that Carbine accordingly directed Plaintiff to “take a relaxed, wait and see
approach where he, Carbine, would be guiding next steps.” (Pl. 56.1 ¶ 37, pp. 22, 40.)
Nonetheless, Plaintiff testified that he “start[ed] reading things” and “going online asking
people” about similar initiatives. (Cayemittes Tr. 83-84; Pl.’s Ex. J.)
•
“Community Group Contracts Project”: At some point in early 2008, Plaintiff was tasked
with a so-called “Contracts assignment,” for which his “charge” was “this new project . .
. where we have all these contracts out there . . . that we don’t know where things are and
would like them in one table so that this information can be handy at meetings . . .
especially with the groups.” (Pl.’s Ex. L #25 p. 12.) Carbine described this project as
“very important.” (Id. #4 p. 4.)
On June 20, 2008, Carbine noted in an email to himself that “Unfortunately, Claudel
showed almost no progress on his assignments at today’s one-on-one. The contract
summary chart was incomplete and incorrect. He asked the same questions he asks every
week.” (Pl.’s Ex. O D003461.) In an email the same day, Carbine removed Plaintiff
from the Community Group Contracts Project “due to the slow progress [he] ha[d] made”
and “reassigned” it. (Pl.’s Ex. L. #4 p. 4.) Plaintiff responded with a lengthy summary of
the work he performed on the Project, to which Carbine replied, “You put more effort
into this e-mail than you did on the assignment.” (Id. #4 p. 4.)
•
“Planning Zones Project”: Plaintiff was also tasked with collecting data for DNP
“planning zones,” which were apparently “crucial” for a new RFP. (Pl.’s Ex. P.
D003473; Pl’s Ex. O D003461.) In a May 23, 2008 email to himself, Carbine noted that
Plaintiff had “made very limited efforts . . . to collect important data for the planning
zones.” (Pl.’s Ex. P. D003473.) In a similar June 20, 2008 email, Carbine further noted
13
that Plaintiff “has been unable to get the appropriate maps and . . . socio-economic data
for the Division’s planning zones.” (Pl’s Ex. O D003461.) In the June 20, 2008 email
referenced in the entry above, Carbine demanded of Plaintiff that “[t]he calculation of CD
[Community Development] eligibility in DNP Planning Zones must be complete . . . next
week and you must make significant progress on the socio-economic research for these
zones by the time I return from vacation.” (Pl.’s Ex. L. #4 p. 3.)
•
“Budget Books Project”: In a May 2, 2008 email to himself, Carbine noted that Plaintiff
“was given the assignment to update the budget briefing books for DNP on April 17. It
was explained that the assignment was one of the highest importance and due on April
23. The update was not submitted by Claudel until April 28 and was not complete.
David Schmid had to redo the update to make it appropriate for submission.” (Pl. Ex. P
D003472.)
In an email to himself, also dated May 2, 2008, Plaintiff described the same conversation,
as follows: “Had a 2 o’clock conference w/ [Carbine]. He said first that the Briefing
document was late and not complete. I tried to explain that it wasn’t before[.] [H]e said
that that’s (the issue of the assignment being late) not important anyway [sic]. He
mentioned that he thought that I should be more communicative but did not elaborate
what he meant and why he felt I was not being communicative. I did not wish to be
called ‘confrontational’ so I said nothing . . .” (Pl.’s Ex. L #23 p. 74.)
•
“Borough Consultations Project”: As Carbine explained this Project: “Every year the
community boards around the city . . . have an opportunity in the city’s budget process to
ask questions or ask for reports from different agencies . . . it’s a very big operation and it
goes a couple of weeks. We have to go to these meetings to answer questions. Prior to
going to the meetings the questions are submitted and the answers are prepared and made
into these books by the various agencies . . . it’s quite a bit of work.” (Carbine Tr. 25354.) Carbine tasked Plaintiff with gathering the relevant information from various
sources. (Pl.’s Ex. G D002152.)
In an effort to gather the prepared answers, Plaintiff sent an August 8, 2008 email,
attaching a “list of questions for the Queens Community Planning Boards,” to various
recipients asking them to “provide the portion of the attached that pertains to your area.”
(Id. D002151.) Carbine responded immediately to the email, stating: “Claudel, this is not
the way to handle this. Please withdraw your e-mail immediately, read the questions,
determine which are for DNP and call the relevant individuals for the information. Next
write the answers and show them to me. Thank you for your cooperation.” (Id.)
Carbine viewed Plaintiff’s email as “completely inappropriate” because Carbine “pushed
the work off on others” including those “outside of D[N]P” some of whom were “high
ranking.” (Carbine Tr. 254.) Plaintiff, by contrast, contends that he had been sending
similar emails “for several years” and “tried to perform this particular task in the exact
same manner that . . . it had been successfully completed in the past by [P]laintiff and by
others.” (Pl.’s 56.1 p. 37, 43.)
14
On the whole, Carbine testified that Plaintiff was “not cooperative” following his
reassignment and demonstrated a “resistance to . . . what needed to be done in that role.”
(Carbine Tr. 108-109.) He described Plaintiff as “hostile” and made general reference to “some
e-mails [that] got sent that were sarcastic about assignments.” (Id. 109.) He testified that
Plaintiff had ultimately “shown that [he] didn’t want the job” by way of the “things that [he]
said” and “how [he] took on the responsibilities or didn’t take on the responsibilities.” (Id. 204.)
Initial Discussions Regarding a Position in the Division of Alternative Management Program
Sometime in late 2007, Anne-Marie Hendrickson, the Associate Commissioner of HPD’s
Division of Alternative Management Program (“DAMP”), and Carlecia Taylor, Hendrickson’s
Director of Operations, “had a need for some Senior Project Managers” in DAMP “who had a
background in finance and real estate.” (Hendrickson Tr. 8.) 8 Hendrickson therefore “started to
ask around the agency to see if there were any people interested in coming to work for [her] and
[Taylor].” (Id. 8.)
Around this time, Hendrickson spoke to Carbine and learned that Plaintiff was a
“potential [person] that would be available for [Taylor]” at DAMP. (Id. 11.) Carbine, who up
until this point had been “actively looking for something for [Plaintiff]” responded that he
thought Plaintiff would be a good fit for the DAMP position, (Carbine Tr. 193; Hendrickson Tr.
20), although Plaintiff claims, for reasons unclear, that “Carbine had known tha[t] [he] would not
be interested in working at DAMP.” (Pl.’s 56.1 p. 32.)
In February 2008, Carbine told Plaintiff to reach out to Hendrickson. Carbine testified
that, although the DAMP job was not in development as Plaintiff had hoped, 9 “it involve[d] the
8
According to the DNP website, DAMP “encourages community growth by returning City-owned buildings
to responsible private owners.” See http://www.nyc.gov/html/dof/html/property/property_tax_reduc_damp.shtml.
9
Around the same time, Carbine told Plaintiff to reach out to Holly Leicht, the Associate Commissioner of
15
redevelopment of property and underwriting et cetera” which was “[s]omething that [Plaintiff]
had expressed to [Carbine] that he had an interest in.” (Carbine Tr. 197.) Plaintiff, however,
“had no intention of contacting [her] because he was not interested in work at her area.”
(Cayemittes Tr. 86-87; Pl.’s 56.1 ¶ 43, p. 47.) Hendrickson instead reached out to Plaintiff and
told him, “I have your job for you.” (Cayemittes Tr. 88.) Despite his professed disinterest,
Plaintiff went to DAMP to “interview with her people.” (Id.)
After speaking with Plaintiff, Hendrickson continued to believe he would be a good fit at
DAMP because he was “good at follow up, . . . [and] had a pretty good real estate, and a pretty
good finance background.” (Hendrickson Tr. 28.) The open position there, Senior Project
Manager, was, according to Hendrickson “an extremely important position” that “involve[d]
getting buildings out of the city ownership” and “getting [them] rehabbed.” (Id. 59.) In her
view, the position was “just as important [a] position as director.” (Id.) Although Hendrickson
agreed that Plaintiff would not be reporting directly to her as Assistant Commissioner but rather
to Taylor, she believed a transfer from Plaintiff’s current position as Director of Special Projects
would be a “lateral” move. (Id. 61.)
Plaintiff “doubts seriously” that his position in DNP and the open DAMP position “are
even remotely similar” in part because “the position reports to a director of operations, and was
not administrative, managerial, supervisory or prestigious, highly desirable position like the
TPT/TLS position.” (Pl.’s 56.1 ¶ 68, p. 63.)
Plaintiff claims Hendrickson told him he should transfer to DAMP because “they just
d[id]n’t want [him]” at DNP. (Pl.’s 56.1 p. 38.)
the Division of Development, where there was a “probability of another job.” (Cayemittes Tr. 85-87.) Plaintiff
testified that he “was definitely interested in the development [position],” but that “[g]iven what had transpired
[presumably, his transfer to Director of Special Projects], [he] was suspicious of Carbine’s motives” and “felt that
Carbine only offered the possibility of a position in Development to stall plaintiff from going forward with his threat
to complain up the hierarchy.” (Id. 87; Pl.’s 56.1 ¶ 47.)
16
Congratulatory Letter from Donovan
On February 14, 2008, Donovan wrote Plaintiff a letter (cc’ing Carbine and others) in
which he congratulated Plaintiff for receiving a commendation from a member of the public.
(Rizvi Decl. Ex. O.) The letter noted that Donovan had received “several” complimentary letters
about Plaintiff from members of the public and thanked Plaintiff for “taking customer service to
another level.” (Id.; Pl.’s 56.1 p. 8.)
When Plaintiff “wrote back to Donovan asking him about the other commendations that
he mentioned in his letter,” Carbine allegedly “told plaintiff that ‘someone could easily interpret
your letter to Shaun like you were harassing people.’ ‘What exactly are you trying to do?’”
(Pl.’s 56.1 ¶ 52.) The same day, Plaintiff claims that:
an angry Carbine snapped at [P]laintiff and told him that he would stop signing
for [him] half-hour lunches which [he] had arranged with his supervisors to
address [his] long commute and baby-sitting needs. When [P]laintiff protested
and explained the purpose of the half-hour arrangement, a callous Carbine
responded that he did not care what [P]laintiff did but that he will not sign for
half-hour lunches . . . adding ‘oh, yeah, you’re off Green [Project] too.’ Carbine
did not sign for [P]laintiff’s half-hour lunch for the remainder of [P]laintiff’s
tenure in DNP, even though prior to February 14 Carbine and his predecessors all
allowed [him] this benefit.
(Id. pp. 30-31.)
Plaintiff’s March 10, 2008 Email to Deputy Mayor Robert C. Lieber
On March 10, 2008, Plaintiff sent a lengthy email to the Deputy Mayor for Economic
Development, Robert C. Lieber (“Lieber Email”). (Rizvi Decl. Ex. P.) In the Lieber Email,
Plaintiff again complained that his transfer from his TPT/TLS position was, inter alia,
“retaliatory, to damage [Plaintiff’s] career and reputation, and because of [his] race and national
origin.” (Id.) Plaintiff explains that he emailed Lieber because “[f]ollowing Donovan’s January
13, 2008 response to [his] complaints about unlawful discrimination and retaliation, the next step
17
up the corporate hierarchy was the deputy mayor, Donovan’s direct supervisor.” (Pl.’s 56.1 ¶
54.) Plaintiff further testified that the reason he emailed Lieber was because he “was still
complaining about being removed” from the TPT/TLS position and about being “assigned
nothing of substance to further [his] career,” so he “was going through the channels and then [he]
had reached the deputy mayor.” (Cayemittes Tr. 93.) 10
On March 27, 2008, HPD’s internal Equal Employment Opportunity (“EEO”) Officer
Stanley Whing contacted Plaintiff regarding the Lieber Email and the two scheduled a meeting
for April 1, 2008. (Pl.’s 56.1 p. 45.) When Plaintiff informed Carbine of his planned meeting
with Whing, Carbine allegedly responded that “this complaining is not going to end well,
Claudel.” (Id.)
Further Discussions Regarding Plaintiff’s Transfer to DAMP
On April 4, 2008, Plaintiff and Taylor discussed his transferring to a position at DAMP.
(Rizvi Decl. Ex. M.) That discussion confirmed for Plaintiff that he was “not interested in the
DAMP position [Taylor] discussed” but “out of consideration and courtesy [he] did not say that
right then to her.” (Id.) Specifically, according to Plaintiff, “the position she described was
junior to what [Plaintiff had] done [at DNP] and that even people who worked under [him] had
more responsibilities.”
(Id.)
Taylor also apparently referred to the position as a
“project/program manager” position and that, before considering Plaintiff, Taylor “had requested
a Fellow to undertake it.” (Id.) She also allegedly told Plaintiff that there “was no work” for
him at DAMP “at his skill level” (i.e., that of a “high level professional[]”). (Pl.’s 56.1 p. 61.)
Later that afternoon, Carbine called Plaintiff into his office and told him “he understood
that [Plaintiff] had accepted a position in DAMP and that effective in two weeks [Plaintiff
10
Plaintiff attached the Donovan Email, including Donovan’s response, to the Lieber Email. (Rizvi Decl. Ex.
P.)
18
would] be leaving [Carbine’s] division.” (Rizvi Decl. Ex. M.) Plaintiff responded that “this was
the first [he] heard of this” and described his earlier meeting with Taylor. (Id.) He and Carbine
then discussed “choice versus not having one” and Carbine “said that he wanted [Plaintiff] to
move to DAMP.” (Id.) When Plaintiff “told him that [he] was not interested in the DAMP
position,” Carbine said, “Okay, and that he would talk to [Hendrickson].” (Id.)
On April 7, 2008, after speaking with Hendrickson, Carbine called Plaintiff into his
office and “told [him he] had to go to DAMP.” (Id.; Pl.’s 56.1 p. 46.) Plaintiff relayed the
foregoing to Whing in an email he sent that afternoon, concluding with the following:
There are several areas inside HPD where I believe I can make a contribution. I
have not accepted a position in DAMP. My being forced to go to DAMP at this
point in this capacity is not a serious attempt to get work done. Instead it is partly
punishment of my recent letter to Deputy Mayor Lieber.
(Rizvi Decl. Ex. M.)
The following afternoon, Plaintiff sent another, longer email to Whing, elaborating on his
employment situation. He explained:
For several months now, Bill Carbine has been trying to secure an appropriate
position for me outside of OPS [Office of Preservation Services]. In our
discussions about this I have been my interest in going [sic] to Development very
clear. TSD [presumably, Technology and Strategic Development] would be the
other choice if the right opportunity became available.
Last October I met w/[]Preservation Finance but there was no available fit. Last
February Bill [Carbine] again directed me to contact New Construction and
Management and Disposition in connection with opportunities in those areas. At
the time I said nothing about Management and Disposition because I did not want
to come off as ungrateful or in any[]way negative. Before I could contact the
managers, Associate Commissioner Hendrickson called me and told me she had a
position for me . . . Following an interview w[] one of her managers, I received
another call from her and I informed her that I was not interested in the position
that her manager discussed w/me. This all happened by the end of February. On
my reporting this to my supervisor he assured me that something better would
become available.
I eventually met w/New Construction on March 12th and from there met
19
w/Assistant Commissioner Walters on March 26th [but there was not] an
appropriate position for my background, experience and level. He mentioned the
several other areas in Development where there are possibilities . . . he also
mentioned opportunities he knew about in management and Disposition. . . .
Last week I heard back from Commissioner Hendrickson who advised she had
another position that she wanted me to discuss w/her manager. I met with
[Taylor] on Friday, April 4. We discussed a position in her area . . . The DAMP
position described to me . . . is of absolutely no interest to me for several reasons.
Staff who have worked under me for example have had more substantive
responsibilities. 11
I was taken aback by the recent turn of events. On Friday, Bill [Carbine] asserted
that he had heard that I “accepted the DAMP position.” I then told him that was
not true. He then said that I had to report to DAMP. . . . When I made it clear . . .
that I did not accept that DAMP job, he abruptly ended the meeting asking me if I
was coming to work on Monday and Tuesday. Yesterday morning, I was
summoned to his office and [again] he repeated what he said Friday that I had to
report to DAMP. . . . Earlier today I spoke w/Commissioner Hendrickson who
said that I had to come to DAMP as the “paperwork” has [“]already started.”
During our talk she cited that bill wanted to do me a favor . . . my not having any
work to do in his division to her division where she has work for me. How did it
come that “I have no work” here in DNP?
(Id.)
On April 9, 2008, Deputy Commissioner of the Office of Preservation Services Luiz
Aragon sent an email to Carbine noting that Plaintiff’s DAMP transfer was put on hold. (Rizvi
Decl. Ex. Q.)
Plaintiff’s Office of Equal Employment Opportunity Complaint and Subsequent Investigation
On April 10, 2008, Plaintiff filed an internal complaint with the HPD Office of Equal
Employment Opportunity (“EEO”) against Carbine alleging discriminatory treatment on the
11
On April 11, 2008, Taylor sent an email to Plaintiff attaching the job description for the DAMP Senior
Project Manager position. (Rizvi Decl. Ex. R.) As stated in the job description, a Senior Project Manager works
within DAMP’s Interim Lease II (“TIL II”) and Special Projects program areas. (Id.) Under the TIL II program,
buildings are converted to tenant-owned cooperatives. (Id.) The job description Taylor sent further stated that: “The
Senior Project Manager duties will include coordinating between [DAMP] . . . and the non[-]profit organization[]
Urban Homesteaders Assistance Board . . . which is developing a large volume of buildings transitioning from city
ownership into low income cooperatives. Initially, the Senior Project Manager’s primary responsibility will be
facilitating the ongoing progress of projects in various stages.” (Id.)
20
basis of race, color, national origin and retaliation in opposition to Plaintiff’s past and current
EEO complaints (the “EEO Complaint”). (Rizvi Decl. Ex. T.) 12 The following day, Whing sent
a memorandum notifying Carbine about the EEO Complaint. (Rizvi Decl. Ex. U.)
Whing conducted an investigation into the EEO Complaint during which, he testified, he
“interviewed enough people to give [him] a good sense of what was going on” and “got an
understanding of the totality of the issues.” (Whing Tr. 27-28.) On August 4, 2008, Whing
issued a report to Donovan for final review. (Rizvi Decl. Ex. C.) The report concluded that
Plaintiff’s allegations were unsupported.
(Id.)
On August 18, 2008, Donovan approved
Whing’s final determination, and Whing so notified the parties. (Id.)
Plaintiff’s Ultimate Transfer to DAMP
Following the EEO Complaint, Plaintiff continued work as DNP’s Director of Special
Projects. (Cayemittes Tr. 114.) As discussed above, during this time, Carbine lodged various
criticisms of Plaintiff’s performance on these projects—for instance, his early-2008 criticism of
Plaintiff’s work on the Loan Project (ultimately leading to Plaintiff’s removal from that project),
his May 2008 critique of Plaintiff’s work on the Budget Books Project and his June 2008
removal of Plaintiff from the Community Group Contracts Project. Plaintiff also emphasizes
that, during this time, Carbine reprimanded Plaintiff for “working behind locked doors.” (Pl. Ex.
P D003474.)
Plaintiff was formally transferred to DAMP on September 15, 2008. (Pl. Tr. 114; Rizvi
Decl. Ex. Y.) Although his salary remained the same, Plaintiff was immensely dissatisfied with
his work there. (Cayemittes Tr. 81, 145; Pl.’s 56.1 pp. 61-68.) He testified that, on the “second
or third day” after his arrival, Taylor told him she had been “avoiding” him because DAMP did
12
Aragon was also named in the EEO Complaint in connection with conduct not relevant to this motion.
(Rizvi Decl. Ex. T.)
21
not “have any work” for him. (Cayemittes Tr. 122.)
Indeed, Plaintiff states that he “spent
several months—easily more than 90 percent of his time—in DAMP with nothing to do” and had
“no work to do from September 2008 to November 2008.” (Pl.’s 56.1 pp. 66-67.) Plaintiff states
that at DAMP he was “ignored and isolated.” (Id. p. 64.) Taylor allegedly “avoid[ed] him
because she did not want to talk about work” and Plaintiff “had to rely on secretaries to find out
what was going on.” (Id.) “Attempts to find out where he stood were fruitless,” Plaintiff claims,
because “Hendrickson was never available.” (Id.) This was “part of a coordinated effort on the
part of DAMP officials . . . to frustrate [him] and continue to destroy his career.” (Id.)
In November 2008, Taylor’s last day in DAMP, 13 she sent Plaintiff a new description of
his job responsibilities, which he would conduct under the title of “Senior Policy Analyst”
(Rizvi Decl. Ex. Z; Pl.’s 56.1 ¶ 83.) Plaintiff states that he had no experience in any of the areas
listed in the description and, in any event, he was “never given any work in DAMP that came
close to any of the lofty job elements that Taylor sent to [him].” (Pl.’s 56.1 ¶ 84, p. 65.) 14
Plaintiff asserts that he is now merely a “de facto project manager” at DAMP “reporting to very
young people.” (Pl.’s 56.1 ¶ 81.)
C. Procedural History
Plaintiff filed a Charge of Discrimination with the Equal Employment Opportunity
Commission against HPD (“EEOC Charge”) on November 24, 2008. (Rizvi Decl. Ex. AA.)
13
Following Taylor’s departure, Plaintiff reported directly to Hendrickson. (Cayemittes Tr. 121.)
14
The job description stated: “The Senior Policy analyst will oversee the evaluation, development, and/or
implementation of housing programs designed to preserve and upgrade neighborhoods, or improve urban renewal
areas or public and private housing. The Senior Policy Analyst will provide counsel to the Director of Operations
and Associate Commissioner of [DAMP] on a wide variety of housing policy and planning issues which require
technical knowledge and authoritative interpretation of policies, legislation, regulations, and standards as applied to
complex problems such as evaluating financial feasibility, tax policy, recommending text and policies for new
programs, and other planning policy related matters.” (Rizvi Decl. Ex. Z.) The parties do not dispute that Taylor
had the discretion to change Plaintiff’s position as a supervisor if she decided that it needed to be changed to meet
DAMP needs. (Def.’s 56.1 ¶ 85.)
22
Plaintiff alleged in the EEOC Charge that HPD discriminated against him on the bases of his
race (African-American), color (black), national origin (Haitian), and unlawfully retaliated
against him in violation of Title VII. (Id.) On August 12, 2010, the EEOC closed its file and
issued Plaintiff a Right-to-Sue Letter, which stated that the EEOC was unable to conclude a
violation had occurred. (Id. Ex. BB.)
Plaintiff filed a pro se complaint in this Court on November 10, 2010, which he amended
shortly thereafter on January 10, 2011. (Dkts. 1, 5.) His Amended Complaint asserts claims of
discrimination and retaliation against HPD, Carbine and other of Plaintiff’s supervisors pursuant
to Title VII. Plaintiff also asserted a claim for Intentional Infliction of Emotional Distress. (Dkt.
5.)
On November 10, 2011, Magistrate Judge Theodore H. Katz issued a Report and
Recommendation (“Report”) recommending that U.S. District Judge George B. Daniels, to
whom this case was previously assigned, dismiss Plaintiff’s Amended Complaint in large part.
(Dkt. 20.) Specifically, the Report recommended the Court dismiss all Plaintiff’s claims “except
for his claim [against HPD] that in September 2008 he was transferred to the DAMP Division in
retaliation for his 2008 EEO [C]omplaint.” (Report 16.) In an Order dated February 9, 2012
(“February 9 Order”), Judge Daniels adopted the Report in its entirety. (Dkt. 28.)
The Court’s role, therefore, is to determine whether that remaining claim, broadly
construed, survives summary judgment. On review of the summary judgment record, the Court
concludes it does not.
STANDARD OF REVIEW
“The court shall grant summary judgment if the movant shows that there is no genuine
dispute as to any material fact and the movant is entitled to judgment as a matter of law.” Fed.
23
R. Civ. P. 56(a). “A fact is ‘material’ for these purposes when it ‘might affect the outcome of the
suit under the governing law,’” and “[a]n issue is ‘genuine’ if ‘the evidence is such that a
reasonable jury could return a verdict for the nonmoving party.’” Rojas v. Roman Catholic
Diocese of Rochester, 660 F.3d 98, 104 (2d Cir. 2011) (quoting Anderson v. Liberty Lobby, Inc.,
477 U.S. 242, 248 (1986)). “A court reviewing a motion for summary judgment must ‘construe
the facts in the light most favorable to the non-moving party and must resolve all ambiguities and
draw all reasonable inferences against the movant.’” Beyer v. Cnty. of Nassau, 524 F.3d 160,
163 (2d Cir. 2008) (quoting Dallas Aerospace, Inc. v. CIS Air Corp., 352 F.3d 775, 780 (2d Cir.
2003)).
In reviewing a motion for summary judgment involving a non-moving, pro se plaintiff, a
court “liberally construe[s]” the materials submitted by the pro se litigant, “reading such
submissions to raise the strongest arguments they suggest.” Bertin v. United States, 478 F.3d
489, 491 (2d Cir. 2007) (quotation marks omitted). A plaintiff’s pro se status, however, does not
relieve him from the usual requirements of summary judgment.
Jorgensen v. Epic/Sony
Records, 351 F.3d 46, 50 (2d Cir. 2003); Brown v. City of New York, No. 11 Civ. 6379 (KBF),
2013 WL 4713561, at *3 (S.D.N.Y. Aug. 27, 2013) (“[E]ven pro se plaintiffs must offer some
evidence that would defeat a motion for summary judgment.”).
DISCUSSION
Title VII prohibits retaliation against an employee “because he has opposed any practice
made an unlawful employment practice by this subchapter, or because he has made a charge . . .
in an investigation, proceeding, or hearing under this subchapter.” 42 U.S.C. § 2000e-3(a). Title
VII retaliation claims follow the familiar three-part burden-shifting analysis set out in
McDonnell Douglas Corp. v. Green, 411 U.S. 792 (1973):
24
To make out a prima facie case of retaliation, a plaintiff must make four
showings: that (1) [he] engaged in a protected activity; (2) [his] employer was
aware of this activity; (3) the employer took adverse employment action against
[him]; and (4) a causal connection exists between the alleged adverse action and
the protected activity. Once a prima facie case of retaliation is established, the
burden of production shifts to the employer to demonstrate that a legitimate,
nondiscriminatory reason existed for its action. If the employer demonstrates a
legitimate, non-discriminatory reason, then the burden shifts back to the plaintiff
to establish, through either direct or circumstantial evidence, that the employer’s
action was, in fact, motivated by discriminatory retaliation.
Summa v. Hofstra Univ., 708 F.3d 115, 125 (2d Cir. 2013) (internal citations and punctuation
omitted).
The Court agrees with HPD that Plaintiff’s retaliation claim falters at the prima facie
stage. 15
HPD does not expressly contest that Plaintiff has satisfied the first two prongs of his
prima facie case. Nor could it reasonably do so. Plaintiff’s EEO Complaint, filed on April 10,
2008, clearly constitutes participation in a protected activity. Alston v. N.Y.C. Auth., 14 F.
Supp. 2d 308, 311 (S.D.N.Y. 1998) (“Plaintiff’s filing and maintenance of her internal EEO
complaint certainly put the NYCTA on notice that she was engaged in statutorily protected
activity.”). Plaintiff’s December 3, 2007 Donovan Email and March 10, 2008 Lieber Email also
constitute protected activities. Hubbard v. Total Communications Inc., 347 F. App’x. 679, 681
(2d Cir. 2009) (“[An] informal complaint of discrimination is enough to satisfy the protected
activity requirement under Title VII.”); Kotcher v. Rosa & Sullivan Appliance Ctr., 957 F.2d 59,
15
HPD also moves to dismiss because it “is not a suable legal entity” and “may not be sued in its independent
capacity.” (Mem. 25.) HPD is correct. See Bind v. City of New York, No. 08 Civ. 11105 (RJH), 2011 WL
4542897, at *20 (S.D.N.Y. Sept. 30, 2011) (“HPD itself is not a suable entity.”) (quoting N.Y.C. Charter § 396).
Rather than dismiss the action on this basis, however, the Court finds it appropriate to construe Plaintiff’s claims
against HPD as having been brought against the City of New York, particularly in light of Plaintiff’s pro se status.
Sanders v. N.Y.C. Dep’t of Hous. Pres. & Dev., No. 09 Civ. 4054 (RMB), 2010 WL 3025651, at *1 n.1 (S.D.N.Y.
July 28, 2010) (“Although HPD . . . [is] not [a] suable entit[y] under the New York City Charter, the Court construes
Plaintiff’s claims against [it] as being against the City.”), aff’d, 470 F. App’x 1 (2d Cir. 2012). For purposes of
convenience and consistency, the Court has referred and will continue to refer to the Defendant as HPD.
25
65 (2d Cir. 1992) (“[A]n internal complaint to company management . . . is protected activity
within the policies of Title VII.”). There is likewise no issue as to whether HPD knew of these
protected activities. Gordon v. N.Y. Bd. of Educ., 232 F.3d 111, 116 (2d Cir. 2000) (“Neither
[the Second Circuit] nor any other circuit has ever held that, to satisfy the knowledge
requirement, anything more is necessary than general corporate knowledge that the plaintiff has
engaged in a protected activity.”).
HPD does dispute, however, that Plaintiff can establish the third and fourth elements of
his prima facie case—i.e., that he suffered an adverse employment action under circumstances
giving rise to an inference of discrimination. It is to these elements that the Court now turns.
Adverse Action
The requirement of a materially adverse employment action reflects the principle that
“Title VII does not protect an employee from ‘all retaliation,’ but only ‘retaliation that produces
an injury or harm.’” Tepperwien v. Entergy Nuclear Operations, Inc., 663 F.3d 556, 569 (2d Cir.
2011) (quoting Burlington N. & Santa Fe Ry. Co. v. White, 548 U.S. 53, 67 (2006)). In
Burlington Northern, the Supreme Court described a “material adverse action” as follows: “a
plaintiff must show that a reasonable employee would have found the challenged action
materially adverse, which in this context means it well might have dissuaded a reasonable
worker from making or supporting a charge of discrimination.” 548 U.S. at 68. Still, “[a]ctions
that are ‘trivial harms’—i.e., ‘those petty slights or minor annoyances that often take place at
work and that all employees experience’—are not materially adverse.” Tepperwien, 663 F.3d at
568 (quoting Burlington Northern, 548 U.S. at 68). As the Second Circuit recently stated, in the
summary judgment context, courts must be mindful that “material adversity is to be determined
objectively, based on the reactions of a reasonable employee.” Rivera v. Rochester Genesee
26
Reg’l Transp. Auth., 702 F.3d 685, 698-99 (2d Cir. 2012) (citations and punctuation omitted). It
cautioned, however, that “context matters, as some actions may take on more or less significance
depending on the context.” Id. at 699.
Plaintiff’s primary arguments are that “(1) his transfer from Director of [TPT/TLS] to
Director of Special Projects on about November 9, 2007 [and] (2) his transfer from DNP to little
to no work and the ensuing confusion about what his title is in DAMP on September 15, 2008 . .
. would dissuade a reasonable worker from making or supporting a charge of discrimination.”
(Opp’n 31.)
As to the first argument, Judge Daniels already concluded that a retaliation claim
premised on Plaintiff’s reassignment to Director of Special Projects in late-2007 was timebarred. (February 9 Order 11.) In any event, the argument fails on the merits. Plaintiff was
reassigned from the TPT/TLS position to the Special Projects position as part of a “rotation” or
“reshuffling” involving five DNP directors. After that process, Plaintiff remained within DNP,
reported to the same supervisor (Carbine) and apparently received the same salary, evidence that
indicates that Plaintiff’s reassignment was nothing more than an alteration of his job
responsibilities. See Staff v. Pall Corp., 233 F. Supp. 2d 516, 533 (S.D.N.Y. 2002) (plaintiff’s
“transfer was but one part of a broad company reorganization which involved shifting tasks
between different departments, and with that shift in tasks, a shift in the placement of certain
employees. Indeed, [plaintiff] was not the only employee transferred from R & D.”), aff’d, 76 F.
App’x 366 (2d Cir. 2003).
It is true, of course, that retaliatory transfers are “not limited to pecuniary emoluments,”
and can arise from a “discriminatorily-motivated diminution of duties.” Preda v. Nissho-Iwai
Am. Corp., 128 F.3d 789, 791 (2d Cir. 1997) (citation omitted); see also Harris v. City of New
27
York, No. 03 Civ. 6167 (DLC), 2004 WL 2943101, at *4 (S.D.N.Y. Dec. 21, 2004) (“Lesser
actions such as . . . a diminution in the complexity and prestige of work assignments, and
transfers may also be considered adverse.”).
But the only evidence that Plaintiff’s
responsibilities were diminished comes in the form of his own subjective view of his old
position, which he was “quite happy” with, as compared to his new position, which was “less
desirable” to him. Plaintiff’s own subjective dissatisfaction, however, is insufficient. Kessler v.
Westchester Cnty. Dep’t of Soc. Servs., 461 F.3d 199, 209 (2d Cir. 2006) (“[T]he standard for
assessing . . . a reassignment is an objective, rather than a subjective, one.”); see also Johnson v.
Eastchester Union Free Sch. Dist., 211 F. Supp. 2d 514, 518 (S.D.N.Y. 2002) (“Plaintiff’s mere
dissatisfaction with the transfer and his preference for his former position . . . are insufficient to
constitute a materially adverse employment action.”); Garber v. N.Y.C. Police Dep’t, No. 95
Civ. 2516 (JFK), 1997 WL 525396, at *7 (S.D.N.Y. Aug. 22, 1997), aff’d, 159 F.3d 1346 (2d
Cir. 1998) (“Plaintiff’s dissatisfaction with the transfer, standing alone, does not support his
claim of an adverse employment action.”). Considering Plaintiff’s reassignment in context, the
Court finds no evidence from which a reasonable juror could conclude that his new assignments
as Director of Special Projects were objectively less complex or prestigious than his
responsibilities in the TPT/TLS position.
The Court, however, agrees with Plaintiff that a jury could find that his transfer from
Director of Special Projects in DNP to his position at DAMP—first as Senior Project Manager,
then as Senior Policy Analyst—was materially adverse. Upon his transfer to DAMP, Plaintiff no
longer reported directly to the Assistant Commissioner—Hendrickson, Carbine’s counterpart.
He instead reported to Taylor, who in turn reported to Hendrickson. It is fair to conclude from
this evidence that Plaintiff’s transfer to DAMP was not a “lateral” one as Hendrickson testified,
28
but was, at least structurally, a demotion. A fact-finder could also reasonably conclude that,
upon arriving at DAMP, Plaintiff experienced a rather rapid diminution in the complexity and
prestige of his work assignments.
Despite the “lofty”-sounding position described to him,
Plaintiff would presumably testify that he was “never given any work in DAMP that came close”
to that description. Indeed, crediting Plaintiff’s statements that he “spent several months—easily
more than 90 percent of his time—in DAMP with nothing to do,” had “no work to do from
September 2008 to November 2008,” and now reports to “very young people,” it appears that the
realities of the DAMP position were objectively inferior to the Director of Special Projects
position. Accordingly, the Court concludes that Plaintiff’s transfer to DAMP satisfies the third
prong of his prima facie case. 16
16
In his opposition brief, Plaintiff lists a host of other actions he contends were materially adverse, including:
“final removal from [the Loan Project] . . . when [he] was making unprecedented progress towards officials’ . . .
deadline, the decree not to allow [him] half-hour lunches, the decision not to assign [him] any meaningful
assignments, ignoring [P]laintiff’s serious attempts to provide updates on his progress with the assignments he was
given . . . [and] Carbine[’s] desperate charge that [P]laintiff somehow was violating some agency rule against
working with one’s door closed when [P]laintiff never had his door closed.” (Opp’n 16-17.) The Court disagrees
that any of these actions, viewed in the context of the summary judgment record as a whole, rise beyond the level of
those “trivial harms” that “often take place at work and that all employees experience” and that do not constitute
material adverse actions. Tepperwien, 663 F.3d at 568; Oyewo v. Lahood, No. 10 Civ. 5139 (KNF), 2012 WL
996995, at *10 (S.D.N.Y. Mar. 26, 2012) (“The plaintiff’s allegation that she was ‘offered . . . obsolete
responsibilities,’ without more, is not sufficient to sustain her burden of showing that she was denied meaningful
work and that the duties and responsibilities she had constitute an adverse employment action.”), aff’d, 515 F. App’x
10 (2d Cir. 2013); McNutt v. Nasca, No. 1:10-cv-1301 MAD/RFT, 2013 WL 209469, *22 (N.D.N.Y. Jan. 17, 2013)
(supervisor’s “ignoring” plaintiff not adverse action); Eugenio v. Walder, No. 06 Civ. 4928 (CS) (GAY), 2009 WL
1929311, at *26 (S.D.N.Y. Mar. 3, 2009) (“Reprimands and close monitoring are not adverse employment actions
under Title VII.”).
As to Carbine’s “decree not to allow [Plaintiff] half-hour lunches,” “[w]hether a change in schedule
constitutes an adverse employment action depends on context.” Mugavero v. Arms Acres, Inc., No. 03 Civ. 05724
(PGG), 2009 WL 890063, at *10 (S.D.N.Y. Mar. 31, 2009) (citing Burlington Northern, 548 U.S. at 69). Plaintiff
states, without elaboration, that he required half-hour lunches, which would allow him to leave work early, due to
his “long commute and baby-sitting needs.” This evidence alone is insufficient to create a factual issue as to
whether he suffered a material adverse action. He provides little context for these statements, for instance any
indication that his schedule actually changed. Further, his statement that, when he protested, “Carbine responded
that he did not care what [P]laintiff did” appears to indicate that Plaintiff was not actually adversely affected, even if
Carbine refused to officially sign off on Plaintiff’s “half-hour arrangement.” Accordingly, the Court finds that,
without more, a jury could not find material adversity as to this assertion. See Witkowich v. Holder, No. 05 Civ.
7756 (GBD), 2010 WL 1328364, at *3 (S.D.N.Y. Mar. 31, 2010) (“Plaintiff has not proffered any evidence to show
that this change in his official hours adversely affected him.”), aff’d sub nom. Witkowich v. U.S. Marshals Serv.,
424 F. App’x 20 (2d Cir. 2011); Gelin v. Geithner, No. 06-cv-10176 (KMK), 2009 WL 804144, at *21 (S.D.N.Y.
Mar. 26, 2009) (“An employee’s decision to report discriminatory behavior simply does not immunize him from
29
Causation
The Court agrees with HPD, however, that Plaintiff is unable to satisfy the final prong of
his prima facie case—i.e., that there exists a causal connection between his various protected
activities and his transfer to DAMP in September 2008.
It is well-settled that an adverse employment action cannot serve as the basis for a
retaliation claim if the action was set in motion before a plaintiff engaged in protected activity.
See Slattery v. Swiss Reinsurance Am. Corp., 248 F.3d 87, 95 (2d Cir. 2001) (no causation
where “progressive discipline” began prior to plaintiff’s filing of EEOC charges); Tomasino v.
St. John’s Univ., 476 F. App’x 923, 925 (2d Cir. 2012) (“[B]ecause the record is replete with
undisputed evidence that Defendant imposed progressive discipline against Tomasino well
those petty slights or minor annoyances that often take place at work and that all employees experience. This is
particularly true where, as here, Plaintiff has offered no evidence showing that he suffered any harm or injury as a
result of these actions.”) (citations and internal punctuation omitted), aff'd, 376 F. App’x 127 (2d Cir. 2010).
Finally, the Court declines to hold that Carbine’s alleged comment in late-March 2008 that Plaintiff’s
“complaining is not going to end well,” which Carbine purportedly made upon learning of Plaintiff’s planned
meeting with Whing, constitutes a materially adverse action. As noted above, “context matters,” Rivera, 702 F.3d at
699, and “[t]he Second Circuit has instructed that while the test [for material adversity] is an objective [one], it
remains relevant whether the plaintiff himself was deterred from complaining.” Jantz v. Emblem Health, No. 10
Civ. 6076 (PKC), 2012 WL 370297, at *15 (S.D.N.Y. Feb. 6, 2012) (citing Tepperwien, 663 F.3d at 572). The
record reflects that Plaintiff sent multiple email complaints to Whing only days after Carbine’s alleged comment and
filed his EEO Complaint shortly thereafter on April 10, 2008. Therefore, to the extent Carbine’s somewhat
ambiguous comment could be objectively viewed as threatening, Plaintiff was clearly undettered by it. See
Patterson v. Xerox Corp., No. 10-cv-6097, 2012 WL 2155278, at *7 (W.D.N.Y. June 13, 2012) (“Even assuming
that [plaintiff’s supervisor’s] motivation was retaliatory and considering this warning in connection with [the
supervisor’s] other conduct, this action does not rise to the level of materiality that would implicate the
antiretaliation provisions of Title VII . . . Notably, it did not dissuade plaintiff from making several subsequent
complaints regarding Peterson to the internal ethics helpline and the EEOC.”); Smith v. NYC Health & Hosp. Corp.,
No. 10-CV-714 (RRM) (LB), 2013 WL 3013641, at *6 (E.D.N.Y. June 18, 2013) (intimidating incident “occurred
prior to plaintiff's filing her EEOC charge and clearly did not dissuade her from making her charge of
discrimination”); Bundschuh v. Inn on the Lake Hudson Hotels, LLC, 914 F. Supp. 2d 395, 407 (W.D.N.Y. 2012)
(no material adversity where “Plaintiff attest[ed] that [supervisor’s] actions did not dissuade her from making a
number of subsequent complaints”). Nor does Carbine’s vague and isolated statement suffice to “show retaliatory
animus ‘without resort to inference.’” Redd v. N.Y.S Div. of Parole, 923 F. Supp. 2d 371, 386 (E.D.N.Y. 2012).
The Court therefore cannot conclude that this statement, made over five months before Plaintiff’s transfer to DAMP
and almost as long after that transfer was initially contemplated, constitutes direct evidence of retaliatory intent or
otherwise has any material bearing on the causation analysis discussed below. See Tyler v. Bethlehem Steel Corp.,
958 F.2d 1176, 1183 (2d Cir.1992) (“Direct evidence” is “evidence tending to show, without resort to inference, the
existence of a fact in question.”); see also Cardoso v. Robert Bosch Corp., 427 F.3d 429, 432 (7th Cir. 2005)
(“Direct evidence is essentially an outright admission that a challenged action was undertaken for one of the
forbidden reasons covered in Title VII.”).
30
before September, an inference of discrimination will not arise based solely on the proximity
between her complaint and termination.”).
“If an employer’s conduct before and after an
employee complaint is consistent, the post-complaint conduct is not retaliatory.” Wright v.
N.Y.C. Off-Track Betting Corp., No. 05 Civ. 9790 (WHP), 2008 WL 762196, at *5 (S.D.N.Y.
Mar. 24, 2008); Lessambo v. PricewaterhouseCoopers, L.P., No. 08 Civ. 6272 (WHP), 2010 WL
3958787, at *13 (S.D.N.Y. Sept. 27, 2010) (no causal connection where poor performance
reviews were issued before and after protected activity), aff’d, 451 F. App’x 57 (2d Cir. 2011);
Webb v. Niagara Cnty., No. 11-cv-192S, 2012 WL 5499647, at *5 (W.D.N.Y. Nov. 12, 2012)
(“[Plaintiff] offers no evidence suggesting that the denials [of overtime] which occurred after her
complaint were in any way different from the pre-complaint denials, or that they were somehow
related to the Division of Human Rights complaint. Without evidence of such a causal
connection, this claim must also fail.”).
It is undisputed that HPD’s efforts to secure Plaintiff a position elsewhere within the
agency were part of an extended process that began no later than October 2007, when Plaintiff
voiced frustration about his reassignment within DNP, and ended nearly a year later when
Plaintiff was ultimately transferred to DAMP. During this process, numerous other jobs were
discussed—the DAMP position, of course, but also the Queens Borough Office position, the East
Brooklyn Office for Neighborhood Services position, as well as potential opportunities in
Preservation Finance, New Construction, Management and Disposition and Development—some
of which materialized into concrete offers that Plaintiff rejected.
Plaintiff has admitted that this process was continuing and predated his protected activity
when he emailed Whing in April 2008, stating “for several months now, Bill Carbine has been
trying to secure an appropriate position for me.”
31
That admission undercuts the argument
Plaintiff made to Whing the day before, and makes again here, that Carbine’s efforts to transfer
Plaintiff were “punishment [for Plaintiff’s] recent letter to Deputy Mayor Lieber.” Logically,
then, those efforts could not have been “punishment” for the EEO Complaint filed a month later
either. 17 To find causation here merely because the extended period during which DNP worked
to find Plaintiff a position of interest was punctuated by Plaintiff’s various discrimination and
retaliation complaints would permit a plaintiff, aware that his employer had plans for his
undesirable transfer, to halt that process with a preemptive EEO filing. An employer should not
be required to put a previously-planned, legitimate employment decision on hold simply because
an employee engaged in protected activity.
In any event, the Court agrees with HPD that “[e]ven assuming that the adverse action
plaintiff complains of did not have its genesis before his March 10, 2008 [Lieber Email] and
April 10, 2008 EEO Complaint, [P]laintiff still fails to establish temporal proximity between
those activities and the transfer to DAMP on September 15, 2008.” (Mem. 8.) “[D]istrict courts
within the Second Circuit have consistently held that the passage of two to three months between
the protected activity and the adverse employment action does not allow for an inference of
causation.” See Murray v. Visiting Nurse Servs., 528 F. Supp. 2d 257, 275 (S.D.N.Y. 2007)
(collecting cases); see also Adams v. Ellis, No. 09 Civ. 1329 (PKC), 2012 WL 693568, at *16
(S.D.N.Y. Mar. 2, 2012) (“[C]ase law in the Second Circuit and in this district often finds a limit
at two or three months and almost universally disapproves longer time periods.”).
17
Although it is unclear from the record whether Plaintiff sent the December 3, 2007 Donovan Email before
or after Hendrickson and Carbine commenced discussions in late 2007 regarding a position for Plaintiff in DAMP,
even if those discussions post-dated December 3, 2007, causation remains lacking in light of Carbine’s efforts to
secure Plaintiff several other positions of interest prior to the Donovan Email. In any event, as discussed below,
there is too great a temporal distance between the late-2007 Donovan Email and Plaintiff’s late-2008 transfer to
DAMP to establish the requisite causal connection.
32
The shortest temporal distance between Plaintiff’s most recent protected activity (the
April 2008 EEO Complaint) and his ultimate transfer to DAMP (in September 2008) is over five
months. That is too long a time period as a matter of law and establishes an independent basis on
which to reject Plaintiff’s argument that a causal connection exists. McGinnis v. N.Y. Univ.
Med. Ctr., No. 09 Civ. 6182 (RMB), 2012 WL 5512173, at *4 (S.D.N.Y. Nov. 14, 2012)
(“Because Plaintiff’s basis for her claim of retaliation is the timing between the filing of her
complaint on July 9, 2009 and her termination on February 1, 2010 and because she was subject
to an extensive period of progressive discipline prior to the filing of her complaint, she has failed
to make out a prima facie case of retaliation.”) (internal quotation marks omitted).
It may be true, as Defendant asserts, that Plaintiff’s transfer was the result of its
legitimate efforts to “secure an appropriate position for [Plaintiff]” outside of DNP. It may also
be true, as Plaintiff asserts, that Carbine and others “just d[id]n’t want [him]” at DNP and
“forced” him to transfer. Those two truths would not be mutually exclusive. See Burlington
Northern, 548 U.S. at 68 (“antipathy” is not actionable). Even if this is assumed, however, there
has been no showing—by way of causal inference or otherwise—that Defendant’s decision to
transfer Plaintiff to DAMP was retaliatory such that there exists a factual issue for a jury to
resolve.
Plaintiff’s retaliation claim accordingly fails at the prima facie stage.