Valvetech, Inc. v. Aerojet Rocketdyne, Inc.
Filing
203
DECISION AND ORDER granting in part and denying in part 184 Motion for Summary Judgment. The following claims remain in this case: (1) breach of contract as to the 2011 NDA and 2017 NDA; (2) trade secret claims under CUTSA and DTSA; and (3) replevin. SO ORDERED. Signed by Hon. Frank P. Geraci, Jr. on 9/29/2022. (SFR)
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 1 of 27
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF NEW YORK
VALVETECH, INC.,
Plaintiff,
v.
Case # 17-CV-6788-FPG
DECISION AND ORDER
AEROJET ROCKETDYNE, INC.,
Defendant.
INTRODUCTION
On September 26, 2019, the Court entered a Decision and Order dismissing several claims
from Plaintiff ValveTech, Inc.’s (“Plaintiff”) Amended Complaint against Defendant Aerojet
Rocketdyne, Inc. (“Defendant”). ECF No. 71. Plaintiff subsequently filed a motion seeking leave
to file a Second Amended Complaint (“SAC”), which United States Magistrate Judge Mark W.
Pedersen granted on April 6, 2020. ECF Nos. 95, 105.
The SAC contains four claims: one for breach of contract, two for trade secret
misappropriation (one under federal law and one under California law), and replevin. ECF No.
48. Defendant now moves for summary judgment on Plaintiff’s contract and trade secret claims
and moves for dismissal of Plaintiff’s replevin claim based upon mootness. ECF No. 189 at 1129. For the reasons that follow, the Motion for Summary Judgment, ECF No. 184, is GRANTED
IN PART and DENIED IN PART.
FACTUAL BACKGROUND
The following facts are undisputed unless otherwise noted. Where disputed, the facts are
taken in the light most favorable to Plaintiff.
1
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 2 of 27
Plaintiff engineers, designs, develops, and manufactures valves for use in aerospace
manufacturing. ECF No. 106 ¶ 20. Defendant was hired to design and develop a propulsion
system for the Boeing/NASA Commercial Crew Program. ECF No. 189 at 5. This system
required the use of different kinds of valves, so Defendant, rather than produce all the valves inhouse, sought proposals from, and engaged in discussions with, vendors. Id. As a part of those
dealings, Defendant entered into non-disclosure agreements (“NDA”) with potential vendors. Id.
One such vendor was Plaintiff, from which Defendant specifically sought a proposal
related to a propellant isolation valve to be used in in an Orbital Maneuver and Control Program
(“OMAC”). Id. On August 31, 2011, the parties entered into an NDA related to that proposal (the
“2011 NDA”), which marked the beginning of a multi-year course of dealing, governed by the
additional agreements discussed below. ECF No. 201-1 ¶ 1; ECF No. 106-4.
In March 2013, “Plaintiff was selected to develop, test, and manufacture the propellant
isolation valve,” and the parties subsequently executed purchase order 4410009820 (the “441
P.O.”). ECF No. 189 at 5. Performance of the work under the 441 P.O. did not call for Plaintiff
to deliver hardware to Defendant. ECF No. 201-1 ¶ 29. Rather, the work called for the hardware
to “be designed, analyzed, manufactured, and tested in support of development.” Id. ¶ 29.
In April 2015, Plaintiff and Defendant entered into Purchase Order 200033660 (the “200
P.O.”) which “called for the delivery of propellant isolation valve hardware in early 2016.” ECF
No. 189 at 7; ECF No. 201-1 ¶¶ 88-91. Under the 200 P.O., Plaintiff shipped seventeen 12255SMHFT valves for $50,495.00 each. 1 ECF No. 201-1 ¶ 116.
1
SMHFT is an acronym for “service module hot fire test.” ECF No. 201-1 ¶ 126.
2
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 3 of 27
After the seventeen 12255-SMHFT valves called for under the 200 P.O. were received by
Defendant, they were “delivered to Boeing for use in a service module hot fire test . . . and a pad
abort test (“PAT”).” ECF No. 201-1 ¶ 125.
Effective May 2017, the parties entered into another non-disclosure agreement, the “2017
NDA.” ECF No. 201-2 at 20. The 2017 NDA, like the 2011 NDA, included language concerning
the use of Plaintiff’s proprietary information:
A Party receiving Proprietary Information from the other in support of the Purpose
defined above, agrees to treat such Proprietary Information as proprietary for the
duration of the Protection Period, and will handle such Proprietary Information with
the same degree of care, but no less, than a reasonable degree of care, that it uses
to handle its own proprietary information of alike nature. Such information shall
not be disclosed, duplicated, or used in analysis, design, processes, production or
otherwise, in whole or in part, other than for the Purpose noted above or as
otherwise contemplated by this Agreement, and then only by those employees,
consultants and contract labor of the Receiving Party who have a need-to-know and
have been placed under a duty of confidentiality and limited use consistent with
this Agreement.
All Proprietary Information furnished hereunder (including copies, abstracts, or
derivatives thereat) shall remain the property of the disclosing Party, and shall be
returned to it or promptly destroyed by the receiving Party at the disclosing Party’s
request, except that the receiving Party may keep one copy in the files of its internal
Legal Department (or. if the receiving Party has no such department staffed by one
or more attorneys, in the files of its outside attorneys) to be used solely for purposes
of documenting compliance with the terms of this Agreement.
ECF No. 201-10 at 4-7.
Plaintiff asserts that Defendant began surreptitiously pursuing its own internal design for
the main valve “in parallel” with Plaintiff’s contracted-for design in February 2017—a fact which
Defendant disputes as based upon inadmissible evidence and “vague and confusing.” ECF No.
202-1 at 15. Plaintiff further contends that, in July 2017, Defendant informed Plaintiff that it was
terminating Plaintiff from further involvement in the OMAC program. ECF No. 106 at 8; ECF
No. 201-2 at 9. Defendant disputes this fact as well. ECF No. 202-1 at 21.
3
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 4 of 27
LEGAL STANDARD
Summary judgment is appropriate when the record shows that there is “no genuine dispute
as to any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P.
56(a); see also Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986). Disputes concerning material
facts are genuine where the evidence is such that a reasonable jury could return a verdict for the
non-moving party. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). In deciding
whether genuine issues of material fact exist, the court construes all facts in a light most favorable
to the non-moving party and draws all reasonable inferences in the non-moving party’s favor. See
Jeffreys v. City of New York, 426 F.3d 549, 553 (2d Cir. 2005). However, the non-moving party
“may not rely on conclusory allegations or unsubstantiated speculation.” F.D.I.C. v. Great Am.
Ins. Co., 607 F.3d 288, 292 (2d Cir. 2010) (quotation omitted).
DISCUSSION
I.
Choice of Law
In its prior Decision and Order, the Court determined that California law applies to all of
Plaintiff’s claims except its replevin claim, to which New York law applies. ECF No. 25 at 4-8,
13.
II.
First Claim: Breach of Contract
The first cause of action in Plaintiff’s SAC is breach of contract. ECF No. 106 at 10-14.
Defendant moves for summary judgment on Plaintiff’s breach of contract claims. ECF No. 189 at
14-17.
A. Agreements not Pled in SAC
In response to Defendant’s motion for summary judgment, Plaintiff attempts to rely on
three contracts which were not pled in the SAC: the 200 P.O., 2016 NDA, and the so-called
4
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 5 of 27
Valvetech Terms & Conditions (“Valvetech T&Cs”). See ECF No. 201-2 at 13-20. Plaintiff
asserts that Defendant “omit[ted]” these “key contracts” from its summary judgment motion. Id.
at 13. In its reply brief, Defendant argues that it is “[P]laintiff’s obligation to plead its claim” and,
as such, Plaintiff’s attempt to now claim breaches of “up to six overlapping contracts” is improper.
ECF No. 202 at 5 (emphasis omitted). Defendant requests that the Court “reject these new and
improper theories” and solely consider the “three pleaded contracts.” Id. at 6 (internal quotation
marks omitted).
“[T]he complaint must identify the specific provision of the contract allegedly breached by
the defendant.” Misha Consulting Group, Inc. v. Core Education and Consulting Solutions, Inc.,
No. C–13–04262–RMW, 2013 WL 6073362, at *1 (N.D. Cal. Nov. 15, 2013).
While
“[i]dentifying the specific provision of the contract allegedly breached by the defendant does not
require the plaintiff to attach the contract or recite the contract’s terms verbatim,” it is necessary
that “the plaintiff . . . identify with specificity the contractual obligations allegedly breached by
the defendant.” Id (citing Bell Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007)).
Moreover, “[a] complaint cannot be amended merely by raising new facts and theories in
plaintiffs’ opposition papers, and hence such new allegations and claims should not be considered
in resolving the motion.” Southwick Clothing LLC v. GFT (USA) Corp., No. 99 CV 10452(GBD),
2004 WL 2914093, at *6 (S.D.N.Y. Dec. 15, 2004).
Here, the SAC specifically alleged breaches of the 441 P.O. (referred to in the SAC as the
“2014 Purchase Order”), 2011 NDA, and 2017 NDA. ECF No. 106 at 11-14. Though Plaintiff’s
opposition brief asserts that Defendant’s memorandum of law in support of summary judgment
“omits several key contracts,” it is Plaintiff who must specifically allege in its complaint the
contracts, and specific contractual provisions, which give rise to the obligations allegedly breached
5
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 6 of 27
by Defendant. See Misha Consulting Group, Inc., 2013 WL 6073362, at *1. Moreover, Plaintiff
cannot amend the SAC by raising “new facts and theories”—i.e., additional contracts and
contractual provisions which were allegedly breached—in its opposition papers. See Southwick
Clothing LLC, 2004 WL 2914093, at *6.
Plaintiff attempts to circumvent these principles in several ways. First, it argues with
respect to the 200 P.O. that Defendant “concedes [it] is a valid contract.” ECF No. 201-2 at 17.
However, Defendant cites the 200 P.O. primarily to argue that that agreement’s integration clause
precludes reliance on any contemporaneous NDAs as sources of contractual rights and
obligations—an argument which the Court addresses below. ECF No. 189 at 11-12. In fact, in
the section of Defendant’s brief where it specifically argues that summary judgment is warranted
on Plaintiff’s breach of contract claim, Defendant, understandably, seeks summary judgment only
as to those contracts that are pled in the SAC: the 441 P.O., 2011 NDA, and 2017 NDA. See ECF
No. 189 at 14-17.
Second, regarding the unpled Valvetech T&Cs, Plaintiff argues that Defendant’s
memorandum in support of summary judgment “completely ignores” these terms despite the fact
that they were “identified in [Plaintiff’s] discovery responses.”
ECF No. 201-2 at 20.
Additionally, Plaintiff argues that Defendant “was specifically aware of these provisions at the
time it misappropriated [Plaintiff’s] designs.” Id. Nonetheless, it remains Plaintiff’s obligation to
plead the contracts and specific provisions which were allegedly breached. See Misha Consulting
Group, Inc., 2013 WL 6073362, at *1. Thus, this argument is unavailing.
Third, Plaintiff argues that it should be permitted to rely on the 2016 NDA as a source of
breach at this juncture for two reasons. In the first instance, Plaintiff notes that the SAC “referred
generally to ‘NDAs’ in recognition that additional relevant contracts might be identified during
6
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 7 of 27
discovery.” ECF No. 201-2 at 19. In support of this, Plaintiff cites Paragraph 58 of the SAC,
which states that “[Plaintiff] has at all times complied with its obligations under the NDAs and
under the parties’ contracts.” ECF No. 106 at 11. The Court does not read this paragraph as
asserting that “additional relevant contracts might be identified during discovery,” and even if it
did, Plaintiff should have moved to amend the operative complaint once it identified additional
agreements as a source of contractual obligations at issue, since it is Plaintiff that must plead the
contracts and specific provisions which were allegedly breached. See Misha Consulting Group,
Inc., 2013 WL 6073362, at *1.
Plaintiff also argues that, because Paragraph 59 of the SAC stated that “Defendant has
breached provisions of the contracts repeatedly, including at least the examples provided as
follows,” Plaintiff argues that its allegations “were non-limiting to the contracts specifically
identified at that time.” ECF No. 106 at 11; ECF No. 201-2 at 19. Regardless of whether it was
Plaintiff’s intention for the SAC’s allegations to be “non-limiting” as to which contracts Defendant
allegedly breached, it was still Plaintiff’s responsibility to plausibly allege sufficient facts to
establish a breach of contract claim as to each contract that Defendant allegedly breached—or
timely move to amend pursuant to the Court’s scheduling orders and Federal Rule of Civil
Procedure 16. 2 See Misha Consulting Group, Inc., 2013 WL 6073362, at *1. Plaintiff’s mere
allusion to other contracts does not meet that standard.
Accordingly, for all of the reasons stated above, Defendant’s motion for summary
judgment is GRANTED as to the 200 P.O., 2016 NDA, and Valvetech T&Cs because Plaintiff
Indeed, in keeping with this pattern, Plaintiff’s opposition brief attempts to leave the door open to the identification
of additional breaches with respect to the 2011 NDA, asserting that “[Defendant] breached at least the following
provision.” ECF No. 201-2 at 19 (emphasis added). Plaintiff cites no legal authority that renders it entitled, without
leave of court, to raise new theories of breach after discovery and summary judgment has passed.
2
7
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 8 of 27
may not rely on unpled agreements as sources of rights and obligations.3 The Court turns next to
the remaining agreements which were properly pled in the SAC.
B. 2011 NDA
The first agreement the parties entered into was the 2011 NDA on August 31, 2011 (the
“2011 NDA”). ECF No. 201-1 ¶ 1; ECF No. 106 ¶¶ 71-72, 76. Plaintiff alleges that Defendant
breached paragraphs 1(a) and 1(c) of the 2011 NDA. ECF No. 106 at 12-13. Paragraph 1(a) is a
“safeguarding” provision which states that:
A party receiving Proprietary Information from the other agrees to treat such
Proprietary Information as proprietary for the duration of the Protection Period, and
will handle such Proprietary Information with the same degree of care, but no less
than a reasonable degree of care, that it uses to handle its own proprietary
information of a like nature. Such information shall not be disclosed, duplicated,
or used in analysis, design, processes, production or otherwise, in whole or in part,
other than for the purposes noted above or as otherwise contemplated by this
Agreement, and then only by those employees and agents of the Receiving Party
who have a ‘need to know’ and have been placed under a duty of confidentiality
and limited use consistent with this Agreement. The receiving Party shall not be
responsible, however, for unauthorized disclosures of Proprietary Information by
persons who are or have been in its employ unless such Party failed to treat such
Proprietary Information as proprietary and handle it with the required degree of
care.
ECF No. 106-4 at 3.
Paragraph 1(c) is a provision entitled “control” which provides that:
All Proprietary Information furnished hereunder (including copies or abstracts
thereof) shall remain the property of the disclosing Party, and shall be returned to
it or promptly destroyed by the receiving Party at the disclosing Party’s request,
except that the receiving Party may keep one copy in the filed of its internal Legal
Department (or, if the receiving has no such department staffed by one or more
attorneys, in the files of its outside attorneys) to be used solely for purposes of
documenting compliance with the terms of this Agreement.
As Judge Pedersen noted in his July 13, 2020 scheduling order, “the time to amend the pleadings has passed.” ECF
No. 183 at 1. Indeed, the last deadline to amend pleadings in this case was February 7, 2020. See ECF No. 83 at 2.
Of course, Plaintiff is free to move for leave to amend under Federal Rules of Civil Procedure 15, but Plaintiff would
have to demonstrate why it should receive an extension of the prior deadline under Federal Rule of Civil Procedure
16, and Defendant would be entitled to an opportunity to articulate how it would be prejudiced if such an amendment
were permitted.
3
8
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 9 of 27
Id.
The 2011 NDA defines “Proprietary Information” to include the following:
(i) in the case of written, digitized or recorded information, the disclosing Party
designates as proprietary by appropriate stamp or legend at the time of first
disclosure, and (ii) in the case of information which is orally or visually disclosed
to the receiving Party, is identified as proprietary at the time of disclosure, is
reduced to or identified in writing and marked as proprietary, and forwarded to the
receiving Party within 30 days of its first oral or visual disclosure.
Id. ¶ 8. It also delineates what “Proprietary Information” does not include, stating:
Proprietary Information shall not include information: a. Which was known to the
receiving Party prior to its receipt from the disclosing Party; or b. Which was
independently developed by an employee of the receiving Party who did not have
access to the disclosing Party’s information or any materials derived therefrom; or
c. Which is or becomes public knowledge without the fault of the receiving Party;
or d. Which is or becomes available to a third party from the disclosing Party on an
unrestricted basis; or e. Which has been lawfully obtained by a Party, from a source
other than the other Party, without restrictions on disclosure.
Id.
Defendant advances several grounds upon which it believes that summary judgment is
warranted as to any alleged breach of the 2011 NDA. The Court considers these arguments in turn
in the subsections below.
1. Integration
First, Defendant argues that, “as a matter of contract interpretation, the 2011 NDA has no
relevance to the issues in dispute.” ECF No. 189 at 13, 16. This is so, Defendant contends, because
the 441 P.O. and 200 P.O. “each . . . included an integration clause.” Id. Thus, it is Defendant’s
position that “[a]s a matter of law, the 2011 NDA can have no relevance to the obligations imposed
and rights granted in those purchase orders” and cannot be relied upon “to alter the parties’ rights
and obligations.” Id.
9
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 10 of 27
In response, Plaintiff argues that Defendant’s theory is “completely at odds with the
General Provisions incorporated by reference into [the P.O.’s] that specifically require a
concurrent ‘proprietary information or nondisclosure agreement’ alongside [P.O.’s] to govern the
exchange of proprietary information, rather than extinguish them.” ECF No. 201-2 at 14 (emphasis
in original). The Court agrees with Plaintiff.
In interpreting a contract, “a court reads a contract’s language to understand its plain
meaning as a layperson ordinarily would,” absent some “technical or special” meaning intended
by the parties. Lennar Mare Island, LLC v. Steadfast Ins. Co., 176 F. Supp. 3d 949, 955 (E.D. Cal.
2016). Moreover, “[l]anguage in a contract must be construed in the context of that instrument as
a whole, and in the circumstances of that case, and cannot be found to be ambiguous in the
abstract.” Copart, Inc. v. Sparta Consulting, Inc., 339 F. Supp. 3d 959, 977 (E.D. Cal. 2018).
As a general rule, “a contract’s written terms alone control its interpretation.” Lennar Mare
Island, LLC, 176 F. Supp. 3d at 962. Thus, “when parties enter an integrated written agreement,
extrinsic evidence may not be relied upon to alter or add to the terms of the writing.” Copart, Inc.,
339 F. Supp. 3d at 977. This so-called “parol evidence rule” is one “of substantive law, not of
procedure” and is “founded on the principle that when the parties put all the terms of their
agreement in writing, the writing itself becomes the agreement.” Id.
However, the parol evidence rule “applies only to an integrated written agreement.” Id.
To determine whether a written agreement is “integrated,” courts consider whether it is “a
complete and final embodiment of the terms of an agreement or in other words, if it is intended by
the parties as a final expression of their agreement.” Lennar Mare Island, LLC, 176 F. Supp. 3d
at 962 (citations & internal quotation marks omitted). “Whether a written contract is an integration
is a question of law.” Id.
10
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 11 of 27
Courts look to the following factors in analyzing whether an agreement is integrated:
(1) the presence of an integration clause; (2) the contract’s language and apparent
completeness or incompleteness; (3) if a party argues another contract exists,
whether that agreement’s terms contradict those of the written contract; (4) whether
the alleged additional agreement would naturally be made as a separate agreement;
and (5) whether extrinsic evidence might confuse the jury.
Id. at 962-63.
Here, Defendant is correct that the 441 P.O. and 200 P.O. each contained an integration
clause. There were several versions of the 441 P.O. The operative version of 441 P.O. includes
the following clause which Defendants point to as that agreement’s “integration clause”:
Any terms proposed in Supplier’s acceptance of Buyer’s offer or in any other form
of Supplier that add to or differ from the terms herein are hereby objected to. Any
such proposed terms shall be void and the terms of this order shall constitute the
complete and exclusive statement of the terms of the contract. If this order has been
issued by Buyer in response to an offer and if any of the terms herein are additional
to or different from any terms of such offer, then the issuance of this order by Buyer
shall constitute an acceptance of such offer subject to the express conditions that
Supplier assent to such additional and different terms herein and acknowledge that
this order constitutes the entire agreement between the parties and Supplier shall be
deemed to have so assented and acknowledged unless Supplier notifies Buyer in
writing to the contrary within thirty(30) calendar days of receipt of this order.
ECF No. 189 at 12 (citing ECF No. 190 at 8). 4 The Court reads the plain language of this provision
to be limited to terms proposed in the Supplier’s acceptance that add or differ from the terms of
the General Provisions—not to prior NDAs. More importantly, as Plaintiff argues, the General
Provisions also contain the following clause:
Seller shall not provide any proprietary information of Seller or any third party to
Aerojet Rocketdyne, Inc. without prior execution of a proprietary information or
nondisclosure agreement by the parties. Any knowledge or information that Seller
has disclosed or may disclose to Aerojet Rocketdyne, Inc. incident to the award of
this Contract or the performance of the Contract shall not, unless otherwise agreed
in writing by Aerojet Rocketdyne, Inc., be considered confidential or proprietary to
Seller and shall be acquired free from any restriction other than restrictions that
Plaintiff attached Version 3 to its SAC but Version 4 is the version that was ultimately countersigned. ECF No. 189
at 7; ECF No. 190 at 8.
4
11
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 12 of 27
may be imposed by intellectual property considerations such as patent rights,
copyrights, and trademarks.
ECF No. 201-2 at 14 (citing ECF No. 201-36 at 3). Thus, the 441 P.O. expressly contemplated
that an NDA would be in place notwithstanding the purported integration clause. The plain
language of this provision manifests the parties’ intention to permit (and, indeed, encourage) the
execution of a separate nondisclosure agreement relating to any proprietary information disclosed
in connection with the award of the contract. Defendant offers no alternative interpretation of this
provision, and the general language from the purported “integration” clause that Defendant cites
cannot be read to supersede or conflict with this unambiguous statement of intent relating to the
existence and continuing validity of any separate nondisclosure agreement.
Accordingly, Defendant’s motion for summary judgment as to the 2011 NDA on the basis
of this purported integration clause in the 441 P.O. is DENIED.
In addition, the General Provisions, incorporated by reference into the 200 P.O. and 441
P.O. contained the following integration clause: 5
The Contract constitutes the entire agreement of the parties and integrates, merges,
and supersedes all prior offers, negotiations, agreements, understandings, and
arrangements between the parties related to the subject matter of the Contract. The
Parties agree that this Contract has been drafted by both.
ECF No. 190 ¶ 100. While this clause is certainly more emphatic than the narrower clause
discussed with respect to the 441 P.O., the 200 P.O.’s General Provisions also contained the
following clause:
Seller shall not provide any proprietary information of Seller or any third party to
Aerojet Rocketdyne, Inc. without prior execution of a proprietary information or
nondisclosure agreement by the parties. Any knowledge or information that Seller
has disclosed or may disclose to Aerojet Rocketdyne, Inc. incident to the award of
this Contract or the performance of the Contract shall not, unless otherwise agreed
Defendant only raises this clause with respect to the 200 P.O. but it appears in the General Provisions incorporated
into the 441 P.O. as well. See ECF No. 189 at 12; ECF No. 201-36 at 3. The Court’s reasoning below with respect
to this language applies with equal force to the 441 P.O. and its General Provisions.
5
12
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 13 of 27
in writing by Aerojet Rocketdyne, Inc., be considered confidential or proprietary to
Seller and shall be acquired free from any restriction other than restrictions that
may be imposed by intellectual property considerations such as patent rights,
copyrights, and trademarks.
ECF No. 201-37 at 5. Thus, even though the integration clause in the General Provisions. contains
a more unambiguous integration clause, it, like the 441 P.O. integration clause discussed above,
expressly contemplated that the parties could execute and maintain separate nondisclosure
agreements relating to proprietary information disclosed in connection with the purchase contract.
Reading this provision together with the integration clause, it is clear that the parties intended to
treat the issue of nondisclosure of proprietary information as a distinct “subject matter” that would
not be governed by the 200 P.O. or its integration clause. ECF No. 190 ¶ 100. Instead, any such
rights or duties relating to nondisclosure would be governed, if at all, by a separate “proprietary
information or nondisclosure agreement.” ECF No. 201-37 at 5. Again, Defendant offers no
alternative interpretation of this provision.
Because the integration clause in the General Provisions incorporated into the 200 P.O.
does not extinguish the 2011 NDA, Defendant’s motion for summary judgment as to the 2011
NDA on the basis of the integration clause in the 200 P.O. is DENIED.
2. Scope
Next, Defendant raises arguments related to the scope of the 2011 NDA. First, it argues
that the 2011 NDA is “irrelevant” because it “stated that the ‘Purpose’ of making disclosures [was]
[t]o support discussions regarding Requests for Information, Requests of Quotation, Requests of
Proposal, and/or purchase of components, systems and/or engineering services.” ECF No. 189 at
13 (emphasis in original). In other words, Defendant asserts that the 2011 NDA simply governed
“discussions” during the request for proposal process and did not “cover everything provided
during performance of the [P.O.’s].” ECF No. 202 at 8 (emphasis in original). Thus, Defendant
13
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 14 of 27
contends, the 2011 NDA was not “terminated” by the P.O.’s, rather it “cover[ed] the parties’
discussions, which may result in purchase orders.” Id. (emphasis in original).
This argument fails. While Defendant is correct with respect to how the 2011 NDA defines
its “purpose,” nothing in the operative language of the 2011 NDA limits its protection only to
disclosures occurring during “discussions” prior to performance.
The 2011 NDA defines “Proprietary Information” as:
[I]nformation disclosed by Aerojet in the Aerojet Field or by Company in the
Company Field, that the disclosing Party desires to protect against unrestricted
disclosure and unauthorized use and which (i) in the case of written, digitized or
recorded information, the disclosing Party designates as proprietary by appropriate
stamp or legend at the time of first disclosure, and (ii) in the case of information
which is orally or visually disclosed to the receiving Party, is identified as
proprietary at the time of disclosure, is reduced to or identified in writing and
marked as proprietary, and forwarded to the receiving Party within 30 days of its
first oral or visual disclosure.
ECF No. 106-4 at 2. It also delineates what “Proprietary Information” does not include, stating:
Proprietary Information shall not include information: a. Which was known to the
receiving Party prior to its receipt from the disclosing Party; or b. Which was
independently developed by an employee of the receiving Party who did not have
access to the disclosing Party’s information or any materials derived therefrom; or
c. Which is or becomes public knowledge without the fault of the receiving Party;
or d. Which is or becomes available to a third party from the disclosing Party on an
unrestricted basis; or e. Which has been lawfully obtained by a Party, from a source
other than the other Party, without restrictions on disclosure.
Id. Moreover, the 2011 NDA defines the “Company Field” of disclosure as: “Technical and
business information in support of Requests for Information, Requests of Quotation, Requests for
Proposal, and/or purchase of components, systems, and/or engineering services.” Id. (emphasis
added). The 2011 NDA set forth a Protection Period of 10 years from the date following the
expiration or termination of its 5-year Term, for a total period of protection of 15 years (barring
termination). See ECF No. 106 at 2.
14
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 15 of 27
Thus, the plain meaning of the 2011 NDA is unambiguous in that it is not limited to
disclosures occurring prior to performance. For one thing, the 2011 NDA expressly continued for
a fifteen-year period, far beyond the period of the parties’ pre-performance “discussions.”
Moreover, “Proprietary Information” was defined to include “Technical and business” information
disclosed not only in connection with pre-purchase discussions—i.e., “Requests for Information, .
. . Quotation, . . . [or] Proposal,”—but also in connection with purchase and performance—i.e.,
“purchase of components, systems, and/or engineering services.” See ECF No. 106-4 at 1.
Contrary to Defendant’s argument, the agreement did not limit the scope of the Proprietary
Information to the defined “purpose” of the agreement. Thus, Defendant’s motion for summary
judgment on this basis is DENIED. 6
3. Timing of Disclosure
Finally, Defendant argues that “the 2011 NDA expressly excludes information already
‘known to the receiving Party’; that ‘becomes public knowledge with the fault of the receiving
6
The Court agrees with Defendant that the 2011 NDA does not cover all information that Plaintiff simply views as
confidential or proprietary. See ECF No. 189 at 14 (“ValveTech’s position that the 2011 NDA applies regardless of
the form of the disclosure and regardless of whether a proprietary notice was provided is untenable.”). Information is
only considered proprietary, and thus covered by the 2011 NDA, if it is properly identified as such at the time of
disclosure. See ECF No. 106-4 at 2. Even granting that, however, Defendant has failed to articulate why a “later-sold
physical product[]” could not come within the scope of the 2011 NDA, so long as it is properly identified as
proprietary. ECF No. 189 at 14. A physical item, just like a schematic or blueprint, is capable of “visually
disclos[ing]” information that “the disclosing Party desires to protect against unrestricted disclosure and unauthorized
use.” ECF No. 106-4 at 2. Defendant admits as much. See ECF No. 202 at 12 (noting that “trade secrets” may be
“revealed by opening up the purchased valves”).
The only information that Defendant expressly argues were not properly marked are the “Packing List and Acceptance
Data Package . . . sent with Shipment No. 32290,” the package sent with “Shipment No. 32556,” and two valves set
as a part of Shipment No. 32290. ECF No. 201-1 at 32, 34. Plaintiff responds that the cover page of the packages
incorporated by reference Plaintiff’s “Terms & Conditions,” which made clear that all of Plaintiff’s “Intellectual
Property rights” constitute “Confidential Information” under applicable nondisclosure agreements. ECF No. 201-9 at
9; see also ECF No. 192-26 at 2. Although Defendant argues that it never “agreed” to those Terms & Conditions, the
relevant question, for purposes of determining the applicability of the 2011 NDA, is simply whether such incorporation
by reference sufficiently “designates” or “identifies” the information in the package as proprietary. Defendant does
not develop any argument on that issue, and the Court need not do so on its behalf. See United States v. Zannino, 895
F.3d 1, 17 (1st Cir. 1990) (“It is not enough merely to mention a possible argument in the most skeletal way, leaving
the court to do counsel's work, create the ossature for the argument, and put flesh on its bones.”).
15
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 16 of 27
party,’” ECF No. 189 at 14, and that there was a “gap” in NDA protection “between the 2011
NDA’s expiration in August of 2016 and the 2017 NDA’s execution in May of 2017.” ECF No.
189 at 16. In response, Plaintiff argues that 2011 NDA’s Protection Period remains in effect today
and that no gap existed. ECF No. 201-2 at 15. The Court agrees.
Though the stated Term of the 2011 NDA is “5 year(s) following the Effective Date,”
which is August 31, 2011, the Protection Period of the agreement is “10 years following the
expiration or termination of the Term.” Accordingly, the plan language of the 2011 NDA indicates
that the protection period extends through August 31, 2026. Thus, Defendant’s motion for
summary judgment based upon this argument is DENIED.
C. 441 P.O.
Plaintiff alleges in the SAC that Defendant breached the provision that “proprietary data
cannot be distributed without the written consent of [Plaintiff]” when Defendant “sent [Plaintiff’s]
valve to Boeing without seeking permission of [Plaintiff] before doing so.” ECF No. 106 at 11.
Defendant moves for summary judgment on this “sole act of breach under the 441 P.O. alleged in
the SAC.” ECF No. 189 at 14. Defendant argues that Plaintiff has failed to allege a cognizable
breach of the 441 P.O., arguing, inter alia, that “the 441 P.O. was directed solely to design and
development,” thus “[n]o hardware was delivered under that purchase order.” ECF No. 189 at 14.
In response, Plaintiff agrees with Defendant that the 441 P.O. “‘had no deliverable
hardware to the Buyer’ and ‘was directed to an earlier stage’ of development.” ECF No. 201-2 at
15. In fact, Plaintiff asserts that “[r]elatively little information (and none of the finalized valve
designs or acceptance data packages) was exchanged under the [441 P.O.] before the [200 P.O.]
was entered in 2015.” Id.
16
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 17 of 27
As Defendant asserts in its reply, these admissions “substantially vitiates [Plaintiff’s]
pleaded claims.” ECF No. 202 at 8 (emphasis in original). Though Plaintiff argues against
Defendant’s interpretation of the grant of rights from the 441 P.O., see ECF No. 201-2 at 16, that
argument does not solve the key issue identified by Defendant: it is Plaintiff that “must show a
legally cognizable breach of an obligation owed to [it].” ECF No. 202 at 9 (emphasis in original).
Thus, as Defendant contends, the fact that Defendant argues that certain contractual language
“negat[es] an alleged breach” does not shift the burden that Plaintiff must allege a cognizable
breach in the first place. ECF No. 202 at 9.
The sole breach of the 441 P.O. raised in the SAC—that Defendant “sent a [Plaintiff] valve
to Boeing without seeking permission of [Plaintiff] before doing so”—is undermined by Plaintiff’s
admission that that the 441 P.O. “‘had no deliverable hardware to the Buyer.” ECF No. 201-2 at
15. Accordingly, Defendant’s motion for summary judgment is GRANTED as to Plaintiff’s
breach of contract claim premised on a breach of the 441 P.O. 7
D. 2017 NDA
Defendant seeks summary judgment on any breach of contract claims arising under the
2017 NDA on the same grounds as the 2011 NDA. See ECF No. 189 at 14, 16-17. The Court’s
analysis with respect to the 2011 NDA applies with equal force to the 2017 NDA, thus summary
judgment is DENIED as to breach of contract claims arising under the 2017 NDA on the same
To the extent Plaintiff would argue that the “language added in Version 4 of the [441 P.O.]” which it asserts “does
not give [Defendant] permission to use [Plaintiff’s confidential information in the design of a competing valve,” see
ECF No. 201-2 at 16, is the source of Defendant’s contractual obligations which Defendant breached, such an
argument would fail. It is axiomatic that “[a] complaint cannot be amended merely by raising new facts and theories
in plaintiff’s opposition papers, and hence such new allegations and claims should not be considered in resolving the
motion.” Southwick Clothing LLC, 2004 WL 2914093, at *6; see also Esebag v. Whaley, No. LA CV18-08446, 2020
WL 7414734, at *7 (C.D. Cal. Sept. 8, 2020) (“Because summary judgment is not a procedural second chance to flesh
out inadequate pleadings, . . . courts will not grant or deny summary judgment based on unpled theories or claims.”
(citation & internal quotation marks omitted)); Muhammad v. Wal-Mart Stores East, L.P., No. 10–CV–6074–CJS,
2012 WL 3201668, at *7 (W.D.N.Y. Aug. 2, 2012).
7
17
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 18 of 27
grounds as Section I.A, supra. However, Defendant raises one additional argument with respect
to the 2017 NDA that requires further analysis.
Defendant argues that summary judgment is warranted as to breach of contract claims
arising under the 2017 NDA because “[n]othing in the 2017 NDA states that its terms applied to
previously executed purchase orders.” ECF No. 189 at 14. In response, Plaintiff contends that it
may maintain a breach of contract claim under the 2017 NDA because “[a]t a minimum, all of the
valves used in the Boeing PAT test and their accompanying data packages were shipped after the
execution of the 2017 NDA.” ECF No. 201-2 at 20 (citing ECF No. 201-46 at 4). In its reply,
Defendant does not dispute this assertion. See ECF No. 202 at 7-8. Thus, summary judgment is
DENIED and Plaintiff may maintain its breach of contract claims arising under the 2017 NDA as
to breaches that may have occurred after the execution of that agreement.
II.
Second and Third Claims: Trade Secret Misappropriation
Plaintiff’s second and third claims are for trade secret misappropriation: it brings one claim
under the Defend Trade Secrets Act (“DTSA”), 18 U.S.C. § 1839, et seq., and one under the
California Uniform Trade Secrets Act (“CUTSA”), Cal. Civ. Code § 3426.1, et seq.
The elements of a misappropriation of trade secrets claim under [DTSA] and
[CUTSA] are essentially the same. Under either statute, the owner of “information”
that the owner has made “reasonable” efforts to keep secret and which derives
independent economic value from not being generally known to other persons, must
show the defendant’s wrongful acquisition, disclosure, or use thereof.
Becton, Dickinson & Co. v. Cytek Biosciences Inc., No. 18-CV-00933-MMC, 2018 WL 2298500,
at *2 (N.D. Cal. May 21, 2018) (quotation marks, alterations, and citations omitted).
Plaintiff specifically identified the alleged misappropriated trade secrets at issue in its
“Trade Secret Disclosure Filed Under Seal.” ECF No. 74. In that document, Plaintiff identified
18
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 19 of 27
trade secrets related to its main valve, latch solenoid, pilot valves, and bellows as the basis for its
trade secret claims. See ECF No. 74 at 2-4.
More specifically, Plaintiff identified the following trade secrets related to its main valve:
(1) the primary design of Plaintiff’s main valve; (2) “the process for configuring and stabilizing
the Teflon within [the Teflon Seat Design] configuration” for the main valve; (3) the Poppet Tooth
“configuration and/or design within the main valve” which is unique in its “tooth-like” design and
configuration; (4) “the surface finish” which is “unique in its configuration and process”; and (5)
the Retainer Seal, which is a “dynamic seal” and has a “design, placement, materials and
functioning within the overall valve design [which] constitute[s] trade secrets”. Id. at 2-3.
With respect to the latch solenoid, Plaintiff identified the following trade secrets: (1) “a
center guide which is integrated and made part of a Latch Solenoid, constituting a trade secret”
because “[t]he design and functionality of the center guide is unique”; (2) “the combination of
materials and heating are unique and are the only combination providing the necessary
performance”; (3) the center guide’s design is “unique in controlling positioning”; and (4) “[t]he
method to maintain clearance is unique and its matching is unique and confidential.” Id. at 3-4.
Regarding the pilot valves, Plaintiff identified the following trade secrets: (1) “[t]he use of
remote pilot valves in conjunction with the main valve constitutes a trade secret, as well as the
interface between the pilot valve and main valve”; and (2) “the placement of the Teflon Seat . . .
and Poppet Tooth configuration placement and use in the overall design is a trade secret.” Id. at
4.
As for the bellows, Plaintiff identified the following as its trade secrets: “[t]he use of the
bellows within the valve and/or pilot valve system is a unique and confidential design,” used solely
by Plaintiff and designed “to meet compression requirements.” Id.
19
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 20 of 27
In addition to identifying its trade secrets which were allegedly misappropriated, Plaintiff
attached an exhibit identifying approximately 475 documents “that Defendant possessed prior to
being placed in escrow . . . which contain [the] trade secret information” set out in Plaintiff’s trade
secret disclosure. ECF No. 74 at 6-39.
Defendant moves for summary judgment on Plaintiff’s trade secret claims, raising several
arguments which the Court considers in turn below.
A. Secrecy
Defendant argues that the “secrecy prong” of Plaintiff’s trade secret claims “rel[y] upon
the 2011 and 2017 NDAs” and, “under a proper interpretation of the parties’ agreements, the 441
P.O. and the 200 P.O. each exclusively controls the rights and obligations between the parties
thereunder.” ECF No. 189 at 18. This argument fails because, as ruled in Sections II.B and II.D
above, the plain language of the 441 P.O. and 200 P.O. each contemplates that an NDA would be
in place alongside the purchase order. Thus, Defendant’s motion for summary judgment on
Plaintiff’s trade secret claims based upon the fact that such claims rely upon the 2011 and 2017
NDAs is DENIED.
Defendant’s further press this issue, arguing that “even if the 2011 and 2017 NDAs apply
(i.e., despite the integration clauses contained in the 441 P.O. and the 200 P.O), [Plaintiff] waived
secrecy over its alleged trade secrets by: (1) permitting the disclosure of its Critical Design Review
(CDR) to Boeing; (2) selling valves to [Defendant] without restriction; and (3) placing its alleged
trade secret information (e.g., cross-sections of the seat design, center guide and dynamic seals)
on the public docket.” ECF No. 189 at 18-19. The Court considers each argument in turn.
In response to the first argument, Plaintiff contends that the 2013 CDR presentation to
Boeing contained “only high-level information about certain aspects of the valve [Plaintiff] was
20
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 21 of 27
proposing in 2013, but the level of disclosure . . . is not nearly detailed enough to reproduce the
full design as it existed in 2013 without the full set of more detailed drawings, the assembly
instructions, and the materials.” ECF No. 201-2 at 24-25 (footnote omitted) (citing Timko
Deposition, ECF No. 201-52). Defendant does not meaningfully counter this argument in its reply.
See ECF No. 202 at12-13. Accordingly, summary judgment based upon this argument is DENIED
as Plaintiff has raised a genuine dispute of material fact.
“Defendant’s second argument fails because, as the Court ruled above, an NDA remained
in place despite the integration clause in the relevant purchase orders. See Section II supra.
Plaintiff claims that it sufficiently designated the valves as protected under the 2011 NDA by virtue
of the Valvetech T&Cs accompanying the packages. Since Defendant does not develop any
argument as to why Plaintiff’s action was insufficient to apply the NDA’s protection, see note 6,
supra, this argument is not grounds for judgment as a matter of law.” Finally, Defendant’s third
argument fails because Plaintiff’s public disclosure occurred on April 4, 2020—thus, as Plaintiff
contends, it “is irrelevant to misappropriation in 2016-17.” See ECF No. 201-2 at 25; see also
Cardio Vention, Inc. v. Medtronic, Inc., 483 F. Supp. 2d 830, 835 (D. Minn. 2007) (applying
California law and ruling that “information that become[s] publicly available after the time of the
misappropriation is irrelevant to the existence of a trade secret at the time of the
misappropriation.”). Accordingly, Defendant’s motion for summary judgment is DENIED as to
these arguments.
B. Consent
In addition, Defendant argues that “[t]he 441 P.O. expressly granted consent to ‘use,
disclose and reproduce [Plaintiff’s] Proprietary Information and Materials, and make derivative
works thereof, to fulfill [Defendant’s] obligations under contract[.]” ECF No. 189 at 18; ECF No.
21
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 22 of 27
192-11 at 5. Thus, according to Defendant, its “conduct . . . fails to meet the statutory definition
of misappropriation, which requires a lack of consent.” Id. (citing Cal. Civ. Code § 3426.1(b); 18
U.S.C. § 1839 (5)(B)). Moreover, Defendant argues, “the completed sales of the 1255-SMHFT
valves under the 200 P.O., which were made without restriction, provided consent to use, test,
resell, etc. those valves. As such, [Plaintiff’s] misappropriation claim must fail.” ECF No. 189.
These arguments fail.
The relevant provision in the 441 P.O. states that “Buyer and Seller shall each use
Proprietary Information and Materials of the other only in the performance of and for the purpose
of this contractor Buyer’s Prime Contract for the Commercial Crew Integrated Capability
(CCiCap) Base Program.” ECF No. 192-11 at 5 (emphasis added). However, according to
Plaintiff, it was the “CCtCap program, which covered delivery of all hardware and accompanying
data.” ECF No. 201-2 at 18. In addition, Defendant’s argument that the 200 P.O.’s “completed
sales” was without “restriction” fails to reconcile that the relevant NDA remained in place as set
forth above. And Defendant does not assert in its brief or statement of facts that the 200 P.O. or
any of the provisions incorporated therein contained the same grant of rights that form the basis
for its argument with respect to the 441 P.O. See generally ECF No. 189; 190. Accordingly, the
Court cannot say as a matter of law that any grant of rights under the 200 P.O. was inconsistent
with the protections provided in the NDA. Thus, Defendant’s argument for summary judgment
on this basis is DENIED.
C. “General Knowledge”
Finally, Defendant argues that summary judgment is warranted because Plaintiff has failed
to “sufficiently address its burden to establish that the alleged trade secrets are outside of the
‘general knowledge.’” ECF No. 189 at 19-21. More specifically, Defendant asserts (1) that
22
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 23 of 27
Plaintiff obtained patents on at least two of its alleged trade secrets—the Teflon Seat and the Center
Guide; and (2) that the use of dynamic seals is not a trade secret, as confirmed by Plaintiff’s
technical expert. Id.
In response, Plaintiff raises genuine issues of material fact by pointing to the expert report
of Michael Timko. Specifically, Timko opined that Plaintiff’s trade secrets are not generally
known and have independent economic value. See ECF No. 201-15 at 23-26, 201-07. Indeed,
Timko addresses in his report how the patents identified by Defendant that form the basis for its
argument meaningfully differ from the trade secrets at issue with respect to both the Teflon Seat
and Center Guide. See ECF No. 201-2 at 26 (citing ECF No. 201-15; ECF No. 201-51). Thus,
there is a genuine dispute of material fact as to these issues and Defendant’s motion for summary
judgment on this basis is DENIED.
III.
Damages
A. Contract Damages
Defendant argues that Plaintiff’s contract claim should be dismissed for failure to identify
a legally cognizable damages theory. ECF No. 189 at 21. More specifically, Defendant contends
that each of Plaintiff’s three damages theories—expectation, reliance, and restitution—“comprises
imaginary damages based on speculation divorced from any legally cognizable damages theory.”
Id. at 22.
1. Expectation
Defendant argues that the expert report of Justin Blok, and his opinion that Plaintiff would
have completed valve sales over the course of the next 60 years, but for Defendant’s breach, is
based upon Plaintiff’s unilateral expectation and is fatally speculative. ECF No. 189 at 22-23
(citing ECF No. 192-39 at 47).
23
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 24 of 27
In response, Plaintiff asserts that Blok’s determination relied on Timko’s opinion “that the
Boeing Starliner will have a life of 60 years—similar to the Russian Soyuz program.” ECF No.
201-2 at 22 (internal citation omitted). Indeed, as Blok testified, based on Timko’s report, it is not
uncommon for qualified parts for human spaceflight to be used for decades. See Id. (citing ECF
No. 201-48 at 5). Blok’s testimony, coupled with Timko’s report and expertise, thus raise a
genuine dispute of material fact as to Plaintiff’s expectation damages and summary judgment is
therefore DENIED.
2. Reliance
Next, Defendant argues that summary judgment should be granted as to any theory of
damages based upon reliance because Blok’s calculation for Plaintiff’s “loss” “failed to account
for substantially all of the revenue that [Plaintiff] generated.” ECF No. 189 at 23. In response,
Plaintiff contends that this “Daubert-style argument” fails because against Blok’s calculation of
“costs that have not been reimbursed are net of any revenue or profits [that] have been realized.”
ECF No. 201-2 at 22 (citing ECF No. 201-48 at 13-14). Defendant does not specifically respond
to this testimony in its reply. See ECF No. 202 at 13. The Court finds Blok’s testimony is sufficient
to raise a genuine dispute of material fact and summary judgment is therefore DENIED.
Defendant’s will have a further opportunity to challenge Blok’s methodology in limine under
Daubert.
3. Restitution
Finally, Defendant seeks summary judgment as to Plaintiff’s “restitution” damages
arguing, as a matter of law, that restitution is not a recoverable form of contract damages under
California law. ECF No. 189 at 24. Plaintiff disputes this and asserts that California law permits
24
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 25 of 27
granting restitution as a remedy for breach of contract. ECF No. 201-2 at 22. The Court agrees
with Plaintiff.
“The primary remedies for breach of contract include expectation damages and reliance
damages, and when those are inadequate, restitution.” Canesco v. Ford Motor Co., 570 F. Supp.
3d 872, 891 n. 7 (S.D. Cal. 2021). “Thus, restitution merely represents a form of damages available
to a plaintiff where the expectation and reliance interest prove inadequate.” Id.
Accordingly, the Court cannot say as a matter of law that Plaintiff is precluded from
recovering restitution in this case and a plaintiff may proceed to trial on multiple theories of
recovery. See Nuwintore v. Mgmt. & Training Corp., No. 1:13-CV-967 AWI-JLT, 2018 WL
3491676, at *7 (E.D. Ca. July 19, 2018). Therefore, summary judgment as to Plaintiff’s restitituion
damages is DENIED.
B. Trade Secret Damages
Defendant seeks summary judgment on Plaintiff’s trade secret claims, arguing that “[t]he
existence of damages is . . . a necessary element of a trade secret claims [sic]” and that Plaintiff
fails “to present a cognizable damages theory.” ECF No. 189 at 24. In response, Plaintiff asserts
that “this Court in its prior ruling did not identify damages as a required element of a trade secret
claim under either the CUTSA or the DTSA.” ECF No. 201-2 at 28. Plaintiff further contends
that, even if damages is an element of such claims, Defendant concedes that “actual” loss and
“unjust enrichment” are available damages in trade secrets cases and that Blok calculated such
damages.
Id.
Thus, argues Plaintiff, Defendant’s arguments attacking Blok’s damages
calculations are “really Daubert arguments for a motion that [Defendant] has not made.” ECF No.
201-2 at 28. In its reply, Defendant devotes three sentences to countering Plaintiff’s damages
arguments and simply reasserts that Plaintiff’s “damages theories are not cognizable” and that the
25
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 26 of 27
availability of a future challenge to Block’s methodology “does not preclude summary judgment.”
ECF No. 202 at 13.
The Court finds that Blok’s proffered damages calculations are sufficient to raise a genuine
dispute of material fact and, thus preclude summary judgment on the grounds that Plaintiff has
failed to bring forth a damages theory on its trade secrets claims. Accordingly, Defendant’s motion
for summary judgment on this basis is DENIED.
IV.
Fourth Claim: Replevin
Plaintiff’s fourth and final cause of action is replevin. The Court previously ruled that New
York law applies to this claim. To state a claim for replevin under New York law, “a plaintiff
must allege that he or she owns specified property, or is lawfully entitled to possess it, and that the
defendant has unlawfully withheld the property from the plaintiff[.]” Khoury v. Khoury, 912
N.Y.S.2d 235, 237 (2d Dep’t 2010).
The thrust of Defendant’s argument regarding summary judgment as to Plaintiff’s replevin
claim is that “the replevin claim assumes that the 2011 and 2017 NDAs, rather than the 441 P.O.
and the 200 P.O., provide the return obligation, which is . . . false.” ECF No. 189 at 29. However,
as the Court denied Defendant’s motion for summary judgment as to any breach of the 2011 NDA
and 2017 NDA, Defendant’s motion for summary judgment as to the replevin claim is also
DENIED. 8
CONCLUSION
Defendant’s Motion for Summary Judgment (ECF No. 184) is GRANTED IN PART and
DENIED IN PART.
The Court has also considered the various sub-arguments presented by Defendant and finds them to be either without
merit or insufficiently raised to permit a ruling at this juncture. See Zannino, 895 F.3d at 17.
8
26
Case 6:17-cv-06788-FPG-MJP Document 203 Filed 09/29/22 Page 27 of 27
The following claims remain in this case: (1) breach of contract as to the 2011 NDA and
2017 NDA; (2) trade secret claims under CUTSA and DTSA; and (3) replevin.
IT IS SO ORDERED.
Dated: September 29, 2022
Rochester, New York
______________________________________
HON. FRANK P. GERACI, JR.
United States District Judge
Western District of New York