Cape Hatteras Access Preservation Alliance v. Salazar, et al
Filing
71
ORDER DENYING 48 Plaintiff's Motion for Summary Judgment, GRANTING IN PART AND DENYING IN PART 56 Defendants' Motion for Summary Judgment, and GRANTING IN PART AND DENYING IN PART 58 Intervenors' Motion for Summary Judgment. The clerk is directed to enter judgment in favor of the defendants and intervenors on each of CHAPA's claims and to close the file. Signed by US District Judge Terrence W. Boyle on 6/19/2014. (Fisher, M.)
IN THE UNITED STATES DISTRICT COURT
FOR THE EASTERN DISTRICT OF NORTH CAROLINA
NORTHERN DIVISION
No. 2:13-CV-1-BO
CAPE HATTERAS ACCESS
PRESERVATION ALLIANCE,
Plaintiff,
v.
S.M.R. JEWELL, et al.,
Defendants.
and
DEFENDERS OF WILDLIFE,
NATIONAL AUDUBON SOCIETY,
and NATIONAL PARKS
CONSERVATION ASSOCIATION,
Defendant-Intervenors.
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
ORDER
This cause comes before the Court on cross-motions for summary judgment. A hearing
was held on these matters before the undersigned on March 24, 2014, at Elizabeth City, North
Carolina. For the reasons discussed below, plaintiffs motion for summary judgment is denied,
defendants' motion for summary judgment is granted in part and denied in part, and defendantintervenors' motion for summary judgment is granted in part and denied in part.
PROCEDURAL HISTORY
Plaintiff, the Cape Hatteras Access Preservation Alliance (CHAPA), filed a complaint for
declaratory and injunctive relief in the United States District Court for the District of Columbia
against the Department of the Interior, the National Park Service, and the Superintendent of Cape
Hatteras National Seashore. Defenders of Wildlife, the National Audubon Society, and the
National Parks Conservation Association were permitted to intervene as defendants without
objection from plaintiff by order entered March 9, 2012. Following sua sponte consideration by
the court and by order entered December 23, 2012, this action was transferred to this Court
pursuant to 28 U.S.C. § 1404(a). All parties have filed motions for summary judgment pursuant
to Rule 56 of the Federal Rules of Civil Procedure and agree that the claims can be properly
decided on the administrative record (AR) and the pending motions.
BACKGROUND
The Cape Hatteras National Seashore (the Seashore) was created by Congress in 1937,
which decreed that, except for certain portions deemed especially adaptable for recreational use,
the area would be "permanently reserved as a primitive wilderness and no development of the
project or plan for the convenience of visitors shall be undertaken which would be incompatible
with the preservation of the unique flora and fauna or the physiographic conditions [then]
prevailing". 16 U.S.C. § 459a-2. The Seashore consists of more than 30,000 acres distributed
along approximately sixty-seven miles of shoreline. Special Regulations, Areas of the National
Park System, Cape Hatteras National Seashore- Off-Road Vehicle Management, 77 Fed. Reg.
3124 (Jan. 23, 2012) (codified at 36 C.F.R. pt. 7). At the time of its establishment, the areas
surrounding the Seashore were sparsely populated and beach driving was primarily for
transportation purposes and not recreation. Id.
"Improved access, increased population, and the popularity of the sport utility vehicle
have resulted in a dramatic increase in vehicle use on the Seashore beaches." Id. Though
beginning in the 1970s interim or draft off-road vehicle (ORV) management plans existed, no
final ORV management plans were completed or published. Executive Order 11644, as
amended by Executive Order 11989, requires that ORV use on federal lands be consistent with
"the protection of the resources of the public lands, promotion of the safety of all users of those
lands, and minimization of conflicts among various uses of those land," and that ORV areas and
2
trails be located in order to minimize damage to the natural environment and wildlife. The lack
of a final ORV management plan further violated 36 C.P.R. 4.10(b), which requires that
"[r]outes and areas designated for off-road motor vehicle use shall be promulgated as special
regulations."
On October 18, 2007, defendant-intervenors (intervenors) in this matter filed a complaint
in this Court against the National Park Service and the Department of the Interior alleging that
the federal defendants' failure to issue a long-term plan and special regulation governing ORV
use in the Cape Hatteras National Seashore violated, inter alia, the National Park Service
Organic Act (Organic Act), 16 U.S.C. § 1, et seq.; the Seashore enabling legislation, 16 U.S.C.
§§ 459-459a-10; Executive Order 11644, as amended by Executive Order 11989; and the
National Environmental Policy Act (NEPA), 42 U.S.C. § 4321, et seq. No. 2:07-CV-45-BO.
That matter was resolved by consent decree entered April 30, 2008. CHAPA was permitted to
intervene as a defendant in the 2007 suit, where it represented its beach driving interests and
participated in the resolution of the matter. The consent decree established that the federal
defendants would complete an ORV Management Plan for the Seashore by December 31, 2010,
and would complete and promulgate the final Special Regulation by April 1, 2011. The consent
decree further established a modified interim management plan to be implemented pending the
final special regulation. The modified interim management plan consisted of the interim strategy
as described in a July 2007 Finding ofNo Significant Impact except as modified by the consent
decree (interim strategy).
Beginning in 2008, a negotiated rulemaking committee, consisting of CHAPA's parent
organization, intervenors, and NPS, attempted to come to a consensus on all issues regarding
ORV management on the Seashore but were unable to do so. 72 Fed. Reg. 72,316-18. In
3
March 2010, the National Park Service (NPS) issued a draft environmental impact statement
(DEIS) for the ORV management plan and special regulation. AR 36717-37523. NPS held a
sixty-day comment period on the DEIS, and conducted five public hearings. AR 38402-04.
Over 50,000 individual comments on the DEIS were derived from correspondence received by
NPS. AR 38403.
In November 2010, NPS published a final environmental impact statement (FEIS). AR
37685-38872. A record of decision was published on December 28, 2010, wherein NPS selected
Alternative F. AR 38757-976. NPS published a proposed rule on July 6, 2011, on which
comments were made. The final rule was published in the Federal Register on January 23, 2012.
The final rule "designates off-road vehicle routes and authorizes limited ORV use within Cape
Hatteras National Seashore in a manner that will protect and preserve natural and cultural
resources, provide a variety of safe visitor experiences, and minimize conflicts among various
users." 77 Fed. Reg. 3123.
DISCUSSION
A motion for summary judgment may not be granted unless there are no genuine issues
of material fact for trial and the movant is entitled to judgment as a matter oflaw. Fed. R. Civ.
P. 56(a). The moving party bears the initial burden of demonstrating the absence of a genuine
issue of material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986). Ifthat burden has
been met, the non-moving party must then come forward and establish the specific material facts
in dispute to survive summary judgment. Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475
U.S. 574, 588 (1986). In determining whether a genuine issue of material fact exists for trial, a
trial court views the evidence and the inferences in the light most favorable to the nonmoving
party. Scott v. Harris, 550 U.S. 372, 378 (2007). However, "[t]he mere existence of a scintilla
4
of evidence" in support of the nonmoving party's position is not sufficient to defeat a motion for
summary judgment; "there must be evidence on which the [fact finder] could reasonably find for
the [nonmoving party]." Anderson v. LibertyLobby, Inc., 477 U.S. 242, 252 (1986).
Because both the federal defendants and intervenors raise arguments related to CHAPA's
standing to bring this action, the Court addresses this issue first.
I.
STANDING
A.
Article III Standing
Standing is the determination of whether a particular individual is the proper party to
assert a claim in federal court; it "is founded in concern about the proper-and properly limited
role-ofthe courts in a democratic society." Warth v. Seldin, 422 U.S. 490,498 (1975). The
standing doctrine curtails the types of disputes that an Article III court can decide; it does so by
requiring courts to hew to their express constitutional mandate of resolving "cases" and
"controversies." U.S. Const. art. III, §2, cl. 1; Warth, 422 U.S. at 498. The standing question is
one that asks "whether the litigant is entitled to have the court decide the merits of the dispute or
of particular issues." Warth, 422 U.S. at 498. An affirmative answer to this question requires a
plaintiff to demonstrate at least three "irreducible constitutional minimum" requirements:
First, the plaintiff must have suffered an "injury in fact" -an invasion of a legally
protected interest which is (a) concrete and particularized and (b) "actual or
imminent, not "conjectural" or "hypothetical." Second, there must be a causal
connection between the injury and the conduct complained of-the injury has to be
"fairly ... trace[able] to the challenged action of the defendant, and not ... th[e]
result [of] the independent action of some third party not before the court." Third,
it must be "likely," as opposed to merely "speculative," that the injury will be
"redressed by a favorable decision.
Lujan v. Defenders ofWildlife, 504 U.S. 555, 560-61 (1992) (internal citations omitted).
Intervenors contend that CHAPA, an association which has standing to bring suit on
behalf of its members when, inter alia, its members would otherwise have standing to bring suit
5
in their own right or when the interests it seeks to protect are germane to the organization's
purpose, Hunt v. Washington State Apple Adver. Comm'n, 432 U.S. 333, 343 (1977), has failed
to allege that it has members, who they are, and whether any member would have standing to
bring suit in his or her own right. Intervenors further contend that CHAPA has failed to allege
that it or its members have suffered an injury in fact, that there is a causal connection between
the injury and the conduct complained of, or that such injury will likely be redressed by a
favorable decision here.
In its complaint, CHAPA alleges that it has over 10,000 active members and that its
purpose is to protect and preserve local beaches within a framework of free and open beach
access for all users, including properly licensed drivers and vehicles. Cmp.
~
7. CHAPA further
alleges that its members regularly operate off road vehicles as a means to access seashore
beaches for recreational and commercial purposes. Cmp. ~ 8. Also in the record are declarations
from three CHAPA members who attest that they access areas of the Seashore when permitted
but have been frustrated by ORV access restrictions implemented under the final rule. Couch
Decl.
~
6; Hamilton Decl.
~~
5, 6; Davis Decl. ~~ 4,7. The declarations further attest to the
damage to economic, aesthetic, and recreational interests of CHAPA's members. See also AR
8464-69 (summary of impact of final rule on CHAPA members).
Where, as here, a procedural injury is alleged, the standards for redressability and
immediacy are relaxed. See Lujan, 504 U.S. at 572 n. 7. The Court finds that the allegations in
the complaint, the declarations of CHAPA members, and the administrative record in this matter
support that CHAPA has organizational standing in that some of its members would have
standing to sue in their own right and because the interests CHAPA seeks to protect in this suit
are germane to its mission. Further, CHAPA has sufficiently alleged invasion of a legally
6
protected interest that is causally connected to the issuance ofNPS's final rule and that the injury
would likely be redressed by a favorable decision. Thus, CHAPA has organizational and Article
III standing to bring this action. See also Cape Hatteras Access Preservation Alliance v. United
States Dept. ofInterior, 344 F. Supp.2d 108, 117-18 (D.D.C. 2004) (holding that CHAPA had
Article III standing to bring challenge to defendants' designation of piping plover critical habitat
where CHAPA alleged economic, aesthetic, and recreational harm due to the effect of critical
habitat designation on ORV use).
B.
Prudential Standing
In addition to Article III's case-or-controversy requirement, courts have imposed
prudential limitations on standing which encompass "the requirement that a plaintiffs complaint
fall within the zone of interests protected by the law invoked." Elk Grove Unified Sch. Dist. v.
Newdow, 542 U.S. 1, 12 (2004) (quoting A/len v. Wright, 468 U.S. 737, 751 (1984)). NEPA
provides for no private right of action, requiring parties who seek to bring claims under NEP A to
file suit under the Administrative Procedures Act (APA). Town ofStratford, Connecticut v.
FA.A., 285 F.3d 84, 88 (D.C. Cir. 2002). In order to bring suit challenging an agency action
under the AP A, a plaintiff must demonstrate that he is "adversely affected or aggrieved ...
within the meaning of a relevant statute." 5 U.S.C. § 702; see also Taubman Realty Grp. L.P. v.
Mineta, 320 F.3d 475, 480 (4th Cir. 2003) (plaintiff challenging action under the APA must
satisfy prudential in addition to constitutional standing requirement).
The federal defendants contend that CHAPA's claims do not fall within NEPA's zone of
interests, which has been established to be the protection of the environment. See Town of
Stratford, 285 F.3d at 88 (NEPA "cannot be used as a handy stick by a party with no interest in
protecting against an environmental injury to attack a defendant."); Western Radio Servs. Co.,
7
Inc. v. Espy, 79 F.3d 896, 902-03 (9th Cir. 1996) ("NEPA's purpose is to protect the
environment, not the economic interest of those adversely affected by agency decisions.").
Insofar as CHAPA's alleged environmental harms are preconditioned on its contention
that NPS could have promulgated a rule that would allow for greater or enhanced ORV access on
the Seashore, the Court is wary to find that such interests are sufficiently environmental in order
to fall within NEPA's zone of interests. The Tenth Circuit recently addressed a similar question,
and held that NEP A does not protect an injury where plaintiffs "are harmed because NPS could
have promulgated a rule allowing more snowmobiles into Grand Teton without adverse
environmental effects." Wyoming v. US. Dep't ofInterior, 674 F.3d 1220, 1237-38 (lOth Cir.
2012). However, "[u]nlike Article III standing, issues of prudential standing are nonjurisdictional and may be 'pretermitted in favor of a straightforward disposition on the merits."'
United States v. Day, 700 F.3d 713, 721 (4th Cir. 2012) (quoting Finstuen v. Crutcher, 496 F.3d
1139, 1147 (lOth Cir. 2007)). Thus, the Court assumes without deciding that CHAPA has
prudential standing to raise its claims under NEP A and proceeds to consider the merits of the
instant action. 1
II.
ENABLING ACT CLAIM
In count one of its complaint, CHAPA contends that the final plan and rule are arbitrary
and capricious, an abuse of discretion, and otherwise not in accordance with the Enabling Act.
Specifically, CHAPA alleges that NPS overlooked the Enabling Act's provisions relating to
1
Moreover, while many ofthe injuries alleged by CHAPA are economic in nature, CHAPA
members have arguably alleged environmental harms by alleging that their ability to engage in
recreational activities on the Seashore, such as fishing and shelling, has been curtailed by the
implementation of the final plan and limited ORV access. "A plaintiff can ... have standing
under NEPA even ifhis or her interest is primarily economic, as long as he or she also alleges an
environmental interest or economic injuries that are 'causally related to an act within NEPA's
embrace."' Ranchers Cattlemen Action Legal Fund United Stockgrowers ofAm. v. US. Dep't of
Agric., 415 F .3d 1078, 1103 (9th Cir. 2005) (citation omitted).
8
portions of the Seashore deemed to be especially adaptable for recreational uses, and failed to
even consider how that provision of the Enabling Act might affect its management ofORV use.
"The administration, protection, and development of the [Seashore] shall be exercised
under the direction of the Secretary of the Interior by the National Park Service, subject to the
provisions of [the Organic Act]. ... " 16 U.S.C. § 459a-1. The Court considers first whether
Congress' intent on the issue of whether recreational use or preservation should be paramount on
the Seashore is clear. Chevron, USA., Inc. v. Natural Resources Defense Council, Inc., 467
U.S. 837, 842-3 (1984). Second, if Congress' intent is not clear, the Court considers whether the
NPS' s interpretation in this instance is reasonable and consistent with the plain language of the
statute. Id; see also Grunewald v. Jarvis, 930 F. Supp.2d 73, 84 (D.D.C. 2013) (applying two
step Chevron analysis to dispute over whether NPS failed to comply with national park enabling
act in developing wildlife management plan).
CHAPA frames its Enabling Act claim as simple: "NPS must give effect to the language
of a park enabling act when that language is relevant to its planning decisions, harmonizing it
with the Organic Act when the acts are in conflict (which in this case, they are not)." [DE 60 at
13]. The Court agrees that resolution of this issue is simple. While the Seashore's Enabling Act
does specifically mention recreational activities, Congress' intent as to the priority of natural
resource protection over recreational use on the Seashore is quite plain: no plan for the
convenience of visitors should be implemented if it is incompatible with the preservation of the
flora and fauna of the Seashore. 16 U.S.C. § 459a-2. As CHAPA concedes, the Seashore's
Enabling Act and the Organic Act are not in conflict on this issue, and indeed "over twenty years
of federal court decisions confirm[] that conservation is the predominant facet of the Organic
9
Act." S. Utah Wilderness Alliance v. Nat'/ Park Serv., 387 F. Supp. 2d 1178, 1191 (D. Utah
2005).
While CHAPA contends that NPS should have further considered ORV management in
areas deemed to be especially adaptable for recreational use, CHAPA has not pointed to nor can
the Court identify any basis for such claim. ORV use is not a recreational activity explicitly
mentioned in the Seashore's Enabling Act, and the final rule exhibits that the NPS did
extensively consider ORV use on the Seashore, as it designates more than twenty-eight miles to
year-round ORV driving routes as well as forty-one miles to partial-year ORV use. See AR
8490-13647; 38493-38732. The Court does not find that CHAPA's bare assertion that NPS
should have "meaningfully considered whether ORV use should be managed differently in"
recreational areas can withstand defendants' motions for summary judgment. Moreover,
entering judgment in favor of CHAPA on its Enabling Act claim would require the Court to
override the broad discretion enjoyed by the NPS to implement its mandate to provide for an
ORV management plan on the Seashore, which the Court finds no basis upon which to do. "[A]s
Congress has delegated the administration and preservation of national park resources to Interior
and the Park Service, these agencies enjoy broad discretion in implementing their statutory
responsibilities under the authorizing statutes." Edmonds Inst. v. Babbitt, 93 F. Supp. 2d 63, 69
(D.D.C. 2000).
Accordingly, the federal defendants and intervenors are entitled to summary judgment in
their favor on CHAPA's Enabling Act claim.
III.
NEP A CLAIMS
CHAPA's remaining claims challenge NPS 's preparation of an environmental impact
statement (EIS) and final rule under NEP A. NEP A's goal is to "protect and promote
10
environmental quality." Hughes River Watershed Conservancy v. Glickman, 81 F.3d 437, 443
(4th Cir. 1996). NEPA does not place substantive requirements on an agency, but "requires them
to follow certain procedures prior to undertaking any 'proposed action.'" Hodges v. Abraham,
300 F.3d 432,438 (4th Cir. 2002) (quoting Roberstson v. Methow Valley Citizens Council, 490
U.S. 332 (1989)). In reviewing whether an agency acted in violation ofNEPA, the court's role is
limited to determining whether the decision of the agency was arbitrary and capricious. 5 U.S.C.
§ 706(2)(A). A rule is arbitrary and capricious
if the agency relied on factors that Congress has not intended it to consider,
entirely failed to consider an important aspect of the problem, offered an
explanation for its decision that runs counter to the evidence before the agency, or
is so implausible that it could not be ascribed to a difference in view or the
product of agency expertise.
Hughes River, 165 F.3d at 287-88. The agency's decision must therefore be reasonable, but it
need not be determined to be the most reasonable decision to withstand review. River Runners
for Wilderness v. Martin, 593 F.3d 1064, 1070 (9th Cir. 2010) (quotation and citation omitted).
NEP A requires that every agency proposing to engage in action that will significantly
affect the environment must prepare an EIS in which it takes a "hard look" at the impacts of the
proposed action. 42 U.S.C. § 4321, et seq.; Nat'! Audubon Soc'y v. Dep't ofNavy, 422 F.3d 174,
181 (4th Cir. 2005). In determining whether an agency has taken a hard look at environmental
impacts, a court considers, after engaging in its own "searching and careful inquiry of the
record," Friends of Back Bay v. United States Army Corps. of Engineers, 681 F.3d 581, 587 (4th
Cir. 2012) (citation omitted), whether at a minimum the agency conducted "a thorough
investigation into the environmental impacts of an agency's action and a candid acknowledgment
ofthe risks that those impacts entail." Nat'/ Audubon Soc'y, 422 F.3d at 185. A court may not
second-guess "substantive decisions committed to the discretion of the agency," nor does it
11
"rubber-stamp" any agency decision as having been based on adequate "consideration of the
relevant factors." Id Additionally, whether an agency has taken a hard look is contextual, and a
reviewing court must take "a holistic view of what the agency has done to assess environmental
impact." Id at 186.
CHAPA makes the makes the following NEP A claims in its complaint. CHAPA
challenges the NPS's use of a DEIS and FEIS that it contends lack sound scientific bases and
otherwise impaired meaningful agency and public review. CHAPA specifically challenges
NPS's use oftwo "no action" alternatives in the DEIS and FEIS as unsound and further
challenges the range of alternatives considered by NPS, including the adoption of buffer
distances and closures that did not take into account relevant factors other than species
protection, contending that NPS failed to consider information and perspectives that differed
from its pre-ordained result. Finally, CHAPA alleges that the NPS failed to meaningfully and
accurately assess the economic impacts of the final plan's restrictions on beach access and use.
The Court considers each ofthe specific NEPA challenges as raised in CHAPA's motion
for summary judgment.
A.
Use of Two No Action Alternatives
NEPA requires that an EIS include a no action alternative for comparative purposes. 40
C.P.R.§ 1502.14(d); see also Town ofWinthrop v. F.A.A., 535 F.3d 1, 4 (1st Cir. 2008) (no
action alternative is "one maintaining the status quo."). In this instance, NPS identified two no
action alternatives against which to compare four action alternatives "because management
changed part way through the planning process in May 2008, after the consent decree was
signed." AR 37695. The first of the two no action alternatives used represents continuation of
12
management under the interim strategy, while the second represents continuation of the terms of
the consent decree signed April 30, 2008. AR 37698-99.
CHAPA first challenges the use of two no action alternatives generally, stating that the
regulations require use of only one no action alternative. The Court is unaware of any such
restriction on an agency's selection of no action alternatives, and indeed other courts have held
that the use of two no action alternatives is proper under NEP A. In Montana Wilderness
Association v. McAllister, the Ninth Circuit upheld the United States Forest Service's use of two
no action alternatives where the Service was uncertain of how it would implement a regional
decision regarding off-highway vehicle use. 460 Fed. App'x 667 (9th Cir. 2011) (unpublished).
The first alternative represented a continuation of the most recent plan, and the second no action
alternative attempted to model future management actions which might be taken to implement
the new regional decision; the court of appeals found nothing unreasonable about this approach.
Id at 671.
The Court finds similar circumstances present here. NPS 's use of both the interim
strategy and the consent decree management plans as baseline no action alternatives was not
unreasonable. CHAPA contends in its summary judgment motion that the better no action
alternative would have been no restrictions on ORV use whatsoever, but as NPS correctly stated
in its FEIS, such alternative would be inadequate as would not accurately represent the
environmental baseline of existing impacts. The management plan in place under the consent
decree, no action Alternative B, was the status quo at the time NPS prepared the DEIS, thus it
served as the appropriate baseline for comparison purposes. Custer Cnt y Action Ass 'n v.
Garvey, 256 F.3d 1024, 1040 (lOth Cir. 2001) ("Council on Environmental Quality intended that
agencies compare the potential impacts of the proposed major federal action to the known
13
impacts of maintaining the status quo" when considering no action alternatives). The interim
strategy was the status quo immediately prior to the implementation of the consent decree in
2008, and thus was a reasonable additional no action alternative as it represented the period of
time just before implementation of the consent decree. The use of CHAPA's preferred no action
alternative, the status quo in 2004, was considered by NPS and rejected as a viable baseline
alternative, and CHAPA has not demonstrated that its decision to do so was unreasonable. 2
CHAPA's arguments that NPS' s use of a plan that arose out of litigation as a baseline
was improper and that the FEIS is unreasonable because the final plan shares similarities with
the consent decree are without merit. The realities facing NPS and the Seashore at the time of
the development of the FEIS were that either management would continue under the consent
decree, or, failing continuation of the consent decree or the adoption of a final rule, ORV use on
the Seashore would be prohibited under 36 C.F.R. § 4.10. In selecting the no action alternatives,
NPS did not consider any factors which it was not intended to consider, did not fail to consider
an important aspect of the problem, nor do its explanations for selecting and ultimately rejecting
the no action alternatives run counter to the evidence. See e.g. AR 39769 (no action Alternative
A satisfies some plan objectives but seriously limits ability to meet natural resource and visitor
safety objectives). Though CHAPA has demonstrated that it is dissatisfied with NPS's no
· alternative selections, it has simply failed to demonstrate that such selections were arbitrary or
capncwus.
2
In point of fact, the NPS recognized that absent a special regulation to authorize ORV use,
ORV use on the Seashore was actually prohibited. Thus, the legal status quo in 2004 should
have been no ORV use on the Seashore. NPS ultimately excluded no ORV use as a baseline no
action alternative, however, as it would not represent "a viable alternative for meeting the
purpose and need for this action" and would not serve as an appropriate environmental baseline
of existing impacts. AR 37697-98.
14
B.
Assessment of Social and Economic Impacts
CHAPA contends that NPS failed to evaluate sufficiently all of the significant social and
economic effects of the plan by underrepresenting the impact of the plan on small business,
failing to consider the differences between local communities and more remote areas,
understating the economic impacts on the local communities, and cutting short its assessment
and failing to provide sufficient opportunity for public comment due to concern for meeting a
deadline imposed by the consent decree.
At the outset, the Court notes that while the assessment of socioeconomic impacts of
proposed agency action may be appropriate, those concerns are secondary under NEP A to the
impact of the proposed action on the natural environment. Image of Greater San Antonio, Tex. v.
Brown, 570 F.2d 517, 522 (5th Cir. 1978) (NEPA's "primary concern was with the physical
environmental resources ofthe nation."); see also 40 C.F.R. § 1508.14 (socioeconomic impacts
will not trigger requirement for preparation ofEIS, but where EIS is prepared and socioeconomic
effects are interrelated with natural and environmental effects, EIS should discuss all effects).
CHAPA's first specific argument relates to NPS's reliance on data from Hyde and Dare Counties
and data that included the northern villages, which CHAPA contends was used in order to
obscure the impact ofORV management plans on the villages within and therefore most affected
by accessibility of the Seashore.
The record reveals that NPS fully recognized that the "villages ... would be most
affected by the proposed actions because they are located within the Seashore and depend most
directly on tourists visiting the Seashore for their livelihood." AR 38060. In regard to small
businesses, NPS expressly recognized that "[s]mall businesses ... comprise the majority of
businesses relying directly on ORV users as a large source of revenue [and] [t]hese small
15
businesses may not have the resources to respond to increased fluctuation in visitation from year
to year [and] may be disproportionately affected relative to large business." AR 38336. NPS
further considered the projected revenue impacts on specific businesses located in the Seashore
villages as well as the rest of the region of influence, which includes the larger towns located on
Bodie Island north of the Seashore. AR 38328; 38060. Finally, NPS applied each alternative to
its socioeconomic data. For example, NPS recognized Alternative F would impact commercial
and recreational fisherman who would but for night-driving restrictions fish for longer hours,
which could deter recreational fisherman from visiting the Seashore resulting in direct losses to
the local economy, and that the addition of a permit system could reduce visitation by ORV users
relative to the no-action alternatives due to additional costs. AR 38360-63.
Contrary to CHAPA's assertion, NPS' s data do not obfuscate the impacts of any
proposed alternative on the local economy, and indeed NPS fully recognized that the
implementation of any of its proposed alternatives would have certain adverse or potentially
adverse economic impacts. What is required by NEP A is not that NPS change its approach
because adverse economic effects have been identified, but rather that NPS engage in a
thoughtful and careful review ofthe impacts of its proposed action, both beneficial and
detrimental, prior to engaging in its proposed action. "Because NEP A is a procedural and not a
results-driven statute, even agency action with adverse [human] environmental effects can be
NEPA-compliant so long as the agency has considered those effects and determined that
competing policy values outweigh those costs." Ohio Valley Envtl. Coal. v. Aracoma Coal Co.,
556 F.3d 177, 191 (4th Cir. 2009).
Having reviewed the record in this matter, the Court finds that NPS took the appropriate
hard look at the socioeconomic impact of its proposed activities and properly and reasonably
16
considered such impact against the competing policy values of compliance with 30 C.F .R. § 4.10
and implementation of a special regulation regulating ORV use on the Seashore. That NPS
recognized that long-term impacts would be difficult to quantify due to uncertainties such as
national economic trends, demographic trends, meteorological events such as storms and erosion,
as well as the nesting patterns of birds and turtles does not make its conclusions arbitrary or
capricious. Indeed, a failure to recognize the specific and sometimes unique uncertainties facing
the Seashore in its study of socioeconomic or human impacts could actually have served to
render NPS' s conclusions arbitrary or capricious.
The Court does not find that the agency's actions reveal a rush to meet a deadline at the
expense of public comment and review. The deadline for a final plan included in the consent
decree was extended several times, AR 39977; 39988, and CHAPA has not demonstrated that
additional time would have been required in order for NPS to engage in a sufficiently hard look
at the impacts of its proposed action. CHAPA further contends that NPS should have prepared
an analysis of indirect impacts under the Regulatory Flexibility Act, 5 U.S.C. §§ 601, et seq., but
the Court does not find unreasonable NPS's conclusion that the final rules would not directly
regulate small businesses and that an analysis was therefore not required. See AR 24994-24999
(noting that commercial fisherman and businesses requiring beach access would not have to pay
for a beach-driving permit); AR 30830 (Small Business Association recognizes that the rule
"will not directly regulate small businesses and will have indirect economic effects only.").
Nor was NPS required to prepare a supplemental EIS to present additional data gathered
after the close of the DEIS comment period. The agency's decision that the new data did not
present "a seriously different picture of the environmental impact ofthe proposed project from
what was previously envisioned," was not arbitrary or capricious, and thus a supplemental EIS
17
was not required. Hickory Neighborhood Def League v. Skinner, 893 F.2d 58, 63 (4th Cir.
1990) (quotation omitted) (noting that decision not to prepare supplemental EIS reviewed under
arbitrary and capricious standard); see also AR 38673-74 (results of survey oflocal village
businesses, ORV count at selected ramps, and visitor intercept study did not present significant
new information and were consistent with information present in DEIS). "The NEP A process
involves an almost endless series of judgment calls ... [and] [t]he line-drawing decisions
necessitated by this fact[] are vested in the agencies, not the courts." Coal. on Sensible Transp.,
Inc. v. Dole, 826 F.2d 60,66 (D.C. Cir. 1987). The Court does not find that NPS's decision not
to engage in an indirect economic impact study or to issue a supplemental EIS were
unreasonable in this instance.
C.
Consideration of Range of Buffer Distances and Floating Closures
"The existence of reasonable but unexamined alternatives renders an EIS inadequate."
Friends ofSe. 's Future v. Morrison, 153 F.3d 1059, 1065 (9th Cir. 1998). The focus, however, is
on "reasonable" alternatives, meaning those which are "practical and feasible from the technical
and economic standpoint and using common sense, rather than simply desirable from the
standpoint of the applicant." Forty Most Asked Questions Concerning CEQ's National
Environmental Policy Act Regulations, 46 Fed. Reg. 18026-01 (March 23, 1981).
CHAPA's attempts to demonstrate that NPS failed to consider a range of reasonable
alternatives and thus that its FEIS is flawed fail. The core of CHAPA's claim regarding the
reasonableness of the alternatives considered by NPS amounts to an argument that the bases
cited by the agency for its selected range of alternatives "suggest significant bias in favor of
species protection and against ORV use." AR 08474. As discussed above, however, NPS is
mandated to implement no "project or plan for the convenience of visitors ... which would be
18
incompatible with the preservation of the unique flora and fauna or the physiographic
conditions" ofthe Seashore. 16 U.S.C. § 459a-2. Therefore, while NPS endeavored to
implement an ORV management plant which would accommodate ORV and pedestrian traffic
on the Seashore, a reasonable alternative would not include a plan in which ORV use was
favored above or at expense ofthe preservation ofthe Seashore's unique flora and fauna.
Though NPS considered a range ofbuffer distances, see e.g. AR 38011; 38022, CHAPA
contends that NPS could have considered other buffer distances, but does not provide the Court
with any specific buffer distance or range that should have been considered but was not. The
only specific example relied upon by CHAPA is the inclusion of a "drive-through" section
suggested by the North Carolina Wildlife Resources Commission. AR 26265-69. That
alternative was considered, but was rejected based on, inter alia, the opinion of a biologist at
North Carolina State University and the research he and others had conducted regarding
interference with American Oystercatcher chicks. AR 26277-26422.
Regarding CHAPA's allegation that NPS failed to take a hard look at the use of floating
closures rather than fixed closures, the record demonstrates that this alternative was considered
and that the basis upon which it was rejected was reasonable. As CHAPA and NPS both
recognize, the Seashore is "part of a dynamic barrier island system," which is in constant flux
due to, among other things, changes in sea level and the presence of erosion and overwash. AR
37771. While using floating closures would be one way to address these yearly and seasonal
changes, NPS determined that "fixed" closures, which could be modified every five years to
adapt to changing conditions, or after storm events, or after significant change in protected
species status, would provide for more predictability in the visitor experience and simplify
19
resource management. AR 38689. The Court finds this conclusion and explanation to be
reasonable and based on NPS's consideration ofthe relevant data.
D.
Scientific Basis
CHAPA's general allegation that the DEIS and FEIS were unsupported by science is
facially without merit. In conducting its review of the record in the instance, the Court finds it to
be replete with scientific studies and data regarding the Seashore's wildlife as well as planning
and economic analyses. See e.g. AR 38461-38484 (Literature Review, App'x A to FEIS); AR
40314-40327; AR 42590-42603; AR 45480-45495; AR 52238-52251; AR 64920-64927; AR
73618-73733. Moreover, NPS relied on its own data collected under the consent decree
regarding beach use, closures, and wildlife response. See e.g. AR 73325-73346.
CHAPA's specific challenge to the validity ofthe science upon which the FEIS is based
is again primarily focused on the buffer distances selected by NPS in its final plan. "NEPA does
not require [a court] to decide whether an EIS is based on the best scientific methodology
available or to resolve disagreements among various experts." Laguna Greenbelt, Inc. v. US.
Dep't ofTransp., 42 F.3d 517, 526 (9th Cir. 1994); see also Audubon Naturalist Soc'y ofThe
Cent. At/. States, Inc. v. US. Dep't ofTransp., 524 F. Supp. 2d 642, 712 (D. Md. 2007) (noting
that agencies may rely on the views and opinions of their own experts where there is a conflict in
opinions). The record reveals that NPS relied on scientific data to support its findings regarding
the protection and preservation of wildlife, as well as its own data regarding visitor demands on
the Seashore. AR 37832-33. CHAPA has identified no study or data which would invalidate or
call seriously into question NPS 's conclusions, and thus the Court will not look behind the
agency here, in particular in regard to areas within NPS's own expertise. See Hughes River, 165
F.3d at 288 (where agency considered and responded to comments which called into question its
20
scientific conclusions, NEPA's hard look requirement satisfied); Am. Wildlands v. Kempthorne,
530 F.3d 991, 1000 (D.C. Cir. 2008) ("The rationale for deference is particularly strong when the
[agency] is evaluating scientific data within its technical expertise") (citation omitted); see also
Webster v. US. Dep't ofAgric., 685 F.3d 411, 425-26 (4th Cir. 2012) (court will not "intrude
into [agency's] decisionmaking prerogative where inadequacies identified are trivial).
While "the court may properly be skeptical as to whether an EIS's conclusions have a
substantial basis in fact if the responsible agency has apparently ignored the conflicting views of
other agencies having pertinent expertise," Sierra Club v. US. Army Corps of Engineers, 701
F.2d 1011, 1030 (2d Cir. 1983), the Court is aware of no such conflicting views here. In its
comments on the DEIS and specifically regarding buffer distances, the United States Fish &
Wildlife Service stated that the buffer distances described "reflect our current understanding of
the biological needs of these species." AR 13646. As noted by the federal defendants and
intervenors, CHAPA's challenge to the underlying science ofthe FEIS appears to be a veiled
attempt to argue that recreational interests, specifically ORV interests, should have been assigned
more weight in NPS's analysis. At least one commenting state agency, North Carolina's
Department of Environment and Natural Resources, would disagree, however, having noted that
"[a]lthough Alternative F [the selected alternative] is acceptable to our program, it provides more
visitor access (on foot and by ORV) which appears to have the potential to cause greater harm
[to rare species]." AR 13660. Thus, upon its review of the record, the Court concludes that
NPS 's decisions were based on sound scientific data and that NEP A's hard look requirement has
been satisfied in this regard.
21
E.
Cultural Impacts
Finally, CHAPA contends for the first time in its motion for summary judgment that NPS
failed to meaningfully consider and provide the public an opportunity to review the cultural
impacts of the proposed action and other alternatives. As these allegations were not raised in
CHAPA's complaint, and CHAPA did at any point seek leave to amend its complaint, neither
defendants nor intervenors had notice of this argument until CHAPA filed its motion for
summary judgment. Under these circumstances, the Court treats this argument as having been
waived and does not consider it. See Johnson v. Brock & Scott, PLLC, 5:11-CV-474-F, 2013
WL 6058199 (E.D.N.C. Nov. 15, 2013) ("Defendants were entitled to rely on the operative
complaint as fair notice of the general factual allegations forming the basis of Plaintiffs claims.")
(citing Pickern v. Pier 1 Imports (U.S.), Inc., 457 F.3d 963, 969 (9th Cir. 2006) (district court did
not err in finding that plaintiff failed to provide adequate notice of new allegation when raised
for first time at summary judgment stage)); see also Fleming v. Lind-Waldock & Co., 922 F.2d
20, 24 (1st Cir. 1990) ("summary judgment is not a procedural second chance to flesh out
inadequate pleadings."). 3
At bottom, CHAPA asks this Court to flyspeck NPS 's environmental analysis in order to
identify any minor deficiency to propound as a basis to reject the final rule, which the Court will
not and cannot do. Nat'! Audubon Soc'y, 422 F.3d at 186. A holistic analysis of the process
reveals that NPS engaged in a careful and detailed study of the Seashore, its wildlife and
vegetation, and the visitors and residents who utilize the beaches to arrive at a plan which is
based on the factors that Congress intended be considered and was not preordained or afait
accompli. CHAPA itself was a party to the consent decree, which was a step toward compliance
3
The Court notes that CHAPA does not in its reply brief contest that it has waived this
argument.
22
with Executive Order 11644 and 36 C.F.R. § 4.10 requiring that all ORV use on the Seashore be
pursuant to a final rule or special regulation. CHAPA and its members participated fully in the
rulemaking process, as is evidenced by the number of comments submitted to and considered by
NPS in its formulation of an FEIS and final rule. It is clear from the record in this matter that
NPS sufficiently considered all viewpoints when determining how to regulate ORV use on the
Seashore, bearing in mind that NEP A evinces a "national policy ... to promote efforts which
will prevent or eliminate damage to the environment." 42 U.S.C. § 4321.
The Court thus holds that NPS's rulemaking process for ORV use on the Seashore and
the record in this matter demonstrate that NPS took the requisite hard look at the environmental
impacts of its proposed agency action as required by NEP A and that its final decision was
reasonable and neither arbitrary nor capricious. The federal defendants and intervenors are
therefore entitled to summary judgment in their favor on each of CHAPA's NEPA claims.
CONCLUSION
Accordingly, for the foregoing reasons, CHAPA's motion for summary judgment [DE
48] is DENIED, federal defendants' motion for summary judgment [DE 58] is GRANTED IN
PART and DENIED IN PART, and intervenors' motion for summary judgment [DE 56] is
GRANTED IN PART and DENIED IN PART. The clerk is DIRECTED to enter judgment in
favor of defendants and intervenors on each of CHAPA's claims and to close the file.
SO ORDERED, this
JS_ day of June, 2014.
~~&/.~
TRRfN~
W. BOYLE
UNITED STATES DISTRICT JUDGE