Frankenmuth Mutual Insurance Company v. Ohio Edison Company
Filing
44
Order granting in part and denying in part Plaintiff's Motion in limine to exclude evidence of post-fire repairs (Related Doc # 25 ). Judge John R. Adams on 10/9/18.(K,C)
UNITED STATES DISTRICT COURT
NORTHERN DISTRICT OF OHIO
EASTERN DIVISION
FRANKENMUTH MUTUAL
INSURANCE COMPANY,
Plaintiff,
v.
OHIO EDISON COMPANY,
Defendant.
)
)
)
)
)
)
)
)
)
Case No. 5:17CV2013
JUDGE JOHN R. ADAMS
ORDER
This matter is before the Court on the motion in limine of Defendant Ohio Edison
Company (“Ohio Edison”) to exclude evidence of electrical repairs subsequent to the fire at issue
in this matter. (Doc. 25.) Plaintiff Frankenmuth Insurance Company (“Frankenmuth”) has
opposed the motion. (Doc. 29.) The Court has considered the motion and the opposition thereto.
For the following reasons, the motion is DENIED IN PART and GRANTED IN PART.
I.
BACKGROUND
This matter arises from a fire that occurred on December 12, 2016 at the Everett Building
located at 39 East Market Street, Akron, Ohio (the “Everett Building”). The fire damaged both
the Everett Building and the adjacent Hermes Building located at 43 East Market Street (the
“Hermes Building”). Both the Everett Building and the Hermes Building are owned by Pointe
View, Ltd. (“Pointe View”) and insured by Frankenmuth. See Amended Compl. ¶¶ 6-7. Ohio
Edison supplied electricity and electrical services to both the Everett Building and the Hermes
Building. Id. at ¶¶ 8-9.
The fire originated from within a wall-mounted power tap box or junction box located in
the basement electrical room of the Everett Building, where conductors from outside the Everett
1
Building entered the building.
See id. at ¶ 11. The junction box contained a connection where
conductors from outside the building were connected to conductors running to switchgear and
other equipment in the building. During the fire, the junction box and both the upstream and
downstream conductors were badly damaged. The conductors that entered the building from
outside through conduits buried beneath the sidewalk were damaged and melted in place,
rendering the old conduits useless.
After the fire, it was necessary to restore electricity to the Everett Building both on a
temporary basis and more permanently. A third party, Thompson Electric Company
(“Thompson”), was hired to perform work. This work included laying new conduit and
conductors running from a manhole on Market Street outside the building into the building.
Thompson subsequently laid new conduit and pulled new electrical conductors form the
manhole into the building. These conductors were connected to new electrical equipment such
as switchgear and electrical cabinetry in the building to feed the downstream meters and fixtures
within the Everett Building.
Six months after the fire, in May 2017, significant water condensation appeared within
the new electrical cabinets and troughs in the basement of the Everett Building. Ohio Edison
participated with the relevant parties in an investigation to determine the cause of this
condensation. An outside engineering company undertook an inspection and investigation of the
situation and determined that when Thompson installed the new conduit under the sidewalk, it
failed to use expandable foam or another method to seal the ends of the new conduits. As such,
air (including moist air) was free to migrate into the conduits. The engineer concluded that the
new conduits’ proximity to steam pipes under the sidewalk could lead to a heating/cooling effect,
2
allowing migrated water vapor to condense once it reached the cooler basement. Ultimately,
some of the new equipment was replaced and conduits were sealed with foam.
Ohio Edison anticipates that Frankenmuth will seek to introduce evidence concerning
moisture in the new conduits installed after the fire to “reverse engineer a theory of liability
against Ohio Edison for the December 12 fire.” (Doc. 25-1, p. 3.) Indeed, the only dispute
between the parties’ experts regarding the cause of the fire is whether the fire was more likely
caused by a physical change to or around the box caused by water emanating from the basement
walls, ceiling and overall environment (as Ohio Edison contends), or water that had run into the
box from conduits outside the building, causing the power supply line wiring and connections in
the power tap box to become worn and frayed, resulting in an electrical arcing fault and the
ensuing fire (as Frankenmuth contends).
Ohio Edison now seeks an order excluding evidence of problems with the conduits
installed after the fire. Ohio Edison argues that introduction of such evidence would be
inappropriate (1) under Federal Rule of Evidence 407 as a subsequent remedial measure, and (2)
under Federal Rule of Evidence 403 as more prejudicial than probative. The Court now turns to
the merits of that motion.
II.
LEGAL STANDARD
Federal Rule of Evidence 407 addresses the admissibility of subsequent remedial
measures and provides that:
When measures are taken that would have made an earlier injury or
harm less likely to occur, evidence of the subsequent measures is
not admissible to prove:
• negligence;
• culpable conduct;
• a defect in a product or its design; or
3
• a need for a warning or instruction.
But the court may admit this evidence for another purpose,
such as impeachment or--if disputed--proving ownership,
control, or the feasibility of precautionary measures.
Fed. R. Evid. 407.
Federal Rule of Evidence 403 addresses circumstances under which the Court may
exclude relevant evidence. Rule 403 states, “The court may exclude relevant evidence if its
probative value is substantially outweighed by a danger of one or more of the following: unfair
prejudice, confusing the issues, misleading the jury, undue delay, wasting time, or needlessly
presenting cumulative evidence.” Fed. R. Evid. 403.
III.
DISCUSSION
In its motion in limine, Ohio Edison argues that allowing evidence concerning post-fire
repairs would “erode the purpose of Rule 407,” and that such evidence may not be used to show
pre-fire negligence on behalf of Ohio Edison. (See Doc. 25-1, pp. 4, 5.) Ohio Edison states that,
“The fact that the third-party contractor apparently failed to seal the ends of the new conduits as
part of the repair – essentially as part of the repair – does nothing to prove how the December 12,
2016 fire occurred.” (Id., p. 5.) Ohio Edison further argues that allowing evidence of ongoing
efforts to repair would provide a strong disincentive to parties like Ohio Edison or Thompson to
try to cooperate in repairs of fire scenes.
Ohio Edison also contends that allowing evidence regarding the May 2017 moisture issue
would be prejudicial and confuse the jury, and thus such evidence should be excluded under Rule
403. According to Ohio Edison, the fact that error was allegedly made when the new conductors
were installed months after the fire is only going to confuse the jury into falsely suspecting that
there necessarily was a similar problem prior to the fire. (Id., p. 6.) Ohio Edison argues that the
4
jury is likely to be confused if it has to keep straight pre and post-fire photographs and two sets
of testimony about “conduits,” “conductors,” and moisture. (Id.) According to Ohio Edison,
“any failure by Thompson to install the new conduit properly is not probative of whether 40 or
50 years ago, someone (the then-owner of the building, Ohio Edison or someone else – this fact
is unknown) installed the pre-fire conduits improperly.” (Id.).
In its opposition, Frankenmuth argues that, although evidence of post-fire repairs
involving the conduits is not admissible to prove negligence, such evidence is explicitly
admissible under Rule 407 to prove ownership and control of certain electrical equipment,
wiring, and connections within the Everett Building. Frankenmuth states that “Ohio Edison
incorrectly suggests that Plaintiff’s insured [Pointe View], through the Everett Building
management, and its repair contractor Taylor Construction, were involved with all aspects of
both the replacement of the conduit which contained the secondary power supply lines, and the
subsequent connection of these power supply lines inside of a preplacement junction box in the
basement of the Everett Building after the fire.” (Doc. 29, p. 2.) Frankenmuth contends that
Ohio Edison “does so in an attempt to suggest that [Pointe View] was responsible for this aspect
of the electrical service to the building,” a fact that Frankenmuth disputes. (Id.) Frankenmuth
takes the position that evidence about post-accident repair, restoration, and remediation work is
critical to establish that Ohio Edison owned and exercised control over the power tap box and the
wiring and connections within it. Frankenmuth does not address Ohio Edison’s argument for
exclusion of evidence under Federal Rule of Evidence 403.
The Court agrees with Frankenmuth that evidence of post-fire repairs is admissible under
Rule 407 (1) to the extent that Ohio Edison actually denies ownership or control over the power
tap box and connections within it, and (2) evidence of post-fire repairs rebuts Ohio Edison’s
5
claim of lack of ownership or control over the equipment. Accordingly, Ohio Edison’s motion in
limine is denied to the extent that Frankenmuth may rebut denials of ownership and control by
introducing evidence surrounding the fact that certain parties were hired and repairs were
conducted (by Ohio Edison and/or others) in order to restore electricity to the Everett Building.
Nonetheless, the Court agrees with Ohio Edison that evidence specifically of moisture in
the new conduits in May 2017, after the fire took place, is more prejudicial than probative.
Evidence that a contractor hired after the fire laid new conduit, but failed to seal the conduit, thus
allowing water intrusion, has little or no probative value regarding whether the conduits in place
at the time of the fire were installed improperly 40 or 50 years earlier. Moreover, the
introduction of evidence of moisture in the new conduits carries the real possibility of confusing
the jury into thinking that a similar problem necessarily existed prior to the fire. Accordingly,
although Frankenmuth may attempt to show ownership and control of equipment through
introduction of evidence that work was done to restore electricity to the Everett Building after
the fire, Frankenmuth may not introduce specific evidence that the new conduit laid after the fire
experienced moisture intrusion. Under Federal Rule of Evidence 403, such evidence shall be
excluded as more prejudicial than probative.
IV.
CONCLUSION
For the reasons stated, Frankenmuth’s motion in limine to exclude evidence of post-fire
repairs (Doc. 25) is DENIED IN PART and GRANTED IN PART. The motion is denied to the
extent that evidence of post-fire work to restore electricity to the Everett Building is admissible
under Federal Rule of Evidence 407 to rebut any contention that Ohio Edison did not own and/or
exercise control over certain conduits or wiring within the junction box. However, the motion is
6
granted to the extent that specific evidence of moisture within new conduits laid after the fire is
excluded under Federal Rule of Evidence 403 as more prejudicial than probative.
IT IS SO ORDERED.
__s/John R. Adams________________________
JOHN R. ADAMS
UNITED STATES DISTRICT JUDGE
DATED: ___10/9/18___________
7
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?