Gilberton Coal Company, Inc. (sic) v. Split Vein Coal Company, Inc.
Filing
13
MEMORANDUM AND ORDER - IT IS HEREBY ORDERED that 1)The 12/11/09 Order of the U.S. Bankruptcy Court is AFFIRMED. 2)The Clerk of Court is directed to CLOSE the case. Signed by Chief Judge Yvette Kane on April 29, 2011. (sc)
IN THE UNITED STATES DISTRICT COURT
FOR THE MIDDLE DISTRICT OF PENNSYLVANIA
IN RE:
GILBERTON COAL COMPANY,
Appellant
:
:
:
:
:
:
:
:
:
v.
SPLIT VEIN COAL COMPANY,
Appellee/
Debtor in Possession
CIVIL NO. 4:10-CV-01947
(Chief Judge Kane)
MEMORANDUM
Before the Court is an appeal filed September 17, 2010, by Defendant-Appellant
Gilberton Coal Company (“Gilberton”) pursuant to 28 U.S.C. § 158(a). Gilberton filed a
supporting brief on October 1, 2010. (Doc. No. 7.) Plaintiff-Appellee Split Vein Coal Company
(“Split Vein”) filed a brief in opposition on October 25, 2010. (Doc. No. 10.) Gilberton filed a
reply brief on November 5, 2010. (Doc. No. 11.) For the reasons that follow, the Court will
affirm the decision of the Bankruptcy Court.
I.
STANDARD OF REVIEW
A district court sits as a court of appeals reviewing a final order of the Bankruptcy Court
under 28 U.S.C. § 158(a)(1). See also Fed. R. Bankr. P. 8001(a). Under Federal Rule of
Bankruptcy Procedure 8013, the district court may affirm, modify, or reverse the decision of the
Bankruptcy Court, or may remand with instructions for further proceedings. The district court
reviews the Bankruptcy Court’s legal determinations de novo, its factual findings for clear error,
and its exercise of discretion for abuse thereof. In re O'Brien Envtl Energy, Inc., 188 F.3d 116,
122 (3d Cir. 1999). When an issue is a mixed question of law and fact, the issue is broken down
into its component parts and the appropriate standard is applied to each component. In re
1
Fegley, 118 F.3d 979, 982 (3d Cir. 1997). As such, the Court “accept[s] the trial court's findings
of historical or narrative facts unless they are clearly erroneous, but we must exercise a plenary
review of the trial court's choice and interpretation of legal precepts and its application of those
precepts to the historical facts.” Universal Minerals, Inc. v. C. A. Hughes & Co., 669 F.2d 98,
103 (3d Cir. 1981) (footnote citation omitted).
II.
PROCEDURAL BACKGROUND
On January 1, 2007, Split Vein filed a complaint against Gilberton and Seedco NP, LLC
(“Seedco”). (Doc. No. 2, Ex. 1.) Split Vein filed an amended complaint on May 10, 2007, and
Seedco was dismissed from the case on February 12, 2009. (Doc. No. 2, Ex. 2.) Split Vein
alleged that it deposited approximately 600,000 tons of residual coal waste on properties owned
by Gilberton and Seedco, and that Gilberton improperly removed and converted this waste, also
referred to as culm, which was actually owned by Split Vein. After Split Vein filed its amended
complaint, Gilberton filed its answer and counterclaim with the Bankruptcy Court on February 9,
2007. (Doc. No. 2, Ex. 6.) Gilberton filed a motion for partial summary judgment on August 6,
2007, seeking partial summary judgment on the issue of who legally owned the culm and Split
Vein’s requests that it be compensated for the culm removed. Chief Bankruptcy Judge Mary
France denied the motion by a memorandum and order dated December 7, 2007.
Judge France held a two-day trial in this action on February 11 and 12, 2009. After posttrial briefing by the parties, the Bankruptcy Court issued an order resolving the case on
December 11, 2009. In the order, Judge France concluded that (1) Split Vein had met its burden
in proving that Gilberton had converted the culm, (2) the culm in fact was not abandoned by
Split Vein, (3) the agreement that had been reached between Split Vein and Gilberton in 1991
2
(“the Agreement”) had not been abandoned by Split Vein, (4) the Agreement was not rejected by
law pursuant to 11 U.S.C. § 365(d)(4), and (5) Gilberton was not protected by the defense of
privilege concerning its conversion of the culm. (Doc. No. 2, Ex. 12.)1
Gilberton filed a motion for reconsideration on December 12, 2009. (Doc. No. 2, Ex.
11.) On January 5, 2010, Gilberton filed a brief in support. (Doc. No. 2, Ex. 9.) Split Vein filed
its brief in opposition to the motion for reconsideration on January 19, 2010. (Doc. No. 2, Ex.
8.) Judge France issued an order on August 11, 2010 denying Gilberton’s motion for
reconsideration. (Doc. No. 2, Ex. 14.) Gilberton filed a notice of the instant appeal from the
decision of the Bankruptcy Court on September 17, 2010. (Doc. No. 1.)
III.
FACTUAL BACKGROUND
The factual findings contained in Judge France’s thorough memorandum and order dated
December 11, 2009, are as follows.2 Split Vein is a Pennsylvania corporation whose sole
shareholder and president is Elwood Swank.3 Split Vein’s principal place of business is in
Northumberland County, Pennsylvania. Gilberton4 is also a Pennsylvania corporation and is
1
Judge France also denied Gilberton’s counterclaim filed against Split Vein and Split Vein’s
claim for “wheelage.” (Doc. No. 2, Ex. 12.)
2
As noted above, this Court reviews the Bankruptcy Court's factual findings for clear error. See
In re O'Brien, 188 F.3d at 122; see also In re Nelson Co., 959 F.2d 1260, 1263 (3d Cir. 1992). Upon a
review of the record in this case, the Court concludes that Judge France committed no clear factual errors.
Therefore, the following factual recitation is drawn from Judge France’s thorough synopsis, which is
found in Split Vein Coal Co. v. Gilberton Coal Co., Doc. No. 1:03-bk-02974, 2009 WL 4937760 (Bankr.
M.D. Pa. 2009). See also (Doc. No. 2, Ex. 12.)
3
According to Judge France, Split Vein’s “business activities included the recovery, reprocessing
and sale of coal refuse recovered from lands leased for this purpose. In order to process the coal refuse,
[Split Vein] operated two processing plants known as the Henry Clay and Paxinos breakers.” (Doc. No.
2, Ex. 12 at 2.)
4
“Gilberton is primarily engaged in owning and leasing real property containing anthracite coal
and/or coal refuse banks. Generally, it is Gilberton’s business practice to enter into license agreements
3
owned and operated by the relatives of John Rich.
A.
The Agreement Between Gilberton and Split Vein
Gilberton and Split Vein entered into an agreement (“Agreement”) on or about September
12, 1991. According to the Agreement, Split Vein received “a license and easement” to remove
culm5 that was located on an area of land owned by Gilberton and referred to as the Excelsior
Bank. In paragraph 22 of the Agreement, the Agreement is referred to not as a license or
easement, but instead as a lease.
with parties for the removal of material for which the licensee pays Gilberton a royalty based upon the
tonnage of material removed.” (Id.)
5
As noted by Judge France:
[Culm] is waste material from coal mining operations. Between the early
1800s and late 1970s, mining companies discarded coal refuse by dumping
it on vacant land where it accumulated in large piles or banks. Culm
consists of coal, rock, shale and other non-combustible materials. See 52
P.S. § 30.53. It has a low BTU value, and until new technology was
introduced in the 1980s, culm had no commercial value. It is estimated that
by the late 1970s, when laws were enacted requiring the reclamation of
mined sites, approximately 2.4 billion tons of culm had been abandoned
throughout Pennsylvania's coal region.
Before culm can be burned effectively, it must be processed by running it
through a breaker. The resulting material is separated into different
categories based upon the size of the material. The breaking process is not
a precise one; coal often remains attached to or mixed with non-combustible
materials after the process is completed. Even after this processing, waste
is created, which is redeposited on the property's surface. All phases of coal
refuse processing, including the redepositing of culm, are subject to federal
and state environmental statutes and regulations. In Pennsylvania, a
business engaged in coal refuse recovery must obtain a surface mining
permit ("SMP") from the Pennsylvania Department of Environmental
Protection ("DEP") prior to commencing surface operations. Upon
completion of its work on a culm bank, a mining company is required by
law to commence reclamation activities, including erosion control and
revegetation. See 28 Pa. Code § 88.1 et. seq. (2009).
(Doc. No. 2, Ex. 12 at 2-3) (footnote citation omitted).
4
At a minimum, the terms of the Agreement and the oral modifications agreed to by the
parties included the following:
(1) After an initial term of one (1) year, the Agreement was to run on
a month-to-month basis;
(2) Split Vein was entitled to remove culm that was a size of three
inches or smaller;
(3) In light of its right to recover this culm from the Excelsior Bank,
Split Vein was required to make a royalty payment of $3.50 for each
ton of culm removed;6 and
(4) At a minimum, Split Vein was required to make royalty payments
to Gilberton in the amount of $1,000 each month;
(Doc. No. 2, Ex. 12 at 4.) Importantly, the Agreement did not address whether Split Vein was
entitled to place for storage on Gilberton’s property foreign culm that had been removed from
other locations.
According to Section 8 of the Agreement:
All bank material not removed and transported from the Premises at
the expiration of this Agreement, or not removed at the time of any
breach of this Agreement, shall be and remains the property of
Gilberton. Split Vein’s failure to commence removal of the bank
material, or a suspension or stoppage of removal on the Premises for
a continuous period of four (4) months, shall nullify this Agreement,
and thereupon, at any time thereafter, Gilberton may declare this
Agreement terminated and void, and without leagl procedure,
Gilberton shall retake possession of the Premises together with all
improvements thereon.
(Id. at 5.) It is noteworthy that Gilberton did not provide Split Vein notice of its intent to
terminate the Agreement until after Split Vein filed its bankruptcy petition. Pursuant to Section
6
The parties modified this aspect of the Agreement orally after Split Vein began removing culm
from the Excelsior Bank location. Per this modification, Split Vein was to pay Gilberton “$3.00 per ton
for ‘fine’ culm and $2.00 per ton for ‘coarse’ culm” in royalties. (Doc. No. 2, Ex. 12 at 4.)
5
19 of the Agreement, in the event of a “breach or nonperformance” by Split Vein, the Agreement
“shall be subject to cancellation at the option of Gilberton and then become absolutely void, and
of no effect, and after ten (10) days written notice by Gilberton to Split Vein, it shall and may be
lawful for Gilberton to re-enter and take possession of the Premises and appurtenances . . . .”
(Id.) In addition, should Split Vein fail to make the required royalty payments, Gilberton, at its
option, could cancel the Agreement after providing Split Vein with ten days’ notice of default.
Pursuant to the Agreement, Split Vein agreed “to protect the Premises against forest or other
fire” and, should a fire “occur anywhere on the Premises, Split Vein shall immediately notify
Gilberton thereof and Split Vein shall prosecute such effective measures to extinguish the same
or prevent its extension as Gilberton shall approve or direct . . . .” (Doc. No. 2, Ex. 12 at 6.)
B.
Split Vein’s Operations on the Gilberton Property
Prior to 1991, the Excelsior Bank property was totally surrounded by adjoining real estate
and would have been inaccessible to Split Vein for the purposes of removing culm. Split Vein
purchased two plots of land that adjoined the Excelsior Bank property in November 1990 and
May 1991 so that it would have access to the Excelsior Bank. The Pennsylvania Department of
Environmental Protection (“DEP”) issued a surface mining permit (“SMP”) on October 22,
1991, which allowed Split Vein to deposit culm at the Excelsior Bank site that had been removed
from that site but that had been processed at Split Vein’s breaker.
Although Split Vein did not keep records of the amount of culm redeposited at Excelsior
Bank after processing at Split Vein’s breaker, records do indicate that Split Vein paid royalties to
Gilberton in an amount of $1,299,839.99 from July 1991 to July 1998. Split Vein ceased its
mining operations on the Excelsior Bank in 1998 and ceased making the minimum royalty
6
payments, although it had paid all royalties it owed to Gilberton for the culm it had removed.
Because Split Vein calculated that the expenses associated with hauling the remaining Excelsior
Bank and foreign culm would outweigh any price paid for the culm, Split Vein decided to leave
the remaining culm on the site. Swank informed a DEP inspector that the culm would be taken
away from the Excelsior Bank site upon an improvement of the culm market. Pursuant to the
Agreement, Split Vein was required to comply with DEP regulations. As such, Split Vein was
required to conduct reclamation7 activities on the land. Split Vein began reclamation activities
on the land in 2000. Split Vein hired Ed Linkus to conduct its reclamation activities, which
included spreading leaf compost over the mined areas.
C.
Split Vein’s Bankruptcy Petition
Split Vein initiated bankruptcy proceedings by filing a bankruptcy petition on May 19,
2003. At that time, Split Vein did not list the culm currently at issue as an asset or the
Agreement as a lease or an executory contract. After it filed its complaint in the instant case,
Split Vein amended these omissions in its bankruptcy petition on January 11, 2007. On
September 19, 2006, Split Vein received a letter from Gilberton in which Gilberton sought to
provide Split Vein with notice that Gilberton was terminating the Agreement.
D.
The Excelsior Bank Fire(s)
A fire was discovered on the Excelsior Bank property on or about July 11, 2005.
Although evidence suggests that the fire was extinguished within a matter of days by Linkus, fire
was again discovered in December 2005. After being notified of the fire, Swank immediately
7
As noted by Judge France, “[r]eclamation generally involves the leveling of the mined surface
and the distribution of organic materials such as topsoil or leaf compost so that it will support new
vegetation.” (Doc. No. 2, Ex. 12 at 7.)
7
surveyed the scene and decided that Split Vein’s culm was being destroyed. A number of fire
departments, Split Vein, a Vince Guarna, and Linkus all fought the fire with no success.
Although Reading Anthracite was notified of the fire by the DEP, Gilberton-affiliated companies
did not take action in fighting the blaze.
On December 23, 2005, the DEP issued a compliance order on Split Vein after receiving
a number of complaints from nearby residents concerning the fire. Although the fire appeared to
be extinguished on several occasions, it would reignite. After the fire reignited in July 2006,
Swank requested that his step-son, Victor Kocur, assist him in fighting the fire. As
compensation for fighting the fire, Kocur asked that he be granted permission to remove culm
from the Excelsior Bank. Swank agreed, and on July 3, 2006, the two signed a bill of sale,
pursuant to which Swank agreed to sell to Kocur the “refuse material from Split Vein’s breaker
dumped at the Excelsior job.” (Doc. No. 2, Ex. 12 at 9.) The price per ton was twenty-five
cents. However, this agreement was rescinded on July 30, 2006.
Kocur met with the DEP and a Gilberton official prior to tackling the job of bringing the
Excelsior Bank fire under control. A DEP report dated July 27, 2006, references Kocur’s plan to
remove and reprocess the culm located on the Excelsior Bank. In addition, a DEP report dated
August 16, 2006, notes that “there may be a market for the material and the whole bank may be
removed, eliminating any fuel for future [fires].” (Doc. No. 2, Ex. 12 at 10.) Kocur met with a
Gilberton official to gain its cooperation in bringing the blaze under control in August 2006, but
the parties could not reach an agreement.
Pursuant to a letter dated July 13, 2006, Guarna and the Fox Coal Company (“Fox Coal”)
were granted permission by Gilberton “to excavate, remove and prepare breaker refuse material
8
from the Excelsior Refuse Bank.” (Id.) Although Guarna sought the DEP’s permission to “take
over” Split Vein’s SMP concerning the Excelsior Bank and to receive “all bonds associated with
this project . . . at their cash value,” the DEP conceded to neither request. (Id.) On November
22, 2006, Swank sent a letter to the DEP in which he claimed that Split Vein possessed the legal
title of the foreign culm located on the Excelsior Bank. Upon receipt of this letter, the DEP
directed Gilberton to maintain records of the culm removed from the Excelsior Bank and that
culm be removed only for purposes of fighting the fire on the Excelsior Bank.
E.
The Removal of Culm from the Excelsior Bank During Gilberton’s FireFighting Activities
Pursuant to Gilberton’s agreement with Fox Coal, Gilberton was to pay Fox Coal $1.00
for each ton of culm removed from Excelsior Bank, a fee that was eventually reduced by
Gilberton. On December 7, 2006, the DEP altered its position and entered an order requiring
Gilberton to fight and extinguish the fire and releasing Split Vein from any obligation to
continue its fire-fighting efforts. Gilberton did not completely extinguish the fire until
September 2008.
In total, Fox Coal removed over 507,116 tons of culm from both the Seedco and
Gilberton properties.8 (Id. at 11.) Gilberton sold this removed culm to three different
cogeneration plants, amounting to gross revenues credited to Gilberton in an amount of
$3,241,840.23. (Id.) Additional Gilberton-related entities were involved in the fire-fighting and
removal of culm, including Barakat, which coordinated the independent truckers involved in the
work; WMPI, which provided labor and equipment; Jack Rich, Inc., which supplied fuel; and
8
During the course of the fire, the fire in fact spread onto property owned by Seedco. The
amount of culm removed from the Seedco property amounted to, according to a rough estimation by
Guarna, “at least 100,000 tons.” (Doc. No. 2, Ex. 12 at 11.)
9
SSI, which was the purported culm titleholder. The total cost associated with fighting the fire
was $2,630,802.60. (Id. at 12.)
V.
DISCUSSION
Five distinct issues concerning the Bankruptcy Court’s decision of December 11, 2009,
are raised in the instant appeal. First is whether the Bankruptcy Court properly concluded that
Split Vein met its burden in proving its conversion claim against Gilberton. Second, Gilberton
appeals the part of the Bankruptcy Court’s decision in which it concluded that Split Vein had not
abandoned the culm at issue. The third issue presented on appeal is whether the Bankruptcy
Court was correct in concluding that Split Vein had not abandoned the Agreement. The fourth
issue presented before this Court is whether the Bankruptcy Court correctly concluded that
Gilberton’s argument concerning the operation of 11 U.S.C.A. § 365(d)(4) was waived. The
final issue that this Court is required to address is whether the Bankruptcy Court was correct in
deciding that the doctrine of the “imminent public disaster” privilege was inapplicable. The
Court will address each issue in turn.
A.
The Conversion Claim
The first issue to be addressed on appeal is whether the Bankruptcy Court properly
concluded that Split Vein had met its burden in proving its conversion claim against Gilberton.
Under Pennsylvania law, “[a] conversion is the deprivation of another's right of property in, or
use or possession of, a chattel, or other interference therewith, without the owner's consent and
without lawful justification.” Stevenson v. Econ. Bank of Ambridge, 197 A.2d 721, 726 (Pa.
1964). In addition, in Pennsylvania, the “law is clear that the measure of damages for
conversion is the market value of the converted property at the time and place of conversion.”
10
L.B. Foster Co. v. Charles Caracciolo Steel & Metal Yard Inc., 777 A.2d 1090, 1096 (Pa. Super.
Ct. 2001) (Bank of Landisburg v. Burruss, 524 A.2d 896, 902 (Pa. Super. Ct. 1987). Gilberton
contends that the Bankruptcy Court erred in deciding that Split Vein had met its burden in
proving that Gilberton had converted the culm. As support, Gilberton points to the fact that Split
Vein introduced no evidence at trial as to the amount of culm that it had dumped on the property.
(Doc. No. 7 at 22.) Gilberton also points to testimony that Split Vein did not keep records as to
the amount of culm deposited on the property and that Split Vein failed to list such culm as
assets at the time of its filing for bankruptcy. (Id.)
In response, Split Vein concedes that it does not possess evidence establishing the
amount of culm deposited from foreign sources on the Excelsior Bank. However, Split Vein
notes that testimony was introduced at trial evidencing that thousands of tons of foreign culm
was deposited at the site from Split Vein’s Paxinos Breaker from 2000 to 2003. (Doc. No. 10 at
35.) In addition, Split Vein argues that witness testimony, including that of Gilberton’s
witnesses, supports the conclusion that hundreds of thousands of tons of culm was dumped at the
Excelsior Bank. (Id. at 35 n.2.) Finally, Split Vein posits that even if Excelsior Bank material
were processed through the Paxinos Breaker and returned to the Excelsior Bank, this material
would be owned by Split Vein pursuant to the Agreement. (Id. at 36.)
The Court finds that Judge France correctly concluded that the culm removed by Fox
Coal to fight the fire was placed on the property by Split Vein. As Judge France noted, Split
Vein called a number of witnesses to establish its ownership of the culm, and the evidence
showed that much of the culm was deposited between 1998 and 2003. The two witnesses called
by Gilberton to rebut the testimony of Split Vein’s witnesses – Gabe Nasser and Michael Rich –
11
were ineffective in doing so, as Nasser did not spend time on the property during that time and
Rich was there only “occasionally.” In light of the above, the Court concludes that the Judge
France correctly decided that the culm removed from the Excelsior Bank was placed there by
Split Vein.
B.
Abandonment of the Culm
In order to properly make out a claim for conversion against Gilberton, Split Vein must
have maintained title to the culm prior to the filing of its bankruptcy petition. As such, the
second issue on appeal is whether the Bankruptcy Court was correct in concluding that Split
Vein did not abandon the culm. According to Pennsylvania law, “it is well-established that coal
or coal by-products, when severed from the earth, become personal property which may be
abandoned when left on the land of another with the intention of abandoning them.” In re
G.M.P. Land Co., 33 B.R. 729, 731 (Bankr. E.D. Pa. 1983) (citing Llewellyn v. Philadelphia and
Reading C. and I. Co., 308 Pa. 497 (1932); see also Fidelity-Philadelphia Trust Co. v. Lehigh
Valley Coal Co., 294 Pa. 47 (1928)). “Abandonment includes both the intention and the external
act by which the intention is carried into effect; intention may and indeed often must be inferred
from acts. Ordinarily abandonment is a question of fact to be determined by the jury, under all
the circumstances of the case.” Llewellyn, 308 Pa. at 501-502.9
In Pennsylvania, there exists a presumption against abandonment of personal property.
See Lehigh Valley Coal, 294 Pa. at 65. However, “if the thing claimed to be abandoned is
9
As noted by the United States Court of Appeals for the Third Circuit, “[a]bandonment is not a
question of narrative or historical fact but an ultimate fact, a legal concept with a factual component.”
Universal Minerals, Inc. v. C. A. Hughes & Co., 669 F.2d 98, 103 (3d Cir. 1981). As such, “[i]t is ‘a
conclusion of law or at least a determination of a mixed question of law and fact” that requires “‘the
application of a legal standard to the historical-fact determinations.” Id. (quoting Helvering v.
Tex-Penn Oil Co., 300 U.S. 481, 491 (1937); Townsend v. Sain, 372 U.S. 293, 309 n.6 (1963)).
12
considered valueless and a hindrance in his own opinion and is so considered by the general
opinion of the community, the presumption that he intends to preserve such property cannot
arise.” Id. (emphasis added). In G.M.P. Land Co., 33 B.R. at 732, the United States Bankruptcy
Court for the Eastern District of Pennsylvania stated that “[a]ccording to Lehigh Valley, once it
is established that material deposited upon the property of another was of no use and no
commercial value during the time it was being deposited, it is incumbent upon the party
opposing a determination of abandonment to prove affirmatively that the person or entity that
allegedly abandoned the material actually intended to retain ownership of the material, in light of
all of the circumstances of the case.” (emphasis added).
These two apparently contradictory prerequisites to imposition of the presumption
against abandonment are at the heart of the parties’ arguments concerning abandonment in
general. Split Vein argues that the Bankruptcy Court correctly determined that “commercial
value” is not the proper test in determining whether the presumption against abandonment
should apply, as this term was not used by the Pennsylvania Supreme Court in Lehigh Valley
Coal. (See Doc. No. 10; Doc. No. 2, Ex. 12 at 21, n.18.) Split Vein therefore contends that the
Bankruptcy Court properly concluded that the culm was not “valueless” at the time Split Vein
deposited the culm on the property and that sufficient evidence was offered by Split Vein
showing that it did not intend to abandon the culm. (Doc. No. 10 at 39-40.)
Gilberton contends that Split Vein has mischaracterized the Pennsylvania Supreme
Court’s holding in Lehigh Valley Coal. Gilberton argues that “[a]though the Supreme Court
used the terms ‘valueless’ and a ‘hindrance’ it certainly did not mean that the culm in question
was of absolutely no value whatsoever.” (Doc. No. 7 at 25.) Gilberton points to several factors
13
in Lehigh Valley Coal and argues that these factors show that the culm in that case “was of some
value.” (Id.) Similarly, Gilberton contends that the culm in the instant case was of some value,
as was testified to by Swank. (Id., Bankruptcy Ct. Tr., February 11, 2009, at 33-34.) However,
it is Gilberton’s position that, though the culm in this case may have had some value, it “had no
viable commercial value at the time [it was] dumped by Split Vein.” (Doc. No. 7 at 26.)
Gilberton claims that it need not show the total absence of value or, in other words, show that the
culm was “valueless” and a “hindrance.” (Id. at 27.) Instead, Gilberton contends that it need
only “show that the materials had no value to Mr. Swank at the time of abandonment.” (Id.)
Gilberton argues that this standard is met by the fact that, inter alia, Swank admitted that the
price he could receive for removing the culm was exceed by the cost to transport the material.
(Id.)
Clearly, the threshold issue is the standard to be used to determine the applicability of the
presumption: whether the culm was of no “commercial value” or whether the culm was
“valueless and a hindrance.” The Pennsylvania Supreme Court used the term “valueless and a
hindrance” in its Lehigh Valley Coal decision. 294 Pa. at 480. If the Pennsylvania Supreme
Court had chosen to, it could have used the term “commercial value” or a similar term to indicate
that a finding of valuelessness was not required for the presumption to be extinguished. The
Pennsylvania Supreme Court chose to do no such thing, and this Court will not read the
Pennsylvania Supreme Court to have chosen such a path despite the protestations and attempts
from Gilberton to show that the Pennsylvania Supreme Court meant otherwise. Therefore, the
Court agrees with the Bankruptcy Court in its conclusion that, “because the culm did have value
when it was deposited, [Split Vein] is entitled to the presumption that it did not abandon the
14
materials deposited on Excelsior.” (Doc. No. 21-22.)
Simple non-use “does not constitute abandonment.” United Natural Gas Co. v. James
Bros. Lumber Co., 325 Pa. 469, 473 (1937) (citing Llewellyn, 308 Pa. at 501-502). Instead,
“there must be an intention to abandon, together with ‘external’ acts by which such intention is
carried into effect.” Id. As the Bankruptcy Court noted in its December 11, 2009 opinion,
several facts support abandonment: (1) Split Vein’s failure to report the culm at issue on its
schedules filed in bankruptcy; (2) testimony by Swank as to how this failure occurred; (3) Split
Vein’s failure to maintain records concerning the culm; (4) Swank’s use of the culm to fill in
stripping pits; and (5) Split Vein’s reclamation activities on the site just prior to the fire. (Doc.
No. 2, Ex. 12 at 22-23.) However, the Bankruptcy Court pointed to other factors which
supported the conclusion that Split Vein did not abandon the culm. The Court concludes that
these factors are conclusive. First, Gilberton failed to terminate the lease despite years of Split
Vein’s failure to pay any royalties and, as such, Split Vein remained the lessee under the
Agreement entered into between the parties. (Id. at 23.) Also, at the time of the filing of the
bankruptcy petition, Split Vein had undertaken reclamation processes and, after the filing of the
petition, fought the fire that ignited in the area of these reclamation activities. (Id.)10 Evidence
also shows that, throughout the litigation in this case, Split Vein has maintained signage on the
property and Swank had even tried to transfer Split Vein’s interest in the culm to Swank’s stepson. (Id. at 23-24.)
In light of the above, the Court agrees with the Bankruptcy Court’s conclusion that Split
10
As the Bankruptcy Court noted, the reclamation bonds posted by Split Vein against the
Excelsior Bank property “were still in place at the time of the fire.” (Id.)
15
Vein did not abandon the culm. Therefore, the Court will affirm the Bankruptcy Court’s
decision on the issue of abandonment of the culm.
C.
Abandonment of the Agreement
The third issue on appeal is whether the Bankruptcy Court was correct in concluding that
Split Vein had not abandoned the Agreement. Gilberton argues that, “[i]f any possessory interest
in the premises existed, it was abandoned when Split Vein ceased mining activities in 1998.”
(Doc. No. 7.) The Court agrees with Split Vein that the Bankruptcy Court thoroughly and
properly addressed this issue in its opinion. (Doc. No. 2, Ex. 12 at 23-24.) Many of the same
factors that militate against a finding of abandonment of the culm are similarly applicable to the
issue of abandonment of the Agreement. See supra, Part V.B.2. In addition to these factors, the
Bankruptcy Court noted that the Agreement specifically provided that termination of the lease
required a declaration by Gilberton that the Agreement was void and that such a declaration did
not occur until September 19, 2006. (Doc. No. 2, Ex. 12 at 8, 16.)11 Accordingly, the Court will
affirm the Bankruptcy Court’s finding that Split Vein had not abandoned the Agreement.
D.
11 U.S.C. § 365(d)(4)
The fourth issue presented before the Court is whether the Bankruptcy Court correctly
concluded that Gilberton had waived its argument concerning the operation of 11 U.S.C.A. §
365(d)(4). Gilberton argues that the Bankruptcy Court should have concluded that the
Agreement was terminated, by law, pursuant to 11 U.S.C. § 365(d)(4). At the time of the filing
of the bankruptcy petition, § 365(d)(4) stated the following:
11
As Split Vein correctly points out, in light of this provision, the written Agreement could not be
abandoned or terminated by Split Vein. (Doc. No. 10 at 43.)
16
(4) Notwithstanding paragraphs (1) and (2), in a case under any
chapter of this title, if the trustee does not assume or reject an
unexpired lease of nonresidential real property under which the
debtor is the lessee within 60 days after the date of the order for
relief, or within such additional time as the court, for cause, within
such 60-day period, fixes, then such lease is deemed rejected, and the
trustee shall immediately surrender such nonresidential real property
to the lessor.
11 U.S.C. § 365(d)(4) (2004). As the filing of a bankruptcy petition constitutes such an “order
for relief,” see 11 U.S.C.A. § 301, and Split Vein neither assumed nor rejected the lease under
the allotted time under § 365(d)(4), Gilberton contends that Split’s Vein’s failure constitutes a
rejection. (Doc. No. 7 at 31.)
The issue of termination of the lease pursuant to § 365(d)(4) was first raised in
Gilberton’s motion for reconsideration of the Bankruptcy Court’s December 11, 2009 opinion.
(Doc. No. 2-11; Doc. No. 2-9 at 3-4.) In its opinion denying Gilberton’s motion for
reconsideration, the Bankruptcy Court noted that Gilberton had not previously raised the §
365(d)(4) issue before the court, and “that ‘reconsideration motions may not be used to raise new
arguments or present evidence that could have been raised prior to the entry of the judgment.’”
(Doc. No. 2, Ex. 14 at 8) (quoting Zied v. Astrue, Doc. No. 3:06-cv-2305, 2010 WL 2804879, at
*2 (M.D. Pa. July 15, 2010)). As such, the Bankruptcy Court concluded that “Gilberton’s
argument under § 365(d)(4) does not compel reconsideration of the December 11 Opinion.”
(Doc. No. 2, Ex. 14 at 8.)
The Court agrees with the Bankruptcy Court’s August 11, 2010 opinion in which it
denied Gilberton’s argument under § 365(d)(4). Although Gilberton states that it did not realize
that the Agreement would be construed as a lease until the Bankruptcy Court issued its
December 11, 2009 Order, the Court finds this argument to be without merit. (Doc. No. 7 at 33-
17
34.) As the Bankruptcy Court noted, Gilberton could have raised its § 365(d)(4) argument “as
early as the summary judgment stage” but failed to do so. Therefore, the Court is constrained to
agree with the Bankruptcy Court and conclude that Gilberton has waived its argument under §
365(d)(4).
E.
Applicability of the Imminent Disaster Privilege
The fifth and final issue raised before the Court is whether the Bankruptcy Court was
correct in deciding the inapplicability of the “imminent public disaster” privilege. According to
the Pennsylvania Supreme Court, “the law will excuse a trespass onto the land of another, ‘if it
is, or if the actor reasonably believes it to be necessary for the purpose of averting an imminent
public disaster.’” Commonwealth v. Berrigan, 509 Pa. 118, 123 (1985) (quoting Restatement of
Torts (Second), § 196). In addition, “trespass to the chattel of another or its conversion is
excusable ‘if the act is or is reasonably believed to be necessary for the purpose of avoiding a
public disaster.’” Id. (quoting Restatement of Torts (Second), § 262).12
Gilberton cites no case law in support of its belief that it should be entitled to both the
12
As the Supreme Court stated in Commonwealth v. Berrigan, the defense of justification will lie
only where the actor offers evidence that will demonstrate:
1) that the actor was faced with a public disaster that was clear and
imminent, not debatable or speculative;
2) that the actor could reasonably expect that the actions taken would be
effective in avoiding the immediate public disaster;
3) that there is no legal alternative which will be effective in abating the
immediate public disaster;
4) that no legislative purpose exists to exclude the justification from the
particular situation faced by the actor.
509 Pa. at 124.
18
18
costs and profits of its removal of the culm, as well as its conclusion that “the fire undoubtedly
presented the risk of an imminent public disaster.” (Doc. No. 7 at 34.) First, as the Bankruptcy
Court aptly noted, “under the terms of the Agreement Gilberton was entitled to recover its costs,
but it was not privileged to earn a profit by selling [Split Vein’s] property.” (Doc. No. 2, Ex. 12
at 25.) Second, the Court remains unpersuaded that the bank fire was an “imminent public
disaster.” The Court fails to see how disaster was “imminent” when, inter alia, Split Vein was
allowed eighteen months to fight the fire, with little success, and the DEP granted Gilberton a
number of extensions to fight the fire, eventually taking nearly two years to finally control the
blaze. Because imminence was clearly lacking in this case, the Court agrees with the
Bankruptcy Court’s conclusion that any privilege based upon an “imminent public disaster” is
inapplicable.
VI. CONCLUSION
For the reasons set forth above, the Court will affirm the December 11, 2009 order of the
Bankruptcy Court. An order consistent with this memorandum follows.
19
IN THE UNITED STATES DISTRICT COURT
FOR THE MIDDLE DISTRICT OF PENNSYLVANIA
IN RE:
GILBERTON COAL COMPANY,
Appellant
v.
SPLIT VEIN COAL COMPANY,
Appellee/
Debtor in Possession
:
:
:
:
:
:
:
:
:
CIVIL NO. 4:10-CV-01947
(Chief Judge Kane)
ORDER
NOW, this 29th day of April 2011, for the reasons set forth in the accompanying
memorandum, IT IS HEREBY ORDERED THAT:
1.
The December 11, 2009 Order of the United States Bankruptcy Court for the
Middle District of Pennsylvania is AFFIRMED.
2.
The Clerk of Court is directed to close the case.
s/ Yvette Kane
Yvette Kane, Chief Judge
U.S. District Court
Middle District of Pennsylvania
20