MEMORANDUM OPINION
I. INTRODUCTION
In this case, Plaintiff 714 Ventures, Inc. (“Plaintiff”) alleges that Defendant National
Oilwell Varco, L.P. (“Defendant”) breached two commercial lease agreements by damaging the
floor to an industrial warehouse that it was renting from Plaintiff and its predecessor and failed to
repair such damage prior to departing the premises at the conclusion of the leasehold. (Docket
No. 11). Presently before the Court is a motion for summary judgment filed by Defendant which
is opposed by Plaintiff. (Docket Nos. 33, 39). The motion has been fully briefed and the parties,
through their counsel, waived oral argument. (Docket Nos. 33-42). After careful consideration
of the parties’ arguments and all the evidence of record, and for the following reasons,
Defendant’s Motion [33] is DENIED.
II. BACKGROUND
A.
Relevant Facts1
1
The Court notes that the facts must be viewed in the light most favorable to Plaintiff and all inferences must
be construed in its favor, as the non-moving party. See Santini v. Fuentes, 795 F.3d 410, 416 (3d Cir. 2015). In
addition, Defendant failed to respond to Plaintiff’s Additional Facts set forth in ¶¶ 13-23 of Docket No. 37. (See
Docket No. 40). By operation of Local Rule 56, such facts are deemed admitted for purposes of deciding the
pending motion for summary judgment. See Polansky v. Vail Homes, Inc., Civ. A. No. 2016 WL 2643252, at *4
1
This case involves industrial warehouse and office space at 1349 Saw Mill Run
Boulevard which is located in the South Hills area of Pittsburgh.
An entity named 1301 Saw
Mill Properties purchased the brick building complex in 2003. (Docket No. 38-3 at 9). The
partners in 1301 Saw Mill Properties included brothers George and Larry Turner. (Id.). George
was also the property manager, as he had an office in one of the buildings and handled the dayto-day maintenance needs of the tenants. (Id. at 3-4). After purchasing the property, 1301 Saw
Mill Properties made substantial investments into same, including, among other things,
subdividing the property into separate units with mailing addresses of 1301-1371; renovating the
property; leasing some spaces to tenants; and selling some of the other parcels. (Id.). The
renovations that were completed at the building included the installation of a pebble (or pea
gravel) aggregate floor in 1349 Saw Mill Run Boulevard, the condition of which is at issue in
this litigation. (Id.). These renovations were made for a specific tenant, Exotic Motorcar
Company, which leased the property for a few years. (Id. at 3-4). George Turner testified that
the installation of this floor cost approximately $60,000.00. (Id. at 4).
Saw Mill Run Properties leased 1349 Saw Mill Run Boulevard to Defendant in 2009.
(Docket Nos. 34 at ¶ 2; 37 at ¶ 2). Defendant is a Houston-based company that was in this area
conducting oil and gas operations in the Marcellus Shale Formation. (Docket No. 11 at ¶ 2; 13 at
¶ 2). Defendant used the space at 1349 Saw Mill Run Boulevard to maintain and repair
machinery and other equipment utilized during its oil and gas operations. (Docket No. 38-3 at 67).
The parties agree that Defendant conducted these types of activities on the property
continuously from May 1, 2009 through March 31, 2015. (Docket Nos. 35 at ¶ 12; 37 at ¶ 12).
(W.D. Pa. May 10, 2016) (“Under Local Rule 56(E), undisputed facts ‘will for the purpose of deciding the motion
for summary judgment be deemed admitted unless specifically denied or otherwise controverted by a separate
concise statement of the opposing party.’”). However, for the reasons set forth herein, the Court finds that
Defendant’s motion for summary judgment must fail as a matter of law, regardless of Defendant’s technical
violation of the Local Rules.
2
Gerald Worster was Defendant’s operations manager from July 2011 until the end of the lease
agreement. (Docket No. 37 at ¶ 16). He was onsite and observed the condition of the floor
during that period of time. (Id.).
Plaintiff is a real estate investment company that was incorporated in November of 2010
and is owned and operated by Eric Goldberg. (Docket No. 36-3 at 4). Plaintiff has owned
several of the individual parcels within the Saw Mill Run building at various times. (See
generally, Docket No. 38-1). It first purchased 1371 Saw Mill Run Boulevard at some point
after November of 2010. (Id. at 2). This parcel was then leased to Defendant, which utilized that
area for the same type of maintenance and repair activities that it was performing at 1349. (Id.).
(The condition of the parcel at 1371 is not at issue in this case). Goldberg also maintained an
office at the complex. (Id. at 9). He often ate lunch with George Turner and considered him to
be a friend. (Id.). Through discussions with George and Larry Turner, Goldberg became aware
that Saw Mill Run Properties was marketing additional parcels for sale and, after some brief
negotiations, agreed to purchase 1323 and 1349. (Id. at 5-7).
Relevant here, Plaintiff and 1301 Saw Mill Run Properties entered into an Agreement of
Sale and Purchase on August 30, 2013 (the “Agreement”) wherein Plaintiff purchased the
property for $400,000.00. (Docket No. 36-2). As part of the Agreement, Plaintiff agreed to
lease back certain portions of the property to George and/or Larry Turner for a fee of $2,400.00
per month. (Id.). Defendant is not a party to the Agreement between 1301 Saw Mill Run
Properties as “Seller” and Plaintiff as “Buyer.”
(Id.).
The Agreement contained several
provisions that bear on this dispute:
8.
MAINTENANCE OF THE PROPERTY; BUYER’S
OPTION. Seller will maintain and make all repairs needed to
keep the Property in as good condition as it is now, except for
ordinary wear and tear. Seller will deliver the Property to Buyer is
3
[sic] “as is” condition. If a material change occurs in the physical
condition of the property before Buyer takes possession, Buyer
will have the option to: (A) terminate this Agreement, and upon
termination the parties will be relieved of all obligations in this
Agreement; or (B) proceed with this Agreement and pay the
purchase price, and Seller will assign to Buyer any insurance
proceeds to which Seller may be entitled as a result of the change
in condition. To exercise this option, Buyer will give notice to
Seller before settlement. If Buyer fails to give notice, Buyer will
be conclusively deemed to have chosen option (B).
…
14.
INSPECTION OF PROPERTY. Buyer is relying only
on the inspection of the Property made by Buyer and is not relying
on any oral statement concerning the physical condition of the
Property made by Seller or any written statement concerning the
physical condition of the Property given to Buyer by Seller except
for written statements contained in this Agreement. Buyer is
purchasing the property in “as is” condition, subject to the
inspection rights listed in Paragraph 15.
15.
ADDITIONAL PROVISIONS.
A. Within thirty (30) days after the date of this Agreement, Buyer
shall have the opportunity to conduct an inspection of the Property.
Seller shall provide access to the Property for the purpose of an
inspection. The Buyer shall be the sole judge of whether or not the
condition of the Property is satisfactory. If Buyer determines that
the condition of the Property is not satisfactory, for any reason,
Buyer may, on written notice to Seller received prior to thirty (30)
days from the date of this Agreement, terminate this Agreement,
and it shall be void for all purposes. If the written notice to
terminate is not received within this thirty (30) day period, the
condition of the Property shall be deemed to be acceptable, and
any inspection option shall be deemed to have been waived for all
purposes.
B. Buyer acknowledges that Buyer shall have, prior to closing,
thoroughly inspected, and unconditionally and irrevocably
approved, all elements comprising the Property and all factors
related to their use and operation, including without limitation,
utilities, physical and functional aspects of the Property, the
construction and condition of the Property, all matters affecting
and relating to title and municipal and other legal requirements,
including but not limited to taxes, assessments and bonds, zoning,
use permits, business permits, licenses, and similar entitlements.
Buyer further acknowledges that at closing Buyer will acquire the
Property in “AS IS” and “WHERE IS, WITH ALL FAULTS”
condition and solely in reliance upon Buyer’s own inspection and
4
examination without recourse to Seller.
…
F. Seller shall assign to Buyer its interest in any and all lease
agreements, including amendments and options, for or of the
Property or any portion of the Property. At settlement, Seller shall
deliver to Buyer any security deposits for said leases.
(Docket No. 36-2 at ¶¶ 8, 14-15 (emphases in original)). The Agreement also contained standard
provisions related to contract interpretation including: an integration clause; a no oral
modification clause; and a stipulation that the headings were not to be utilized in interpreting the
terms set forth in the body. Id. at ¶ 23.
The original 2009 lease for 1349 Saw Mill Run Boulevard continued in operation after
the sale from Saw Mill Run Properties to Plaintiff. (Docket Nos. 34 at ¶ 4; 37 at ¶ 4). Defendant
maintained its tenancy and operations, and began paying rent to Plaintiff until the lease expired
in 2014. (Docket No. 37 at ¶ 15). On May 5, 2014, Plaintiff and Defendant entered into a new
commercial lease for the property, with a twelve month term, starting on April 1, 2014 and
expiring on March 31, 2015. (Docket Nos. 34 at ¶ 8; 37 at ¶ 8). George Turner continued to
maintain an office at the complex and was onsite daily throughout the duration of Defendant’s
tenancy. (Docket No. 37 at ¶ 20).
The parties dispute the condition of the pebble aggregate floor in 1349 including the
extent of any such damage and when the damage occurred in relation to the terms of the leases.
(Docket Nos. 34 at ¶ 7; 37 at ¶ 7). For his part, Goldberg admitted that prior to purchasing the
property in August of 2013, he did not inspect or walk-through the building at 1349, noting the
condition of the pebble aggregate floor. (Docket No. 38-1 at 9). He believed that he was in the
parcel before the purchase due to his presence in various other parcels, his familiarity with the
building generally and his many interactions with George Turner. (Id.). Goldberg was also
aware of the type of work that Defendant performed as he had leased 1371 for a few years. (Id.
5
at 2). From his perspective, George Turner testified that the condition of the floor worsened over
the period of time that Defendant leased the property. (Docket No. 37 at ¶¶ 20, 23). Defendant’s
operations manager, Gerald Worster, explained that when he arrived on site in July of 2011, he
observed some defects in the floor, including that it was dirty, had some grease stains and
portions of the floor were missing pebble gravel. (Docket No. 38-2 at 4-6). Turner also
explained that Worster told him if Defendant damaged anything in the property that it would take
care of the problems. (Docket No. 37 at ¶ 21). Turner added that most of the damage to the floor
occurred after Plaintiff purchased the property in August of 2013 as he observed that Defendant
began to do much heavier work at the site. (Id. at ¶ 22). At this point in time, Turner believes
that the oil and gas market had contracted and observed that Defendant had started to cut costs in
its business operations, including dealings with his own company. (Docket No. 38-4 at 8-9). He
explained that these issues caused Defendant’s employees to pay less attention to attempting to
clean and care for the floor of 1349. (Id.).
Plaintiff obtained an estimate of $137,500.00 to repair the floor from Three Rivers
Dismantlement.
(Docket No. 1-3).
Plaintiff forwarded the estimate to Defendant’s
representatives on January 29, 2015 and demanded payment, which was refused. (Docket No. 12). After Defendant left the property, Plaintiff leased the space to a towing company. (Docket
No. 36-3 at 7-8). This litigation ensued.
B.
Procedural History
Plaintiff filed this case on June 19, 2015 in the Court of Common Pleas of Allegheny
County and Defendant removed the action to this Court on July 16, 2015. (Docket No. 1). In
response to a motion to dismiss filed by Defendant, Plaintiff submitted an Amended Complaint
on August 20, 2015. (Docket Nos. 9, 10, 11). The parties’ efforts at resolving the matter
6
through Court-ordered mediation were unsuccessful and the case continued through discovery,
which ended on March 30, 2016. (Docket Nos. 19, 32). Thereafter, Defendant submitted the
pending motion for summary judgment, supporting brief, concise statement of material facts and
appendix on May 2, 2016. (Docket Nos. 33-36). Plaintiff responded on June 1, 2016 by filing
its responsive concise statement of material facts appendix and opposing brief. (Docket Nos. 3739). Defendant replied on June 14, 2016. (Docket No. 40). Plaintiff then filed its sur-reply on
June 28, 2016. (Docket No. 42). Oral argument was initially scheduled for July 11, 2016.
(Docket No. 30). However, the parties waived oral argument through their respective counsel,
and agreed to submit the matter to the Court on the briefs. (Docket No. 41). Accordingly, as the
motion is now fully briefed, it is ripe for disposition.
III. LEGAL STANDARD
A grant of summary judgment is appropriate when the moving party establishes “that
there is no genuine dispute as to any material fact and the movant is entitled to judgment as a
matter of law.” Heffernan v. City of Paterson, 777 F.3d 147, 151 (3d Cir. 2015) (quoting Fed. R.
Civ. P. 56(a)). A genuine dispute of material fact is one that could affect the outcome of
litigation. Willis v. UPMC Children’s Hosp. of Pittsburgh, 808 F.3d 638, 643 (3d Cir. 2015)
(citing Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986)). However, “‘[w]here the
record taken as a whole could not lead a rational trier of fact to find for the non-moving party,
there is no genuine issue for trial.’” N.A.A.C.P. v. North Hudson Reg’l Fire & Rescue, 665 F.3d
464, 475 (3d Cir. 2011) (quoting Matsushita Elec. Indus. Co., Ltd. v. Zenith Radio Corp., 475
U.S. 574, 587 (1986)).
The initial burden is on the moving party to adduce evidence illustrating a lack of
genuine disputes. Hugh v. Butler Cnty. Family YMCA, 418 F.3d 265, 267 (3d Cir. 2005) (citing
7
Celotex Corp. v. Catrett, 477 U.S. 317, 323 – 24 (1986)). Once the moving party satisfies its
burden, the non-moving party must present sufficient evidence of a genuine dispute, in rebuttal.
Santini v. Fuentes, 795 F.3d 410, 416 (3d Cir. 2015) (citing Matsushita Elec. Indus. Co., 475
U.S. at 587). When considering the parties’ arguments, the Court is required to view all facts
and draw all inferences in the light most favorable to the non-moving party. Id. (citing United
States v. Diebold, Inc., 369 U.S. 654, 655 (1962)). Further, the benefit of the doubt will be given
to allegations of the non-moving party when in conflict with the moving party’s claims. Bialko
v. Quaker Oats Co., 434 F.App’x 139, 141 n. 4 (3d Cir. 2011) (citing Valhal Corp. v. Sullivan
Assocs., 44 F. 3d 195, 200 (3d Cir. 1995)).
Nonetheless, a well-supported motion for summary judgment will not be defeated where
the non-moving party merely reasserts factual allegations contained in the pleadings. Betts v.
New Castle Youth Dev. Ctr., 621 F.3d 249, 252 (3d Cir. 2010) (citing Williams v. Borough of
West Chester, 891 F.2d 458, 460 (3d Cir. 1989)).
The non-moving party must resort to
affidavits, depositions, admissions, and/or interrogatory answers to demonstrate the existence of
a genuine dispute. Guidotti v. Legal Helpers Debt Resolution, L.L.C., 716 F.3d 764, 773 (3d Cir.
2013) (citing Celotex Corp., 477 U.S. at 324).
IV. DISCUSSION
Defendant raises two related theories in support of its motion for summary judgment: (1)
Plaintiff released any claims for damages to the floor prior to its August 2013 purchase due to
the “as is” provision in its Agreement with 1301 Saw Mill Properties; and (2) Plaintiff’s claims
for damages of $137,500.00 are speculative and unsupported because Plaintiff allegedly cannot
link the floor damage to the post-August 2013 activities of Defendant at the site. (Docket Nos.
34, 40). Plaintiff responds that it acquired the initial lease between Defendant and Saw Mill
8
Properties via assignment as part of the Agreement to purchase the property and that it obtained
sufficient evidence during discovery to meet its burden to raise a genuine dispute of material fact
to support its claim for damages. (Docket Nos. 39, 42). Having carefully considered the parties’
arguments, the Court agrees with Plaintiff’s position and will deny the motion for summary
judgment. The Court now addresses each of Defendant’s arguments, in turn.
A. Applicability of the “As Is” Provision in the Agreement
Before directly addressing the merits of the parties’ positions as to the import of the “as
is” provision in the Agreement on Plaintiff’s breach of contract claim in this matter, the Court
must first look to a few threshold procedural and substantive legal principles.
Initially, Defendant’s reliance upon the purported release in the Agreement is an
affirmative defense to Plaintiff’s breach of contract claim alleging that Defendant breached both
the 2009 and 2014 commercial leases. (See Docket No. 34). When a party moves for summary
judgment on an affirmative defense, “it must show that it has produced enough evidence to
support the findings of fact necessary to win” at trial and that “a reasonable juror would be
compelled to find its way on the facts needed to rule in its favor on the law.” El v. Southeastern
Pennsylvania Trans. Auth. (SEPTA), 479 F.3d 232, 238 (3d Cir. 2007) (citations omitted). Given
same, Defendant can only obtain summary judgment through a showing that there are no genuine
disputes of material fact and that it is entitled to judgment as a matter of law as to every element
of the affirmative defense. Id.
Additionally, the parties agree that Pennsylvania law applies to the substantive claims
and defenses in this litigation as well as the interpretation of the Agreement, all of which relate to
real property situated within the Commonwealth. (See Docket Nos. 34, 39, 40, 42). Further,
Defendant is not a party to the Agreement that it is seeking to enforce; rather, it claims to be a
9
third party beneficiary of the Agreement. (Id.). Pennsylvania courts have held that “[i]n order
for a third party beneficiary to have standing to recover on a contract, both contracting parties
must have expressed an intention that the third party be a beneficiary, and that intention must
have affirmatively appeared in the contract itself.” Kirschner v. K & L Gates LLP, 46 A.3d 737,
762 (Pa. Super. Ct. 2012), appeal denied, 65 A.3d 414 (Pa. 2013). Hence, Defendant has the
burden to show both that there are no genuine disputes of material fact and it is an intended third
party beneficiary of the “as is” provision in the Agreement between Plaintiff and Saw Mill
Properties.
See e.g., Urban Redev. Auth. of Pittsburgh v. KML Sales, Inc., 391 Pa. Super 92,
570 A.2d 528, n.4 (Pa. Super. Ct. 1990).
With respect to contract interpretation, “[i]n Pennsylvania, it is well settled that the effect
of a release is to be determined by the ordinary meaning of its language,” and that releases are to
be interpreted in accordance with general contractual principles. Taylor v. Solberg, 566 Pa. 150,
155-56, 778 A.2d 664, 667-68 (2001) (citations omitted). As this Court has previously held:
Pennsylvania rules of contract interpretation require this
Court to “ascertain and give effect to the intent of the contracting
parties.” Murphy v. Duquesne University, 565 Pa. 571, 777 A.2d
418, 429 (Pa. 2001). Such intent is to be determined from reading
the entire agreement as a whole and “[c]ourts do not assume that a
contract’s language was chosen carelessly, nor do they assume that
the parties were ignorant of the meaning of the language they
employed.” Murphy, 777 A.2d at 429 (citations omitted). One part
of a contract cannot be interpreted so as to annul another part, and
a contract must be construed, if possible, to give effect to all of its
terms. Capek v. Devito, 564 Pa. 267, 767 A.2d 1047, 1050 (Pa.
2001); Cerceo v. DeMarco, 391 Pa. 157, 137 A.2d 296, 298 (Pa.
1958); Flatley v. Penman, 429 Pa.Super. 517, 632 A.2d 1342, 1344
(Pa. Super. 1993), appeal denied, 537 Pa. 620, 641 A.2d 586 (Pa.
1994); Second Federal Sav. and Loan Ass'n. v. Brennan, 409
Pa.Super. 581, 598 A.2d 997, 1000 (Pa. Super.1991). Clauses that
seem in conflict must be construed, where possible, as consistent
with one another. [Flatley by Flatley v. Penman, 632 A.2d 1342,
1344 (Pa. Super. Ct. 1993)] (“Clauses in a contract should not be
read as independent agreements thrown together without any
10
consideration of their combined effect.”).
“When a writing is clear and unequivocal, its meaning must
be determined by its contents alone.” Murphy, 777 A.2d at 429
(internal quotation omitted). If the terms of a contract are
unambiguous, the plain meaning of the terms of the agreement will
be enforced. Id. To this end, Pennsylvania courts generally enforce
the unambiguous terms of agreements between sophisticated
parties that are freely negotiated at arm's length in order to allow
the parties to such agreements the benefits of their bargains. See
McMullen v. Kutz, 603 Pa. 602, 985 A.2d 769, 778 (Pa.2009)
(“freely negotiated agreements entered into at arm’s length are
generally enforced according to their terms to allow parties the
benefit of their bargains.”); see also John B. Conomos, Inc. v. Sun,
Inc., 831 A.2d 696, 708 (Pa. Super. Ct. 2003) (“courts should not
[generally] set aside terms on which sophisticated parties
agreed.”).
Westmoreland Opportunity Fund, L.L.C. v. Zappala, No. 2:13-CV-456, 2014 WL 3420129, at *5
(W.D. Pa. July 11, 2014).
Returning to the merits, Defendant points to two non-binding decisions of the
Pennsylvania Superior Court in support of its position, i.e., PBS Coals, Inc. v. Burnham Coal
Co., 384 Pa. Super. 323, 558 A.2d 562 (Pa. Super. Ct. 1989) and Barker v. Dahlkemper
Landscape Architects & Contractors, Inc., 2014 WL 10788863, at *4-6 (Pa. Super. Ct. 2014)
(unpublished). Plaintiff counters that both cases are distinguishable and that the defense motion
for summary judgment should be denied. (Docket Nos. 39, 42).
Having reviewed the cited
decisions in light of the contractual principles noted above, and the relevant provisions of the
Agreement, the Court finds that Defendant is not a third party beneficiary to the “as is” provision
in the Agreement. Hence, its motion for summary judgment must be denied. The Court reaches
this result for several reasons.
First, the Court agrees that PBS Coals and Barker are factually distinct from this matter
as the contracts at issue in those cases did not involve both an “as is” sales agreement between a
11
buyer and seller and a corresponding assignment of an existing lease, as are clearly set forth in ¶¶
8, 14, 15.B and 15.F of the Agreement between Plaintiff and Saw Mill Properties. (See Docket
No. 36-2 at ¶¶ 15.B, 15.F). PBS Coals involved the non-liability of a seller to a buyer for
breaches of warranty due to an “as is” purchase agreement between those parties. See PBS Coals,
384 Pa. Super. 323. The Barker Court found that a landscape architect was a third party
beneficiary of the “as is” sales agreement between the buyer and seller, holding that it was not
liable for damage to a retaining wall – but there was no corresponding assignment language in
the sales agreement. Barker, 2014 WL 10788863, at *4-6. Hence, neither decision is directly on
point with the present circumstances.
Second, while it is true that a nonparty to an agreement may be released from liability
under Pennsylvania law, such instances are limited to situations where the terms and conditions
of the release are broadly drafted to release all claims as to any and all parties, see Taylor, 566
Pa. at 155-56, or when the language of the release makes clear that the non-party is an intended
beneficiary, see Kirschner, 46 A.3d at 762. In this Court’s estimation, the language of ¶ 15.B is
not broad and all-encompassing but expressly limits Saw Mill Properties’ liability for breaches
of warranties to the buyer, Plaintiff, not unnamed third parties. (See Docket No. 36-2 at ¶ 15.B.
(“Buyer further acknowledges that at closing Buyer will acquire the Property in ‘AS IS’ and
‘WHERE IS, WITH ALL FAULTS’ condition and solely in reliance upon Buyer’s own
inspection and examination without recourse to Seller”)). The plain language of ¶ 14 expressly
states that it is limited by ¶ 15. (See Docket No. 36-2 at 14 (“Buyer is purchasing the property in
“as is” condition, subject to the inspection rights listed in Paragraph 15.”)). And, to the extent
that ¶ 8 is not expressly limited, such provision must be read consistently with the limitations set
forth in ¶¶ 14 and 15.B. See Flatley, 632 A.2d at 1344. This interpretation of the “as is”
12
provision is also consistent with the Superior Court’s decision in PBS Coals, wherein the Court
explained:
[…] the agreement contained a term which has common meaning;
when something is accepted “as is” the buyer is put on notice that
there may be liabilities attendant to the purchase. The warranties
which may otherwise be implied by law do not attach when the
buyer agrees to accept the [property] in the condition in which [it
is] found. [ … ] If [a party intends] to avoid any potential liability
arising from the purchase of [property], it [is] necessary to bargain
for a clause to that effect before executing the agreement.
PBS Coals, Inc., 384 Pa. Super. at 328.
Third, the provisions set forth in ¶¶ 8, 14, 15.B and 15.F of the Agreement must be read
in tandem, see Flatley, 632 A.2d at 1344, and the “as is” clause cannot be read to annul the
assignment language at ¶ 15.F, see Capek, 767 A.2d at 1050. It is well established that upon a
valid assignment, “the assignee stands in the shoes of the assignor and assumes all of his rights”
including causes of action. American Soc. for Testing & Materials v. Corrpro Co. Inc., 292 F.
Supp. 2d 713, 718 (E.D. Pa. Nov. 20, 2003). Defendant does not contest the validity of the
assignment. (Docket No. 40 at 2 (“Defendant does not dispute Plaintiff’s ability, as an assignee,
to pursue certain claims arising out of the 2009 lease.”)). Thus, the presence of the assignment
clause at ¶ 15.F. through which the 2009 lease was assigned to Plaintiff, including any
corresponding causes of action, defeats Defendant’s contention that it is an intended beneficiary
of the “as is” clause.
All told, it is this Court’s opinion that the “as is” and assignment clauses, read together in
accordance with the applicable canons of contract interpretation noted above, simply mean that
Plaintiff was purchasing the property in “as is” condition, without any recourse (or liability) to
Saw Mill Properties for breaches of warranty arising from the condition of the property and that
Saw Mill Properties assigned all of its rights under the 2009 lease to Plaintiff, including any
13
potential cause of action against its tenant, Defendant, for breaching the lease by damaging the
floor, as is alleged here. (See Docket No. 36-2 at ¶¶ 8, 14, 15.B., 15.F). Defendant has failed to
demonstrate that it is an intended beneficiary of the “as is” clause. See Urban Redev. Auth. of
Pittsburgh, 391 Pa. Super at 99, n.4 (“Though KML is certainly an intended third party
beneficiary of the contract for the sale of the produce terminal with regard to enforcement of the
provisions of the written lease, equally certain is the fact the KML is not an intended beneficiary
of the contract with regard to the “as is” purchase provision. Therefore, KML has no authority to
enforce the “as is” provision of the contract.”). Accordingly, Defendant cannot meet its burden
to demonstrate that a reasonable juror would be compelled to find in its favor. El, 479 F.3d at
238.
For these reasons, Defendant’s motion for summary judgment is denied insofar as it
contends that the Agreement between Plaintiff and Saw Mill Properties bars the breach of
contract claims prior to August of 2013.
B.
Sufficiency of Evidence as to Damages
Defendant also maintains that summary judgment is appropriate because Plaintiff’s
damages evidence is allegedly speculative as it cannot link the damage to the pebble aggregate
floor to the post-August 2013 activities conducted by Defendant at 1349 Saw Mill Run
Boulevard. (Docket Nos. 34, 40). Plaintiff contends that the evidence of record demonstrates
that it has set forth a prima facie case of damages resulting from the alleged breach of the 2009
and 2014 lease agreements and that there are genuine disputes of material fact which otherwise
preclude summary judgment. (Docket Nos. 39, 42). After reviewing the parties’ arguments, the
Court once again finds in favor of Plaintiff.
At the outset, to the extent that Defendant’s argument on the sufficiency of the damages
14
evidence relies upon its now-overruled position on liability that claims prior to August of 2013
are barred by the Agreement, it must likewise be denied. (See § IV.A., supra). The Court
further holds that Plaintiff has introduced sufficient evidence into the record to move this case
beyond the summary judgment stage as there are genuine disputes of material fact regarding the
factual predicate of the damages claim.
“To prove a breach of contract claim under Pennsylvania law, a plaintiff must
demonstrate (1) the existence of a contract, including its essential terms, (2) a breach of a duty
imposed by the contract, and (3) resultant damages.” Haywood v. Univ. of Pittsburgh, 976 F.
Supp. 2d 606, 625 (W.D. Pa. 2013) (citing Ware v. Rodale Press, Inc., 322 F.3d 218, 225 (3d
Cir. 2003)). Defendant does not contest that Plaintiff has produced sufficient evidence to support
the first two elements of its breach of contract claims, i.e., the existence of the 2009 and 2014
leases and breaches of duties imposed by those contracts. (See Docket Nos. 34, 40). Hence,
only the third element, resultant damages, is at issue.
“To prove damages, a plaintiff must give a factfinder evidence
from which damages may be calculated to a ‘reasonable
certainty.’” Ware, 322 F.3d at 225-26 (quoting ATACS Corp. v.
Trans World Commc'n, Inc., 155 F.3d 659, 668 (3d Cir.)). “At a
minimum, reasonable certainty embraces a rough calculation that
is not ‘too speculative, vague or contingent’ upon some unknown
factor.” Ware, 322 F.3d at 226 (quoting ATACS Corp., 155 F.3d at
669).
Haywood, 976 F. Supp. 2d at 638–39.
Having reviewed the evidence of record in the light most favorable to Plaintiff and
drawing all reasonable inferences in its favor, the Court holds that there are genuine disputes of
material fact as to the resultant damages in this case. To this end, the parties dispute the extent
of the damage to the pebble aggregate floor caused by Defendant’s maintenance and repair
operations. (Docket Nos. 34 at ¶ 7; 37 at ¶ 7). Turner testified that he was in the property daily
15
throughout the duration of the leasehold, i.e. from 2009 through March of 2015, and that the
condition of the floor worsened over time, particularly with respect to heavier activities
conducted by Defendant after 2013. (Docket No. 37 at ¶¶ 20, 23). Worster testified that when
he arrived in July of 2011, the floor had already sustained some damage as it was dirty, had some
grease stains and portions of the floor were missing pebble gravel. (Docket No. 38-2 at 4-6).
Goldberg admitted that he did not conduct a walk-through or an inspection of the property prior
to his company’s purchase of same in August of 2013 but he took pictures of the floor’s
condition in 2015. (Docket Nos. 38-1 at 9; 36-3 at 7-8).
Neither Plaintiff nor its predecessor
took any formal action against Defendant with respect to the floor until January of 2015, near the
conclusion of the 2014 lease. (Docket Nos. 1-2; 1-3). However, Turner explained that he
pointed out the floor damage to Worster and was told that Defendant would take care of any
issues. (Docket No. 37 at ¶ 21). Overall, these underlying factual disputes present credibility
questions that a jury must resolve. See Santini, 795 F.3d at 416.
With respect to the amount of damages, Plaintiff has presented sufficient evidence to
show its damages to a “reasonable certainty,” as is required.
Ware, 322 F.3d at 225-26.
However, the factual predicate underlying the damages claim is also disputed, requiring the
resolution of credibility issues prior to awarding a judgment on the issue of damages. See
Marino v. Indus. Crating Co., 358 F.3d 241, 247 (3d Cir. 2004) (citation omitted) (“In
considering a motion for summary judgment, a district court may not make credibility
determinations or engage in any weighing of the evidence.”). In this regard, Turner testified that
the pebble aggregate floor was installed in 2005 at a cost of approximately $60,000.00. (Docket
No. 38-3 at 4). Plaintiff obtained an estimate in 2015 to repair the floor from Three Rivers
Dismantlement for $137,500.00. (Docket No. 1-3). Yet, Plaintiff has not repaired or replaced
16
the floor and rented the property to another tenant, a towing company, subsequent to the
expiration of Defendant’s lease. (Docket No. 36-3 at 7-8). Hence, there are genuine disputes of
material fact as to the resultant damages in this case and the motion for summary judgment must
be denied. See Marino, 358 F.3d at 247.
V. CONCLUSION
Based on the foregoing, Defendant’s Motion [33] is denied. An appropriate Order
follows.
s/Nora Barry Fischer
Nora Barry Fischer
U.S. District Judge
Dated: October 11, 2016
cc/ecf: all counsel of record
17
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?