HOUNGSEN PRODUCTION IMPORT & EXPORT CO. LTD et al

Filing 202

ORDER. GRANTED in part and DENIED in part 39 Motion to Dismiss. Signed by Judge Salvador E. Casellas on 8/16/2011. (AVB)

Download PDF
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF PUERTO RICO 1 2 3 4 HUONGSTEN PRODUCTION IMPORT & EXPORT CO. LTD, ET AL Plaintiffs 5 6 Civil No. 10-1610 (SEC) v. SANCO METALS LLC., ET AL 7 Defendants 8 9 OPINION AND ORDER 10 Before the Court are plaintiffs Huongsen Production Import & Export Company LTD 11 a/k/a Senprodimex Vietnam, Linh Hoang, and Tung Mai’s (collectively “Plaintiffs”) Motion to 12 Dismiss (Docket # 39);1 Corporación LAREB and Héctor Ayala’s (collectively “LAREB”) 13 opposition thereto (Docket # 56);2 and Plaintiffs’ reply (Docket # 91). After reviewing the 14 filings and the applicable law, Plaintiffs’ motion is GRANTED IN PART AND DENIED IN 15 PART. 16 17 Factual and procedural Background 18 This diversity case dates back to July 2, 2010, when Plaintiffs filed suit for breach of 19 contract and damages against LAREB, among others, in connection with a contract for the 20 extraction of scrap and steel metal from the Lafayette Mill in Arroyo (the “Mill”). Docket # 1. 21 On August 18, 2010, LAREB filed its answer and a counterclaim against Plaintiffs, alleging that 22 Plaintiffs (1) tortiously interfered with an agreement between LAREB and Sanco Metals LLC 23 24 1 Senprodimex is a limited liability company organized under the laws of the Socialist Republic of Vietnam, and is represented by Hoang and Mai. 25 2 26 Hector Ayala, LAREB’s president, is being sued in his personal capacity. For simplicity’s sake, however, the Court will refer to Ayala and LAREB indistinctively. 1 CIVIL NO. 10-1610 (SEC) Page 2 2 3 4 5 6 7 and Sanco Metal & Recycling Center- Puerto Rico Branch (collectively “SANCO”); (2) negligently hired Puerto Rico Salvage & Demolition Inc. and Zen America Capital Corporation (collectively the “Independent Contractors”) to remove the steel and scrap metal from the Mill; and (3) failed to adequately supervise the Independent Contractors. LAREB’s allegations are predicated on Article 1802 and 1803, Puerto Rico’s tort statutes.3 8 On October 1, 2009, LAREB and SANCO signed their first contract whereby LAREB 9 sold to SANCO all of the scrap metal contained at the Mill, and conferred upon SANCO the 10 rights to extract it from the Mill.4 This contract required SANCO to obtain a public liability 11 insurance policy for the work performed, workers’ compensation insurance, as well as all of the 12 legal permits required by the Commonwealth for the extraction of scrap metal and toxic waste.5 13 Subsequently, on December 15, 2009, LAREB and SANCO signed a second contract that 14 stipulated essentially the same aforementioned obligations. Under the new contract, however, 15 SANCO was also obligated to employ “competent” personnel who would efficiently remove 16 both the scrap metal and the toxic waste from the Mill. As part of the contract’s negotiations, 17 18 19 20 3 Ruling upon motion to dismiss pursuant to Federal Rule of Civil Procedure 12(b)(6), the Court will relate the facts as alleged in the counterclaim. See SEC v. Tambone, 597 F.3d 436, 438 (1st Cir. 2010) (en banc). 21 4 22 5 23 24 25 26 The Court is aware that LAREB has impugned the authenticity of this contract. It was not until November 23, 2009, that LAREB and “Asociación Azucarera Cooperativa Lafayette” (“Asociación”), the Mill's owner, executed a contract whereby LAREB acquired all metal, steel and scrap metal at the Mill and its boundaries. As part of its contractual obligations LAREB had to remove said materials from the Mill within a six-month period. Additionally, LAREB was obligated to remove the toxic waste, including any asbestos, found within the structures of the Mill. The contract stipulated that if LAREB was unable to comply with the time requirements or conditions therein expressed, it would be subject to financial penalties. 1 CIVIL NO. 10-1610 (SEC) Page 3 2 3 4 5 6 7 LAREB informed SANCO of the agreement between LAREB and Asociación, particularly regarding the time restrictions for removing all steel and scrap metal without penalties, and the responsibility of removing all asbestos from the site. During these negotiations, SANCO never informed LAREB that it intended to resell the steel and scrap metal from the Mill; this led LAREB to believe that SANCO would directly perform and engage in all required work. 8 On November 9, 2009, while SANCO and LAREB negotiated the terms of their second 9 contract, SANCO turned around and sold all the steel and scrap metal to Plaintiffs.6 LAREB 10 alleges that Plaintiffs knew about the contractual agreements between LAREB and SANCO, 11 and that it was unaware that SANCO had contracted with Plaintiffs. On January 14, 2010, 12 Plaintiffs signed a service agreement with the Independent Contractors to remove all steel and 13 scrap metal from the Mill and transport the same to Plaintiffs. 14 According to the counterclaim, notwithstanding their knowledge, Plaintiffs’ agreements 15 with the Independent Contractors tortiously interfered with the terms and conditions of the 16 LAREB-SANCO agreement. By virtue of Plaintiffs’ agreements with the Independent 17 Contractors, the latter had to obtain all required permits to remove the steel and scrap metal 18 from the Mill; they also had the duty to obtain workers’ compensation insurance for all 19 employees who would remove the scrap metal from the Mill. According to LAREB, the 20 Independent Contractors were unqualified to perform the removal of the steel and scrap metal 21 from the Mill. They failed to (1) obtain the demolition permits necessary for the extraction of 22 metal; (2) secure the permits for the removal of asbestos from the metal in the Mill; (3) acquire 23 a workers’ compensation insurance policy or public liability insurance; and (4) secure the Mill’s 24 25 6 26 On or about November 4, 2009, LAREB signed an Assignment Letter assigning to SANCO all rights in the Mill. 1 CIVIL NO. 10-1610 (SEC) Page 4 2 3 4 premises. This last omission resulted in the loss through theft of substantial amounts of steel and scrap metal. 5 As a result of these omissions, LAREB faced proceedings before local government 6 agencies as well as workers’ compensations claims from employees injured at the Mill. LAREB 7 was also forced to seek injunctive relief before the state courts to enjoin Puerto Rico Salvage 8 & Demolition Inc., and SANCO from removing metal from the Mill without the appropriate 9 permits. Additionally, LAREB failed to remove the metal from the Mill within six months, as 10 agreed with Asociación, and consequently, had to pay fines because of said breach of contract. 11 In its counterclaim, LAREB advances two claims. First, that under Articles 1802 and 12 1803 of the Puerto Rico Civil Code, Plaintiffs were negligent or at fault in selecting the 13 Independent Contractors to remove the steel and scrap metal from the Mill, and that Plaintiffs 14 failed to properly supervise the work performed by them. Second, that Plaintiffs tortiously 15 interfered with the agreement between LAREB and SANCO, by executing agreements with the 16 Independent Contractors that contained terms and conditions contrary to those of the 17 LAREB-SANCO agreement. 18 19 On September 8, 2010, Plaintiffs moved to dismiss the counterclaim, arguing that 20 LAREB lacks standing to claim (1) damages to the Mill property; (2) damages as a result of 21 claims for injured workers; and (3) damages for loss of steel and scrap metal. They also contend 22 that LAREB’s tortious interference claim fails because Plaintiffs’ intent to interfere, a required 23 element, cannot be inferred from their actions. Alternatively, they argue that LAREB is 24 estopped from enforcing the LAREB-SANCO Contract II. 25 26 1 CIVIL NO. 10-1610 (SEC) Page 5 2 Regarding LAREB’s Article 1803 claims, Plaintiffs contend that the Independent 3 4 5 6 7 Contractors were experienced in their line of business. Furthermore, Plaintiffs aver that they were not required to supervise them. Finally, they allege that LAREB suffered no damages because they were paid for all rights to the metal at the Mill.7 LAREB timely opposed. Docket # 56. 8 Standard of Review 9 To survive a Rule 12(b)(6) motion to dismiss, Plaintiffs’ “well-pleaded facts must 10 possess enough heft to show that [they are] entitled to relief.” Clark v. Boscher, 514 F. 3d 107, 11 112 (1st Cir. 2008).8 In evaluating whether Plaintiffs are entitled to relief, the court must accept 12 as true all “well-pleaded facts [and indulge] all reasonable inferences” in plaintiffs’ favor.” Bell 13 Atlantic Corp. v. Twombly, 550 U.S. 544 (2007). The First Circuit has held that “dismissal for 14 failure to state a claim is appropriate if the complaint fails to set forth factual allegations, either 15 direct or inferential, respecting each material element necessary to sustain recovery under some 16 actionable legal theory.” Gagliardi v. Sullivan, 513 F. 3d 301, 305(1st Cir. 2008). Courts “may 17 augment the facts in the complaint by reference to documents annexed to the complaint or fairly 18 incorporated into it, and matters susceptible to judicial notice.” Id. at 305-306. Nevertheless, in 19 judging the sufficiency of a complaint, courts must “differentiate between well-pleaded facts, 20 on the one hand, and ‘bald assertions, unsupportable conclusions, periphrastic circumlocution, 21 7 22 23 Whether or not LAREB was paid for all rights to the metal at the Mill is irrelevant insofar as many of the counterclaim’s claims are extraneous to the rights in question; that is, the damages allegedly suffered by LAREB because of the Independent Contractors’ mishaps. This argument is thus unavailing and will not be considered further. 24 8 25 26 Fed. R. Civ. P. 8(a)(2) requires only “a short and plain statement of the claim showing that the pleader is entitled to relief,” in order to allow the defendant fair notice of what the claim is and the grounds upon which it rests. Bell Atlantic Corp. v. Twombly, 127 S. Ct. 1955, 1964 (2007) (emphasis added). 1 CIVIL NO. 10-1610 (SEC) Page 6 2 3 4 5 6 7 8 9 and the like,’ on the other hand; the former must be credited, but the latter can safely be ignored.” LaChapelle v. Berkshire Life Ins., 142 F.3d 507, 508 (quoting Aulson v. Blanchard, 83 F.3d 1, 3 (1st Cir.1996)); Buck v. American Airlines, Inc., 476 F. 3d 29, 33 (1st Cir. 2007); see also Rogan v. Menino, 175 F.3d 75, 77 (1st Cir. 1999). Thus, Plaintiffs must rely on more than unsupported conclusions or interpretations of law, as these will be rejected. Berner v. Delahanty, 129 F.3d 20, 25 (1st Cir. 1997) (citing Gooley v. Mobil Oil Corp., 851 F.2d 513, 515 (1st Cir. 1988)). 10 Moreover, “even under the liberal pleading standards of Fed R. Civ. P. 8, the Supreme 11 Court has recently held that to survive a motion to dismiss, a complaint must allege ‘a plausible 12 entitlement to relief.’” Twombly, 550 U.S. at 559. Although complaints do not require detailed 13 factual allegations, the plausibility standard is not akin to a “probability requirement,” but it asks 14 for more than a sheer possibility that a defendant has acted unlawfully. Id. at 556. 15 In Ashcroft v. Iqbal, 129 S. Ct. 1937, 173 L. Ed. 2d 868 (2009), the Supreme Court 16 reaffirmed Twombly and clarified that two underlying principles must guide a court's 17 assessment of the adequacy of pleadings when evaluating whether a complaint can survive a 18 Rule 12(b)(6) motion. See Iqbal, 129 S. Ct. at 1949-50. First, the court must identify any 19 conclusory allegations in the complaint as such allegations are not entitled to an assumption of 20 truth. Id. at 1949. Specifically, the court is not obligated to accept legal conclusions set forth as 21 factual allegations in the complaint. Id. Moreover, “threadbare recitals of the elements of a 22 cause of action, supported by mere conclusory statements, do not suffice.” Id. (quoting 23 Twombly, 550 U.S. at 555); see also Peñalbert-Rosa v. Fortuño-Burset, 631 F.3d 592, 595 (1st 24 Cir. 2011) (“[S]ome allegations, while not stating ultimate legal conclusions, are nevertheless 25 so threadbare or speculative that they fail to cross the line between the conclusory to the 26 1 CIVIL NO. 10-1610 (SEC) Page 7 2 3 4 5 factual.”). In other words, “[a] plaintiff is not entitled to ‘proceed perforce’ by virtue of allegations that merely parrot the elements of the cause of action.” Ocasio-Hernandez v. Fortuño-Burset, 640 F.3d 1,12 (1st Cir. 2011). 6 Second, a complaint survives only if it states a plausible claim for relief. Id. (citing 7 Twombly, 550 U.S. at 556). Thus, any nonconclusory factual allegations in the complaint, 8 accepted as true, must be sufficient to give the claim facial plausibility. Id. A claim has facial 9 plausibility when the pleaded facts allow the court to reasonably infer that the defendant is liable 10 for the specific misconduct alleged. Id. at 1949, 1952. Such inferences must amount to more 11 than a sheer possibility and be as plausible as any obvious alternative explanation. Id. at 1949, 12 1951. Plausibility is a context-specific determination that requires the court to draw on its 13 judicial experience and common sense. Id. at 1950. 14 Applicable Law and Analysis 15 In diversity cases, such as this one, state law governs the substantive outcome. See Erie 16 R.R. Co. v. Tompkins, 304 U.S. 64, 78, 58 (1938); Univ. Emergency Med. Found. v. Rapier 17 Invs., Ltd., 197 F.3d 18, 19 n. 1 (1st Cir.1999). When interpreting state law, federal courts 18 employ the method and approach promulgated by the state’s highest court. See Nat'l 19 Pharmacies, Inc. v. Feliciano-de-Melecio, 221 F.3d 235, 241-42 (1st Cir. 2000). It is Puerto 20 Rican hornbook law that “[f]ield of damages is governed-both in form and in content-by the 21 civil law system.” Valle v. American International Insurance Co., 108 D.P.R. 692, 8 P.R. Offic. 22 Trans. 735, 736 (1979). 23 24 I. Standing 25 As a preliminary matter, the Court will address Plaintiffs’ contention regarding LAREB’s 26 lack of standing to claim (1) damages to the Mill property; (2) damages as a result of claims for 1 CIVIL NO. 10-1610 (SEC) Page 8 2 3 4 injured workers; and (3) damages for loss of steel and scrap metal. The Court will address these arguments seriatim. 5 “Article III of the Constitution limits the ‘judicial power’ of the United States to the 6 resolution of ‘cases’ and ‘controversies.’” Valley Forge Christian Col. v. Ams. United for 7 Separation of Church & State, 454 U.S. 464, 471, 102 S.Ct. 752, 70 L.Ed.2d 700 (1982). “No 8 principle is more fundamental to the judiciary’s proper role in our system of government than 9 the constitutional limitation of federal court jurisdiction to actual cases or controversies.” Raines 10 v. Byrd, 521 U.S. 811, 818, 117 S.Ct. 2312, 138 L.Ed.2d 849 (1997). A vital part of case and 11 controversy limitation on the power of federal courts is the requirement that a plaintiff must 12 have standing to invoke federal court jurisdiction. See Valley Forge, 454 U.S. at 471-73, 102 13 S.Ct. 752; Am. Postal Workers Union v. Frank, 968 F.2d 1373, 1374 (1st Cir.1992). “[S]tanding 14 is a threshold issue, determining whether the court has the power to hear the case, and whether 15 the putative plaintiff is entitled to have the court decide the merits of the case.” Libertad v. 16 Welch, 53 F.3d 428, 436(1st Cir.1995) (citing United States v. AVX Corp., 962 F.2d 108, 113 17 (1st Cir.1992)). Therefore, if a plaintiff lacks standing to bring a matter before a court, the court 18 lacks jurisdiction to decide the merits of the underlying case, and must dismiss the complaint. 19 AVX Corp., 962 F.2d at 113. 20 Based on the foregoing principles, to acquire Article III standing to act as independent 21 litigants, a Plaintiff “[m]ust have suffered an ‘injury in fact’ that is causally connected to the 22 complained-of conduct and that will likely be redressed by a favorable federal court decision.” 23 Indus. Commc'ns & Elecs., Inc. v. Town of Alton, ––– F.3d ––––, No. 10–1738, 2011 WL 24 1887334, at *3 (1st Cir. May 19, 2011) (quoting Lujan v. Defenders of Wildlife, 504 U.S. 555, 25 560–61, 112 S.Ct. 2130, 119 L.Ed.2d 351 (1992)). 26 1 CIVIL NO. 10-1610 (SEC) Page 9 2 3 4 5 6 7 8 Damages to the Mill property In their motion to dismiss, Plaintiffs proclaim that LAREB lacks standing to claim damages to the Mill property because LAREB is not its owner. But LAREB does not allege damages to the Mill property anywhere in the counterclaim. The Plaintiffs thus misstate the counterclaim’s allegations; in consequence, the Court need not address this matter further. Damages as a result of claims for injured workers 9 According to the counterclaim, “[d]ue to the failure to obtain . . . workmen’s [sic] 10 compensation and liability insurance, LAREB had to endure hearings and proceedings before 11 local government agencies, as well as face workmen’s compensation claims from employees 12 injured at the project site.” Docket # 29 at 33 ¶ 18 (emphasis added). Plaintiffs contend, 13 however, that LAREB has no standing to claim damages for the Independent Contractors’ 14 failure to obtain the State Insurance Fund Policy because “[n]either LAREB nor Ayala is the 15 employer o[f] any of the employees that allegedly were injured at the project site.” Docket # 39 16 at 10. And because it is the employer’s responsibility to compensate employees, Plaintiffs argue 17 that “[L]AREB’s exposure to these worker’s claims is the same regardless of whether an 18 insurance policy existed.” Id. 19 Here, LAREB alleges economic interests impaired by the Independent Contractors’ 20 failure to obtain workers’ compensation. Had the Independent Contractors obtained the State 21 Insurance Fund policy, LAREB argues, these claims would not have been directed at LAREB. 22 Pursuant to the Workers’ Compensation Act, P.R. Laws Ann. tit. 11, § 1 et seq, Plaintiffs have 23 the better argument as LAREB is neither the worker’s employer nor a statutory employer; the 24 immunity only extends to an employer or a statutory employer. See e.g., Torres Solis v. A.E.E., 25 136 D.P.R. 302, 310 (1994); Feliciano Rolon v. Ortho Biologics LLC, 404 F.Supp.2d 409, 41526 1 CIVIL NO. 10-1610 (SEC) Page 10 2 5 (D.P.R. 2005). Indeed, because LAREB did not subcontract the services of the Independent 3 Contractors, its liability as a third party is the same regardless of the existence of an insurance 4 policy. Cf. Torres Solis, 136 D.P.R. at 310. It follows that LAREB’s alleged damages cannot 5 be redressed by a favorable federal court decision. Accordingly, LAREB has no standing to 6 claim damages for the Independent Contractors’ failure to obtain such a policy. 7 8 Damages for loss of steel and scrap metal 9 According to the counterclaim, LAREB also claims damages “[f]or lost steel and scrap 10 metal at the Mill.” Docket # 29 at 35 ¶30. In opposition, Plaintiffs aver that LAREB 11 relinquished its rights and obligations to SANCO on November 4, 2009, by means of an 12 assignment letter. Furthermore, per the December 15, 2009 contract, LAREB purportedly 13 transferred to SANCO all the metal acquired from Asociación. Given these circumstances– 14 LAREB’s abrogation of its rights over the steel and scrap metal– Plaintiffs reason that LAREB 15 could suffer no injury in connection with the lost steel and scrap metal at the Mill as a 16 consequence of Plaintiffs’ actions. Plaintiffs conclude that LAREB no longer has a legal 17 interest in the steel and scrap metal, and thus lacks standing to claim damages for it. 18 Plaintiffs’ argument is sound. Taking into account, however, the possibility that SANCO 19 never acquired these rights from LAREB, or that LAREB somehow reacquired these rights, see 20 e.g., Docket # 1 ¶¶ 48-49; Docket # 39 at 8, the Court will defer this determination for a later 21 stage of the proceedings. See Ocasio-Hernandez, F.3d at 12-13 (“[A] court [may not] attempt 22 to forecast a plaintiffs’ likelihood of success on the merits; a well-pleaded complaint may 23 proceed even if . . . a recovery is very remote and unlikely”) (internal quotation marks omitted). 24 25 26 1 CIVIL NO. 10-1610 (SEC) Page 11 2 Having disposed of this preliminary matter, the Court turns to the substantive merits of 3 Plaintiffs’ 12(b)(6) motion. 9 4 5 II. Article 1802 claims 6 Article 1802 establishes that a “person who by an act or omission causes damage to 7 another through fault or negligence shall be obliged to repair the damage so done.” P.R. Laws 8 Ann. tit. 31, § 5141. A claimant seeking relief under this article must establish “(1) a negligent 9 act or omission, (2) damages, and (3) a causal relationship between them.” Soc. Gananciales v. 10 Padin Co., Inc., 17 P.R. Offic. Trans. 111, 117 P.R. Dec. 94 (1986). The scope of negligence 11 under Article 1802 is broad—“as broad as the behavior of human beings... includ[ing] any fault 12 that causes harm or injury.” Bonilla v. Chardon, 18 P.R.Offic. Trans. 696, 709, 118 P.R.Dec. 13 599 (1987) (quoting Colon v. Romero-Barcelo, 112 P.R.Dec. 573, 579 (1982)); see also Vernet 14 v. Serrano Torres, 566 F.3d 254, 259 (1st Cir. 2009)(noting that the provisions of Article 1802 15 must be interpreted expansively). Nevertheless, the existence of an injury or damages alone is 16 not grounds for liability under Article 1802. A defendant will be liable only for those reasonably 17 foreseeable consequences associated with his acts or omissions. Wojciechowicz v. United 18 States, 576 F. Supp. 2d 241, 270-72 (D.P.R. 2008) (citing De-Jesus-Adorno v. Browning Ferris 19 Industries of Puerto Rico, Inc., 160 F.3d 839, 842 (1st Cir. 1998)). 20 21 22 23 24 25 26 9 Plaintiffs also argue that LAREB is estopped from enforcing the LAREB-SANCO “Contract II,” see Docket #39 at 8. But at this stage of the proceedings, the Court is unable to ascertain, nor the Plaintiffs can show, whether LAREB intentionally induced Plaintiffs’ reliance on the Assignment Letter, among other requirements. See Vistamar, Inc. v. Fagundo-Fagundo, 430 F.3d 66, 73 (1st Cir. 2005); Clauson v. Smith, 823 F.2d 660, 661 (1st Cir. 1987). Either way, this argument misses the mark for LAREB’s counterclaim does not necessarily seek to enforce Contract II. In fact, most of LAREB’s grievances pertain to incidents related to the performance of the agreements between Plaintiffs and the Independent Contractors. See Docket # 56 at 6. 1 CIVIL NO. 10-1610 (SEC) Page 12 2 Regarding a defendant’s omissions, those “that generate[] liability under Article 1802 3 happen[] when ‘the law imposes a duty of care requiring the defendant to conform to a certain 4 standard of conduct for the protection of others against unreasonable risk.’” Zabala-Calderon 5 v. U.S., 616 F. Supp. 2d 195, 199 (D.P.R. 2008). The duty of care may arise in one of three 6 ways: “(1) by a statute, regulation, ordinance, bylaw, or contract; (2) as the result of a special 7 relationship between the parties that has arisen through custom; or (3) as the result of a 8 traditionally recognized duty of care particular to the situation.” De Jesus, 160 F.3d 842. 9 Moreover, “the duty is defined by the general rule that one must act as would a prudent and 10 reasonable person under similar circumstances.” Vazquez-Filippetti v. Banco Popular de Puerto 11 Rico, 504 F.3d 43, 49 (1st Cir, 2007) (citing Ortiz v. Levitt & Sons of P.R., Inc., 1 P.R. Offic 12 Trans. 407, 101 P.R.Dec. 290 (1973). Although the duty of care calls for the anticipation of 13 reasonably probable injuries to probable victims, Marshall v. Perez Arzuaga, 828 F.2d 845, 847 14 (1st Cir. 1987), “the foreseeability required under [Article] 1802 does not extend to all 15 imaginable effects resulting from defendant’s conduct. This would be tantamount to turning the 16 defendant into an absolute insurer of its acts and omissions.” Wojciechowicz, 576 F. Supp. 2d 17 at 272. Therefore, a person breaches the duty of reasonable care only when his actions create 18 reasonably foreseeable risks. Vazquez-Filippetti, 504 F.3d 43, 49. 19 20 In Gen. Office Prods. v. A. M. Capen’s Sons, 115 P.R. Dec. 553 (1984), the Puerto Rico 21 Supreme Court recognized a cause of action for third parties’ tortious interference with 22 contractual obligations, as a subset of claims under Article 1802. To establish such a claim, the 23 moving party must show (1) the existence of a contract with which a third party interferes (2) 24 fault must be present as the third party must act tortiously with knowledge of the contract’s 25 existence; (3) there must be a damage; and 4) the damages must be a consequence of the tortious 26 acts of the third party. Gen. Office Prods. Corp. v. A. M. Capen's Sons, Inc., 115 P.R. Dec. 553, 1 CIVIL NO. 10-1610 (SEC) Page 13 2 559 (1984); Dolphin Int'l of P.R. v. Ryder Truck Lines, 127 P.R. Dec. 869 (1991); Jusino v. 3 Walgreens, 155 P.R. Dec. 560 (2001). Regarding the second prong, knowledge, without more, 4 is not akin to fault. Cf. New Comm Wireless Servs. v. SprintCom, Inc., 287 F.3d 1, 10 (1st Cir. 5 2002) (“[T]he fault element of tortious interference requires a stronger showing”) (internal 6 quotation marks omitted). In Jusino, the Puerto Rico Supreme Court affirmed that, regarding 7 this element, the defendant has to intentionally interfere, knowing that such interference will 8 injure the plaintiff. See Jusino, 155 P.R. Dec. at 575-6 (2001). The aggrieved party need only 9 show or present evidence from which it could be inferred that the third person acted in a willful 10 manner and with knowledge of the existence of the contract. General Office Prods., 115 P.R. 11 Dec. at 557. 12 13 At the outset, the Court notes the counterclaim’s failure to satisfy the second element of 14 a tortious interference claim: the existence of fault. Here, LAREB alleges that Plaintiffs knew 15 “[o]f the existence of a contractual relationship between LAREB and SANCO, yet the 16 [Independent Contractors] agreements tortiously interfered with the terms and conditions of the 17 [a]greement executed by and between LAREB and SANCO.” Docket # 29 at 34 ¶ 29. 18 Conceding, Plaintiffs argue that “[they] were aware only of a contract executed by and between 19 LAREB and SANCO on or about October 1, 2009 (the “LAREB-SANCO Contract I”), which 20 significantly differed from the LAREB-SANCO Contract II.” Docket # 39 at 6 n. 1 (citing 21 Verified Complaint ¶ 43-45). Because Plaintiffs’ contracts with [the Independent Contractors] 22 antedated the LAREB-SANCO “Contract II,” Plaintiffs argue, LAREB’s allegations that 23 Plaintiffs interfered with the LAREB-SANCO Contract II [are] “not merely implausible, but 24 absurd.” Id. at 6. 25 26 1 CIVIL NO. 10-1610 (SEC) Page 14 2 Responding to these charges, LAREB contends that Plaintiffs’ admitted knowledge of 3 the assignment letter is sufficient to infer their knowledge. See Docket # 56 at 6. “[P]recise 4 knowledge of the chain of events leading to the . . . violation may often be unavailable to . . . 5 at this early stage of the litigation. . . .” Ocasio-Hernandez, F.3d at 16. Although this is a close 6 case,“[o]n a motion to dismiss, [courts] are obligated to view the facts of the complaint in the 7 light most favorable to the [counterclaimants], and to resolve any ambiguities in their favor.” 8 Id. at 17. Accordingly, Plaintiffs’ knowledge of the LAREB-SANCO agreements is plausible. 9 10 Mere knowledge, however, does not equate to fault. Cf. New Comm Wireless Servs, 287 11 F.3d at 10. Accordingly, the counterclaim also needs to show that Plaintiffs acted in a willful 12 manner. See General Office Prods., 115 P.R. Dec. at 557. Here, LAREB concludes, with no 13 supporting facts, that Plaintiffs’ contracts with the Independent Contractors tortiously interfered 14 with the LAREB-SANCO agreements. But these allegations are merely conclusions and 15 recitations of the legal elements of the cause of action, and as such, ought to be disregarded. See 16 Iqbal, 129 S.Ct. at 1949 (“Where a complaint pleads facts that are ‘merely consistent with’ a 17 defendant's liability, it ‘stops short of the line between possibility and plausibility of entitlement 18 to relief.’”) (quoting Twombly, 550 U.S. at 557, 127 S.Ct. 1955). LAREB offers no facts to 19 provide heft to their otherwise bare and insufficient allegations. 20 Common sense, moreover, dictates the implausibility of LAREB’s claims on this end: 21 Plaintiffs relied on the Assignment Letter wherein LAREB transferred to SANCO all of its 22 rights and responsibilities in the Mill for they presumably thought it was a valid and enforceable 23 instrument. After all, “[t]here is a presumption that every contract has a consideration and that 24 it is licit unless said presumption is overcome by evidence to the contrary.” Docket # 58 at 2 25 (citing Ledesma Marrero v. Ledesma Marrero, 84 P.R. Dec. 167 (1961)). After disbursing large 26 1 CIVIL NO. 10-1610 (SEC) Page 15 2 quantities of money, Plaintiffs engaged the Independent Contractors to complete their 3 investment. The Court concurs with Plaintiffs that their reliance “[o]n the Assignment Letter 4 and the LAREB-SANCO Contract I cannot be construed, even with the most extensive 5 contortions, as . . . [intentionally interfering] with the LAREB-SANCO Contract II.” Docket # 6 58 at 5. Although Plaintiffs had knowledge of the agreements between LAREB and SANCO, 7 LAREB offers no facts to infer that Plaintiffs interfered in a willful manner. And no reasons can 8 be drawn to support such an inference. The counterclaim thus fails to comply with the second 9 element of a tortious interference claim. 10 11 With LAREB having failed to meet this prong, the Court need not go further. LAREB’s 12 lack of factual allegations fail to nudge their claims of tortious interference “across the line from 13 conceivable to plausible.” Iqbal, 129 S.Ct at 1951. Accordingly, LAREB’s tortious interference 14 claims are hereby DISMISSED. 15 Although the counterclaim fails to properly plead all requirements for a tortious 16 interference claim, it nevertheless stands as a general tort claim. According to the counterclaim, 17 “[Plaintiffs] are . . . liable for the negligent or at fault acts and omissions of [their independent 18 contractors] at the [Mill], while acting as contractors or agents for Plaintiffs. Docket # 29 at 19 at 33 ¶ 24 (emphasis added). Similarly, the counterclaim states that Plaintiffs selected the 20 Independent Contractors to perform the removal of steel and scrap material from the Mill 21 (despite their lacking the necessary skill, permits, and knowledge to perform such work), and 22 failed to supervise their work at the Mill. 23 In Pons Anca v. Engenbretson, 160 P.R. Dec. 347 (2003), the Supreme Court of Puerto 24 Rico reiterated that an independent contractor’s principal “[m]ay be liable for the negligent acts 25 of an independent contractor when the work for which the contractor has been hired, by its 26 1 CIVIL NO. 10-1610 (SEC) Page 16 2 nature, entails particular risks or hazards and the principal neither requires the contractor to take 3 special safety measures nor takes these measures himself.” Ocasio v. Hogar Geobel Inc., 693 4 F.Supp.2d 167, 180 (D.P.R. 2008) (quoting Pons Anca, 160 P.R. Dec. at 358; Martinez v. Chase 5 Manhattan Bank, 8 P.R. Offic. Trans. 542 (1979). Contrary to LAREB’s assertions, see Docket 6 56 at 9, however, the principal is not vicariously liable for the negligent act of its independent 7 contractor; rather, the principal’s source of liability stems from Article 1802, i.e., direct liability. 8 See Lopez v. Cruz Ruiz, 131 P.R. Dec. 694, 706 (1992) (“This test does not hold the employer 9 vicariously liable for injuries caused by an independent contractor or his employee.”).10 10 11 According to the counterclaim, the Independent Contractors failed to obtain the 12 demolition permits necessary for the extraction of metal; secure the permits for the removal of 13 asbestos from the metal in the Mill; obtain a workers’ compensation insurance policy or public 14 liability insurance; and secure the Mill’s premises which resulted in the loss through theft of 15 substantial amounts of steel and scrap metal. LAREB alleges that, as a result of these omissions, 16 it faced proceedings before local government agencies, and was also forced to seek injunctive 17 relief before state courts to enjoin Plaintiffs’ independent contractors from removing metal from 18 the Mill without the appropriate permits. 19 Furthermore, the work performed by the Independent Contractors–namely the demolition 20 of structures and the removal of steel and scrap material– poses inherent risks. Cf. Pacheco v. 21 A.F.F., 112 P.R. Dec. 296 (1982) (electricity-related labors are inherently dangerous); Vda. de 22 23 24 25 26 10 The Court further stated: “[i]t only imposes liability when through said contractor’s own fault or negligence, and lack of foreseeability with regard to the need to take special precautions, injuries are caused to third persons. The fault or negligence that gives rise to the employer’s liability is the result of the failure to take the necessary precautions, given the particular risks of a project. Id. (footnote omitted). 1 CIVIL NO. 10-1610 (SEC) Page 17 2 Delgado v. Boston Ins. Co., 99 P.R. Dec. 714 (1971) (flammable substances are inherently 3 dangerous); see also Wagner v. Continental Cas. Co., a Div. of CNA Ins. Companies, 143 Wis. 4 2d 379, 421 N.W.2d 835 (1988) (demolition work on building is “inherently dangerous”). 5 Taking this into account, and after affording LAREB’s allegations the presumption of truth to 6 which they are entitled, the counterclaim plainly shows the plausibility of Plaintiffs’ liability 7 for the omissions of the Independent Contractors. 8 9 In their motion to dismiss, Plaintiffs allege that the Independent Contractors “[are] 10 experienced in the pertinent lines of business.” Docket # 39 at 11 (footnote omitted). But at this 11 juncture, this fact-based allegation is not ripe for determination. Indeed, in resolving a motion 12 to dismiss, the Court evaluates “[t]he plausibility of a legal claim . . . .” Ocasio-Hernandez, F.3d 13 at 12, not the merits of Plaintiffs’ factual defenses. “Although discovery may reveal facts that 14 belie the plaintiffs’ claim, that possibility does not negate its plausibility.” Id. at 19. Lacking any 15 legal support, Plaintiffs also aver that they were not required to supervise the Independent 16 Contractors. This ipse dixit is unavailing because, given the particular risks involved in this 17 case, Plaintiffs’ liability stems from their duty to ensure that the Independent Contractors took 18 special safety measures to avoid the foreseeable risks inherent to the demolition of structures 19 and the removal of steel and scrap material. See Pons Anca, 160 P.R. Dec. at 358. 20 Taking all these well-pleaded factual allegations as true, LAREB has pleaded adequate 21 factual material to support a reasonable inference; that Plaintiffs, as principals, could be liable 22 for LAREB’s damages stemming from Plaintiffs’ negligent selection and/or lack of supervision 23 of the Independent Contractors. In light of the foregoing, the collective weight of LAREB’s 24 factual allegations, nudge their general tort claims “across the line from conceivable to 25 plausible.” Iqbal, 129 S.Ct at 1951. 26 1 CIVIL NO. 10-1610 (SEC) Page 18 2 III. Cause of action under Article 1803 3 LAREB also seeks redress under Article 1803 of the Puerto Rico Civil Code, P.R. Laws 4 Ann. tit. 31 § 5142 , which provides a list of situations wherein a party can be found liable for 5 the tortious acts of another. The Supreme Court of Puerto Rico has said that this list “is 6 limitative and is not a mere collection of examples.” Torres v. Pérez v. López, 113 P.R. Dec. 7 72, 76 (1982). These exceptions are as follows: the liability (1) of the father or mother for the 8 damage caused by minor children; (2) of guardians for the damage caused by the persons under 9 their authority who reside with them; (3) of employers for the damage caused by an employee 10 acting in the course of his employment; (4) of masters or directors of arts and trades for the 11 damage caused by their pupils or apprentices, and (5) of the government of the Commonwealth 12 of Puerto Rico under certain pre-established circumstances. § 5142 13 14 Pursuant to the foregoing, the only plausible scenario where Plaintiffs may be vicariously 15 liable is if LAREB alleges enough facts to infer that an employer-employee relationship existed 16 between Plaintiffs and the Independent Contractors. The counterclaim, however, even viewed 17 in the light most favorable to LAREB, is devoid of any allegations concerning an employer- 18 employee relationship. The allegation that “[Plaintiffs] are also jointly liable for acts or 19 omissions, of [the Independent Contractors], constituting fault or negligence under [Article 20 1803], which have caused damages to LAREB and Mr. Ayala Vega” (Docket # 29 at at 34 ¶ 21 28) are “[t]hreadbare recitals of the elements of a cause of action.” Twombly, 550 U.S. at 555. 22 Indeed, because it is plausible that Plaintiffs are liable for the acts of the Independent 23 Contractor, it is inconceivable, and thus implausible that the Independent Contractors are also 24 Plaintiffs’ employees. See supra n. 10 and accompanying text. Viewed in the light most 25 favorable to LAREB, and “draw[ing] on our ‘judicial experience and common sense’ as we 26 make a contextual judgment about the sufficiency of the pleadings,” Rodriguez-Garcia v. 1 CIVIL NO. 10-1610 (SEC) Page 19 2 Miranda-Marin, 610 F.3d 756, 768 (1st Cir. 2010) (quoting Iqbal, 129 S.Ct. At 1950), LAREB’s 3 Article 1803 claims are implausible. 4 5 LAREB thus has failed to plead sufficient facts to state a claim under Article 1803 to 6 hold Plaintiffs’ vicariously liable for the damages caused by the Independent Contractors as 7 LAREB has failed to establish an employer-employee relationship between Plaintiffs and the 8 Independent Contractors. Accordingly, LAREB’s Article 1803 claims are hereby DISMISSED. 9 Conclusion 10 In light of the foregoing, LAREB's Article 1803 and tortious interference claims are 11 hereby DISMISSED. But LAREB’s general tort claims survive. Accordingly, Plaintiffs’ 12 motion to dismiss LAREB’s counterclaim is GRANTED IN PART AND DENIED IN PART. 13 14 IT IS SO ORDERED. 15 In San Juan, Puerto Rico, this 16th day of August, 2011. 16 17 18 19 20 21 22 23 24 25 26 s/Salvador E. Casellas Salvador E. Casellas U.S. Senior District Judge

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?