IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF PUERTO RICO
1
2
3
4
HUONGSTEN PRODUCTION IMPORT
& EXPORT CO. LTD, ET AL
Plaintiffs
5
6
Civil No. 10-1610 (SEC)
v.
SANCO METALS LLC., ET AL
7
Defendants
8
9
OPINION AND ORDER
10
Before the Court are plaintiffs Huongsen Production Import & Export Company LTD
11
a/k/a Senprodimex Vietnam, Linh Hoang, and Tung Mai’s (collectively “Plaintiffs”) Motion to
12
Dismiss (Docket # 39);1 Corporación LAREB and Héctor Ayala’s (collectively “LAREB”)
13
opposition thereto (Docket # 56);2 and Plaintiffs’ reply (Docket # 91). After reviewing the
14
filings and the applicable law, Plaintiffs’ motion is GRANTED IN PART AND DENIED IN
15
PART.
16
17
Factual and procedural Background
18
This diversity case dates back to July 2, 2010, when Plaintiffs filed suit for breach of
19
contract and damages against LAREB, among others, in connection with a contract for the
20
extraction of scrap and steel metal from the Lafayette Mill in Arroyo (the “Mill”). Docket # 1.
21
On August 18, 2010, LAREB filed its answer and a counterclaim against Plaintiffs, alleging that
22
Plaintiffs (1) tortiously interfered with an agreement between LAREB and Sanco Metals LLC
23
24
1
Senprodimex is a limited liability company organized under the laws of the Socialist Republic
of Vietnam, and is represented by Hoang and Mai.
25
2
26
Hector Ayala, LAREB’s president, is being sued in his personal capacity. For simplicity’s sake,
however, the Court will refer to Ayala and LAREB indistinctively.
1
CIVIL NO. 10-1610 (SEC)
Page 2
2
3
4
5
6
7
and Sanco Metal & Recycling Center- Puerto Rico Branch (collectively “SANCO”); (2)
negligently hired Puerto Rico Salvage & Demolition Inc. and Zen America Capital Corporation
(collectively the “Independent Contractors”) to remove the steel and scrap metal from the Mill;
and (3) failed to adequately supervise the Independent Contractors. LAREB’s allegations are
predicated on Article 1802 and 1803, Puerto Rico’s tort statutes.3
8
On October 1, 2009, LAREB and SANCO signed their first contract whereby LAREB
9
sold to SANCO all of the scrap metal contained at the Mill, and conferred upon SANCO the
10
rights to extract it from the Mill.4 This contract required SANCO to obtain a public liability
11
insurance policy for the work performed, workers’ compensation insurance, as well as all of the
12
legal permits required by the Commonwealth for the extraction of scrap metal and toxic waste.5
13
Subsequently, on December 15, 2009, LAREB and SANCO signed a second contract that
14
stipulated essentially the same aforementioned obligations. Under the new contract, however,
15
SANCO was also obligated to employ “competent” personnel who would efficiently remove
16
both the scrap metal and the toxic waste from the Mill. As part of the contract’s negotiations,
17
18
19
20
3
Ruling upon motion to dismiss pursuant to Federal Rule of Civil Procedure 12(b)(6), the Court
will relate the facts as alleged in the counterclaim. See SEC v. Tambone, 597 F.3d 436, 438 (1st Cir.
2010) (en banc).
21
4
22
5
23
24
25
26
The Court is aware that LAREB has impugned the authenticity of this contract.
It was not until November 23, 2009, that LAREB and “Asociación Azucarera Cooperativa
Lafayette” (“Asociación”), the Mill's owner, executed a contract whereby LAREB acquired all metal,
steel and scrap metal at the Mill and its boundaries. As part of its contractual obligations LAREB had
to remove said materials from the Mill within a six-month period. Additionally, LAREB was obligated
to remove the toxic waste, including any asbestos, found within the structures of the Mill. The contract
stipulated that if LAREB was unable to comply with the time requirements or conditions therein
expressed, it would be subject to financial penalties.
1
CIVIL NO. 10-1610 (SEC)
Page 3
2
3
4
5
6
7
LAREB informed SANCO of the agreement between LAREB and Asociación, particularly
regarding the time restrictions for removing all steel and scrap metal without penalties, and the
responsibility of removing all asbestos from the site. During these negotiations, SANCO never
informed LAREB that it intended to resell the steel and scrap metal from the Mill; this led
LAREB to believe that SANCO would directly perform and engage in all required work.
8
On November 9, 2009, while SANCO and LAREB negotiated the terms of their second
9
contract, SANCO turned around and sold all the steel and scrap metal to Plaintiffs.6 LAREB
10
alleges that Plaintiffs knew about the contractual agreements between LAREB and SANCO,
11
and that it was unaware that SANCO had contracted with Plaintiffs. On January 14, 2010,
12
Plaintiffs signed a service agreement with the Independent Contractors to remove all steel and
13
scrap metal from the Mill and transport the same to Plaintiffs.
14
According to the counterclaim, notwithstanding their knowledge, Plaintiffs’ agreements
15
with the Independent Contractors tortiously interfered with the terms and conditions of the
16
LAREB-SANCO agreement. By virtue of Plaintiffs’ agreements with the Independent
17
Contractors, the latter had to obtain all required permits to remove the steel and scrap metal
18
from the Mill; they also had the duty to obtain workers’ compensation insurance for all
19
employees who would remove the scrap metal from the Mill. According to LAREB, the
20
Independent Contractors were unqualified to perform the removal of the steel and scrap metal
21
from the Mill. They failed to (1) obtain the demolition permits necessary for the extraction of
22
metal; (2) secure the permits for the removal of asbestos from the metal in the Mill; (3) acquire
23
a workers’ compensation insurance policy or public liability insurance; and (4) secure the Mill’s
24
25
6
26
On or about November 4, 2009, LAREB signed an Assignment Letter assigning to SANCO
all rights in the Mill.
1
CIVIL NO. 10-1610 (SEC)
Page 4
2
3
4
premises. This last omission resulted in the loss through theft of substantial amounts of steel and
scrap metal.
5
As a result of these omissions, LAREB faced proceedings before local government
6
agencies as well as workers’ compensations claims from employees injured at the Mill. LAREB
7
was also forced to seek injunctive relief before the state courts to enjoin Puerto Rico Salvage
8
& Demolition Inc., and SANCO from removing metal from the Mill without the appropriate
9
permits. Additionally, LAREB failed to remove the metal from the Mill within six months, as
10
agreed with Asociación, and consequently, had to pay fines because of said breach of contract.
11
In its counterclaim, LAREB advances two claims. First, that under Articles 1802 and
12
1803 of the Puerto Rico Civil Code, Plaintiffs were negligent or at fault in selecting the
13
Independent Contractors to remove the steel and scrap metal from the Mill, and that Plaintiffs
14
failed to properly supervise the work performed by them. Second, that Plaintiffs tortiously
15
interfered with the agreement between LAREB and SANCO, by executing agreements with the
16
Independent Contractors that contained terms and conditions contrary to those of the
17
LAREB-SANCO agreement.
18
19
On September 8, 2010, Plaintiffs moved to dismiss the counterclaim, arguing that
20
LAREB lacks standing to claim (1) damages to the Mill property; (2) damages as a result of
21
claims for injured workers; and (3) damages for loss of steel and scrap metal. They also contend
22
that LAREB’s tortious interference claim fails because Plaintiffs’ intent to interfere, a required
23
element, cannot be inferred from their actions. Alternatively, they argue that LAREB is
24
estopped from enforcing the LAREB-SANCO Contract II.
25
26
1
CIVIL NO. 10-1610 (SEC)
Page 5
2
Regarding LAREB’s Article 1803 claims, Plaintiffs contend that the Independent
3
4
5
6
7
Contractors were experienced in their line of business. Furthermore, Plaintiffs aver that they
were not required to supervise them. Finally, they allege that LAREB suffered no damages
because they were paid for all rights to the metal at the Mill.7 LAREB timely opposed. Docket
# 56.
8
Standard of Review
9
To survive a Rule 12(b)(6) motion to dismiss, Plaintiffs’ “well-pleaded facts must
10
possess enough heft to show that [they are] entitled to relief.” Clark v. Boscher, 514 F. 3d 107,
11
112 (1st Cir. 2008).8 In evaluating whether Plaintiffs are entitled to relief, the court must accept
12
as true all “well-pleaded facts [and indulge] all reasonable inferences” in plaintiffs’ favor.” Bell
13
Atlantic Corp. v. Twombly, 550 U.S. 544 (2007). The First Circuit has held that “dismissal for
14
failure to state a claim is appropriate if the complaint fails to set forth factual allegations, either
15
direct or inferential, respecting each material element necessary to sustain recovery under some
16
actionable legal theory.” Gagliardi v. Sullivan, 513 F. 3d 301, 305(1st Cir. 2008). Courts “may
17
augment the facts in the complaint by reference to documents annexed to the complaint or fairly
18
incorporated into it, and matters susceptible to judicial notice.” Id. at 305-306. Nevertheless, in
19
judging the sufficiency of a complaint, courts must “differentiate between well-pleaded facts,
20
on the one hand, and ‘bald assertions, unsupportable conclusions, periphrastic circumlocution,
21
7
22
23
Whether or not LAREB was paid for all rights to the metal at the Mill is irrelevant insofar as
many of the counterclaim’s claims are extraneous to the rights in question; that is, the damages
allegedly suffered by LAREB because of the Independent Contractors’ mishaps. This argument is thus
unavailing and will not be considered further.
24
8
25
26
Fed. R. Civ. P. 8(a)(2) requires only “a short and plain statement of the claim showing that
the pleader is entitled to relief,” in order to allow the defendant fair notice of what the claim is and the
grounds upon which it rests. Bell Atlantic Corp. v. Twombly, 127 S. Ct. 1955, 1964 (2007) (emphasis
added).
1
CIVIL NO. 10-1610 (SEC)
Page 6
2
3
4
5
6
7
8
9
and the like,’ on the other hand; the former must be credited, but the latter can safely be
ignored.” LaChapelle v. Berkshire Life Ins., 142 F.3d 507, 508 (quoting Aulson v. Blanchard,
83 F.3d 1, 3 (1st Cir.1996)); Buck v. American Airlines, Inc., 476 F. 3d 29, 33 (1st Cir. 2007);
see also Rogan v. Menino, 175 F.3d 75, 77 (1st Cir. 1999). Thus, Plaintiffs must rely on more
than unsupported conclusions or interpretations of law, as these will be rejected. Berner v.
Delahanty, 129 F.3d 20, 25 (1st Cir. 1997) (citing Gooley v. Mobil Oil Corp., 851 F.2d 513, 515
(1st Cir. 1988)).
10
Moreover, “even under the liberal pleading standards of Fed R. Civ. P. 8, the Supreme
11
Court has recently held that to survive a motion to dismiss, a complaint must allege ‘a plausible
12
entitlement to relief.’” Twombly, 550 U.S. at 559. Although complaints do not require detailed
13
factual allegations, the plausibility standard is not akin to a “probability requirement,” but it asks
14
for more than a sheer possibility that a defendant has acted unlawfully. Id. at 556.
15
In Ashcroft v. Iqbal, 129 S. Ct. 1937, 173 L. Ed. 2d 868 (2009), the Supreme Court
16
reaffirmed Twombly and clarified that two underlying principles must guide a court's
17
assessment of the adequacy of pleadings when evaluating whether a complaint can survive a
18
Rule 12(b)(6) motion. See Iqbal, 129 S. Ct. at 1949-50. First, the court must identify any
19
conclusory allegations in the complaint as such allegations are not entitled to an assumption of
20
truth. Id. at 1949. Specifically, the court is not obligated to accept legal conclusions set forth as
21
factual allegations in the complaint. Id. Moreover, “threadbare recitals of the elements of a
22
cause of action, supported by mere conclusory statements, do not suffice.” Id. (quoting
23
Twombly, 550 U.S. at 555); see also Peñalbert-Rosa v. Fortuño-Burset, 631 F.3d 592, 595 (1st
24
Cir. 2011) (“[S]ome allegations, while not stating ultimate legal conclusions, are nevertheless
25
so threadbare or speculative that they fail to cross the line between the conclusory to the
26
1
CIVIL NO. 10-1610 (SEC)
Page 7
2
3
4
5
factual.”). In other words, “[a] plaintiff is not entitled to ‘proceed perforce’ by virtue of
allegations that merely parrot the elements of the cause of action.” Ocasio-Hernandez v.
Fortuño-Burset, 640 F.3d 1,12 (1st Cir. 2011).
6
Second, a complaint survives only if it states a plausible claim for relief. Id. (citing
7
Twombly, 550 U.S. at 556). Thus, any nonconclusory factual allegations in the complaint,
8
accepted as true, must be sufficient to give the claim facial plausibility. Id. A claim has facial
9
plausibility when the pleaded facts allow the court to reasonably infer that the defendant is liable
10
for the specific misconduct alleged. Id. at 1949, 1952. Such inferences must amount to more
11
than a sheer possibility and be as plausible as any obvious alternative explanation. Id. at 1949,
12
1951. Plausibility is a context-specific determination that requires the court to draw on its
13
judicial experience and common sense. Id. at 1950.
14
Applicable Law and Analysis
15
In diversity cases, such as this one, state law governs the substantive outcome. See Erie
16
R.R. Co. v. Tompkins, 304 U.S. 64, 78, 58 (1938); Univ. Emergency Med. Found. v. Rapier
17
Invs., Ltd., 197 F.3d 18, 19 n. 1 (1st Cir.1999). When interpreting state law, federal courts
18
employ the method and approach promulgated by the state’s highest court. See Nat'l
19
Pharmacies, Inc. v. Feliciano-de-Melecio, 221 F.3d 235, 241-42 (1st Cir. 2000). It is Puerto
20
Rican hornbook law that “[f]ield of damages is governed-both in form and in content-by the
21
civil law system.” Valle v. American International Insurance Co., 108 D.P.R. 692, 8 P.R. Offic.
22
Trans. 735, 736 (1979).
23
24
I.
Standing
25
As a preliminary matter, the Court will address Plaintiffs’ contention regarding LAREB’s
26
lack of standing to claim (1) damages to the Mill property; (2) damages as a result of claims for
1
CIVIL NO. 10-1610 (SEC)
Page 8
2
3
4
injured workers; and (3) damages for loss of steel and scrap metal. The Court will address these
arguments seriatim.
5
“Article III of the Constitution limits the ‘judicial power’ of the United States to the
6
resolution of ‘cases’ and ‘controversies.’” Valley Forge Christian Col. v. Ams. United for
7
Separation of Church & State, 454 U.S. 464, 471, 102 S.Ct. 752, 70 L.Ed.2d 700 (1982). “No
8
principle is more fundamental to the judiciary’s proper role in our system of government than
9
the constitutional limitation of federal court jurisdiction to actual cases or controversies.” Raines
10
v. Byrd, 521 U.S. 811, 818, 117 S.Ct. 2312, 138 L.Ed.2d 849 (1997). A vital part of case and
11
controversy limitation on the power of federal courts is the requirement that a plaintiff must
12
have standing to invoke federal court jurisdiction. See Valley Forge, 454 U.S. at 471-73, 102
13
S.Ct. 752; Am. Postal Workers Union v. Frank, 968 F.2d 1373, 1374 (1st Cir.1992). “[S]tanding
14
is a threshold issue, determining whether the court has the power to hear the case, and whether
15
the putative plaintiff is entitled to have the court decide the merits of the case.” Libertad v.
16
Welch, 53 F.3d 428, 436(1st Cir.1995) (citing United States v. AVX Corp., 962 F.2d 108, 113
17
(1st Cir.1992)). Therefore, if a plaintiff lacks standing to bring a matter before a court, the court
18
lacks jurisdiction to decide the merits of the underlying case, and must dismiss the complaint.
19
AVX Corp., 962 F.2d at 113.
20
Based on the foregoing principles, to acquire Article III standing to act as independent
21
litigants, a Plaintiff “[m]ust have suffered an ‘injury in fact’ that is causally connected to the
22
complained-of conduct and that will likely be redressed by a favorable federal court decision.”
23
Indus. Commc'ns & Elecs., Inc. v. Town of Alton, ––– F.3d ––––, No. 10–1738, 2011 WL
24
1887334, at *3 (1st Cir. May 19, 2011) (quoting Lujan v. Defenders of Wildlife, 504 U.S. 555,
25
560–61, 112 S.Ct. 2130, 119 L.Ed.2d 351 (1992)).
26
1
CIVIL NO. 10-1610 (SEC)
Page 9
2
3
4
5
6
7
8
Damages to the Mill property
In their motion to dismiss, Plaintiffs proclaim that LAREB lacks standing to claim
damages to the Mill property because LAREB is not its owner. But LAREB does not allege
damages to the Mill property anywhere in the counterclaim. The Plaintiffs thus misstate the
counterclaim’s allegations; in consequence, the Court need not address this matter further.
Damages as a result of claims for injured workers
9
According to the counterclaim, “[d]ue to the failure to obtain . . . workmen’s [sic]
10
compensation and liability insurance, LAREB had to endure hearings and proceedings before
11
local government agencies, as well as face workmen’s compensation claims from employees
12
injured at the project site.” Docket # 29 at 33 ¶ 18 (emphasis added). Plaintiffs contend,
13
however, that LAREB has no standing to claim damages for the Independent Contractors’
14
failure to obtain the State Insurance Fund Policy because “[n]either LAREB nor Ayala is the
15
employer o[f] any of the employees that allegedly were injured at the project site.” Docket # 39
16
at 10. And because it is the employer’s responsibility to compensate employees, Plaintiffs argue
17
that “[L]AREB’s exposure to these worker’s claims is the same regardless of whether an
18
insurance policy existed.” Id.
19
Here, LAREB alleges economic interests impaired by the Independent Contractors’
20
failure to obtain workers’ compensation. Had the Independent Contractors obtained the State
21
Insurance Fund policy, LAREB argues, these claims would not have been directed at LAREB.
22
Pursuant to the Workers’ Compensation Act, P.R. Laws Ann. tit. 11, § 1 et seq, Plaintiffs have
23
the better argument as LAREB is neither the worker’s employer nor a statutory employer; the
24
immunity only extends to an employer or a statutory employer. See e.g., Torres Solis v. A.E.E.,
25
136 D.P.R. 302, 310 (1994); Feliciano Rolon v. Ortho Biologics LLC, 404 F.Supp.2d 409, 41526
1
CIVIL NO. 10-1610 (SEC)
Page 10
2
5 (D.P.R. 2005). Indeed, because LAREB did not subcontract the services of the Independent
3
Contractors, its liability as a third party is the same regardless of the existence of an insurance
4
policy. Cf. Torres Solis, 136 D.P.R. at 310. It follows that LAREB’s alleged damages cannot
5
be redressed by a favorable federal court decision. Accordingly, LAREB has no standing to
6
claim damages for the Independent Contractors’ failure to obtain such a policy.
7
8
Damages for loss of steel and scrap metal
9
According to the counterclaim, LAREB also claims damages “[f]or lost steel and scrap
10
metal at the Mill.” Docket # 29 at 35 ¶30. In opposition, Plaintiffs aver that LAREB
11
relinquished its rights and obligations to SANCO on November 4, 2009, by means of an
12
assignment letter. Furthermore, per the December 15, 2009 contract, LAREB purportedly
13
transferred to SANCO all the metal acquired from Asociación. Given these circumstances–
14
LAREB’s abrogation of its rights over the steel and scrap metal– Plaintiffs reason that LAREB
15
could suffer no injury in connection with the lost steel and scrap metal at the Mill as a
16
consequence of Plaintiffs’ actions. Plaintiffs conclude that LAREB no longer has a legal
17
interest in the steel and scrap metal, and thus lacks standing to claim damages for it.
18
Plaintiffs’ argument is sound. Taking into account, however, the possibility that SANCO
19
never acquired these rights from LAREB, or that LAREB somehow reacquired these rights, see
20
e.g., Docket # 1 ¶¶ 48-49; Docket # 39 at 8, the Court will defer this determination for a later
21
stage of the proceedings. See Ocasio-Hernandez, F.3d at 12-13 (“[A] court [may not] attempt
22
to forecast a plaintiffs’ likelihood of success on the merits; a well-pleaded complaint may
23
proceed even if . . . a recovery is very remote and unlikely”) (internal quotation marks omitted).
24
25
26
1
CIVIL NO. 10-1610 (SEC)
Page 11
2
Having disposed of this preliminary matter, the Court turns to the substantive merits of
3
Plaintiffs’ 12(b)(6) motion. 9
4
5
II. Article 1802 claims
6
Article 1802 establishes that a “person who by an act or omission causes damage to
7
another through fault or negligence shall be obliged to repair the damage so done.” P.R. Laws
8
Ann. tit. 31, § 5141. A claimant seeking relief under this article must establish “(1) a negligent
9
act or omission, (2) damages, and (3) a causal relationship between them.” Soc. Gananciales v.
10
Padin Co., Inc., 17 P.R. Offic. Trans. 111, 117 P.R. Dec. 94 (1986). The scope of negligence
11
under Article 1802 is broad—“as broad as the behavior of human beings... includ[ing] any fault
12
that causes harm or injury.” Bonilla v. Chardon, 18 P.R.Offic. Trans. 696, 709, 118 P.R.Dec.
13
599 (1987) (quoting Colon v. Romero-Barcelo, 112 P.R.Dec. 573, 579 (1982)); see also Vernet
14
v. Serrano Torres, 566 F.3d 254, 259 (1st Cir. 2009)(noting that the provisions of Article 1802
15
must be interpreted expansively). Nevertheless, the existence of an injury or damages alone is
16
not grounds for liability under Article 1802. A defendant will be liable only for those reasonably
17
foreseeable consequences associated with his acts or omissions. Wojciechowicz v. United
18
States, 576 F. Supp. 2d 241, 270-72 (D.P.R. 2008) (citing De-Jesus-Adorno v. Browning Ferris
19
Industries of Puerto Rico, Inc., 160 F.3d 839, 842 (1st Cir. 1998)).
20
21
22
23
24
25
26
9
Plaintiffs also argue that LAREB is estopped from enforcing the LAREB-SANCO “Contract
II,” see Docket #39 at 8. But at this stage of the proceedings, the Court is unable to ascertain, nor the
Plaintiffs can show, whether LAREB intentionally induced Plaintiffs’ reliance on the Assignment
Letter, among other requirements. See Vistamar, Inc. v. Fagundo-Fagundo, 430 F.3d 66, 73 (1st Cir.
2005); Clauson v. Smith, 823 F.2d 660, 661 (1st Cir. 1987). Either way, this argument misses the mark
for LAREB’s counterclaim does not necessarily seek to enforce Contract II. In fact, most of LAREB’s
grievances pertain to incidents related to the performance of the agreements between Plaintiffs and the
Independent Contractors. See Docket # 56 at 6.
1
CIVIL NO. 10-1610 (SEC)
Page 12
2
Regarding a defendant’s omissions, those “that generate[] liability under Article 1802
3
happen[] when ‘the law imposes a duty of care requiring the defendant to conform to a certain
4
standard of conduct for the protection of others against unreasonable risk.’” Zabala-Calderon
5
v. U.S., 616 F. Supp. 2d 195, 199 (D.P.R. 2008). The duty of care may arise in one of three
6
ways: “(1) by a statute, regulation, ordinance, bylaw, or contract; (2) as the result of a special
7
relationship between the parties that has arisen through custom; or (3) as the result of a
8
traditionally recognized duty of care particular to the situation.” De Jesus, 160 F.3d 842.
9
Moreover, “the duty is defined by the general rule that one must act as would a prudent and
10
reasonable person under similar circumstances.” Vazquez-Filippetti v. Banco Popular de Puerto
11
Rico, 504 F.3d 43, 49 (1st Cir, 2007) (citing Ortiz v. Levitt & Sons of P.R., Inc., 1 P.R. Offic
12
Trans. 407, 101 P.R.Dec. 290 (1973). Although the duty of care calls for the anticipation of
13
reasonably probable injuries to probable victims, Marshall v. Perez Arzuaga, 828 F.2d 845, 847
14
(1st Cir. 1987), “the foreseeability required under [Article] 1802 does not extend to all
15
imaginable effects resulting from defendant’s conduct. This would be tantamount to turning the
16
defendant into an absolute insurer of its acts and omissions.” Wojciechowicz, 576 F. Supp. 2d
17
at 272. Therefore, a person breaches the duty of reasonable care only when his actions create
18
reasonably foreseeable risks. Vazquez-Filippetti, 504 F.3d 43, 49.
19
20
In Gen. Office Prods. v. A. M. Capen’s Sons, 115 P.R. Dec. 553 (1984), the Puerto Rico
21
Supreme Court recognized a cause of action for third parties’ tortious interference with
22
contractual obligations, as a subset of claims under Article 1802. To establish such a claim, the
23
moving party must show (1) the existence of a contract with which a third party interferes (2)
24
fault must be present as the third party must act tortiously with knowledge of the contract’s
25
existence; (3) there must be a damage; and 4) the damages must be a consequence of the tortious
26
acts of the third party. Gen. Office Prods. Corp. v. A. M. Capen's Sons, Inc., 115 P.R. Dec. 553,
1
CIVIL NO. 10-1610 (SEC)
Page 13
2
559 (1984); Dolphin Int'l of P.R. v. Ryder Truck Lines, 127 P.R. Dec. 869 (1991); Jusino v.
3
Walgreens, 155 P.R. Dec. 560 (2001). Regarding the second prong, knowledge, without more,
4
is not akin to fault. Cf. New Comm Wireless Servs. v. SprintCom, Inc., 287 F.3d 1, 10 (1st Cir.
5
2002) (“[T]he fault element of tortious interference requires a stronger showing”) (internal
6
quotation marks omitted). In Jusino, the Puerto Rico Supreme Court affirmed that, regarding
7
this element, the defendant has to intentionally interfere, knowing that such interference will
8
injure the plaintiff. See Jusino, 155 P.R. Dec. at 575-6 (2001). The aggrieved party need only
9
show or present evidence from which it could be inferred that the third person acted in a willful
10
manner and with knowledge of the existence of the contract. General Office Prods., 115 P.R.
11
Dec. at 557.
12
13
At the outset, the Court notes the counterclaim’s failure to satisfy the second element of
14
a tortious interference claim: the existence of fault. Here, LAREB alleges that Plaintiffs knew
15
“[o]f the existence of a contractual relationship between LAREB and SANCO, yet the
16
[Independent Contractors] agreements tortiously interfered with the terms and conditions of the
17
[a]greement executed by and between LAREB and SANCO.” Docket # 29 at 34 ¶ 29.
18
Conceding, Plaintiffs argue that “[they] were aware only of a contract executed by and between
19
LAREB and SANCO on or about October 1, 2009 (the “LAREB-SANCO Contract I”), which
20
significantly differed from the LAREB-SANCO Contract II.” Docket # 39 at 6 n. 1 (citing
21
Verified Complaint ¶ 43-45). Because Plaintiffs’ contracts with [the Independent Contractors]
22
antedated the LAREB-SANCO “Contract II,” Plaintiffs argue, LAREB’s allegations that
23
Plaintiffs interfered with the LAREB-SANCO Contract II [are] “not merely implausible, but
24
absurd.” Id. at 6.
25
26
1
CIVIL NO. 10-1610 (SEC)
Page 14
2
Responding to these charges, LAREB contends that Plaintiffs’ admitted knowledge of
3
the assignment letter is sufficient to infer their knowledge. See Docket # 56 at 6. “[P]recise
4
knowledge of the chain of events leading to the . . . violation may often be unavailable to . . .
5
at this early stage of the litigation. . . .” Ocasio-Hernandez, F.3d at 16. Although this is a close
6
case,“[o]n a motion to dismiss, [courts] are obligated to view the facts of the complaint in the
7
light most favorable to the [counterclaimants], and to resolve any ambiguities in their favor.”
8
Id. at 17. Accordingly, Plaintiffs’ knowledge of the LAREB-SANCO agreements is plausible.
9
10
Mere knowledge, however, does not equate to fault. Cf. New Comm Wireless Servs, 287
11
F.3d at 10. Accordingly, the counterclaim also needs to show that Plaintiffs acted in a willful
12
manner. See General Office Prods., 115 P.R. Dec. at 557. Here, LAREB concludes, with no
13
supporting facts, that Plaintiffs’ contracts with the Independent Contractors tortiously interfered
14
with the LAREB-SANCO agreements. But these allegations are merely conclusions and
15
recitations of the legal elements of the cause of action, and as such, ought to be disregarded. See
16
Iqbal, 129 S.Ct. at 1949 (“Where a complaint pleads facts that are ‘merely consistent with’ a
17
defendant's liability, it ‘stops short of the line between possibility and plausibility of entitlement
18
to relief.’”) (quoting Twombly, 550 U.S. at 557, 127 S.Ct. 1955). LAREB offers no facts to
19
provide heft to their otherwise bare and insufficient allegations.
20
Common sense, moreover, dictates the implausibility of LAREB’s claims on this end:
21
Plaintiffs relied on the Assignment Letter wherein LAREB transferred to SANCO all of its
22
rights and responsibilities in the Mill for they presumably thought it was a valid and enforceable
23
instrument. After all, “[t]here is a presumption that every contract has a consideration and that
24
it is licit unless said presumption is overcome by evidence to the contrary.” Docket # 58 at 2
25
(citing Ledesma Marrero v. Ledesma Marrero, 84 P.R. Dec. 167 (1961)). After disbursing large
26
1
CIVIL NO. 10-1610 (SEC)
Page 15
2
quantities of money, Plaintiffs engaged the Independent Contractors to complete their
3
investment. The Court concurs with Plaintiffs that their reliance “[o]n the Assignment Letter
4
and the LAREB-SANCO Contract I cannot be construed, even with the most extensive
5
contortions, as . . . [intentionally interfering] with the LAREB-SANCO Contract II.” Docket #
6
58 at 5. Although Plaintiffs had knowledge of the agreements between LAREB and SANCO,
7
LAREB offers no facts to infer that Plaintiffs interfered in a willful manner. And no reasons can
8
be drawn to support such an inference. The counterclaim thus fails to comply with the second
9
element of a tortious interference claim.
10
11
With LAREB having failed to meet this prong, the Court need not go further. LAREB’s
12
lack of factual allegations fail to nudge their claims of tortious interference “across the line from
13
conceivable to plausible.” Iqbal, 129 S.Ct at 1951. Accordingly, LAREB’s tortious interference
14
claims are hereby DISMISSED.
15
Although the counterclaim fails to properly plead all requirements for a tortious
16
interference claim, it nevertheless stands as a general tort claim. According to the counterclaim,
17
“[Plaintiffs] are . . . liable for the negligent or at fault acts and omissions of [their independent
18
contractors] at the [Mill], while acting as contractors or agents for Plaintiffs. Docket # 29 at
19
at 33 ¶ 24 (emphasis added). Similarly, the counterclaim states that Plaintiffs selected the
20
Independent Contractors to perform the removal of steel and scrap material from the Mill
21
(despite their lacking the necessary skill, permits, and knowledge to perform such work), and
22
failed to supervise their work at the Mill.
23
In Pons Anca v. Engenbretson, 160 P.R. Dec. 347 (2003), the Supreme Court of Puerto
24
Rico reiterated that an independent contractor’s principal “[m]ay be liable for the negligent acts
25
of an independent contractor when the work for which the contractor has been hired, by its
26
1
CIVIL NO. 10-1610 (SEC)
Page 16
2
nature, entails particular risks or hazards and the principal neither requires the contractor to take
3
special safety measures nor takes these measures himself.” Ocasio v. Hogar Geobel Inc., 693
4
F.Supp.2d 167, 180 (D.P.R. 2008) (quoting Pons Anca, 160 P.R. Dec. at 358; Martinez v. Chase
5
Manhattan Bank, 8 P.R. Offic. Trans. 542 (1979). Contrary to LAREB’s assertions, see Docket
6
56 at 9, however, the principal is not vicariously liable for the negligent act of its independent
7
contractor; rather, the principal’s source of liability stems from Article 1802, i.e., direct liability.
8
See Lopez v. Cruz Ruiz, 131 P.R. Dec. 694, 706 (1992) (“This test does not hold the employer
9
vicariously liable for injuries caused by an independent contractor or his employee.”).10
10
11
According to the counterclaim, the Independent Contractors failed to obtain the
12
demolition permits necessary for the extraction of metal; secure the permits for the removal of
13
asbestos from the metal in the Mill; obtain a workers’ compensation insurance policy or public
14
liability insurance; and secure the Mill’s premises which resulted in the loss through theft of
15
substantial amounts of steel and scrap metal. LAREB alleges that, as a result of these omissions,
16
it faced proceedings before local government agencies, and was also forced to seek injunctive
17
relief before state courts to enjoin Plaintiffs’ independent contractors from removing metal from
18
the Mill without the appropriate permits.
19
Furthermore, the work performed by the Independent Contractors–namely the demolition
20
of structures and the removal of steel and scrap material– poses inherent risks. Cf. Pacheco v.
21
A.F.F., 112 P.R. Dec. 296 (1982) (electricity-related labors are inherently dangerous); Vda. de
22
23
24
25
26
10
The Court further stated: “[i]t only imposes liability when through said contractor’s own fault
or negligence, and lack of foreseeability with regard to the need to take special precautions, injuries are
caused to third persons. The fault or negligence that gives rise to the employer’s liability is the result
of the failure to take the necessary precautions, given the particular risks of a project. Id. (footnote
omitted).
1
CIVIL NO. 10-1610 (SEC)
Page 17
2
Delgado v. Boston Ins. Co., 99 P.R. Dec. 714 (1971) (flammable substances are inherently
3
dangerous); see also Wagner v. Continental Cas. Co., a Div. of CNA Ins. Companies, 143 Wis.
4
2d 379, 421 N.W.2d 835 (1988) (demolition work on building is “inherently dangerous”).
5
Taking this into account, and after affording LAREB’s allegations the presumption of truth to
6
which they are entitled, the counterclaim plainly shows the plausibility of Plaintiffs’ liability
7
for the omissions of the Independent Contractors.
8
9
In their motion to dismiss, Plaintiffs allege that the Independent Contractors “[are]
10
experienced in the pertinent lines of business.” Docket # 39 at 11 (footnote omitted). But at this
11
juncture, this fact-based allegation is not ripe for determination. Indeed, in resolving a motion
12
to dismiss, the Court evaluates “[t]he plausibility of a legal claim . . . .” Ocasio-Hernandez, F.3d
13
at 12, not the merits of Plaintiffs’ factual defenses. “Although discovery may reveal facts that
14
belie the plaintiffs’ claim, that possibility does not negate its plausibility.” Id. at 19. Lacking any
15
legal support, Plaintiffs also aver that they were not required to supervise the Independent
16
Contractors. This ipse dixit is unavailing because, given the particular risks involved in this
17
case, Plaintiffs’ liability stems from their duty to ensure that the Independent Contractors took
18
special safety measures to avoid the foreseeable risks inherent to the demolition of structures
19
and the removal of steel and scrap material. See Pons Anca, 160 P.R. Dec. at 358.
20
Taking all these well-pleaded factual allegations as true, LAREB has pleaded adequate
21
factual material to support a reasonable inference; that Plaintiffs, as principals, could be liable
22
for LAREB’s damages stemming from Plaintiffs’ negligent selection and/or lack of supervision
23
of the Independent Contractors. In light of the foregoing, the collective weight of LAREB’s
24
factual allegations, nudge their general tort claims “across the line from conceivable to
25
plausible.” Iqbal, 129 S.Ct at 1951.
26
1
CIVIL NO. 10-1610 (SEC)
Page 18
2
III. Cause of action under Article 1803
3
LAREB also seeks redress under Article 1803 of the Puerto Rico Civil Code, P.R. Laws
4
Ann. tit. 31 § 5142 , which provides a list of situations wherein a party can be found liable for
5
the tortious acts of another. The Supreme Court of Puerto Rico has said that this list “is
6
limitative and is not a mere collection of examples.” Torres v. Pérez v. López, 113 P.R. Dec.
7
72, 76 (1982). These exceptions are as follows: the liability (1) of the father or mother for the
8
damage caused by minor children; (2) of guardians for the damage caused by the persons under
9
their authority who reside with them; (3) of employers for the damage caused by an employee
10
acting in the course of his employment; (4) of masters or directors of arts and trades for the
11
damage caused by their pupils or apprentices, and (5) of the government of the Commonwealth
12
of Puerto Rico under certain pre-established circumstances. § 5142
13
14
Pursuant to the foregoing, the only plausible scenario where Plaintiffs may be vicariously
15
liable is if LAREB alleges enough facts to infer that an employer-employee relationship existed
16
between Plaintiffs and the Independent Contractors. The counterclaim, however, even viewed
17
in the light most favorable to LAREB, is devoid of any allegations concerning an employer-
18
employee relationship. The allegation that “[Plaintiffs] are also jointly liable for acts or
19
omissions, of [the Independent Contractors], constituting fault or negligence under [Article
20
1803], which have caused damages to LAREB and Mr. Ayala Vega” (Docket # 29 at at 34 ¶
21
28) are “[t]hreadbare recitals of the elements of a cause of action.” Twombly, 550 U.S. at 555.
22
Indeed, because it is plausible that Plaintiffs are liable for the acts of the Independent
23
Contractor, it is inconceivable, and thus implausible that the Independent Contractors are also
24
Plaintiffs’ employees. See supra n. 10 and accompanying text. Viewed in the light most
25
favorable to LAREB, and “draw[ing] on our ‘judicial experience and common sense’ as we
26
make a contextual judgment about the sufficiency of the pleadings,” Rodriguez-Garcia v.
1
CIVIL NO. 10-1610 (SEC)
Page 19
2
Miranda-Marin, 610 F.3d 756, 768 (1st Cir. 2010) (quoting Iqbal, 129 S.Ct. At 1950), LAREB’s
3
Article 1803 claims are implausible.
4
5
LAREB thus has failed to plead sufficient facts to state a claim under Article 1803 to
6
hold Plaintiffs’ vicariously liable for the damages caused by the Independent Contractors as
7
LAREB has failed to establish an employer-employee relationship between Plaintiffs and the
8
Independent Contractors. Accordingly, LAREB’s Article 1803 claims are hereby DISMISSED.
9
Conclusion
10
In light of the foregoing, LAREB's Article 1803 and tortious interference claims are
11
hereby DISMISSED. But LAREB’s general tort claims survive. Accordingly, Plaintiffs’
12
motion to dismiss LAREB’s counterclaim is GRANTED IN PART AND DENIED IN PART.
13
14
IT IS SO ORDERED.
15
In San Juan, Puerto Rico, this 16th day of August, 2011.
16
17
18
19
20
21
22
23
24
25
26
s/Salvador E. Casellas
Salvador E. Casellas
U.S. Senior District Judge