Gear Design and Manufacturing LLC v. Sansera Engineering Limited
Filing
54
OPINION and ORDER granting in part and denying in part 43 Motion for Summary Judgment. The Court grants Sansera's motion as to Metaldyne's fifth and sixth causes of action and denies the motion as to Metaldyne's first, second, third, and fourth causes of action. Signed by Honorable Bruce Howe Hendricks on 08/28/2024.(rhei, )
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF SOUTH CAROLINA
CHARLESTON DIVISION
Metaldyne
Inc.,
Powertrain
Components, )
)
)
Plaintiff, )
)
v.
)
)
Sansera Engineering Limited,
)
)
Defendant. )
________________________________ )
Civil Action No. 2:21-cv-3588-BHH
Opinion and Order
In this business dispute, Plaintiff Metaldyne Powertrain Components, Inc.
(“Metaldyne”) has sued Defendant Sansera Engineering Limited (“Defendant” or
“Sansera”) about an allegedly defective motorcycle component purchased by Metaldyne
from Sansera. Metaldyne, a supplier of motorcycle transmission gearbox assemblies,
contracted with Sansera, an integrated manufacturer of complex and high-quality
precision components for the automotive sector, to manufacture and supply Metaldyne
with shift forks for inclusion in Metaldyne’s assemblies. Metaldyne, in turn, contracted with
Bayerische Motorer Werke Aktiengesellschaft, also known as BMW AG (“BMW”), to
supply its assemblies for certain BMW motorcycles. According to the complaint, certain
of the shift forks Sansera supplied to Metaldyne for inclusion in its assemblies had
defective, non-conforming shift fork pins.
Jurisdiction is founded on diversity, pursuant to 28 U.S.C. § 1332. The complaint
contains the following six counts: (1) breach of contract; (2) breach of express warranties;
(3) breach of implied warranty of merchantability; (4) breach of implied warranty of fitness
for particular purpose; (5) contractual indemnification; and (6) alternatively, equitable
indemnification. (ECF No. 1.) Metaldyne seeks actual and consequential damages as to
all claims to be determined at trial, as well as attorneys’ fees and costs. (Id.) Metaldyne
also specifically seeks to recover from Sansera the amount it paid to BMW to settle
BMW’s claims against it related to costs BMW incurred flowing from the nonconforming
shift fork pins. Attached to the complaint is a copy of the written contract between the
parties. 1 (ECF No. 1-1.)
Now before the Court is Sansera’s motion for summary judgment pursuant to Fed.
R. Civ. P. 56. (ECF No. 43.) Metaldyne filed a response in opposition. (ECF No. 48.)
Sansera filed a reply. (ECF No. 49.) After review, the Court finds that no hearing is
necessary to resolve the motion. For the reasons that follow, the Court grants the motion
in part and denies the motion in part.
I.
Background
Metaldyne was a supplier of motorcycle transmission gearbox assemblies for
certain BMW motorcycles. Metaldyne entered into a written Contract with Sansera,
pursuant to which Sansera agreed to supply Metaldyne with shift forks, which would be
incorporated into Metaldyne’s assemblies.
BMW learned of rear-wheel-locking incidents with its K1600 motorcycle, which led
it to issue recalls and to conduct investigations related to the nonconforming shift forks in
the transmissions of this motorcycle. (Id. ¶ 37.) This motorcycle incorporated a
transmission known as the K48, which was supplied to BMW by Metaldyne. (Id. ¶ 28.) As
Plaintiff is formerly known as Gear Design and Manufacturing, LLC (“GDM”). (ECF No. 1.) After this case
was filed, GDM merged into Metaldyne. (ECF No. 48 at 1 n.1.) GDM purchased certain assets and contracts
from TorqTek Design and Manufacturing, LLC, which included the contract at issue in this case. (Id.) GDM
kept TorqTek’s terms and incorporated them into its purchase order and scheduling agreement with
Sansera. (Id.) Thus, the contract is comprised of a purchase order, a scheduling agreement, and the
incorporated TorqTek general terms and conditions (hereinafter, “Terms”) (collectively, the “Contract”). (ECF
No. 1 at 4; ECF No. 1-1.)
1
2
a result, BMW asserted a claim against Metaldyne for costs and damages BMW incurred
related to the non-conforming shift forks. (Id. ¶ 38.) “BMW and Metaldyne participated in
months of negotiations,” which ultimately led to a signed settlement agreement on
December 8, 2020. (ECF No. 48 at 13-14. See also id. (“[B]etween July and September
2020, BMW and Metaldyne negotiated and exchanged various commercial offers of
settlement regarding the recall and global warranty and field service action costs
associated with Sansera’s non-conforming shift fork assemblies.”).) In addition to seeking
actual and consequential damages as to its claims, Metaldyne seeks indemnification from
Sansera “for the costs and amounts it was obligated to pay BMW.” (ECF No. 1. ¶¶ 40, 7374. See also ECF No. 48 at 18 (“Metaldyne seeks recovery of the amounts paid to BMW
for the recall and global field service actions undertaken by BMW to remedy the
nonconforming shift fork assemblies.”).)
II.
Legal Standard
Summary judgment shall be granted “if the pleadings, the discovery and disclosure
materials on file, and any affidavits show that there is no genuine dispute as to any
material fact and that the movant is entitled to judgment as a matter of law.” Fed. R. Civ.
P. 56(c). Rule 56(c) of the Federal Rules of Civil Procedure requires that the district court
enter judgment against a party who, “‘after adequate time for discovery . . . fails to make
a showing sufficient to establish the existence of an element essential to that party’s case,
and on which that party will bear the burden of proof at trial.’” Stone v. Liberty Mut. Ins.
Co., 105 F.3d 188, 190 (4th Cir. 1997) (quoting Celotex Corp. v. Catrett, 477 U.S. 317,
322 (1986)). “[T]his standard provides that the mere existence of some alleged factual
dispute between the parties will not defeat an otherwise properly supported motion for
3
summary judgment; the requirement is that there be no genuine issue of material fact.”
Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-48 (1986). “Only disputes over facts
that might affect the outcome of the suit under the governing law will properly preclude
the entry of summary judgment.” Id. at 248. “[S]ummary judgment will not lie if the dispute
about a material fact is ‘genuine,’ that is, if the evidence is such that a reasonable jury
could return a verdict for the nonmoving party.” Id.
“[A]t the summary judgment stage the judge’s function is not himself to weigh the
evidence and determine the truth of the matter but to determine whether there is a
genuine issue for trial.” Id. at 249. When the party moving for summary judgment does
not bear the ultimate burden of persuasion at trial, it may discharge its burden by
demonstrating to the court that there is an absence of evidence to support the non-moving
party's case. Celotex, 477 U.S. at 325. The non-movant must then “make a showing
sufficient to establish the existence of an element essential to that party's case, and on
which that party will bear the burden of proof at trial.” Id. at 322.
Any reasonable inferences are to be drawn in favor of the nonmoving party.
Anderson, 477 U.S. at 255; Webster v. U.S. Dep’t of Agric., 685 F.3d 411, 421 (4th Cir.
2012). However, to defeat summary judgment, the nonmoving party must rely on more
than conclusory allegations, mere speculation, the building of one inference upon another,
or the mere existence of a scintilla of evidence. See Anderson, 477 U.S. at 252; Stone,
105 F.3d at 191. Rather, “a party opposing a properly supported motion for summary
judgment . . . must ‘set forth specific facts showing that there is a genuine issue for trial.’”
Bouchat v. Baltimore Ravens Football Club, Inc., 346 F.3d 514, 522 (4th Cir. 2003)
(quoting Fed. R. Civ. P. 56(e) (2002) (amended 2010)). If the adverse party fails to provide
4
evidence establishing that the fact finder could reasonably decide in his favor, then
summary judgment shall be entered “regardless of ‘[a]ny proof or evidentiary
requirements imposed by the substantive law.’” Id. (quoting Anderson, 477 U.S. at 248).
III.
Discussion
There is no dispute that an enforceable contract between Metaldyne and Sansera
was formed. (ECF No. 1-1.) Rather, the meaning and applicability of two provisions under
the Terms is at issue: Section 9 and Section 14.
Section 9 is titled “Product Liability,” and it states in relevant part that:
Seller shall indemnify and defend Buyer against third-party claims asserted
against Buyer or its customers for bodily injury, death, or property damage
and any resulting damages, losses, costs, and expenses (including
reasonable attorney’s fees), if and to the extent caused by Seller's design
or manufacture of Products or provision of Services. The parties will
cooperate with each other to determine the root cause of a defect in or
failure of the Products and an equitable allocation of responsibility among
all responsible parties. Seller may examine and test all available Products
that are subject to a third-party claim. Buyer will endeavor to include Seller
in settlement discussions where indemnity has been or will be sought from
Seller, and Buyer may not settle or compromise any third-party claim that
gives rise to an indemnification claim without Seller's prior written consent,
which consent shall not be unreasonably withheld, conditioned or delayed.
(ECF No. 1-1 at 17.) Section 14 contains the following remedies provision:
The rights and remedies reserved to Buyer in this Contract shall be
cumulative with, and additional to, all other or further remedies provided at
law or in equity. Without limiting the foregoing, should any Products goods
fail to conform to the warranties set forth in Section 7, 2 Buyer shall notify
Seller and Seller shall, if requested by Buyer, reimburse Buyer for any
incidental and consequential damages caused by such nonconforming
goods, including, but not limited to, costs expenses and losses incurred by
Buyer (a) in inspecting, sorting, repairing or replacing such nonconforming
goods, (b) resulting from production interruptions, (c) conducting recall
campaigns or other corrective service actions, and (d) claims for personal
injury (including death) or property damage caused by such nonconforming
Products.
It appears to the Court that this should read Section 8, not Section 7, which is titled “Payment.” (See infra
at n.3; ECF No. 1-1 at 14-15.)
2
5
(Id. at 23.)
As an initial matter, the Terms provide under Section 21.10 that the Contract will
be governed by and interpreted under South Carolina law. (Id. at 28.) “A federal court
exercising diversity jurisdiction is obliged to apply the substantive law of the state in which
it sits, including the state's choice-of-law rules.” Volvo Const. Equip. N. Am., Inc. v. CLM
Equip. Co., Inc., 386 F.3d 581, 599-600 (4th Cir. 2004). “Choice of law clauses are
generally honored in South Carolina.” Team IA, Inc. v. Lucas, 717 S.E.2d 103, 108 (S.C.
Ct. App. 2011). Accordingly, the Court respects the Contract’s choice of law provision and
considers the Contract in light of South Carolina law.
A federal court sitting in diversity should use the federal summary judgment
standard involving contract interpretation and ambiguity. See World-Wide Rights Ltd.
P'ship v. Combe Inc., 955 F.2d 242, 245 (4th Cir. 1992); Monsanto Co. v. ARE-108
Alexander Road, LLC, 632 F. App'x 733, 736 (4th Cir. 2015); Keystone Ne., Inc. v.
Keystone Retaining Wall Sys., LLC, 2015 WL 1186398, at *6 (D.S.C. March 16, 2015),
amended on reconsideration on other grounds, 2015 WL 1400102 (D.S.C. March 25,
2015). “A court faces a conceptually difficult task in deciding whether to grant summary
judgment on a matter of contract interpretation.” World-Wide Rights Ltd. P'ship, 955 F.2d
at 245. The court must first determine if the contract at issue is ambiguous. Id. If “the
contract is unambiguous on the dispositive issue,” it may grant summary judgment. Id.
However, if the court determines that the contract is ambiguous, “it may yet examine
evidence extrinsic to the contract that is included in the summary judgment materials,
and, if that evidence is, as a matter of law, dispositive of the interpretive issue, grant
summary judgment on that basis.” Id. (citing Jaftex Corp. v. Aetna Cas. & Surety Co., 617
6
F.2d 1062, 1063 (4th Cir. 1980)). But if the review of the extrinsic evidence still “leaves
genuine issues of fact respecting the contract’s proper interpretation, summary judgment
must of course be refused and interpretation left to the trier of fact.” Id. “Therefore,
summary judgment is appropriate when the contract in question is unambiguous or when
an ambiguity can be definitively resolved by reference to extrinsic evidence.” Washington
Metro. Area Transit Auth. v. Potomac Inv. Properties, Inc., 476 F.3d 231, 235 (4th Cir.
2007).
Sansera argues that it is entitled to summary judgment as to all claims because
Section 9 of the Contract bars Metaldyne’s recovery. (ECF No. 43.) According to Sansera,
Metaldyne’s entire case falls within the scope of Section 9 because “[t]he only damages
Metaldyne seeks are a reimbursement for what it paid BMW to settle all potential claims
BMW may have against Metaldyne that arise from allegedly defective shift forks.” (ECF
No. 43 at 7.) Its assertion as to the damages being sought by Metaldyne is based on
Metaldyne’s Rule 26(a)(1) disclosures and answer to Interrogatory No. 4, seeking a
statement of damages sustained. (Id. at 7-9.) As to its disclosures, Metaldyne provided a
“total damages amount,” and the amount listed is the exact same amount it paid to BMW
to resolve BMW’s claims against it. (ECF No. 43-9 at 8-9.) As to its answer to Interrogatory
No. 4, Metaldyne simply referred to its initial disclosures. (ECF No. 43-11 at 10-11.) Thus,
Sansera contends that Metaldyne’s claims fail as a matter of law because there is no
dispute that Metaldyne did not secure Sansera’s written consent before it settled with
BMW, as required by the plain language of Section 9. (ECF No. 43 at 1.)
In stark contrast, Metaldyne asserts that its claims “do not sound in third-party
indemnification for bodily injury, death, or property damage arising out of a Sansera
7
defective product, as is required under Section 9.” (ECF No. 48 at 15.) Rather, it contends
that its claims “arise out of [Sansera’s] breach of warranty and breach of contract” under
Section 8 3 and 14 of the Contract, as well as the South Carolina Uniform Commercial
Code. (Id.) According to Metaldyne, Section 9 does not apply to its claims because the
following three conditions precedent to trigger its application are not met here: (1) the
assertion of a third-party claim; (2) a claim asserted against Metaldyne or its customer,
BMW; and (3) a third-party claim related to bodily injury, death, or property damage. (Id.
at 17.)
The Court has carefully considered the parties’ arguments, the legal authorities
cited, and the provisions of the Contract at issue. Neither party asserts, nor does the
Court find, that the language of Section 9 is ambiguous or is susceptible to more than one
interpretation. Instead, the dispute over Section 9’s applicability centers on the parties’
differing view of both the claims being asserted by Metaldyne and the damages being
sought by Metaldyne. It is evident to the Court that Sansera views this case as asserting
only a claim for indemnification and seeking only recovery of the settlement amount
Metaldyne paid to BMW. While there is no dispute that Metaldyne does seek to recover
the amount it paid to BMW, Metaldyne also asserts claims under Section 8 of the Contract
(Product Warranties) and seeks damages under Section 14 of the Contract (the remedies
provision). (ECF No. 48 at 18.) Indeed, the complaint plainly asserts more than
indemnification claims against Sansera, and it specifically references Sections 8 and 14
of the Contract and seeks actual and consequential damages with regard to each cause
of action. (ECF No. 1.)
Section 8 is entitled “Product Warranties,” and 8.1 outlines Sansera’s warranties to Metaldyne. (See ECF
No. 1-1 at 15.)
3
8
Under South Carolina law, the Court undertakes the interpretation of Section 9 as
a matter of law. Lee v. Univ. of S.C., 757 S.E.2d 394, 397 (S.C. 2014). Upon review, the
Court agrees with Sansera that Section 9 applies to Metaldyne’s indemnification claims,
specifically, Metaldyne’s fifth and sixth causes of action. In other words, as to Metaldyne’s
fifth and sixth causes of action, the Court finds that there is no dispute that BMW is a
third-party to the Contract, that it asserted claims against “the Buyer,” Metaldyne; and that
BMW’s claims against Metaldyne were for “property damage” to its motorcycles and
“damages, losses, costs, and expenses” BMW incurred due to the “defective, nonconforming . . . shift fork pin component” in the transmission assemblies. (ECF No. 1 at
1.) While Metaldyne notes that “neither [it] nor BMW is a defendant,” (ECF No. 48 at 15),
the plain, unambiguous language of Section 9 does not require the filing of a lawsuit nor
does it use the word “defendant.” Rather, it states in more general terms that “Seller shall
indemnify . . . Buyer against third-party claims asserted against Buyer.” (ECF No. 1-1 at
16-17.) See Lindsay v. Lindsay, 491 S.E.2d 583, 589 (Ct. App.1997) (“The court must
enforce an unambiguous contract according to its terms regardless of its wisdom or folly,
apparent unreasonableness, or the parties' failure to guard their rights carefully.”) Thus,
the Court finds that Section 9 is applicable to Metaldyne’s indemnification claims against
Sansera.
Given this determination, the question becomes whether Metaldyne adhered to the
requirements set forth in Section 9 to trigger Sansera’s indemnification obligation to
Metaldyne. Section 9 states:
Buyer will endeavor to include Seller in settlement discussions where
indemnity has been or will be sought from Seller, and Buyer may not settle
or compromise any third-party claim that gives rise to an indemnification
9
claim without Seller's prior written consent, which consent shall not be
unreasonably withheld, conditioned or delayed.
(ECF No. 1-1 at 17) (emphasis added.) Thus, according to the plain terms of Section 9,
Metaldyne faced two requirements. Notably, while the first requirement only required
Metaldyne to endeavor to include Seller in settlement discussions, the second
requirement plainly required Buyer to obtain Seller’s prior written consent before Buyer
settled or compromised any third-party claim giving rise to an indemnification claim.
Here, there is no dispute that Metaldyne settled BMW’s claims against it without
first obtaining the prior written consent of Sansera. Metaldyne does not argue otherwise.
Indeed, a review of its response in opposition reveals no discussion of requirement two.
Rather, Metaldyne simply argues that it tried to include Sansera in the settlement
discussions with BMW but that Sansera “opted not to participate in meaningful
discussions” with it. (ECF No. 48 at Section B.) Section 9’s requirements, however, are in
the conjunctive, so even assuming without deciding that Metaldyne satisfied the first one,
there is no genuine dispute of material fact as to Metaldyne’s failure to satisfy the second
one. Accordingly, the Court finds that Sansera is entitled to summary judgment on
Metaldyne’s fifth and sixth causes of action seeking due to Metaldyne’s failure to first
obtain Sansera’s written consent as required by Section 9 of the Contract.
This does not end the Court’s inquiry, however, because Metaldyne’s complaint
includes claims other than for indemnification. Also, as previously mentioned, in addition
to Section 9, which speaks only to indemnification for third-party claims, Section 8 of the
Contract contains certain warranties regarding non-confirming products, and it contains
a cumulative, broadly worded remedies provision for breach of said warranties in Section
14. And the complaint plainly references these sections and seeks relief pursuant to
10
them. Additional principles of South Carolina contract interpretation dictate that contracts
“will be interpreted so as to give effect to all of their provisions, if practical.” Reyhani v.
Stone Creek Cove Condo. II Horizontal Prop. Regime, 494 S.E.2d 465, 468 (Ct. App.
1997) (citing 17A Am. Jur. 2d Contracts § 385 (1991)). As such, “[i]t is fundamental that,
in the construction of the language of a contract, it is proper to read together the different
provisions therein dealing with the same subject matter, and where possible, all the
language used should be given a reasonable meaning.” Bluffton Towne Ctr., LLC v.
Gilleland-Prince, 772 S.E.2d 882, 890 (Ct. App. 2015) (quoting Ecclesiastes Prod.
Ministries v. Outparcel Assocs., LLC, 649 S.E.2d 494, 498-99 (Ct. App. 2007)). “In
construing and determining the effect of a written contract, the intention of the parties and
the meaning are gathered primarily from the contents of the writing itself, or, as otherwise
stated, from the four corners of the instrument.” Silver v. Aabstract Pools & Spas, Inc.,
658 S.E.2d 539, 542 (Ct. App. 2008) (quoting McPherson v. J.E. Sirrine & Co., 33 S.E.2d
501, 509 (1945)).
Accordingly, after review, the Court declines to grant summary judgment in
Sansera’s favor on Metaldyne’s remaining four claims: (1) breach of contract; (2) breach
of express warranties; (3) breach of implied warranty of merchantability; and (4) breach
of implied warranty of fitness for particular purpose. After a close review of the complaint
and Metaldyne’s response in opposition, it appears to the Court that Metaldyne has not
abandoned its breach of contract and warranty claims and is seeking to recover
consequential damages that may be available to it under Section 14, separate and apart
from the settlement amount it paid to BMW. Thus, the Court is not persuaded by
Sansera’s argument that Section 14 governs no aspect of this case “[b]ecause Metaldyne
11
exclusively seeks to be indemnified for its settlement payment to BMW,” and “is not
seeking other remedies.” (ECF No. 49 at 4-5.) Importantly, under Section 14, Metaldyne
may be entitled to be “reimburse[d] [by Sansera] for any incidental and consequential
damages caused by such nonconforming goods.” (ECF No. 1-1 at 23.) This provision then
provides examples of costs and expenses that the Buyer may be able to recoup, which
Sansera argues were not incurred by Metaldyne. However, Sansera’s argument ignores
the “including, but not limited to language” preceding the examples, and the Court further
notes that Section 21.8 under the Terms provides that “including” means “including
without limitation.” (ECF No. 1-1 at 27.) Even assuming the examples of costs and
expenses were not incurred by Metaldyne, such a finding would not bar Metaldyne from
seeking other consequential damages it may have suffered due to the breach of
warranties. The Court must read together and give reasonable meaning to all provisions
of the Contract, and at this juncture, where the parties have not had the benefit of full
discovery as to potential damages under Section 14, the Court cannot find as a matter of
law that Sansera is entitled to summary judgment on Metaldyne’s first four causes of
action.
Conclusion
For the reasons set forth above, the Court grants in part and denies in part
Sansera’s motion for summary judgment. (ECF No. 43.) The Court grants Sansera’s
motion as to Metaldyne’s fifth and sixth causes of action and denies the motion as
to Metaldyne’s first, second, third, and fourth causes of action.
IT IS SO ORDERED.
/s/ Bruce Howe Hendricks
United States District Judge
August 28, 2024
12
Charleston, South Carolina
13
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.