Sherwood et al v. Tennessee Valley Authority (TV3)
Filing
425
MEMORANDUM OPINION. Signed by Chief District Judge Thomas A Varlan on 7/31/17. (JBR)
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF TENNESSEE
DONNA W. SHERWOOD, et al.,
Plaintiffs,
v.
TENNESSEE VALLEY AUTHORITY,
Defendant.
)
)
)
)
)
)
)
)
)
No.:
3:12-CV-156-TAV-HBG
MEMORANDUM OPINION
This civil action is before the Court on the following motions: (1) defendant’s
Motion for Judgment in Plaintiffs’ Favor [Doc. 378]; (2) plaintiffs’ Motion for Sanctions
and an Evidentiary Hearing [Doc. 397]; (3) plaintiffs’ Motion for Discovery [Doc. 399];
(4) plaintiffs’ Motion for Leave to File Fourth Amended Complaint and to Join Additional
Plaintiff [Doc. 401]; (5) defendant’s Motion for Entry of Order or Hearing [Doc. 405]; (6)
plaintiffs’ Motion for Approval to File FOIA Response re Woodward Instructions or Lack
of Instructions [Doc. 408]; and (7) plaintiffs’ Motion for Approval to File FOIA Response
re TVA’s Instructions to Suspend the 15-Foot Rule and/or Revert to Previous Practices
[Doc. 424]. The parties filed several responses and replies in connection with the pending
motions [Docs. 392, 394, 400, 404-1, 407, 410, 413-1, 414–17]. The Court held a hearing
to address these motions on June 26, 2017 [Doc. 421].
For the reasons discussed herein, the Court will: (1) grant in part and deny in part
defendant’s Motion for Judgment in Plaintiffs’ Favor [Doc. 378]; (2) deny plaintiffs’
Motion for Sanctions and an Evidentiary Hearing [Doc. 397]; (3) deny plaintiffs’ Motion
for Discovery [Doc. 399]; (4) deny plaintiffs’ Motion for Leave to File Fourth Amended
Complaint and to Join Additional Plaintiff [Doc. 401]; (5) grant in part and deny in part
defendant’s Motion for Entry of Order or Hearing [Doc. 405]; (6) deny plaintiffs’ Motion
for Approval to File FOIA Response re Woodward Instructions or Lack of Instructions
[Doc. 408]; and (7) deny plaintiffs’ Motion for Approval to File FOIA Response re TVA’s
Instructions to Suspend the 15-Foot Rule and/or Revert to Previous Practices [Doc. 424].
I.
Background
This litigation started in 2012, when plaintiffs sued defendant for violating the
National Environmental Policy Act (“NEPA”), 42 U.S.C. §§ 4321–4370m-12. Plaintiffs
alleged that defendant violated NEPA by not preparing and publishing an environmental
impact statement (“EIS”) prior to implementing a new policy, referred to in this litigation
as the “the 15-foot rule.” See Sherwood v. Tenn. Valley Auth., 842 F.3d 400, 402 (6th Cir.
2016). After several rounds of litigation in this Court and in the Court of Appeals for the
Sixth Circuit, this matter is back before the Court on remand from the Sixth Circuit [Doc.
356]. The Court presumes familiarity with this action based on the Court’s previous
opinions and orders as well as the Sixth Circuit’s opinions. The Court will, however,
provide some background as to the most recent appeal and the issues currently pending
before the Court.
When this matter was on remand before this Court after the first appeal, defendant
moved to dismiss the case as moot [Doc. 232], asserting that it had suspended use of the
fifteen-foot rule and reverted to the right-of-way maintenance practices that were utilized
2
prior to the introduction of the fifteen-foot rule [Doc. 276 p. 2]. Defendant provided the
Court with declarations from Jacinda B. Woodward, Senior Vice President of Transmission
and Power Supply of TVA, attesting to the suspension of the rule [Docs. 233-1, 240-1].
The Court granted defendant’s motion and dismissed the case as moot [Docs. 276, 277],
and plaintiffs appealed that decision to the Sixth Circuit [Doc. 286].
On this second appeal, the Sixth Circuit provided that even if defendant had
formally abandoned the 15-foot rule, “evidence in the record suggests that [defendant] has
not reverted back to the right-of-way practices it used before adopting the rule” [Doc. 356
p. 8]. The Sixth Circuit determined that some evidence in the record suggested that the 15foot rule has some continuing effect and, therefore, that the case was not moot [Id. at 8–9].
In making this finding, the Sixth Circuit relied on declarations by Billy Anderson, Shiras
Walker, and Anthony King, which plaintiffs submitted [See id. at 6–11]. Furthermore, the
Sixth Circuit found that defendant’s “promise to perform NEPA review before changing
its buffer-zone maintenance policies is not an adequate assurance that its challenged
conduct will not recur” [Id. at 10]. The Sixth Circuit further determined that “the record
shows more than a ‘mere possibility’ that defendant’s challenged conduct will recur (or is
continuing)” [Id.]. The Sixth Circuit then remanded the case, providing that this Court
should require defendant to compile an administrative record of its decision to implement
the 15-foot rule [Id. at 11].
Defendant filed its administrative record on February 13, 2017 [Docs. 360–76]. On
March 10, 2017, defendant filed a Confession of Judgment in Plaintiffs’ Favor [Doc. 377]
3
and a Motion for Judgment in Plaintiffs’ Favor [Doc. 378]. In defendant’s confession of
judgment, defendant consents to entry of a judgment declaring that its implementation of
the 15-foot rule violated NEPA [Doc. 377 p. 1]. Defendant also informs the Court that it
has published notice in the Federal Register that it is preparing a programmatic, systemwide EIS of its transmission line right-of-way vegetation maintenance practices. One of
the alternatives defendant will study in that EIS encompasses the level of tree clearing
specified by the challenged 15-foot rule. Defendant also confesses judgment in plaintiffs’
favor and consents to entry of judgment as requested in plaintiffs’ controlling complaint.
Defendant attached a proposed judgment to its motion for the Court’s review [Doc. 3791].
In response, plaintiffs argue that the initial proposed injunction, although it mirrors
the relief requested in the complaint, does go far enough in light of the defendant’s actions
throughout the pendency of this litigation. Specifically, plaintiffs point out that defendant
previously informed the Court that it had suspended the 15-foot rule and reverted to its past
vegetation management practices, when it had not in fact done so. Since defendant’s initial
filings asking the Court to issue judgment in plaintiffs’ favor, the parties have presented
several versions of proposed injunctions for the Court’s review. While the parties have
narrowed the issues the Court must determine regarding the terms of the injunction, the
parties have not agreed on several terms of the injunction.
Plaintiffs have also filed a motion to amend their complaint to add an additional
plaintiff [Doc. 401], a motion for sanctions [Doc. 397], a motion for discovery [Doc. 399],
4
and two motions for leave to file FOIA responses [Docs. 408, 424]. Defendant also filed
a motion for entry of order or hearing [Doc. 405], which essentially narrows the issues
regarding the terms of the injunction. The Court will first address plaintiffs’ motion to
amend. The Court will then turn consider the parties’ arguments regarding the terms of the
injunction. Finally, the Court will address plaintiffs’ motion for sanction, motion for
discovery, and motion to file the FOIA response.
II.
Plaintiffs’ Motion to Amend
Plaintiffs move to amend their complaint to add Billy J. Anderson as a plaintiff and
to seek equitable relief for him.1
Plaintiffs assert that defendant’s destruction of
Anderson’s orchard played a central role in the second appeal in that the Sixth Circuit
recognized that defendant destroyed Anderson’s orchard six months after it advised this
Court that it had suspended the 15-foot rule and reverted to its prior practices. Plaintiffs
seek relief for Anderson in the form of a Court order requiring defendant to “re-plant Mr.
Anderson’s orchard with trees mature enough to bear fruit and nuts” [Doc. 402 p. 3; see
also Doc. 401-1 ¶ 157].
Aside from the situations described in Federal Rule of Civil Procedure 15(a)(1),
which do not apply here, “a party may amend its pleading only with the opposing party’s
written consent or the court’s leave.” Fed. R. Civ. P. 15(a)(2). “The court should freely
give leave,” however, “when justice so requires.” Id. Leave is appropriate “[i]n the
1
The Court notes that plaintiffs initially moved to add additional amendments. In their
reply brief, however, plaintiffs rescinded those requests and stated that the Court should only
consider whether to add Anderson’s claims [Doc. 413-1 p. 7].
5
absence of . . . undue delay, bad faith or dilatory motive on the part of the movant, repeated
failure to cure deficiencies by amendments previously allowed, undue prejudice to the
opposing party by virtue of allowance of the amendment, [or] futility of the amendment.”
Leary v. Daeschner, 349 F.3d 888, 905 (6th Cir. 2003) (quoting Foman v. Davis, 371 U.S.
178, 182 (1962)). “Amendment of a complaint is futile when the proposed amendment
would not permit the complaint to survive a motion to dismiss.” Miller v. Calhoun Cty.,
408 F.3d 803, 807 (6th Cir. 2005). Pursuant to Federal Rule of Civil Procedure 20(a)(1):
Persons may join in one action as plaintiffs if:
(A)
they assert any right to relief jointly, severally, or in the
alternative with respect to or arising out of the same
transaction, occurrence, or series of transactions or
occurrences; and
(B)
any question of law or fact common to all plaintiffs will arise
in the action.
Fed. R. Civ. P. 20(a)(1).
Defendant argues that the proposed amendment to add Anderson as a plaintiff and
seek relief on his behalf is futile because, according to defendant, the equitable relief
plaintiffs seek to add for Anderson is not available under NEPA. In considering whether
the Court may order defendant to re-plant Anderson’s orchard, the Court is cognizant that
“[u]nless a statute in so many words, or by a necessary and inescapable inference, restricts
the court’s jurisdiction in equity, the full scope of that jurisdiction is to be recognized and
applied.” Weinberger v. Romero-Barcelo, 456 U.S. 305, 313 (1982) (citation omitted).
NEPA violations are “subject to traditional standards in equity for injunctive relief,” and
6
in crafting an injunction, “court[s] must balance the equities between the parties.” N.
Cheyenne Tribe v. Norton, 503 F.3d. 836, 842 (9th Cir. 2007). Courts must also “give due
regard to the public interest,” which includes “giving due regard to the protection of the
environment and the welfare of the affected” parties. Id. at 842–43. In addition, courts
“should take care not to craft a remedy that extends beyond what NEPA itself and its
implementing regulations require.” Nat’l Audubon Soc’y v. Dep’t of Navy, 422 F.3d 174,
202 (4th Cir. 2005).
NEPA “seeks to guarantee process, not specific outcomes.” Massachusetts v. U.S.
Nuclear Regulatory Comm’n, 708 F.3d 63, 67 (1st Cir. 2013). NEPA does not “require[]
that action be taken to mitigate the adverse effects of major federal actions.” Robertson v.
Methow Valley Citizens Council, 490 U.S. 332, 353 (1989). In addition, it “makes no
provision for awarding damages and restitution to a private party.” Pye v. Dep’t of Transp.
of Ga., 513 F.2d 290, 293 (5th Cir. 1975). Furthermore, courts often find that no remedy
is available under NEPA if a project is substantially or entirely complete. See, e.g., Mont.
Wilderness Ass’n v. Fry, 408 F. Supp. 2d 1032, 1037 (D. Mont. 2006) (noting that “a NEPA
violation will usually result in a simple remand of the issue to the agency before any action
has taken place,” but that in some cases there is “no remedy,” such as “when a NEPAviolating timber harvest has already been completed”); see also Pub. Interest Research
Grp. of Mich. (Pingam) v. Brinegar, 517 F.2d 917, 918 (6th Cir. 1975) (per curiam)
(finding that the district court did not abuse its discretion in denying motion for preliminary
injunction where project was substantially complete).
7
Plaintiffs contend that the question of whether the Court should provide Anderson
with the proposed relief is not properly before the Court at this juncture [Doc. 413-1 p. 3].
Rather, plaintiffs argue that the only question here is whether the Court should permit
Anderson to join the case and make his allegations. The Court notes, however, that private
litigants fail to state a claim under NEPA when requesting relief that is inappropriate under
the statute. See United States v. 45,149.58 Acres of Land, 455 F. Supp. 192, 203 (E.D.N.C.
1978) (holding that litigant failed to state a claim under NEPA because “private litigants
can recover no money damages for an agency’s failure to file an EIS, even if required”).
Although plaintiffs are not seeking money damages for Anderson, the Court finds
that the relief plaintiffs seek for Anderson “extends beyond what NEPA itself and its
implementing regulations require.” See Nat’l Audubon Soc’y, 422 F.3d at 202. The
proposed individual relief for Anderson, although framed as injunctive relief, is akin “to
mitigat[ing] the adverse effects of [a] major federal action[],” and NEPA does not require
such mitigation. See Robertson, 490 U.S. at 353. As such, Anderson’s proposed claims
would not survive a motion to dismiss because the requested additional relief is not
available under NEPA. See 45,149.58 Acres of Land, 455 F. Supp. at 203.
In addition, defendant argues that allowing the amendment would be unduly
prejudicial because adding Anderson as a plaintiff would effectively add a separate legal
claim at a late stage in this litigation [Doc. 407 p. 5]. Furthermore, defendant provides that
“Anderson is free to bring his own lawsuit against [defendant]” [Id. at 6]. In response,
plaintiffs contend that “another Court should [not] be forced to come to grips with the facts
8
that this Court and the Court of Appeals are already familiar with” [Doc. 413-1 p. 5]. The
Court notes, however, that should Anderson file a separate suit in the Eastern District of
Tennessee, that suit would be deemed related to the instant action and the Court would be
assigned to the case. As such, another court needing to familiarize itself with the facts at
issue is not a valid concern.
Plaintiffs also assert that they are not asking the Court to further delay the resolution
of the “current litigation” [Id. at 5]. Rather, they argue that “the rest of the current litigation
should not await the resolution of Mr. Anderson’s individual claims” [Id.]. Based on these
arguments, it appears that plaintiffs recognize that Anderson’s proposed claims are
somewhat distinct from those already before the Court. Consequently, the Court finds that
it would be more appropriate for Anderson to bring his claims in a separate suit. This
action has been pending before the Court since 2012, and adding Anderson as a plaintiff in
this matter would only prolong this litigation and would cause undue prejudice to
defendant. Furthermore, both parties agree that the claims before the Court can be resolved
upon the Court’s determination of the current pending motions. Thus, adding Anderson as
a plaintiff would preclude the Court from resolving the action at this juncture. In addition,
the Court finds that Anderson would not be prejudiced by the Court’s holding as Anderson
may pursue his claims in a separate action. Consequently, the Court will deny plaintiffs’
motion to amend [Doc. 401].
9
III.
Injunctive Relief
Defendant moves the Court to enter judgment in this case in plaintiffs’ favor
pursuant to Federal Rule of Civil Procedure 58 [Doc. 378] based on its confession of
judgment [Doc. 377]. The Court will grant defendant’s Motion for Judgment in Plaintiffs’
Favor [Doc. 378]. The Court will also grant defendant’s Motion for Entry of Order or
Hearing [Doc. 405] to the extent that the Court will enter judgment in plaintiffs’ favor and
issue an injunction order.
Consequently, pursuant to defendant’s confession of judgment, the Court finds that
defendant’s implementation of the 15-foot rule violated NEPA, as well as its implementing
regulations, because it was a major federal action significantly affecting the quality of the
human environment and was not properly studied under NEPA prior to its implementation.
As to the appropriate injunctive relief, the Court notes that the parties have provided several
versions of proposed injunctions and, ultimately, defendant largely agrees to the terms of
the injunction in plaintiffs’ second proposed order [Doc. 404-2] with a few objections.
Therefore, the Court will include in the injunction the terms the parties agree on.
The remaining issues before the Court regarding the terms of the injunction are: (1)
what standard to include for defendant’s vegetation management practices; (2) whether to
include a spending-reporting requirement; and (3) when the injunction should dissolve.
The Court will address each of these issues in turn.
10
A.
Standard for Defendant’s Vegetation Management Practices
The parties have proposed several potential standards to restrict defendant’s
vegetation management practices during the injunctive period. In plaintiffs’ second
proposed injunction order, plaintiffs requested the following language:
TVA will leave the existing trees in the wire zone so long as they do not pose
an immediate hazard to the transmission lines.
TVA may remove or trim any tress in the wire zone of the right-of-way, in
accordance with its contract rights, that it deems to present an immediate
hazard to its transmission lines.
....
IT IS FURTHER ORDERED that where TVA has previously allowed a
given landowner to trim his or her own trees, TVA shall continue to do so
except that TVA will have the right to immediately remove or trim any tree
that it seems to present an immediate hazard to its transmission lines [Doc.
404-2 p. 3 (emphasis added)].
In response to this proposal, defendant contends that the standard “immediate
hazard” does not comply with Federal Rule of Civil Procedure 65(d), as defendant argues
that the standard is not sufficiently detailed. Consequently, defendant suggests either:
(1)
replacing “immediate hazard” with “any tree that, at the time of
removal, is within 20 feet of any conductor with the distance being
determined at maximum design sag or that could when falling strike
a structure or come within 5 feet of any conductor lower than 200-kV,
or within 10 feet of any conductor 200-kV or higher, with the distance
being determined at maximum design sag”; or
(2)
defining “immediate hazard” to mean a tree that meets that criteria
[Doc. 405 p. 2].
While maintaining that the “immediate hazard” standard is appropriate, plaintiffs
propose a third standard in response to defendant’s proposal. They submit that the Court
11
should take into account the North American Electric Reliability Corporation’s (“NERC”)
reliability standard known as FAC-003-3 [See Doc. 411-1].
This standard requires
defendant, and other companies transmitting high-voltage electricity, to maintain minimum
vegetation clearance distances on their high-voltage lines.
The required clearance
distances vary with elevation and voltage. Plaintiffs point out that at the typical elevation
for Knoxville, the minimum clearance for 500kV is 5.25 feet and for 161kV, it is 2.09 feet.
In determining which standard to apply, the Court will first discuss the specificity
requirements applicable to injunction orders. The Court will then discuss the following
standards in turn: (1) defendant’s proposed standard; (2) plaintiffs’ proposed NERC
standard; and (3) plaintiffs’ proposed “immediate hazard” standard.
1.
Specificity Requirements for Injunctions
Federal Rule of Civil Procedure 65(d) requires that an injunction “state its terms
specifically” and “describe in reasonable detail . . . the act or acts restrained or required.”
Fed. R. Civ. P. 65(d)(1)(B)–(C). Such specificity is required to “prevent uncertainty and
confusion on the part of those faced with injunctive orders .” Schmidt v. Lessard, 414 U.S.
473, 476 (1974). In explaining the fundamental policies underlying Rule 65(d), the
Supreme Court has provided that “judicial contempt power is a potent weapon,” and
“[w]hen it is founded upon a decree too vague to be understood, it can be a deadly one.”
Int’l Longshoremen’s Ass’n, Local 1921 v. Phila. Marine Trade Ass’n, 389 U.S. 64, 76
(1967).
12
While courts must state injunction terms specifically, it is not necessary for courts
to “identify every conceivable act that would be covered by an injunction.” Delphi Auto.
PLC v. Absmeier, No. 15-CV-13966, 2016 WL 1156741, at *5 (E.D. Mich. Mar. 24, 2016).
Rather, “the fair notice requirement of Rule 65(d) must be applied ‘in the light of the
circumstances surrounding (the injunction’s) entry: the relief sought by the moving party,
the evidence produced at the hearing on the injunction, and the mischief that the injunction
seeks to prevent.” Common Cause v. Nuclear Regulatory Comm’n, 674 F.2d 921, 927
(D.C. Cir. 1982) (quoting United States v. Christie Indus., Inc., 465 F.2d 1000, 1007 (3d
Cir. 1972)). Courts are “entitled to expect that [an] injunction would be interpreted with a
modicum of common sense.” United States v. ITS Fin., LLC, 592 F. App’x 387, 398 (6th
Cir. 2014). Furthermore, “[t]he language of the injunction need only be as specific as
possible in light of the commercial environment in which it arises, such that a reasonable
person could understand what conduct is proscribed.” Delphi Auto. PLC, 2016 WL
1156741, at *5 (citing Medtronic, Inc. v. Benda, 689 F.2d 645, 649 (7th Cir. 1982)).
2.
Defendant’s Proposed Standard
In opposition to plaintiffs’ proposed “immediate hazard” standard, defendant
proposes a new standard, which would permit it to remove any tree that is within 20 feet
of a conductor. Defendant asserts that the purpose of this standard is to identify with
reasonable specificity those trees that may be removed during the injunctive period.
Defendant provides that it created this standard after considering which trees pose a hazard
to safety and reliability in light of defendant’s multi-year vegetation management schedule.
13
Defendant contends that this standard, coupled with its projected budget, sufficiently
circumscribes the number of trees it will cut during the injunctive period.
While defendant’s proposed definition provides specific standards, the fair notice
condition of Rule 56(d) requires consideration of the injunctive relief plaintiffs seek. See
Common Cause, 674 F.2d at 927. Plaintiffs seek to enjoin defendant from engaging in
vegetation management practices that are contrary to its practices prior to the
implementation of the 15-foot rule. Plaintiffs assert that defendant’s proposed standard is
inadequate because it is not in line with defendant’s prior practices. Indeed, defendant has
not represented to the Court that this new proposed standard encompasses its prior
practices. Rather, this appears to be an entirely new standard that defendant seeks to
implement. Although defendant’s proposed approach would result in defendant removing
fewer trees than under the 15-foot rule, the proposal is still a new policy and plaintiffs seek
to enjoin defendant from engaging in activity that is not in line with its practices prior to
the implementation of the 15-foot rule.
The Court notes that in determining the proper level of specificity for an injunction,
it also considers “the mischief that the injunction seeks to prevent.” See id. Defendant has
confessed that its implementation of the 15-foot rule violated NEPA because defendant
failed to publish an EIS prior to the rule’s implementation. Plaintiffs have indicated that
they believe that this proposed practice is, like the 15-foot rule, a new federal action with
significant environmental impact that would require an EIS before implementation.
Although the Court has not determined that this is the case, it would be inappropriate for
14
the Court to allow defendant to implement this new policy absent a valid determination
that no EIS is necessary or that defendant has published an adequate EIS. Including
defendant’s proposed standard in the injunction would thus risk sanctioning the exact type
of “mischief” the injunction should seek to prevent. See id.
In light of these considerations, the Court agrees with plaintiffs that defendant’s
proposed vegetation management standard is not appropriate.
3.
Plaintiffs’ Proposed NERC Standard
The Court now turns to plaintiffs’ proposed NERC standard. If the Court is inclined
to consider a foot-measured basis for determining “immediate hazard,” plaintiffs propose
that it should consider NERC’s reliability standard known as FAC-003-3 [See Doc. 4111]. In response to this request, defendant notes that the NERC standards plaintiffs rely on
are out of date and the minimum clearance standards have since increased [See Doc. 4151]. Defendant also asserts that crafting an appropriate standard for the injunction requires
consideration of factors other than the minimum vegetation clearance distances, such as
the length of defendant’s maintenance cycles, growth rates of certain trees, and safe
working distances [Doc. 394 p. 2].
The Court agrees with defendant that the NERC minimum vegetation clearance
distances do not provide a workable standard, as they do not take into account several
factors defendant must consider in its vegetation management. As defendant notes, the
NERC minimum standards plaintiffs rely on expressly recognize that “prudent vegetation
management practices dictate substantially greater distances” than NERC requires [Doc.
15
411-1 p. 26 n.16 (“The distances in this Table are the minimums required to prevent Flashover; however prudent vegetation maintenance practices dictate that substantially greater
distances will be achieved at time of vegetation maintenance.”)]. In light of this, the Court
finds that plaintiffs’ proposed NERC standard inappropriate.
4.
Plaintiffs’ Proposed “Immediate Hazard” Standard
The final proposed standard is plaintiffs’ “immediate hazard” standard. Plaintiffs
submit that this proposed standard is in line with defendant’s prior practices because it
gives defendant “complete discretion” to “ trim or remove any trees in the right-of-way,
whether wire zone or buffer zone, or danger trees outside the right-of-way if [defendant]
deems any such tree to present an immediate hazard to the transmission lines” [Doc. 4041 p. 13].
Defendant argues, however, that “immediate hazard” does not provide a
sufficiently defined standard that would allow the Court and the parties to ascertain the
exact conduct proscribed by the injunction.
The Court recognizes that there is some ambiguity in the phrase “immediate
hazard,” but the Court also notes that defendant has extensive experience with vegetation
management and should know what conduct is proscribed by this standard. See Delphi
Auto. PLC, 2016 WL 1156741, at *5 (considering that an injunction’s language “need only
be as specific as possible in light of the . . . environment in which it arises”). Before
defendant implemented the 15-foot rule, it had the same discretion in vegetation
management that plaintiffs’ proposed standard now provides.
As this standard
encompasses defendant’s prior practices, a “reasonable person” in vegetation management
16
“could understand what conduct is proscribed.” See id.; see also Mayfield Eng’g, Inc. v.
Ohio Tpk. Comm’n, No. 97-4474, 1999 WL 196562, at *3 (6th Cir. Mar. 31, 1999) (finding
that Rule 65(d) did not require the court to specifically identify trade secrets in an
injunction where the parties understood the meaning).
Furthermore, as previously discussed, creating a new, more specific standard may
result in implementing a practice in violation of NEPA. Plaintiffs and defendant both
appear to recognize the value in determining the proper standard for this injunction
expeditiously [See Doc. 394 p. 10; Doc. 401-1 pp. 12, 14]. Furthermore, the parties assert
that the Court should establish a standard on the present record rather than requiring the
parties to expressly define defendant’s prior practices through further discovery [See Doc.
394 p. 10; Doc. 401-1 pp. 12, 14]. The Court also notes that at the June 26, 2017, hearing
in this matter, the Court provided the parties with another opportunity to come to an
agreement on an appropriate vegetation management practice. The parties informed the
Court via a Joint Status Report that they could not reach an agreement on the matter [Doc.
422].
As the Court has already recognized, there is some ambiguity in the term
“immediate hazard.” However, given that the parties agree discovery is not warranted, and
after considering that imposing a new standard could run afoul of NEPA, the Court finds
it fitting to adopt plaintiffs’ proposed “immediate hazard” standard. This standard is
appropriate after considering Rule 65(d) in the light of the circumstances surrounding the
injunctions entry, including the relief plaintiffs seek, the record before the Court, and “the
17
mischief that the injunction seeks to prevent.” See Common Cause, 674 F.2d at 927; see
also ITS Fin., LLC, 592 F. App’x at 398 (providing that courts are “entitled to expect that
[an] injunction would be interpreted with a modicum of common sense”).
Should the parties have concerns in the future as to the meaning of “immediate
hazard,” the Court notes that it will include a provision in the injunction retaining
jurisdiction “to clarify the injunction should the need arise.” ITS Fin., LLC, 592 F. App’x
at 398 (finding that although an injunction had “some ambiguity,” the district court’s
decision to retain jurisdiction lessened the impact of the lack of specificity). In addition, if
a party seeks to modify any provision of the injunction, the Court will require that the
parties first meet and confer, in order to attempt to reach agreement before applying to the
Court.
In sum, the Court will include plaintiffs’ proposed “immediate hazard” standard in
the injunction. The Court now turns to the question of whether to include a spendingreporting requirement in the injunction.
B.
Spending-Reporting Requirement
Defendant’s final proposed order provides: “The Court accepts TVA’s
representation that it has budgeted $15 million for its yearly vegetation management, and
$14 million for vegetation management during Fiscal Year 2018 through 2020.”
Defendant, however, objects to the inclusion of the following spending-reporting
requirement in plaintiffs’ second proposed order:
TVA shall report its monthly and cumulative annual spending levels to the
Plaintiffs when those figures are reasonably available through its accounting
18
department. The Plaintiffs are granted leave of court to advise the Court if it
believes that TVA’s expenditures are exceeding these levels, and the Court
will take appropriate action if it deems advisable [Doc. 404-2 p. 3].
Defendant argues that requiring it to allot its revenue in a particular manner violates
separation-of-powers principles. It asserts that this Court has no authority to order
defendant to reduce its budget and that defendant’s board has the exclusive statutory
authority to oversee implementation of the budget. Defendant also points out that NEPA
is a procedural statute that does not have substantive requirements.
Plaintiffs provide that they proposed this language in order to keep defendant honest
in what it tells the Court and what it actually does. They assert that defendant’s argument
regarding separation of powers is premature as, under the proposed language, this Court
may or may not take action should defendant exceed its represented spending levels and,
if the Court decides to take such action, that action may or may not be an order to reduce
spending levels.
While not dispositive on the issue of whether defendant is complying with the
injunction, the Court finds that spending levels are one indicator of whether they are in
compliance. Although defendant points out that NEPA is a procedural statute that does not
have substantive requirements, the injunction at issue does have substantive requirements,
namely, that defendant must revert to its prior practices. Whether defendant is adhering to
its represented budget would help to illustrate whether defendant has reverted to prior
practices, and thus, whether defendant is adhering to the substantive requirements of the
injunction.
19
Furthermore, the Court agrees with plaintiffs that defendant’s separation-of-powers
concern is premature. Including a provision in the injunction requiring defendant to report
spending levels does not, as defendant argues, “presuppose judicial authority” to “order an
agency to reduce its budget in conjunction with the enjoinment of a particular action” [Doc.
415 p. 6]. As the Court indicated at the hearing on this matter, the Court does not intend
to restrict defendant in this manner. The Court notes that the injunction will not include a
requirement that defendant stay within its represented budget for vegetation management.
Rather, as the Court has already noted, spending levels are an indication as to whether
defendant is violating the terms of the injunction.
Particularly in light of defendant’s previous representations that it had abandoned
the 15-foot rule, when there was evidence that the rule was still having an on-the-ground
effect, the Court finds that including a spending-reporting requirement in the injunction is
warranted. Rather than requiring defendant to report their spending levels on a monthly
basis, however, the Court finds that reporting on a quarterly and annual basis is more
appropriate. In addition, rather than granting plaintiffs leave to advise the Court if
defendant is exceeding its represented budget, the Court finds that plaintiffs may use these
spending reports as evidence of defendant’s compliance with the injunction, and plaintiffs
may file an appropriate motion if they believe defendant is not in compliance.
C.
When the Injunction Should Dissolve
The final issue the parties disagree on is when the injunction should dissolve.
Defendant submits that the injunction should dissolve once it notifies the Court that its final
20
EIS has been published. Plaintiffs, however, assert that that this proposal does not provide
them with meaningful relief because “there is no mechanism for the Court to determine
whether the anticipated EIS will be sufficient, that is, whether it adequately addresses the
environmental effects of the proposed action” [Doc. 392 p. 19]. As such, plaintiffs include
the following language in their second proposed order:
IT IS FURTHER ORDERED that TVA is ENJOINED from further
implementing the 15-foot rule until this Court determines that it has prepared
and published an [EIS] that takes the requisite “hard look” at the
environmental consequences of the proposed action, as required by NEPA.
IT IS FURTHER ORDERED that the injunctions contained in this order will
remain in effect until the Court determines that TVA has prepared and
published an [EIS] that takes the requisite “hard look” at the environmental
consequences of the proposed action, as required by NEPA, and has entered
an order dissolving the injunctions [Doc. 404-2 pp. 1–2].
Defendant argues that plaintiffs’ proposed language providing for this Court’s
maintenance of jurisdiction to review the sufficiency of the EIS would be improper.
According to defendant, the harm plaintiffs seek to remedy in the current litigation is based
on defendant’s implementation of the 15-foot rule without performing an appropriate
environmental review and the fact that this policy continues to have an impact. Defendant
further asserts that any harm plaintiffs may allege they will suffer based on the proposed
vegetation management alternative policy that defendant will eventually choose to
implement is not tethered to the harm sought to be remedied by the injunction at issue here.
Defendant points out that while it plans to include and study an alternative that has effects
comparable to the 15-foot rule, this is not necessarily the alternative defendant will choose.
Defendant contends that once it has notified the Court that the EIS is complete and a record
21
of decision has been issued, the injunction in this lawsuit should dissolve and any
challenges plaintiffs have to the sufficiency of the EIS must be made in a separate lawsuit.
In response, plaintiffs argue that accepting defendant’s proposal would result in
unnecessary procedural hurdles, in that plaintiffs would have to file a separate lawsuit
challenging the policy and there would be “yet another unnecessary court emergency, with
another request for temporary injunction” [Doc. 410 p. 2]. While litigating this new case,
plaintiffs assert that defendant would be “chopping away at the buffer zones and other trees
in the right-of-way” [Id.]. Plaintiffs contend that given defendant’s substantial history of
disregarding its environmental obligations, it would be an “exceptionally bad idea” to
require plaintiffs to file yet another request for an injunction [Id.]. Plaintiffs argue that in
the interests of judicial economy, the Court should retain jurisdiction until it has determined
whether defendant has taken the requisite “hard look” at the environmental consequences
of its actions.
The Court notes that several courts have issued injunctions that require parties to
institute separate proceedings to challenge the adequacy of environmental documents filed
in response to the injunction. See, e.g, Hunt v. N.C. Dep’t of Transp., 299 F. Supp. 2d 529,
532 (E.D.N.C. 2004) (noting in a NEPA case that the court “entered an order dissolving
the injunction, with the understanding that plaintiffs would be allowed to file a new suit
and challenge the ‘adequacy’ of the [new] EIS”); see also Minn. Pub. Interest Research
Grp. v. Butz, 498 F.2d 1314, 1325 n.32 (8th Cir. 1974) (concluding that injunction would
“terminate upon the filing of the final EIS” and that a “challenge to the adequacy of the
22
final EIS will require institution of a separate proceeding”); Morgan v. U.S. Postal Serv.,
405 F. Supp. 413, 425 n.16 (W.D. Mo. 1975) (“The temporary injunction issued in this
case will terminate when a final EIS is filed by the [Postal] Service. Challenges to the
adequacy of the EIS must be made in a separate suit.”).
Other courts, however, have expressed intention when issuing an injunction to retain
jurisdiction to review whether the defendants have complied with necessary procedural
requirements. See, e.g., Sierra Club v. Penfold, 857 F.2d 1307, 1322 (9th Cir. 1988)
(holding that “the district court did not abuse its discretion in retaining jurisdiction to
review the adequacy of the EIS”); Sierra Club v. Callaway, 499 F.2d 982, 994 (5th Cir.
1974) (ordering that the injunction “will continue in force pending the determination of the
sufficiency of the respective [environmental] statements”); Mont. Wilderness Ass’n, 408 F.
Supp. 2d at 1038–39 (providing that the defendants shall submit “a request for dissolution
of the injunction” after “completion of the procedural steps necessary to comply with
NEPA” and the “[p]laintiffs will have an opportunity to state their position with respect to
dissolution of the injunction”); Nat’l Audubon Soc’y v. Butler, 160 F. Supp. 2d 1180, 1191
(W.D. Wash. 2001) (ordering that the court will “retain jurisdiction to dissolve the
injunction upon a showing the defendants have prepared an adequate EIS”); Pub. Serv. Co.
of Colo. v. Andrus, 825 F. Supp. 1483, 1510–11 (D. Idaho 1993) (noting that “court shall
exercise its discretion and retain jurisdiction over this case for the purpose of hearing and
resolving any dispute between Idaho and DOE regarding the adequacy of the final EIS”).
23
As there is precedent supporting both positions regarding whether the Court should
retain jurisdiction, the Court turns to the parties’ additional arguments in support of their
respective positions. Defendant contends that this Court should not retain jurisdiction to
review the EIS because “[w]hether plaintiffs will suffer irreparable harm by
implementation of the vegetation management practice [defendant] will ultimately choose
as its preferred alternative following public comment and study is unestablished” [Doc.
394 p. 11]. Defendant argues, therefore, that any harm plaintiffs may suffer is “contingent
harm not tied to the harm [p]laintiffs allege they suffered from the date they filed their
[c]omplaint through today” [Doc. 394 p. 11].
Plaintiffs, however, contend that they have suffered harm from the management of
vegetation on defendant’s transmission system even after defendant purported to suspend
the 15-foot rule. Should defendant choose an alternative action, that action may still be
tied to the harm the Court seeks to remedy with this injunction. The Court is cognizant
that plaintiffs would have to engage in procedural hurdles to challenge the new vegetation
policy. The Court recognizes plaintiffs’ argument that this could result in a circumstance
in which defendant would be “chopping away at the buffer zones and other trees in the
right-of-way,” while plaintiffs file another lawsuit and this Court makes a determination
on that action [Doc. 410 p. 2]. As such, the Court finds that plaintiffs’ concerns have merit
and the Court will retain jurisdiction over the injunction beyond defendant’s representation
that it has issued an EIS.
24
The Court recognizes, however, that defendant may implement a rule very different
from the 15-foot rule. Should that situation occur, it may constitute a “significant change
in factual circumstances” that could warrant dissolving the injunction. See Sierra Club v.
U.S. Dept. of Agric., No. 94-CV-4061, 2013 WL 811672, at *17–20 (N.D. Ill. Mar. 5, 2013)
(finding that “a significant change in factual circumstances” warranted dissolving the
injunction when the defendant “embarked on an entirely new forest planning process that
was based on an entirely new environmental analysis and resulted in the selection of a
different forest planning alternative”).
Once defendant issues a final decision it believes complies with NEPA, the Court
will require defendant to file a request for dissolution of the injunction. At that point,
plaintiffs will have the opportunity to state their position regarding whether the injunction
should be dissolved. See Mont. Wilderness Ass’n, 408 F. Supp. 2d at 1038–39 (providing
that the defendants shall submit “a request for dissolution of the injunction” and the
“[p]laintiffs will have an opportunity to state their position with respect to dissolution of
the injunction”).
The Court would then determine whether there is a change in
circumstances that justifies dissolving the injunction without reviewing the EIS.
In adopting this approach, the Court finds that crafting an injunction allowing it to
retain jurisdiction over reviewing the EIS would not cause any unwarranted harm to
defendant.
Rather, it would help to ensure defendant’s compliance with NEPA.
Presumably, should the Court decide not to retain jurisdiction, and plaintiffs do not believe
25
the EIS is adequate, plaintiffs would file another lawsuit challenging the new policy and
this Court would engage in the same analysis at it would have in retaining jurisdiction.
The Court finds that this approach appropriately balances the parties’ concerns
regarding the Court’s retention of jurisdiction.
IV.
Motion for Sanctions, Motion for Discovery, and Motions to File FOIA
Responses
Plaintiffs move the Court to issue sanctions against defendant because defendant
allegedly: (1) falsely represented that it was suspending the 15-foot rule and reverting to
its prior practices; and/or (2) disregarded those representations and continued with its new
practices. Plaintiffs assert that the following sanctions are appropriate: (1) an award of a
separate attorney’s fee; and (2) an order precluding defendant’s personnel involved in the
alleged wrongdoing from participating in the environmental review of vegetation
management policies. Plaintiffs also seek discovery2 and seek leave to file a FOIA
response in connection with their request for sanctions.
As to plaintiffs’ request for an additional attorney’s fee, the Equal Access to Justice
Act (“EAJA”) already provides an avenue for plaintiff to seek this fee. Specifically, 29
U.S.C. § 2412(b) permits a fee award to a prevailing party and states that “[t]he United
States shall be liable for such fees and expenses to the same extent that any other party
would be liable under the common law or under the terms of any statute which specifically
2
The Court notes that plaintiffs initially also sought discovery to determine defendant’s
prior practices and in connection with its motion to amend. Plaintiffs, however, contend that
discovery is not needed to determine prior practices and the Court will deny plaintiffs’ motion to
amend. As such, the requested discovery is only in connection to plaintiffs’ sanctions motion.
26
provides for such an award.” 29 U.S.C. § 2412(b). This “common-law exception” allows
a litigant to seek attorney’s fees at a market hourly rate if a court determines that the
government “has acted in bad faith, vexatiously, wantonly or for oppressive reasons.”
Prince v. Colvin, 94 F. Supp. 3d 787, 796 (N.D. Tex. 2015) (internal quotation marks
omitted). The Court notes that this is the same bad-faith determination required for the
imposition of sanctions. Because an existing statute will provide plaintiffs with the same
fees plaintiffs’ seek as sanctions, the Court finds it appropriate for plaintiff to seek such
fees in connection with its request for fees under the EAJA.
Plaintiffs also propose precluding defendant’s personnel involved in the alleged
wrongdoing from participating in the environmental review of vegetation management
policies. In considering this sanction, the Court is cognizant that “impos[ing] sanctions on
executive conduct that is otherwise permitted by the Constitution, a federal statute or a rule
will most likely be invading the executive sphere rather than protecting itself from
invasion.” United States v. Gatto, 763 F.2d 1040, 1046 (9th Cir. 1985). The Court also
notes that after defendant has rendered a final agency decision, plaintiffs may challenge
the action if they believe it does not comply with NEPA. Consequently, the Court does
not find it appropriate in this circumstance to restrict defendant’s discretion to choose who
participates in its policymaking.
As plaintiffs may seek fees pursuant to the EAJA, and because the Court will not
impose limitations on which of defendant’s employees participate in the environmental
review, the Court will deny plaintiffs’ Motion for Sanctions [Doc. 397] at the juncture.
27
Because plaintiffs’ Motion for Discovery [Doc. 399], Motion for Approval to File FOIA
Response re Woodward Instructions or Lack of Instructions [Doc. 408], and Motion for
Approval to File FOIA Response Re TVA’s Instructions to Suspend the 15-Foot Rule
and/or Revert to Previous Practices [Doc. 424] all relate to plaintiffs’ request for sanctions,
the Court will also deny those motions at this time. Plaintiffs may refile such motions in
the context of its request for attorney’s fees under the EAJA.
V.
Conclusion
For the reasons discussed herein, the Court will:
a. GRANT in part and DENY in part defendant’s Motion for Judgment in
Plaintiffs’ Favor [Doc. 378], to the extent that the Court will enter judgment
in plaintiffs favor and will issue an injunction, but will not accept all of
defendant’s terms in the injunction;
b. DENY plaintiffs’ Motion for Sanctions and an Evidentiary Hearing [Doc.
397];
c. DENY plaintiffs’ Motion for Discovery [Doc. 399];
d. DENY plaintiffs’ Motion for Leave to File Fourth Amended Complaint and
to Join Additional Plaintiff [Doc. 401];
e. GRANT in part and DENY in part defendant’s Motion for Entry of Order
or Hearing [Doc. 405], to the extent that the Court held a hearing in this
matter and will issue an injunction order, but will not accept all of
defendant’s terms in the injunction;
f. DENY plaintiffs’ Motion for Approval to File FOIA Response re Woodward
Instructions or Lack of Instructions [Doc. 408];
g. DENY plaintiffs’ Motion for Approval to File FOIA Response re TVA’s
Instructions to Suspend the 15-Foot Rule and/or Revert to Previous Practices
[Doc. 424].
28
Pursuant to these rulings and based on defendant’s Confession of Judgment [Doc.
377], the Court will ADJUDGE that defendant’s implementation of the 15-foot rule
violated NEPA and its implementing regulations because it was a major federal action
significantly affecting the quality of the human environment and was not properly studied
under NEPA prior to its implementation. The Court will enter a separate Injunction Order,
and the Clerk of Court will be DIRECTED to CLOSE this case.
ORDER ACCORDINGLY.
s/ Thomas A. Varlan
CHIEF UNITED STATES DISTRICT JUDGE
29