Peoples Bank of the South v. Fiserv Solutions, Inc. (TV3)
Filing
91
MEMORANDUM signed by District Judge Aleta A. Trauger on 12/16/2016. (DOCKET TEXT SUMMARY ONLY-ATTORNEYS MUST OPEN THE PDF AND READ THE ORDER.)(hb)
UNITED STATES DISTRICT COURT
MIDDLE DISTRICT OF TENNESSEE
NASHVILLE DIVISION
PEOPLES BANK OF THE SOUTH,
)
)
)
)
)
)
)
)
)
Plaintiff,
v.
FISERV SOLUTIONS, INC.,
Defendant.
Case No. 3:14-1104
Judge Aleta A. Trauger
MEMORANDUM
The court conducted a two-day bench trial in this breach of contract action on December
6-7, 2016. In accordance with Rule 52 of the Federal Rules of Civil Procedure, the court sets
forth herein its findings of fact and conclusions of law. For the reasons discussed more fully
below, the court will enter judgment in favor of the plaintiff, Peoples Bank of the South, in the
amount of $148,700, plus attorney’s fees and costs.
CLAIMS
The Complaint contains the following five counts: Count I alleges that the defendant
breached the de-conversion fee schedule in a data processing agreement entered into between the
plaintiff bank and a predecessor-in-interest to the defendant (the “Core Services Agreement”);
Count II alleges the defendant’s breach of a separate, independent contract between the plaintiff
and the defendant for electronic fund transfer services (the “EFT Agreement”); Count III alleges
the defendant’s breach of an oral agreement between the plaintiff and the defendant to modify
yet another contract between the plaintiff and a predecessor-in-interest to the defendant for
software licensing (the “Licensing Agreement”); Count IV alleges that the defendant collected
improper charges from the plaintiff related to an anticipated contract that was never signed by
1
the plaintiff (the nature of which was not clarified in the Complaint but that was referred to at
trial as the “Accell Network Charges”);1 and Count V alleges the defendant’s breach of the
covenant of good faith and fair dealing. (Docket No. 1-1.)
Count II was dismissed by the court following the pre-trial conference on December 2,
2016, due to a binding arbitration clause in the EFT Agreement. (Docket No. 88.)
During opening statements at trial, counsel for the plaintiff withdrew Count III and stated
that Count V had been dismissed by the court on Summary Judgment and was no longer at
issue.2
Thus, the only claims that were tried before the court are Count I for breach of the Core
Services Agreement and Count IV for the Accell Network Charges.
FINDINGS OF FACT3
I.
The Core Services Agreement
David Reynolds, President and CEO of the plaintiff bank, testified that the plaintiff
contracted with Financial Data Technology Corporation (“Fi-Data”) to provide the plaintiff’s
data processing, through a series of agreements beginning in 1994. On July 26, 2007, the
plaintiff entered into its final written contract with Fi-Data, according to which Fi-Data (as the
1
There appears to have been some confusion in the Complaint between Counts II and IV
(particularly with respect to damages sought) but, for simplicity sake, the court refers to the
claims at issue as outlined herein, in keeping with the way the plaintiff referenced the claims
during the pre-trial conference and at trial.
2
In fact, the court’s Memorandum on Summary Judgment did not dismiss Count V in its entirety
but simply held that the duty of good faith and fair dealing could not provide grounds for the
plaintiff to recover payments made to the defendants for charges that were legitimately incurred.
(Docket No. 44, pp. 6-7.) In any event, Count V of the Complaint did not identify any additional
damages to the plaintiff beyond those alleged for breach of the express terms of the contracts at
issue, and this claim appears to have been abandoned by the plaintiff at trial.
3
No official transcript of the bench trial has yet been prepared, and all references to the
testimony are from the court’s memory and notes.
2
Processor) would provide data processing services to the plaintiff (as the Customer) for a fiveyear term, beginning on October 1, 2007 (this is the Core Services Agreement). (Plaintiff’s Ex.
1.) The Core Services Agreement contemplates renewal by mutual agreement and states: “In the
event Customer wishes to discontinue this Agreement, Customer agrees to provide Processor
notice of non-renewal at least one hundred [sic] (180) days prior to the expiration of the term.”
(Id. at § 1.b.) The Core Services Agreement further provides as follows:
Upon termination of this Agreement, whether for reasons of expiration, nonrenewal, or termination under Section 1 of the Agreement, Customer may obtain
from Processor relevant data files and records for the purpose of de-conversion to
an alternative data processing system by a machine-readable media. Processor
hereby agrees to provide reasonable and customary levels of transition assistance
if Customer decides to convert to other automation alternatives. Except as
provided in Section 3d, the de-conversion activities constitute services that create
fees payable to Processor. Such fees are enumerated in Schedule A--Deconversion Fee Schedule.
(Id. at § 3.a-c.) The exception identified in Section 3-d of the Core Service Agreement provides,
simply, that the Customer is not required to pay any de-conversion fees if the agreement is
terminated as a result of the Processor’s breach and is not relevant to this action. (Id. at § 3.d.)
Finally, the Core Services Agreement states that “[a] party in breach of this Agreement agrees to
reimburse the other party for any expenses, including reasonable attorney’s fees, that such party
incurs in enforcing its remedies for breach of contract under this section.” (Id. at § 2.)
Schedule A, which is attached to the Core Services Agreement, provides as follows with
respect to de-conversion fees:
Demand Deposit
$500 plus $.20 per account
Savings
$500 plus $.20 per account
Certificates
$500 plus $.20 per account
IRA’s
$500 plus $.20 per account
3
Loans
$500 plus $.20 per account
Any additional applications, such as general ledger accounting, etc., will be
additional cost of $500. Incidental requests such as standard reports, etc., will be
billed at $50 per report.
(Id. at p. 11.) Nowhere in the Core Services Agreement – including Schedule A or any other
attachment – is there any indication that the de-conversion process must either begin or end
within any specified time period in order for Schedule A to apply, or that the customer must
provide the processor with the identity of its new provider within any specified period of time in
order for Schedule A to govern the de-conversion fees whenever the process begins. This fact
was conceded by Jean Ramsey, the President of Fi-Data at the time, who drafted the Core
Services Agreement and was the main Fi-Data point of contact for the plaintiff throughout the
course of their relationship.
Both Mr. Reynolds and Ms. Ramsey testified that, in 2011, Fi-Data filed for Chapter 11
bankruptcy relief and, beginning at that point in time, the parties had concerns about maintaining
their ongoing relationship. On February 29, 2012, following the bankruptcy court’s appointment
of an external trustee rather than allowing Fi-Data to proceed with Chapter 11 as a debtor-inpossession, the plaintiff gave written notice to Fi-Data of non-renewal of the Core Services
Agreement. (Plaintiff’s Ex. 4.) This was within 180 days of the expiration of the contract term
on October 1, 2012 and, therefore, the plaintiff provided the defendant with proper notice of nonrenewal under the terms of the Core Services Agreements. Mr. Reynolds and Ms. Ramsey both
testified that, upon receiving the notice of non-renewal, Ms. Ramsey asked for the plaintiff’s
patience while Fi-Data went through the bankruptcy process, as she did not want to lose the
plaintiff as a customer. Ms. Ramsey specifically testified that she responded to the notice by
4
fighting to retain the plaintiff’s business rather than wanting to begin the de-conversion process
right away.
On September 14, 2012, the United States Bankruptcy Court for the Middle District of
Tennessee approved (subject to certain modifications not relevant to this action) an Asset
Purchase Agreement entered between the defendant – Fiserv Solutions, Inc. – and Fi-Data, by
which the defendant purchased certain Fi-Data contracts, including the Core Services
Agreement, and became bound by their terms. (Plaintiff’s Ex. 2.) After this time, the defendant
continued to do business with the plaintiff under the terms of the Core Services Agreement, and
Ms. Ramsey, who became an employee of the defendant in connection with the sale and who
continued to service the plaintiff’s accounts, testified that she hoped the plaintiff would not go
forward with the non-renewal but would continue to do business with the defendant.
Specifically, Mr. Reynolds and Ms. Ramsey testified that negotiations between the plaintiff and
the defendant were ongoing from the time the defendant took over the Core Services Agreement
through its expiration on October 1, 2012 and beyond. Ms. Ramsey and Mr. Reynolds also both
testified that, between October 1, 2012 and December 31, 2012, the parties continued to do
business under the terms of the Core Services Agreement, while these negotiations were
ongoing. Ms. Ramsey testified that the defendant was bound by FDIC regulations to continue to
service the plaintiff until a new provider was identified and the de-conversion was complete, but
Ms. Ramsey’s testimony also strongly suggests that the defendant encouraged this ongoing
relationship, rather than asking for the new provider to be identified immediately, in the hope of
retaining the plaintiff’s business.
Ultimately, the negotiations fell apart and, on December 31, 2012, Mr. Reynolds sent a
letter to Ms. Ramsey, informing her that the plaintiff would be transferring its data processing
5
business to Jack Henry. (Defendant’s Ex. 21.) Mr. Reynolds testified that part of the reason the
negotiations between the parties were unsuccessful is that the plaintiff wanted any new contract
entered between the parties to contain the same de-conversion fees as offered in Schedule A
under the Core Services Agreement, in the event the relationship did not work out, but the
defendant refused. The court finds this testimony credible and also finds that it supports the
inference that, during this time, the parties understood that Schedule A would apply to deconversion of the plaintiff’s data, whenever that was to occur, so long as no new contract
between the parties was entered into. Otherwise, if there were a window within which Schedule
A would apply, the plaintiff would have been dis-incentivized to continue negotiations rather
than begin de-conversion immediately. Alternatively, if Schedule A were already inapplicable
after the expiration of the Core Services Agreement, the plaintiff would have had no reason not
to continue with the defendant rather than switching to a new provider .
The defendant’s de-conversion of the plaintiff’s data officially began after the plaintiff
provided notice of its final decision to switch to Jack Henry on December 31, 2012. According
to the testimony of all witnesses at trial, the de-conversion process is the process by which a
customer’s data is transferred to a new data processing provider and is no longer retained by the
old provider. Ms. Ramsey testified that, as of December 31, 2012, Schedule A no longer applied
to the plaintiff’s de-conversion because the Core Services Agreement was no longer in effect.
The court finds this interpretation inconsistent with the plain language of the contract as well as
the parties’ actions.
Mr. Reynolds testified that he believed that Schedule A would control the fees for the deconversion and that he estimated a cost of roughly $8,000 for the process. According to Mr.
Reynolds’ testimony, the plaintiff had no more than 20,000 customer accounts when combining
6
all five account types listed on Schedule A (demand deposit, savings, certificate, IRA, and loan
accounts). Multiplying these 20,000 accounts times $0.20 per account as indicated on Schedule
A totals $4,000. Mr. Reynolds further testified that the plaintiff bank had approximately 6 or 7
additional applications, which would be charged at a rate of $500 each under Schedule A (for a
total of no more than $3,500). The court’s understanding of Mr. Reynold’s $8,000 estimate is
that it reflects the total of $4,000 for the individual accounts plus $3,500 for the additional
applications plus $500 as a base account charge under Schedule A.
In fact, the court calculates that, with 20,000 individual customer accounts of all five
account types, plus 7 additional applications, the de-conversion fees under the plain language of
Schedule A would equal $10,000. The court reaches this calculation as follows: $0.20 times
20,000 individual accounts equals $4,000, $500 as a base account charge per account type times
five account types equals $2,500, 7 additional applications times $500 per additional application
equals $3,500, and these sums added together equal $10,000. When asked by the court whether
Mr. Reynolds may have inadvertently failed to include the base $500 account charge for each
account type as provided under Schedule A, the plaintiff’s counsel conceded to the court’s
$10,000 calculation as the appropriate cost of the plaintiff’s de-conversion under Schedule A.
Finally, Mr. Reynolds testified that the plaintiff ultimately paid the defendant $158,700
for de-conversion fees under protest. While the defendants placed documents into the record
showing that an amount just slightly greater than this was invoiced to the plaintiff for deconversion, the defendant did not present any evidence refuting that $158,700 was the final
amount paid by the plaintiff. Although the plaintiff’s evidence on the correct calculation of deconversion fees under Schedule A was limited to Mr. Reynold’s testimony, the court found Mr.
Reynold’s testimony to be credible, and the defendant entered no evidence to the contrary with
7
respect to the number of customer accounts, nor did it proffer its own calculation of the fees
using Schedule A.
Ms. Ramsey testified that, even if Schedule A were to apply to the de-conversion of the
plaintiff’s data, it would govern the de-conversion of the basic account types only, and not the
de-conversion of data from other data processing services provided by the defendant pursuant to
addenda to the Core Service Agreement entered between the plaintiff and Fi-Data. Ms. Ramsey
could not, however, explain what the language “additional applications” in Schedule A refers to,
aside from a general ledger, though she specifically testified that these additional services added
by addendum are not “additional applications” under Schedule A. Meanwhile, she admitted that
the addenda did not address de-conversion and that Schedule A remains the only place in the
written agreement between the parties where de-conversion fees are listed. Moreover, the court
finds Ms. Ramsey’s testimony that Schedule A should be read to apply to basic accounts only to
be unpersuasive because Ms. Ramsey herself testified that banks have not limited their services
to basic accounts since the 1970s or 1980s, but the Core Services Agreement was entered into in
2007 and the addenda were added later. If Ms. Ramsey is correct that Schedule A does not apply
to these other services, then the parties’ agreement completely fails to account for these clearly
contemplated services with respect to de-conversion. Finally, Ms. Ramsey testified that, if she
could go back and re-draft the Core Services Agreement, she would change the wording to
explain that services like those added by addenda are not included in the Schedule A pricing and
are not a part of the “additional applications.”
Cindy Woodard, a control analyst in charge of software development for the defendant
who handled the plaintiff’s de-conversion, similarly testified that the “additional applications”
language in Schedule A refers only to additional applications that would be stored under the
8
processor’s “main frame,” which the additional services added by addendum were not.
However, there is no such definition in the contract itself, nor was any evidence presented that
the parties discussed this or otherwise reached such an understanding. Moreover, when asked,
Ms. Woodard – like Ms. Ramsey – could not fully explain what an additional application would
be, if not these additional services added by addendum, nor could she give any examples of
additional applications aside from a general ledger, despite the wording of Schedule A clearly
indicating that there are others.
Kendra Latish, the Director of Project Management for the defendant, who carried out
dozens of de-conversions and provided the pricing the defendant charged for the plaintiff’s deconversion, testified that there are seven types of services that the defendant processes for a bank
customer aside from the core accounts enumerated in Schedule A, all of which would require deconversion: ACH (or automatic deposit for a customer’s paychecks), OBB (or online banking,
allowing a customer to view balances and make transactions), Source Capture (which allows a
customer to deposit a check online), EBPP (or electronic bill payment, which allows a customer
to pay bills online), Debit/Credit Card Services, Item Processing (which captures a check image),
and Risk (which refers to fraud detection and prevention services). These items are illustrated in
Defendant’s Ex. 39, a demonstrative. According to Ms. Latish, each of these items would have
generated additional de-conversion fees for the plaintiff. It appears from the testimony that these
services are, in fact, the type that the plaintiff received from the defendant pursuant to the
addenda to the Core Services Agreement and are the same services Mr. Reynolds was referring
to when he stated that the plaintiff had six or seven additional applications.
Indeed, the court’s reading of the contract would suggest that the words “additional
applications” expressly contemplate addenda to the agreement for services beyond the
9
processing of the basic accounts in Schedule A and that Mr. Reynold’s testimony that the
plaintiff had six or seven such additional applications is consistent with the seven additional
services, beyond the core accounts, enumerated in defendant’s Exhibit 39. Ultimately, the court
is unpersuaded by the testimony of Ms. Ramsey and Ms. Woodard that “additional applications”
does not refer to these additional services added by addendum, because this testimony is
inconsistent with the plain language of the Core Services Agreement as a whole and the other
evidence in the record. For these reasons, the court finds that Schedule A controlled all of the
core accounts and the additional services enumerated above and that de-conversion for all of
these items is $10,000, as calculated above.
The majority of the defense evidence was focused on explaining why the amounts
ultimately charged to the plaintiff for de-conversion were “reasonable,” in support of the
defendant’s position that Schedule A does not apply and, therefore, the only theory under which
the plaintiff could recover is one of quantum meruit. Specifically, Ms. Latish testified that the
process involves many people working outside of business hours on detailed tasks and that the
defendant’s pricing is not only reasonable but competitive in the market and a reflection of the
defendant’s dedication to providing a customer with as good of an experience as possible in the
hopes they may someday return their data processing business to the defendant. The defense,
however, presented no evidence to rebut the plaintiff’s position that these charges were not made
in accordance with Schedule A. To the contrary, Ms. Ramsey, Ms. Latish, and Ms. Woodard all
conceded that no calculation of de-conversion fees under Schedule A was ever conducted by the
defendant and that they did not know what de-conversion would cost under Schedule A.
While the court finds Ms. Latish’s testimony to be credible with respect to the deconversion fees charged by the defendant being reasonable, given industry standards and the
10
amount of work involved, the court also finds this evidence irrelevant in light of the Core
Services Agreement and Schedule A. Ms. Woodard testified that the de-conversion charges
were determined in part by the options selected by the plaintiff in the de-conversion agreement
with the defendant (such as opting to do a test run of the de-conversion before the final run). Ms.
Woodard specifically testified that she worked with plaintiff’s representative Chris Cooper and
went over charges, including optional charges, with him in detail and received his authorization
to carry out all parts of the de-conversion process. Indeed, Mr. Cooper signed off on a final deconversion agreement indicating all of the options selected by the plaintiff. Ms. Woodard
testified, however, that all options agreed to by Mr. Cooper were options she recommended as
necessary for a successful de-conversion. Ms. Woodard further testified that a successful deconversion is critical to a plaintiff’s ongoing business. Ms. Latish and Ms. Woodard also
testified that the optional services selected by Mr. Cooper for the plaintiff’s de-conversion are
not things they would recommend omitting from de-conversion, because that could lead to
inefficiencies and other problems for a bank, such as customers being unable to access their
accounts or needing to reset passwords.
Schedule A did not contemplate different fees for different de-conversion options, and
the plain language of the Core Services Agreement states that de-conversion includes whatever is
reasonable and customary. The court, thus, interprets the Core Services Agreement to render
Schedule A applicable for whatever services were necessary to implement a successful and
efficient de-conversion process. Ms. Woodard specifically testified that that is precisely what
the defendant did for the plaintiff, nothing more and nothing less.
At the point in time that Chris Cooper, acting for the plaintiff, agreed to the various deconversion options recommended by Ms. Woodard and the associated charges, Ms. Woodard
11
conceded that both parties were aware of the dispute as to whether Schedule A applied, the
defendant had refused to release the data and complete the de-conversion process without full
payment of their invoices, and the plaintiff ultimately paid the de-conversion fees under express
reservation of rights. This is consistent with Mr. Reynolds’s recounting that he tried to “play
chicken” with the defendant to see if they would release the data without payment, and they
would not. Ms. Woodard testified that, at some point in this process, Mr. Reynolds informed her
that he estimated the de-conversion should cost $40,000. Ms. Woodard did not, however,
provide the context for this calculation, and it appears to have been in the course of negotiations,
once the defendant had made clear its refusal to honor Schedule A (and perhaps a way to settle
the dispute between the parties short of litigation). The court, therefore, does not find this to be
credible evidence that the proper pricing under Schedule A is $40,000, nor to undermine the
$10,000 calculation outlined above.
For these reasons, the court finds that the de-conversion agreement the plaintiff entered
into with the defendant pursuant to the conversations between Ms. Woodard and Mr. Cooper
does not supersede the Core Services Agreement, render Schedule A inapplicable, or otherwise
justify any of the fees charged outside of Schedule A. The court finds, to the contrary, that the
plaintiff was going along with what needed to be done to have their data successfully deconverted, in light of the defendant’s refusal to honor Schedule A.
In sum, the court finds that: 1) the parties were subject to the terms of the Core Services
Agreement as a binding contract, pursuant to which Schedule A controlled the pricing for deconversion of basic account data as well as additional applications, upon the contract’s
termination, irrespective of when de-conversion began; 2) at the time of de-conversion, the
plaintiff had no more than 20,000 core accounts of all five account types listed in Schedule A
12
and was utilizing 7 additional applications as accounted for in Schedule A pursuant to addenda to
the Core Services Agreement (the items enumerated in Defendant’s Ex. 39); 3) accordingly,
under Schedule A, the total de-conversion should have cost no more than $10,000; 4) the
defendant charged the plaintiff a minimum of $158,700, without considering Schedule A at all or
making any attempt to calculate the de-conversion pursuant to Schedule A rates, but relying on a
wholly separate (if not unreasonable) pricing formula; 5) the defendant refused to complete the
plaintiff’s de-conversion process without payment, which would have seriously impeded the
plaintiff’s ability to continue doing business; and 6) as a result, the plaintiff paid the defendant
$158,700 under reservation.
II.
The Accell Network Charges
Mr. Reynolds testified that the Accell Network Exchange is owned by the defendant and
provides services related to credit and debit card transactions, though Mr. Reynolds does not
understand the nature of these services or how the plaintiff benefitted from them. He further
testified that he was not aware that the plaintiff was purchasing these services from the defendant
until the plaintiff received an invoice from the defendant for the early termination of an
agreement between the parties for the defendant to provide these services and for the deconversion fees associated with ending this service. Because Mr. Reynolds was not aware of the
services and because the defendant initially mistakenly represented that there had been a contract
between the parties for these services, Mr. Reynolds challenged the propriety of the Accell
Network Charges. Mr. Reynolds testified, however, that the de-conversion fees associated with
the Accell Network are wholly unrelated to de-conversion under the Core Services Agreement
and are not governed by Schedule A. Mr. Reynolds also conceded that the plaintiff did, in fact,
use the Accell Network beginning at least as early as 2003 and through the time of the events
13
giving rise to this dispute. This testimony was confirmed by Ms. Ramsey, who testified that the
Accell Network services had always been provided by the defendant and had never been offered
by Fi-Data, even at the time that Fi-Data was providing other services to the plaintiff pursuant to
the Core Services Agreement. According to Ms. Ramsey’s testimony, the Accell Network was
responsible for processing merchant purchases made on debit or credit cards issued by the
plaintiff, and the costs of this processing were charged primarily to merchants and passed back in
part to the plaintiff. Ms. Ramsey testified that the Accell Network services were of value to the
plaintiff and a necessary part of its business and that the de-conversion fees charged by the
defendant for this service were reasonable.
Though not explicitly elicited through testimony, the parties appear to agree that the
Accell Network charges were ultimately paid in full by the plaintiff. The plaintiff also testified
that the defendant’s counsel offered him a check refunding the early termination fee, a fact that
was confirmed by defense counsel at argument. In fact, counsel for the defendant conceded at
argument that there was never a signed agreement for these services and, thus, the early
termination fee was improper. Counsel for the defendant further stated on the record the
defendant’s willingness to refund this amount to the plaintiff. The court finds credible the
defense testimony that the plaintiff did in fact receive reasonable services associated with the
Accell Network and that the amounts charged for de-conversion related to these services were
also reasonable and not otherwise governed by any contractual agreement. The plaintiff offers
no evidence to the contrary, other than that Mr. Reynolds was not personally aware of the nature
of the services or the propriety of the charges.
CONCLUSIONS OF LAW
Under Tennessee law,
14
[t]he interpretation of a contract is a question of law . . . . Allstate Ins. Co. v.
Tarrant, 363 S.W. 3d 508, 526-27 (Tenn. 2012.) The cardinal rule of contract
interpretation is to ascertain and give effect to the intention of the parties.
Christenberry v. Tipton, 160 S.W.3d 487, 494 (Tenn. 2005). In interpreting a
contract, we first look to the ordinary meaning of the language in the contract and
determine whether the language is ambiguous. 84 Lumber Co. v. Smith, 356
S.W.3d 380, 383 (Tenn. 2011); Planters Gin Co. v. Fed. Compress & Warehouse
Co., 78 S.W.3d 885, 889-90 (Tenn. 2002). If the contract language is clear and
unambiguous, ‘the literal interpretation of the language controls the outcome of
the contract disputes,’ and we must enforce the contract as written. Planters Gin
Co., 78 S.W.3d at 890; see Union Reality Co., Ltd. v. Family Dollar Stores of
Tenn., Inc., 255 S.W.3d 586, 591 (Tenn. Ct. App. 2007) (citing Int’l Flight Ctr. v.
City of Murfreesboro, 45 S.W.3d 565, 570 (Tenn. Ct. App. 2000). If the language
at issue is ambiguous – that is, if the meaning is uncertain and susceptible to more
than one reasonable interpretation – the ambiguity is generally construed against
the drafter of the contract.” See Hanover Ins. Co. v. Haney, 221 Tenn. 148, 425
S.W.2d 590, 592 (1968); Realty Shop, Inc. v. RR Westminster Holding, Inc., 7
S.W.3d 581, 598 (Tenn. Ct. App. 1999).
White v. Empire Express, Inc., 395 S.W. 696, 714-15 (Tenn. Ct. App. 2012)
The Core Services Agreement is a straightforward contract between the parties setting
forth the pricing for de-conversion in Schedule A in the event that the contract is terminated or
not renewed for any reason, with no additional requirements in order for Schedule A to apply.
The contract sets forth the de-conversion pricing for both the core services and any “additional
applications.” The court finds that the contract itself is unambiguous and that Schedule A clearly
applies to the de-conversion of the plaintiff’s data. The defendant argues that Schedule A does
not apply because the plaintiff terminated the contract and neither identified its subsequent
provider nor allowed the de-conversion process to begin during the 180-day period following
notice of non-renewal or immediately upon the contract’s expiration. According to the
defendant, the plaintiff is attempting to “have its cake and eat it too” by ending its obligations
under the contract while still binding the defendant to the terms of Schedule A. This
interpretation is in clear contradiction to the plain language of the Core Services Agreement,
which states that Schedule A applies “upon termination,” irrespective of the reason for
15
termination and, therefore, necessarily contemplates the application of Schedule A after the other
contract terms no longer apply. Indeed, it is only when the contract ends that de-conversion
becomes necessary or possible, because de-conversion results in the transfer of the customer’s
data to a new provider and the inability of the former provider to continue to provide deconversion services. As for limiting the application of Schedule A to any particular time period,
that is simply not a term of the Core Services Agreement itself, nor is there any evidence that the
parties contemplated such an interpretation. Moreover, as discussed above, the application of
Schedule A to the defendant’s de-conversion of the plaintiff’s data, regardless of when this deconversion took place, is consistent with the parties’ actions in 2012.
To the extent that there is any ambiguity in the Core Services Agreement with respect to
the meaning of “additional applications,” the agreement was drafted by a predecessor-in-interest
to the defendant, which had an opportunity to use different wording if it did not intend for
“additional applications” to include the types of additional services that the plaintiff procured
pursuant to addenda. The defendant then knowingly acquired the Core Services Agreement,
having an opportunity to conduct its own due diligence into the wording of the agreement. The
court must now resolve any disputes about the meaning of the agreement in favor of the plaintiff.
Finally, with respect to Count I arising from the Core Services Agreement, the plaintiff
has presented unchallenged evidence that there were 20,000 accounts and 7 additional
applications. Accordingly, the court holds that the plaintiff is entitled to recovery in the amount
of $148,700 (the amount actually paid for de-conversion less the $10,000 that should have been
charged under Schedule A as calculated above).4 Because there is no evidence in the record as to
4
The court’s Memorandum on Summary Judgment limited the amount of de-conversion fees
recoverable by the plaintiff, due to concessions by the plaintiff in the record, without wholly
clarifying to which agreements (and which corresponding counts) these fees were related. After
16
when the plaintiff paid the defendant the $158,700 for de-conversion fees, no prejudgment
interest will be awarded.
The court is not wholly unsympathetic to the defendant’s well-supported position that
$158,700 better reflects the reasonable value of the difficult de-conversion process that the
defendant performed on the plaintiff’s behalf. This does not, however, materially affect the
question at issue here, which is what the parties agreed to in the executed Core Services
Agreement. Nor does the defendant’s position take into account the potential intangible benefits
Fi-Data received by entering into the Core Services Agreement as drafted and becoming a longterm provider of the plaintiff, or the benefits to the defendant of acquiring Fi-Data’s business,
regardless of being thus bound by an agreement that under-valued the de-conversion process.
With respect to the Accell Network Charges, counsel for the defendant conceded at
argument that there was no contract and that the defendant will return to the plaintiff the early
termination fee charged under the mistaken belief that a contract had been executed. There is,
therefore, no dispute as to this early termination fee for the court to resolve. Additionally,
because the court finds that the defendant provided services to the plaintiff through the Accell
Network and charged what it believed to be a reasonable amount for de-conversion (absent any
controlling contractual price), and because the plaintiff, which bears the burden of proof at trial,
has offered no evidence that it was charged for services not received, charged at a rate
a thorough review of the record, the court notes that, with the exception of $5,500 for deconversion under the Core Services Agreement, these concessions relate to Count II, which has
now been dismissed and, therefore, these limitations of damages (for $2,050 and $2,575) have no
bearing on the court’s final judgment in this action. The $5,500 conceded by the plaintiff as the
minimum rightful de-conversion charges under the Core Services Agreement is consistent with
testimony presented by the plaintiff at trial and is reflected in the court’s final judgement, which
includes the greater total of $10,000 as the rightful de-conversion charges to be deduced from the
$158,700 paid in reaching the final damages calculation.
17
inconsistent with any applicable contract, or charged an unreasonable amount, the court finds
that the plaintiff is not entitled to any recovery under Count IV.
CONCLUSION
For the foregoing reasons, the court will enter judgment in favor of the plaintiff in the
amount of $148,700 plus attorney’s fees and costs.
An appropriate order will enter.
______________________________
ALETA A. TRAUGER
United States District Judge
18