Witherspoon v. Moneyhun Equipment Sales and Service Co
Filing
116
MEMORANDUM DECISION granting in part 94 Motion for Partial Summary Judgment ; denying 96 Motion for Partial Summary Judgment. Witherspoon is ORDERED to execute an assignment of rights to the ULE in order to evidence MESSCOs sol e ownership of the ULE. This assignment is to be executed within thirty (30) days from the issuance of this Order. Defendant David Moneyhun is to be terminated from the case because the remaining claims contained within the Second Amended Complaint a re directed against solely against Defendant MESSCO. The Parties are FURTHER ORDERED to meet and confer and submit to the Court within thirty (30) days from the issuance of this Order a Proposed Amended Scheduling Order that will govern the remainder of the case going forward. Signed by Magistrate Judge Brooke C. Wells on 05/03/2013. (asp)
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF UTAH, NORTHERN DIVISION
JOE WITHERSPOON, an individual,
Plaintiff,
MEMORANDUM DECISION AND ORDER
RE: MOTIONS FOR SUMMARY
JUDGMENT
v.
Case No. 1:10-cv-199-BCW
MONEYHUN EQUIPMENT SALES AND
SERVICE CO., INC., a Wyoming corporation;
DAVID H. MONEYHUN, an individual,
Magistrate Judge Brooke C. Wells
Defendants.
Before the Court are Defendants Moneyhun Equipment Sales and Service Co., Inc.
(“MESSCO”) and David H. Moneyhun’s [hereinafter collectively referred to as “Defendants”],
Motion for Partial Summary Judgment1 and Plaintiff Joe Witherspoon’s (“Witherspoon”) Motion
for Partial Summary Judgment.2 Oral argument on both Motions was held on September 26,
2012, at which time attorney John V. Mayer appeared on behalf of Witherspoon and attorneys
Paul Hickey and Jed Hansen appeared on behalf of Defendants.3 Before the hearing, the Court
carefully considered the memoranda and other materials submitted by the parties. Since taking
the matter under advisement4, the Court has further considered the law and facts relating to these
motions. For the reasons stated below, the Court grants Defendants’ Motion for Partial Summary
Judgment in part and denies Plaintiff’s Motion for Partial Summary Judgment.
1
Docket no. 94.
Docket no. 96.
3
Docket nos. 111-112.
4
Docket no. 111.
2
BACKGROUND5
The facts of this case arise from Plaintiff, Joe Witherspoon’s employment with Defendant
MESSCO. Witherspoon was employed as a Senior Process/Design Engineer at MESSCO’s
facility in Rock Springs, Wyoming from approximately September 2009 to October 2010. The
subject of this lawsuit and the motions for partial summary judgment are the ownership rights to
two inventions: clean coal technology6 and an ultra-low emission gas dehydration unit (“ULE”).
These inventions/technologies were developed and/or worked on by Witherspoon during the
period Witherspoon was employed by MESSCO.
In November 2007, prior to his employment as a Senior Process/Design Engineer with
MESSCO, Witherspoon was introduced to a clean coal technology that had been invented by Mr.
Harold Bennett. In the beginning of 2008, Witherspoon entered into a business agreement with a
group of partners in a venture known as the Columbia Fuel Company (“Columbia Fuel”). The
goal of Columbia Fuel was to explore development and implementation of Mr. Bennett’s
invention. Mr. Witherspoon remained involved in the venture, which went through various name
and membership changes, from 2008 to approximately the spring of 2009. In approximately
March of 2009, Witherspoon and another member of Columbia Fuel, John Klee, met with a patent
attorney regarding Mr. Witherspoon’s work on the clean coal technology but an application for
patent protection was not initiated at that time. According to Mr. Witherspoon, by May of 2009,
he had invented the clean coal technology that is in dispute in this case.7
5
All facts included in this section were taken from the briefs and exhibits filed in conjunction with the Plaintiff’s and
Defendants’ Motions for Summary Judgment. See docket nos. 94, 95, 96, 97, 98, 100 and 107.
6
Throughout the briefs, the terms “clean coal process,” “coal reformation process,” and/or “clean coal technology”
are used to describe the invention at issue in this lawsuit. However, for sake of clarity, and for purposes of this
Memorandum Decision, this disputed invention will be referred to as “clean coal technology.”
7
However, it is undisputed that in conversations with Ms. Moneyhun during Witherspoon’s employment with
MESSCO, that Witherspoon was trying to come up with a new way to modify Mr. Bennett’s prior clean coal process
to make it patentable—thus the invention was undoubtedly based upon Mr. Bennett’s work.
2
Witherspoon continued to work on the clean coal technology; and in June or July 2009,
Mr. Witherspoon and another member of the Columbia Fuel, Mr. Michael Pavicic, broke ties with
Mr. Klee and Columbia Fuel. In early August, 2009, Witherspoon and Mr. Pavicic met with
David Moneyhun (“Moneyhun”), President of MESSCO, in Salt Lake City, Utah in order to pitch
Witherspoon’s clean coal technology to Moneyhun with the hope that MESSCO and/or
Moneyhun would invest in the technology.
MESSCO, which is headquartered in Rock Springs, Wyoming, has been in operation since
1998. MESSCO is in the business of customizing solutions for oil and gas producers in order to
control emissions that meet or exceed ambient air standards. According to an article published in
September 2009 (prior to Mr. Witherspoon’s employment) in the Wyoming Business Report,
MESSCO was developing a dehydration unit that would result in lower emissions of hazardous
air pollutants as compared to the current products used in the oil and gas industry at the time. As
stated in the article, “MESSCO…is on the cutting edge of technological solutions to getting water
out of natural gas pipelines while flaring off the vast majority of air pollution that’s been giving
state and federal regulators a major headache in Wyoming’s gas fields.” According to Abby
Moneyhun, co-founder of MESSCO and the current Chief Financial Officer who was interviewed
for the article, “[MESSCO] has been solving dehydration and air emission problems for clients
throughout the state.” Defendant Moneyhun, in his capacity as President and co-founder of
MESSCO is responsible for MESSCO’s overall business operations including business growth
and delegation of responsibilities.
During the initial meeting in Salt Lake City between Witherspoon, Moneyhun and
Pavicic, the discussion turned away from potential investment in the clean coal technology toward
3
Witherspoon’s qualifications as an engineer.8
Thereafter, two additional meetings or “job
interviews9” and a telephone conversation between Moneyhun and Witherspoon took place. At
one of the meetings, at another restaurant in Salt Lake City, a representative from The Williams
Company (“Williams”), Danny Stahl was also present. Williams is a client of MESSCO and
according to deposition testimony of Danny Stahl, prior to Witherspoon’s employment with
MESSCO, Williams and MESSCO had been discussing a “cleaner,” more efficient dehydration
unit for use in natural gas fields. Witherspoon admitted that he understood Mr. Stahl to be the
person addressing dehydration units attendant to Williams’s production of natural gas.
At the final pre-employment meeting with Mr. Moneyhun in Salt Lake City, salary and
expectations of Witherspoon’s job as a design engineer for MESSCO were discussed. During his
deposition, Witherspoon admitted he was expected to meet customers’ needs with field
dehydration and troubleshoot or fix the existing dehydration systems. Mr. Witherspoon further
admitted he understood his job to include working on other various MESSCO products under the
direction of Moneyhun.
On or about September 2, 2009, Witherspoon received a letter from MESSCO, offering
him a position as a Senior Process/Design Engineer for MESSCO. The employment offer letter
set forth the following terms:
$130,000/year Salary
Group Medical Insurance (family coverage) available and paid 100% by Employer
Group Dental Insurance available (family coverable) available and paid 100 % by
Employer
Group Life Insurance available (Employee paid)
Supplemental Indemnity Insurance (AFLAC) available (Employee paid)
Simple IRA with employer matching employee contribution, up to 3% of annual
earnings
8
After the presentation to Mr. Moneyhun, a subsequent presentation regarding the clean coal technology was
presented to Abby Moneyhun in Rock Springs Wyoming on or about August 10, 2009.
9
See Exhibit Q, Docket no. 107 at 25-26.
4
Two (2) weeks paid vacation available during the first year, with additional
flexibility with regards to allowable personal time (contingent on completion of
assigned work) 10
No other terms were included in the offer letter. Specifically, no mention was made as to
the ownership of any intellectual property created by or worked on by Witherspoon during the
term of his employment. Witherspoon signed this letter and returned it to MESSCO and began
work at MESSCO’s Rock Springs facility on or about September 16, 2009.
A.
DEVELOPMENT OF THE ULTRA-LOW EMISSION GAS DEHYDRATION UNIT (“ULE”)
The parties dispute how the development of the ULE was initiated. MESSCO contends
they were in the business of improving natural gas dehydration units and Witherspoon was aware
of this when he began work for MESSCO. Therefore, the development of the ULE was within
the scope of Witherspoon’s employment as a Design Engineer. Witherspoon, on the other hand,
argues that he came up with the idea for the ULE on his own initiative because he became aware
of impending regulation changes and saw the usefulness of a low-emission dehydration unit.
Witherspoon admitted in deposition testimony that the ULE is an improvement in the
process and outcome of previously engineered devices that MESSCO manufactures and
Moneyhun authorized the work performed on the ULE. Witherspoon also does not dispute that
work on the ULE became part of his duties while employed at MESSCO. Further, it is
undisputed that all of the work performed by Witherspoon on the ULE took place during his
salaried employment with MESSCO. MESSCO provided and paid for the materials and
equipment used in the development of the ULE. Specifically, in developing the ULE,
Witherspoon utilized software programs purchased by MESSCO, including Aspen HYSYS, and
CODE WARE. MESSCO also paid for drafting support for Witherspoon’s work on the ULE and
10
In addition to these benefits, Mr. Witherspoon was also provided housing in Rock Springs, Wyoming, and a laptop
computer that he could use both at the MESSCO facility and elsewhere. Witherspoon’s personal cellular telephone
bill was also paid by MESSCO during his employment with the company.
5
other MESSCO employees were allowed by the company to contribute to the development of the
ULE prototype. Witherspoon admits that the development of the ULE became a team project at
MESSCO. However, Witherspoon contends in his Opposition Memorandum and in his Third
Supplemental Responses to MESSCO’s discovery requests that Moneyhun and/or MESSCO
promised him additional compensation for the development of the ULE. MESSCO disputes this
fact and no additional compensation was ever paid to Witherspoon.
On April 8, 2010, a Provisional Patent Application, paid for by MESSCO and prepared by
MESSCO’s attorney, Garron Hobson, was filed with the United States Patent and Trademark
Office (“USPTO”). This patent application is identified as number 61/322,022 and lists
Witherspoon as the sole inventor. Witherspoon and a draftsman paid by MESSCO, prepared the
documentation and drawings that accompanied this patent application. According to a
declaration filed by MESSCO’s patent attorney, Garron Hobson, he conversed via telephone and
email with Witherspoon in the preparation of the Provisional Patent Application.
After this Provisional Patent Application was filed, Attorney Hobson, on behalf of
MESSCO requested that Witherspoon execute an assignment of rights to the ULE. Initially,
Witherspoon did not object to this request but eventually refused to execute the assignment.
Witherspoon’s employment with MESSCO was terminated on October 14, 2010. Witherspoon
claims his employment was terminated because he failed to assign or otherwise surrender his
rights in the ULE and/or in the clean coal technology.
Since his termination with MESSCO, Witherspoon has not taken any further steps to
produce or build the ULE. However, both Witherspoon and MESSCO have filed NonProvisional Patent Applications in conjunction with the ULE after the initiation of this lawsuit.
The first Non-Provisional Patent Application was filed April 7, 2011 by MESSCO with
6
Witherspoon and Moneyhun listed as co-inventors of the ULE. The second Non-Provisional
Patent Application was filed the next day, April 8, 2011 by Witherspoon, naming himself as the
sole inventor of the ULE.
B.
FURTHER DEVELOPMENT OF CLEAN COAL TECHNOLOGY
It is undisputed that Witherspoon was not hired to specifically work on the clean coal
technology and was directed that “anything he was doing with the coal project was going to be
aside from MESSCO at that point in time.”11 However, after his employment commenced with
MESSCO, Witherspoon continued to work on the clean coal technology. Despite leading
MESSCO to believe he had cut all ties with his former clean coal associates, sometime between
November of 2009 and February 2010, Mr. Witherspoon again became involved with his former
associates. But as of November, 2009, a member of the Columbia Fuel (which had been renamed
NuCoal Solutions) testified in his deposition that he had not seen a complete written description
of the process or full mechanical drawings of the technology. In February 2010, Witherspoon
hired and paid a draftsman to prepare drawings for the clean coal technology.
Witherspoon contends that all further work he performed on the clean coal technology
while employed by MESSCO was undertaken outside of normal business hours, except for an
occasional email or telephone call with others that are were interested in the technology. Also,
although no evidence has been presented that Mr. Witherspoon used the software Aspen HYSYS
and CODE WARE that MESSCO had purchased for the development of the natural gas
dehydration units (including the ULE that is in dispute here), the software was capable of being
used on the further development of the clean coal technology. There is evidence however, that
Witherspoon used other software purchased by MESSCO on the clean coal technology. Through
the sworn statement of Moneyhun, “it appears to [Moneyhun] that Witherspoon completed work
11
See Undisputed Fact #5, Pl.’s Mem. in Supp. of M. for Sum. J., docket no. 97.
7
on the clean coal [technology] using MESSCO software in at least October of 2009 and in May of
2010.” Mr. Moneyhun’s statement is based upon an email that was sent from Witherspoon to his
former colleagues with design specifications using software named COMPRESS owned by
MESSCO. This software, according to Moneyhun, was used by Witherspoon without MESSCO’s
authorization.
However, other than Moneyhun’s statement relating to the COMPRESS software, no one
at MESSCO saw Witherspoon work on the clean coal technology during normal business hours.12
Numerous employees of MESSCO testified they assumed he was working on the technology but
no employee testified they actually witnessed Witherspoon using MESSCO’s software or working
on the clean coal technology at MESSCO’s facility.
By the spring of 2010, Witherspoon’s development of the clean coal technology was
complete. In March of 2010, while still working for and receiving a full salary from MESSCO,
Witherspoon became a full member of NuCoal Solutions holding 866,667 shares of the company
in exchange for rights in the alleged improvement of the clean coal technology. In addition,
Witherspoon traveled to Arizona for a meeting where the latest developments in the clean coal
technology were discussed by Witherspoon and a deadline for preparing materials for a
Provisional Patent Application was set for April 9, 2010. MESSCO did not pay for any of
Witherspoon’s travel costs to Arizona and Witherspoon told MESSCO that he had to miss work
because he was having surgery.
On April 15, 2010, a Provisional Patent Application was filed with the USPTO by
Witherspoon entitled “Coal Reformation Process.” This application was assigned serial no.
12
MESSCO states in its Opposition Memorandum to Witherspoon’s Motion for Summary Judgment that although
MESSCO employees did not observe Witherspoon working on the clean coal technology during the work day or
utilizing MESSCO’s resources or materials, including software, “Defendants did not observe Mr. Witherspoon at all
times during the work day to monitor whether he was indeed working on the clean coal process during regular
business hours.”
8
61/324,151. MESSCO did not pay for the prosecution of this patent. After the Provisional
Patent Application was filed, Witherspoon continued to work on the technology and made another
trip to Arizona. MESSCO did not pay for this trip to Arizona either.
Witherspoon argues statements made by Ms. Moneyhun during Witherspoon’s exit
interview relinquished any claim MESSCO might have in the clean coal technology. Specifically,
another MESSCO employee, Pat Samples who was present during the interview, testified that Ms.
Moneyhun stated “they [MESSCO] didn’t want anything to do with the clean coal [technology].
That it was his, and they didn’t want anything to do with that and they hadn’t been involved in it,
and that’s why they never did anything further on it.”13 MESSCO on the other hand, argues that
that Ms. Moneyhun’s statements “stressed that to the extent that Mr. Witherspoon was interested
in stripping Mr. Bennett of his patent rights, MESSCO was not interested in the clean coal
[technology]. Otherwise MESSCO’s interest in the clean coal [technology] was intact.” 14
In addition, MESSCO argues it did not totally abandon its potential interest and
investigation into the clean coal technology during Witherspoon’s term of employment. For
example, there were discussions relating to the technology between Witherspoon and both Mr.
and Ms. Moneyhun during Witherspoon’s employment and officers of MESSCO made numerous
contacts with state and federal representatives and government agencies regarding the potential
use of the clean coal technology. Officers of MESSCO also traveled to New Mexico to meet with
Mr. Harold Bennett to better understand the clean coal technology. MESSCO also met with its
patent attorney regarding potential liabilities and patentability of the clean coal technology.
Witherspoon and Mr. Pavicic were present during least one of those meetings with MESSCO’s
patent counsel on January 4, 2010.
13
14
Exh. G, docket no. 97.
Docket no. 98 at p. 22.
9
Lastly, MESSCO argues that during his term of employment, Witherspoon frequently
missed deadlines and MESSCO was forced to hire additional employees in order to make up for
the work for which Witherspoon was negligent. This, according to Defendants evidences that
while still being paid a full salary Witherspoon was neglecting his duties at MESSCO in order to
work on the clean coal technology.
STANDARD OF REVIEW
Under Rule 56 of the Federal Rules of Civil Procedure, a party is entitled to summary
judgment if the party can demonstrate through pleadings, depositions, answers to interrogatories,
admissions on file, or affidavits, that there is no genuine issue as to any material fact.15 A genuine
issue of material fact exists when, after viewing the record and making all reasonable inferences
in a light most favorable to the non-moving party, a reasonable jury could return a verdict for the
non-moving party.16
Moreover, the opposing party’s response must set forth specific facts showing a genuine
issue for trial, and it “must do more than simply show that there is some metaphysical doubt as to
the material facts.”17 “The mere existence of a scintilla of evidence in support of the [non-moving
party’s] position will be insufficient.”18 Thus, “[s]ummary judgment procedure is properly
regarded not as a disfavored procedural shortcut, but rather as an integral part of the Federal Rules
as a whole, which are designed ‘to secure the just, speedy and inexpensive determination of every
action.’”19
15
Fed. R. Civ. P. 56(c).
Anderson v. Liberty Lobby, 477 U.S. 242, 248 (1986); see also Scott v. Harris, 550 U.S. 372, 380 (2007)(internal
citations and quotations omitted)(“Where the record taken as a whole could not lead a rational trier of fact to find for
the non-moving party, there is no genuine issue for trial.”).
17
Matushita Elec. Indus. Co., Ltd. v. Zenith Radio Corp., 475 U.S. 574, 586 (1986).
18
Anderson, 477 U.S. at 252.
19
Celotex Corp. v. Catrett, 477 U.S. 317, 327 (1986)(quoting Fed. R. Civ. P. 1).
16
10
ANALYSIS
Witherspoon’s Second Amended Complaint20 alleges four causes of action: (1) Breach of
Implied-In-Fact Contract-MESSCO; (2) Punitive Damages-MESSCO; (3) Declaratory ReliefProvisional Patent Application No. 61/322,022 [ULE]-All Defendants; (4) Declaratory ReliefProvisional Patent Application No. 61/324,151 [clean coal technology]-MESSCO.
Defendants have asserted the following counterclaims against Witherspoon: (1)
Declaratory Relief-ULE; (2) Declaratory Relief-ULE and Clean Coal Technology; and (3) Unjust
Enrichment.21
Earlier in this litigation, by applying Wyoming law, the Court dismissed additional tort
claims that Witherspoon brought against MESSCO.22 In accordance with the Court’s July 8,
2011 Order and for consistency, the Court will apply Wyoming law where applicable to the
remaining claims contained in the Second Amended Complaint and Counterclaims that are the
subject of the cross motions for summary judgment.23
Also, in its Order of July 8, 2011, the Court held that Witherspoon was an at-will
employee with MESSCO. Importantly too, in his Opposition Memorandum to Defendants’
Motion for Partial Summary Judgment, Witherspoon does not dispute that he has provided no
evidence that MESSCO had any policies or procedures that created an implied-in-fact contract or
that MESSCO violated any federal or state law by terminating his employment.24
20
Docket no. 85.
Docket no. 92. For clarity, all quotations or citations to the Claims for Relief and Counterclaims were copied in
this Order exactly how they appear in Second Amended Complaint (Docket no. 85) and Defendants Answer to
Second Amended Complaint and Counterclaim (Docket no. 92).
22
Docket no. 30.
23
The Court notes that the Defendants cited Wyoming law in support of their Motion for Summary Judgment while
Plaintiff made no such reference.
24
See docket no. 100 at p.12-13.
21
11
A. GENERAL RIGHTS OF EMPLOYEE AND EMPLOYER TO INTELLECTUAL PROPERTY &
“SHOP RIGHTS”25
Generally, “an invention presumptively belongs to its creator” and an “individual owns the
patents rights” in his or her invention.26 But “[t]his simple proposition becomes more complex
when one creates while employed by another person”27 and “the law has recognized that
employers may have an interest in the creative products of their employees.”28 Therefore, courts
have recognized that in certain situations, employers may be entitled to ownership in an
employee’s invention or may be entitled to license rights known as “shop rights.”
In order to determine the rights of employees and employers, generally, courts first
examine the employment contract. However, if, the contract of employment does not contain a
provision regarding inventions, as is the case here, an employer is not necessarily precluded from
claiming a right to an employee’s invention.
Courts, including the Wyoming Supreme Court, have recognized what is termed the
“hired to invent doctrine.” This doctrine is described as follows:
[i]f an employee’s job duties include the responsibility for inventing or for solving a
particular problem that requires invention, any invention created by that employee
during the performance of those responsibilities belongs to the employer. Hence,
such an employee is bound to assign to the employer all rights to the invention. This
is so because, under these circumstances, the employee has produced only that which
he was employed to produce, and the courts will find an implied contract obligation
to assign any rights to the employer.29
25
The Court notes that this case appears to present issues of first impression in this district as the Court has failed to
find any cases that have applied wither the “hired to invent” or “shop rights doctrine.”
26
Teets v. Chromalloy Gas Turbine Company, 83 F.3d 403, 407 (Fed. Cir. 1996).
27
Id.
28
Id. (internal citations omitted).
29
Scott System, Inc. v. Scott, 996 P.2d 775 (Colo. App. 2000)(citing United States v. Dubilier Condenser Corp., 289
U.S. 178 (1933); Solomons v. United States, 137 U.S. 342 (1890); Hewett v. Samsonite Corp., 507 P.2d 1119
(1973)(emphasis added). See also Preston v. Marathon Oil Co., 2012 WY 84, ¶ 2, 277 P.3d 81, 84 (Wyo. 2012) (“[i]f
an employee’s job duties include the responsibility for inventing or for solving a particular problem that requires
invention, any invention created by that employee during the performance of these responsibilities belongs to the
employer…”)(internal citations omitted)(emphasis added).
12
Alternatively, “when an employee who was not hired to invent does invent something as
part of his work duties, the employer is given a “shop right” to use the invention.”30 A “shop
right is an employer’s royalty or fee, a nonexclusive and nontransferable license to use an
employee’s patented invention.”31 In determining whether a shop right exists, the parties’
relationship is examined and an
employer will have shop rights in an invention in situations where the employer has
financed an employee’s invention by providing wages, materials, tools and a work
place. Other factors in creating shop rights include an employee’s consent,
acquiescence, inducement, or assistance to the employer in using the invention
without demanding compensation or other notice of restriction.32
PLAINTIFF’S MOTION FOR SUMMARY JUDGMENT-CLEAN COAL TECHNOLOGY
Witherspoon moves for partial summary judgment related to the parties’ rights in the clean
coal technology. Specifically, Witherspoon moves for summary judgment as to the following
causes of action: (a) Count Four Second Amended Complaint, Declaratory Relief as to Patent
Application 61-324,151 [clean coal patent] and (b) Counterclaim Two, Declaratory Relief as to
Clean Coal Technology under the “shop rights doctrine.”
Here, Witherspoon argues that he did not conceive or further develop the clean coal
technology as part of his employment with MESSCO. Further, Witherspoon argues that he did
not work on the clean coal technology on MESSCO time or using MESSCO’s resources, except
for an occasional email or telephone call during his work day at MESSCO. Witherspoon does
admit he used a laptop issued by MESSCO for the clean coal technology but that the laptop’s use
was largely for emails. Witherspoon argues he conceived of the idea for the clean coal
technology prior to his employment with MESSCO as evidenced by the purpose for the initial
30
Preston, at 84.
Id.
32
McElmurry v. Arkansas Power & Light Company, 995 F.2d 1576, 1582 (Fed. Cir. 1993)(internal citations
omitted).
31
13
meeting with Moneyhun, which was to secure investors in his technology--not to secure
employment with MESSCO.
MESSCO, on the other hand, asserts it is entitled to a “shop right” in the coal reformation
process based on allegations that Witherspoon “did specific work on the further development and
refinement of clean coal technology” while a salaried employee of MESSCO.33 MESSCO
believes Witherspoon used MESSCO materials in the further development of the clean coal
technology. While the record is not plush with evidence of what exact materials other than an
company-issued laptop were used by Witherspoon, Moneyhun by way of sworn affidavit
contends that based upon an email sent from Witherspoon to his former colleagues with design
specifications, MESSCO-owned software, named COMPRESS was used by Witherspoon
without MESSCO’s authorization. “It appears to [Moneyhun] that Witherspoon completed work
on the clean coal [technology] using MESSCO software in at least October of 2009 and in May of
2010.”34 There is also evidence by way of Witherspoon’s own admission that he used
MESSCO’s company-issued laptop and his personal cellular telephone that was paid for by
MESSCO in order to communicate with others about the clean coal technology.
MESSCO contends also Witherspoon missed deadlines and didn’t complete his work in a
satisfactory manner because he was working on the clean coal technology while still being a
salaried employee of MESSCO. MESSCO further argues development efforts of the clean coal
technology were conducted primarily while Witherspoon was employed by MESSCO.
This Court has also considered that Witherspoon never indicated to MESSCO or Mr. or
Ms. Moneyhun that he was not interested in their investment in the clean coal technology after his
employment with MESSCO commenced. In fact, there were discussions relating to the
33
34
Docket no. 31.
Exh. 7, docket no. 97, ¶ 10.
14
technology between Witherspoon and both Mr. and Ms. Moneyhun during Witherspoon’s
employment. Witherspoon also did not advise the Moneyhuns that he was seeking outside
funding or that he was traveling to Arizona to meet with others that were interested in the project,
or that he became a shareholder in a company in exchange for development of the clean coal
technology.
Accordingly, in the Court’s view, during Witherspoon’s employment with MESSCO, the
company did not lose interest in the clean coal technology. For example, officers of MESSCO
made numerous contacts with state and federal representatives and government agencies
regarding the potential use of the clean coal process and also traveled to New Mexico to meet
with Mr. Harold Bennett to better understand the clean coal technology. MESSCO met with its
patent attorney regarding potential liabilities MESSCO might have related to the clean coal
technology. Witherspoon and Mr. Pavicic were present for a meeting with MESSCO’s patent
counsel on January 4, 2010. Although ultimately Witherspoon sought patent protection on his
own for the clean coal technology.
The meaning of statements made by Ms. Moneyhun during Witherspoon’s dismissal
interview is also in dispute. Witherspoon contends Ms. Moneyhun’s statements relinquished any
interest in the clean coal technology, while Defendants argue that Ms. Moneyhun’s statements
“stressed that to the extent that Mr. Witherspoon was interested in stripping Mr. Bennett of his
patent rights, MESSCO was not interested in the clean coal [technology].”35 Therefore,
MESSCO’s interest in the clean coal [technology] was intact and Ms. Moneyhun’s statements are
consistent with MESSCO seeking a “shop right” in the clean coal technology.
In sum, the Court is convinced that genuine issues of material fact exist with respect to
whether MESSCO is entitled to a shop right in the clean coal technology. Based upon the
35
Docket no. 98 at p. 34.
15
evidence presented and drawing all reasonable inferences in a light most favorable to the
Defendants, the non-moving party, the Court concludes that a reasonable jury could rule in favor
of Defendants. Thus, summary judgment is inappropriate and Plaintiff’s Motion for Summary
Judgment as to the clean coal technology is denied.
DEFENDANTS’ MOTION FOR SUMMARY JUDGMENT-ULE
Defendants move for partial summary judgment declaring MESSCO as the sole owner of
the ULE, or in the alternative, to declare that MESSCO is entitled to a “shop right” in the ULE.
Defendants also move for dismissal with prejudice of Witherspoon’s claims for breach of
implied-in-fact contract and punitive damages. Thus, Defendants move for partial summary
judgment on the following counts: (a) Count One of Second Amended Complaint, Breach of
Implied-In-Fact Contract as to MESSCO; (b) Count Two of the Second Amended ComplaintPunitive Damages as to MESSCO; (c) Count Three, Declaratory Relief-Patent Application No.
61/322,022 [ULE Patent] as to All Defendants; (d) Counterclaim One-Declaratory Relief-ULE;
and (e) Counterclaim Two-Declaratory Relief-ULE and Clean Coal Technology under the “Shop
Right” Doctrine.36
1.
Ownership & Shop Rights of the ULE
Defendants’ Motion for Summary Judgment as to the ULE technology is Granted. First,
there can be no doubt that MESSCO has a “shop right” in the ULE. At oral argument,
Witherspoon conceded this point and there has been no dispute in the written materials as to that
issue. However, in addition to the shop right, MESSCO is entitled to be declared as the sole
owner of the ULE. This Court reaches this conclusion based on the following:
36
Docket no. 96. In their Motion for Partial Summary Judgment asks the court to dismiss “Counts Two, Four, and
Five of the Plaintiff’s Second Amended Complaint.” However, the Second Amended Complaint does not contain a
“Count Five.” Thus, by reading further into the briefs, and through oral argument, it appears that this was a typo and
therefore the correct counts Defendants seek to dismiss are set forth above.
16
First, the employment letter that was sent to Witherspoon offering him employment only
states that Witherspoon was to be hired for the position of “Senior Process/Design Engineer.”37 It
does not state with specificity exactly what Witherspoon’s responsibilities were to be while
employed by MESSCO or state any terms describing the ownership arrangements for any
intellectual property created by Witherspoon. Thus, because an express contract is not present
here, MESSCO requests that the Court apply the “hired-to-invent” doctrine in order to find that an
implied-in-fact contract existed between Witherspoon and MESSCO. Such a contract, MESSCO
argues would establish that MESSCO has full ownership rights in the ULE.
When applying the “hired to invent” doctrine, courts “must examine the employment
relationship at the time of the inventive work to determine if the parties entered into an impliedin-fact contract to assign patent rights.”38 In making this determination, state contract law
principles provide the rules for identifying and enforcing implied-in-fact contracts.39 In
Wyoming, “[i]n determining whether an implied contract was formed, [we] look not to the
subjective intent of the parties, but to ‘the outward manifestations of a party's assent sufficient to
create reasonable reliance by the other party.’”40 Thus, “an implied-in-fact contract to assign
inventive rights is a question of fact.”41
The Court finds the following cases to be analogous and uses them as guidance in
applying the hired-to-invent doctrine to the present case.
37
The general nature of the “Design Engineer” position can be better understood by looking at the definitions of the
two words independently. “Design” is defined as “to form or conceive in the mind; contrive; plan” or “to plan and
fashion the form and structure of an object, work of art, decorative or scheme, etc.” or “the combination of details or
features of something executed or constructed.” “Engineer” is defined as “a person trained and skilled in the design,
construction, and use of engines or machines.” WEBSTER’S COLLEGE DICTIONARY 360, 437 (Deluxe ed. 2000).
Thus, it seems to the Court it would be fair to say that Witherspoon was hired to “conceive or design” for MESSCO.
38
Teets, at 407.
39
Banks v. Unisys Corp., 288 F.3d 1357, 1359 (Fed. Cir. 2000)(internal citations omitted).
40
Birt v. Wells Fargo Home Mortgage, Inc., 75 P.3d 640, 649 (Wyo. 2003)(quoting Givens v. Fowler, 984 P.2d
1092, 1095 (Wyo.1999).
41
Teets, at 408.
17
In Teets v. Chromalloy Gas Turbine Corp., the Court of Appeals for the Federal Circuit
found an implied-in-fact contract of assignment where the plaintiff undertook a project to develop
a one-piece leading edge for airplane turbine blades.42 The court reasoned that the plaintiff spent
70% of his time on the project, invented a solution, and reduced the invention to practice using his
employer’s resources.43 Further, the court noted that the employer paid for the prosecution of the
patent application and that the plaintiff acknowledged his employer’s role in the development of
the invention.44
Like the plaintiff in Teets, Witherspoon invented a solution to a problem that Defendants
were trying to solve prior to his employment. Namely, MESSCO was working to improve the
existing dehydration units that were in service in the oil and gas industry in order to produce a
“cleaner” dehydration unit to meet existing and future environmental quality standards. Such is
evidenced by an article in the Wyoming Business report published prior to Witherspoon’s
employment which stated “MESSCO…is on the cutting edge of technological solutions to getting
water out of natural gas pipelines while flaring off the vast majority of air pollution that’s been
giving state and federal regulators a major headache in Wyoming’s gas fields.” In addition,
Danny Stahl, an employee of Williams (one of MESSCO’s clients) had conversations with
Moneyhun regarding emissions standards in the hopes an improved dehydration unit could be
developed. Mr. Stahl also accompanied Moneyhun to one of the “job interviews” with
Witherspoon and the trio discussed dehydration units as well as Witherspoon’s qualifications as
an engineer.
Witherspoon asserts that he was not hired to develop the ULE specifically and conceived
the idea on his own initiative. Therefore summary judgment is not appropriate because there are
42
Id. at 408.
Id.
44
Id.
43
18
issues of material fact as to the purpose of his employment with regard to the ULE and the
purpose of his employment is vital to the hired-to-invent analysis. To further bolster his
arguments that summary judgment is inappropriate, Witherspoon asserts that Moneyhun promised
him extra compensation for his development of the ULE which evidences MESSCO and/or
Moneyhun’s acknowledgement that the development of the ULE was beyond his normal salaried
duties with MESSCO.
Although the purpose of Witherspoon’s employment as it relates to invention was not
“expressly” relayed to him at the outset of his employment nor relayed to him directly during his
employment, Witherspoon has admitted that the ULE is an improvement in the process and
outcome of previously engineered devices that MESSCO manufactures and that he was hired to
meet customers’ needs with field dehydration, troubleshoot and work on MESSCO’s existing
dehydration units. He also admits that the work on the ULE became part of his duties at
MESSCO. As recognized by the Court in Teets,
…when an employer hires a person for general service and the employee invents
on the side, the invention belongs to the employee. However, the employer may
claim ownership of the invention if the employer hires a person for the ‘specific
purpose for making the invention.’” Even if hired for a general purpose, an
employee with the specific task of developing a device or process may cede
ownership of the invention from that task to the employer.45
Here, it is undisputed that Witherspoon did not do any “inventing on the side” with respect
to the ULE. All of the work performed on the ULE was performed with the full acquiescence and
support of MESSCO. Through his deposition testimony, Witherspoon admitted that the work
performed on the ULE was authorized by Moneyhun and became part of his duties. No evidence
has been presented that Witherspoon acted on his idea prior to getting approval by Moneyhun.
Further, Witherspoon and other employees of MESSCO spent significant time on this project,
45
Teets, at 407-408 (emphasis added).
19
including the development of a prototype. Thus, although Witherspoon may have been hired as a
general purpose Design Engineer, he was given a specific task of meeting customers’
expectations and working on existing MESSCO dehydration units. In looking at the time of the
inventive work, the development of the ULE was within the tasks assigned to Witherspoon. The
ULE not only met an unmet need of MESSCO’s customers, specifically Williams, but improved
upon technology that MESSCO had already developed. MESSCO provided all the materials
necessary to Witherspoon to develop the ULE, including purchase of software programs, hiring of
a third party draftsman and the use of other MESSCO employees. MESSCO also paid for
prosecution of the patent for the ULE invention. Therefore, the Court finds that the facts in this
case analogous to those evaluated in the Teets decision.
Next, Witherspoon argues that his refusal to sign an assignment of rights to the ULE
evidences that an implied-in-fact contract does not exist. To support his position, Plaintiff cites to
Banks v. Unisys Corp.46 In Banks, the Court held that summary judgment was not appropriate
under the hired to invent doctrine where an employee-inventor refused to sign an agreement to
assign his inventive rights to the company at the commencement of his employment and was
listed without his knowledge as a co-inventor on patent applications filed by the employer.
Unlike Banks, Witherspoon was not approached about assigning his rights to any
intellectual property at the beginning of his employment. Nor was Witherspoon unaware of the
patent applications that were filed listing him as a co-inventor. Rather, Witherspoon met and
corresponded with MESSCO’s patent counsel and also prepared documents that accompanied the
Provisional Patent Application. Further, the Court agrees with the argument made by counsel for
both parties during oral argument that Witherspoon being listed as the sole inventor on the
Provisional Patent Application filed by MESSCO does not raise genuine issues of material fact
46
228 F.3d 1357 (Fed. Cir. 2007).
20
because the inventor listed on a Provisional Patent Application is customarily merely a
placeholder. Lastly, unlike Banks, there have been no allegations made by Witherspoon that he
was fraudulently induced to assign his rights to MESSCO or that Witherspoon refused to sign any
other agreements related to intellectual property.
Lastly, as to Witherspoon’s arguments that he was promised additional compensation and
the idea for the ULE was brought about by his own initiative, the Court finds that these arguments
do not raise issues of genuine material fact in light of the evidence in this case. There is no
evidence other than Mr. Witherspoon’s own statements that he was promised additional
compensation by MESSCO. Witherspoon was never paid additional compensation nor was the
promise ever reduced to writing. In addition, even if Witherspoon’s arguments related to
additional compensation are viewed in the light most favorable to him, additional compensation
does not disturb the Court’s analysis as to the Teets or Banks decisions. Neither of those courts
discussed the issue nor would a promise of a “bonus” indicate that an implied-in-fact contract did
not exist. The evidence clearly indicates that although Witherspoon may have come up with the
idea for the ULE on his own, the reduction to practice of the ULE and/or actual inventive work
was performed within the scope of his duties as a Design Engineer for MESSCO. Therefore, the
Court finds Witherspoon’s arguments as to the ULE do not raise genuine issues of material fact.
The Court finds a reasonable jury could not rule in Witherspoon’s favor in relation to ownership
of the ULE because of MESSCO’s significant investment in the ULE and what Witherspoon
admitted his position with MESSCO to entail. Thus, summary judgment is granted in favor of the
Defendants as to the ULE.
Accordingly, MESSCO is declared the sole owner of the ULE. Witherspoon has no rights
in the ULE and Witherspoon is therefore ORDERED to execute an assignment of rights to
21
MESSCO for this invention as evidence of MESSCO’s ownership of the ULE. Because
MESSCO is declared the sole owner of the ULE, Defendants’ claims as to the “shop right
doctrine” in the ULE are moot. Lastly, as to the ULE, Witherspoon’s claims that MESSCO
breached and implied-in-fact contract fail and are dismissed.
2. Breach of Implied-in-Fact Contract and Shop Rights in Clean Coal Technology
For the reasons set forth more fully above, the Court finds there are genuine issues of
material fact relating to the clean coal technology and has denied Plaintiff’s Motion for Summary
Judgment with respect to that technology. Accordingly, the Court also denies Defendants’
Motion for summary judgment as to the claims associated with the clean coal technology.
Namely, summary judgment is denied as to Count Two of the Amended Complaint as to the clean
coal technology and Counterclaim Two-Declaratory Judgment under the “Shop Rights” Doctrine
as to the clean coal technology.
3. Punitive Damages
As to Plaintiff’s Count Two alleging Punitive Damages against MESSCO, Defendant’s
Motion for Summary Judgment is granted. As a preliminary matter, Plaintiff has failed to
discuss either at oral argument or through its Opposition Memorandum to Defendant’s Motion for
Summary Judgment Plaintiff’s claim for Punitive Damages. However, even despite Plaintiff’s
failure to oppose summary judgment with regard to punitive damages, the Court finds that
summary judgment is appropriate on this claim.
First, “in Wyoming, punitive damages are an element of a claim or cause of action and are
not a separate claim.”47 In addition, Wyoming Courts have recognized that “punitive damages are
generally not recoverable in an action upon a contract…[and] are not proper in an action upon a
47
Errington v. Zolessi, 9 P.3d 966, 969 (Wyo, 2000).
22
contract to recover damages resulting from a breach of contract.”48 Moreover, “in order to recover
punitive damages in an action upon a contract, ‘there must be evidence of spite, ill will or willful
and wanton misconduct at the inception of the fraudulent contact.’”49
Here, the only remaining claims other than for punitive damages are for breach of implied
contract and for declaratory relief. As recognized above, in Wyoming punitive damages are
generally unavailable for breach of contract claims. In addition, although the Court is denying
summary judgment as to Count Two of the Amended Complaint as it relates to a Breach of
Implied-in-Fact Contract and the Clean Coal Technology, the Court is satisfied that there are no
issues of material fact with regard to evidence of spite, ill will or willful and wanton misconduct
on MESSCO’s behalf related to Witherspoon’s termination of employment. In addition, at least
one Court in Wyoming has recognized that a claim for punitive damages may be available when
one party breaches a contract in bad faith, attendant to a claim of breach of the implied covenant
of good faith and fair dealing.50 However, Plaintiff’s claim for breach of the implied covenant of
good faith and fair dealing was dismissed by the July 8th Order of the Court. Therefore, based
on the remaining claims in this case, Witherspoon has no basis for recovery of punitive damages
and summary judgment is proper as to this claim.
48
Arnold v. Mountain West Farm Bureau Mut. Ins. Co., Inc., 707 P.2d 16, 164 (Wyo. 1985)(citing United States v.
Redland, Wyo., 695 P.2d 1031 (1985)); see also TruGreen Cos., LLC v. Mower Bros., Inc., 199 P.3d 929, 933 (Utah
2008)(quoting Hal Taylor Assocs. v. Unionamerica, Inc., 657 P.2d 743, 750 (Utah 1982)(“We have held that punitive
damages for breach of contract, by themselves, are inappropriate “even if intentional and unjustified.”)
49
Id.
50
See Arnold at 164.
23
CONCLUSION & ORDER
For the foregoing reasons:
1.
Defendants’ Motion for Partial Summary Judgment51 is GRANTED in part.
2. Plaintiff’s Motion for Partial Summary Judgment52 is DENIED.
In accordance with this Order:
a. Witherspoon is ORDERED to execute an assignment of rights to the ULE in order to
evidence MESSCO’s sole ownership of the ULE. This assignment is to be executed
within thirty (30) days from the issuance of this Order.
b. Defendant David Moneyhun is to be terminated from the case because the remaining
claims contained within the Second Amended Complaint are directed against solely
against Defendant MESSCO.
c. The Parties are FURTHER ORDERED to meet and confer and submit to the Court
within thirty (30) days from the issuance of this Order a Proposed Amended
Scheduling Order53 that will govern the remainder of the case going forward.
DATED this 3rd day of May, 2013.
Brooke C. Wells
United States Magistrate Judge
51
Docket no. 94.
Docket no. 96.
53
Per Order of the Court, the Scheduling Order in this case was vacated and all deadlines were terminated. See
docket no. 115.
52
24
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?