Sprint Communications Company, L.P. v. Ntelos Telephone, Inc.
Filing
84
MEMORANDUM OPINION. Signed by District Judge Michael F. Urbanski on 7/26/12. (kld)
IN THE UNITED STATES DISTRICT COURT
FOR THE WESTERN DISTRICT OF VIRGINIA
HARRISONBURG DIVISION
SPRINT COMMUNICATIONS
COMPANY, L.P.,
Plaintiff,
v.
NTELOS TELEPHONE INC.,
Defendant.
)
)
)
)
)
)
)
)
)
)
)
Civil Action No. 5:11cv00082
By:
Michael F. Urbanski
United States District Judge
MEMORANDUM OPINION
This matter is before the court on cross motions for summary judgment filed by plaintiff
Sprint Communications Company, L.P., (“Sprint”) and defendant Ntelos Telephone Inc.
(“NTELOS”) (Dkt. # 50 & 57), and NTELOS’ motion to stay and refer the case to the Federal
Communications Commission (“FCC”) (Dkt. # 64). The parties have briefed the issues, and oral
argument was held on March 2, 2012. For the reasons set forth below, the cross motions for
summary judgment are DENIED and NTELOS’ motion to stay and refer this matter to the FCC
is GRANTED.
I.
Since at least 2002, Sprint, a long distance telephone carrier,1 has used the local
telephone services provided by NTELOS, a local exchange carrier (“LEC”), for long distance
calls originating and terminating in the NTELOS service area in the Western District of Virginia.
Sprint contends that it was overcharged for local telephone services provided by NTELOS and
1
As such carriers transmit long distance calls between local telephone exchanges, they are referred to as
interexchange carriers (“IXCs”).
seeks a refund of more than $3.9 million for service between July 21, 2007 and October 31,
2009.
Telecommunications carriers, such as NTELOS, file tariffs which, upon FCC approval,
govern their rate structure and establish procedures for ordering a carrier’s service. See MCI
Telecomm. Corp. v. Dominion Commc’n Corp., 984 F. Supp. 185, 187 (S.D.N.Y. 1997). Tariffs
have been defined as “essentially offers to sell on specified terms, filed with the FCC and subject
to modification or disapproval by it.” Cahnmann v. Sprint Corp., 133 F.3d 484, 487 (7th Cir.
1998). On September 18, 2002, NTELOS concurred in the ICORE, Inc. Tariff F.C.C. No. 2
(“ICORE Tariff”) filed with the FCC for the provision and billing of its services. Sprint alleges
that from the time of NTELOS’ concurrence in the ICORE Tariff until November 2009,
NTELOS billed Sprint, and Sprint paid NTELOS, for local telephone services at a rate in excess
of that authorized by the ICORE Tariff.2 It is undisputed that from 2002 to October 31, 2009,
Sprint ordered, was billed and paid for local access services on a per minute per mile basis
referred to as Tandem Switched Transport (“TST”). Sprint now asserts that the ICORE Tariff
precludes billing at TST rates and requires that it be charged a lower, flat rate for dedicated
service referred to as Direct Trunked Transport (“DTT”). Sprint argues that the plain language
of the ICORE Tariff and application of the filed rate doctrine3 requires the court to grant its
motion for summary judgment and award it damages. NTELOS counters that Sprint’s claim is
2
Sprint claims that NTELOS overbilled Sprint for local access services from the time the ICORE Tariff was
adopted by NTELOS in 2002 until October 31, 2009, but recognizes that its claim for refund of overpayments is
limited to overcharges assessed within two years of filing this action.
3
“The filed rate doctrine provides that tariffs filed with the [Interstate Commerce Commission] are lawful for all
purposes and binding with the force of law unless the [Interstate Commerce Commission] declares the tariff to be
unlawful or unreasonable.” Beach v. Atlas Van Lines, Inc., Nos. 2:07-764-CWH, 2:07-2861-CWH, 2008 WL
8602539, at *3 (D.S.C. Mar. 31, 2008); see In re Carolina Motor Express, Inc., 949 F.2d 107, 109 (4th Cir. 1991)
(citing Louisville & Nashville R.R. Co. v. Maxwell, 237 U.S. 94, 97 (1915)), rev’d on other grounds sub nom.
Reiter v. Cooper, 507 U.S. 258 (1993); see also Am. Tel. & Tel. Co. v. Cent. Office Tel., Inc., 524 U.S. 214, 222
(1998) (applying the “century-old ‘filed rate doctrine’ associated with the [Interstate Commerce Act] tariff
provisions” to the Communications Act).
2
barred by NTELOS’ 2003 Chapter 11 bankruptcy or, alternatively, should be stayed and referred
to the FCC under the doctrine of primary jurisdiction. As to the merits of Sprint’s claim,
NTELOS contends that Sprint was billed and paid for the local telephone services it ordered, and
that Sprint is obligated to pay for those services.
II.
NTELOS moves for summary judgment, arguing any claim Sprint had related to
NTELOS’ billing practices following adoption of the ICORE Tariff was discharged in NTELOS’
2003 Chapter 11 bankruptcy proceeding. NTELOS asserts that Sprint’s allegations in this case
stem from NTELOS’ failure to switch to DTT billing upon adoption of the tariff on September
18, 2002.4 According to NTELOS, this failure, which occurred prior to the filing of NTELOS’
bankruptcy petition on March 4, 2003, gave rise to Sprint’s claim, or right of payment, in
bankruptcy. However, Sprint failed to assert any such claim in NTELOS’ bankruptcy
proceeding, despite having received written notice of the filing of the bankruptcy petition. Thus,
NTELOS argues, any claim Sprint had was discharged by virtue of the confirmation of the
Chapter 11 reorganization plan in August 2003 and Sprint’s cause of action fails as a matter of
law.5
4
With respect only to this motion, NTELOS does not contest Sprint’s legal theory. See NTELOS’ Mem. In
Support of Mot. for Summ. J., Dkt. # 51, at 2 n.1. Thus, the court will accept Sprint’s allegations as true for
purposes of this analysis.
5
Under Federal Rule of Civil Procedure 56, the court “shall grant summary judgment if the movant shows that there
is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.” See Celotex
Corp. v. Catrett, 477 U.S. 317, 322 (1986); Nguyen v. CNA Corp., 44 F.3d 234, 236-37 (4th Cir. 1995). When
making this determination, the court should consider “the pleadings, depositions, answers to interrogatories, and
admissions on file, together with . . . [any] affidavits” filed by the parties. Celotex, 477 U.S. at 322. Whether a fact
is material depends on the relevant substantive law, and “[o]nly disputes over facts that might affect the outcome of
the suit under the governing law will properly preclude the entry of summary judgment. Factual disputes that are
irrelevant or unnecessary will not be counted.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). The
moving party bears the initial burden of demonstrating the absence of a genuine issue of material fact. Celotex, 477
U.S. at 323; Nguyen, 44 F.3d at 237. If that burden has been met, the non-moving party must then come forward
and establish the specific material facts in dispute to survive summary judgment. Matsushita Elec. Indus. Co. v.
Zenith Radio Corp., 475 U.S. 574, 586-87 (1986). “All reasonable inferences drawn from the evidence must be
3
For its part, Sprint argues that the relevant conduct is not NTELOS’ adoption of the
ICORE Tariff but rather NTELOS’ repeated billing for local telephone services at a rate in
excess of that authorized by the ICORE Tariff. Sprint views each bill containing an overcharge
as a separate, actionable violation of the tariff, and therefore, a separate claim. In its Second
Amended Complaint, Sprint asserts it is entitled to a refund for overpayments made from July
21, 2007 through October 31, 2009, well after NTELOS filed its bankruptcy petition and the
reorganization plan was confirmed by the bankruptcy court. Sprint argues these post-bankruptcy
claims survive, regardless of how similar they are to pre-bankruptcy claims that may have been
discharged. To hold otherwise, Sprint asserts, would be to give NTELOS a license to continue to
violate the law long after its bankruptcy proceedings concluded, which defies both legal
precedent and common sense.
A.
Under the Bankruptcy Code, the confirmation of a reorganization plan discharges the
debtor from any debt arising before the date of confirmation. 11 U.S.C. § 1141(d)(1)(A). A
“debt” is defined as a “liability on a claim,” 11 U.S.C. § 101(12), and a “claim” is defined as a
“right to payment, whether or not such right is reduced to judgment, liquidated, unliquidated,
fixed, contingent, matured, unmatured, disputed, undisputed, legal, equitable, secured or
unsecured. . . .” 11 U.S.C. § 101(5)(A). Congress intended this definition to be “as broad as
possible, noting that ‘the bill contemplates that all legal obligations of the debtor, no matter how
remote or contingent, will be able to be dealt with in the bankruptcy. It permits the broadest
possible relief in the bankruptcy court.’” Grady v. A.H. Robins Co., Inc., 839 F.2d 198, 200 (4th
viewed in the light most favorable to the party opposing the motion,” but “[a] mere scintilla of evidence supporting a
case is insufficient.” Nguyen, 44 F.3d at 237 (quoting Straw v. Stroud, 13 F.3d 791, 798 (4th Cir. 1994)).
4
Cir.) (citing legislative history of 11 U.S.C. § 101(4), which formerly defined the term “claim,”
now codified in § 101(5)), cert. denied, 109 S. Ct. 201 (1988).
In Grady, the Fourth Circuit addressed the issue of when a claim arises for purposes of
bankruptcy. Grady filed a tort action on October 15, 1985, alleging she was injured by an
interuterine contraceptive device, the Dalkon Shield, manufactured and marketed by defendant.
Id. at 199. Defendant had filed for Chapter 11 bankruptcy a few months earlier, on August 21,
1985. Grady asked the court to find that her claim did not arise prior to the filing of the
bankruptcy petition and was therefore not subject to the automatic stay. Id.; see 11 U.S.C.
§ 362(a)(1). Relying on the relevant state law, Grady argued that her cause of action did not
accrue until she was injured, and because she was injured after the petition was filed, the
automatic stay provision in § 362 did not bar her suit from prosecution. She relied on Matter of
M. Frenville Co., Inc., 744 F.2d 332 (3d Cir. 1984), in which the Third Circuit held that a right to
payment must exist prior to the filing of a bankruptcy petition in order for a claim to exist and
that courts must look to state law to determine when such a right to payment arises. Grady, 839
F.2d at 200.
The Fourth Circuit rejected plaintiff’s argument and the Third Circuit’s holding in
Frenville.6 839 F.2d at 201-02. The court held that “the bankruptcy Code is superimposed upon
the law of the State,” and courts should look to the Bankruptcy Code, rather than state law, to
determine when a claim arises. Id. at 202. With respect to the definition of “claim” in the
Bankruptcy Code, the court found that Congress contemplated “the broadest possible relief,”
6
In addition to the Fourth Circuit, the Frenville approach has been “universally rejected” by its sister circuits. In re
Andrews, 239 F.3d 708, 710 n.7 (5th Cir. 2001); see, e.g., In re Parker, 313 F.3d 1267, 1269 (10th Cir. 2002); In re
Jastrem, 253 F.3d 438, 442 (9th Cir. 2001); Epstein v. Official Comm. of Unsecured Creditors, 58 F.3d 1573, 1576
n.2 (11th Cir. 1995). Indeed, Frenville was later overruled by the Third Circuit in the case of In re Grossman’s Inc.,
607 F.3d 114 (3d Cir. 2010).
5
intending “that all legal obligations of the debtor, no matter how remote or contingent, will be
able to be dealt with in bankruptcy.” Id. The Fourth Circuit went on to hold:
We do not believe that there must be a right to the immediate
payment of money in the case of a tort or allied breach of warranty
or like claim, as present here, when the acts constituting the tort or
breach of warranty have occurred prior to the filing of the petition,
to constitute a claim under § 362(a)(1). . . . Congress has created a
contingent right to payment as it has the power to create a
contingent tort or like claim within the protection of § 362(a)(1).
We are of opinion that it has done so.
Id. at 203. Thus, the court found that Grady’s claim arose at the time the Dalkon Shield was
inserted, which occurred prior to the filing of the bankruptcy petition, and that Grady’s claim
was therefore subject to the automatic stay. The analysis used by the Fourth Circuit in Grady to
determine when a bankruptcy claim arises is known as the “conduct test.”
Although the Grady court expressly limited its holding to the context of the automatic
stay,7 the Fourth Circuit applied the same reasoning and holding in Holcombe v. U.S. Airways,
Inc., 369 F. App’x 424, cert. denied, 131 S. Ct. 343 (2010), a case brought under the Americans
with Disabilities Act, in which the court considered whether plaintiff’s discrimination claim had
been discharged in bankruptcy. In Holcombe, plaintiff alleged that she was denied
accommodations for her medical condition beginning January 2002, and she filed grievances as a
result in February and March 2002. Id. at 426. On August 11, 2002, U.S. Airways and its
affiliates filed for relief under Chapter 11 of the Bankruptcy Code. Id. at 427. A reorganization
plan was confirmed on March 18, 2003. Holcombe filed suit in September 2003. One year later,
U.S. Airways filed a second petition for bankruptcy relief under Chapter 11. Although
7
“We emphasize, as did the district court, that we do not decide whether or not Mrs. Grady’s claim or those of the
Future Tort Claimants are dischargeable in this case. . . . We hold only that the Dalkon Shield claim in the case
before us, when the Dalkon Shield was inserted in the claimant prior to the time of filing of the petition, constitutes a
‘claim’ ‘that arose before the commencement of the case’ within the meaning of 11 U.S.C. § 362(a)(1).” Grady, 839
F.3d at 203.
6
Holcombe did not file a proof of claim in the first bankruptcy case, she did file a proof of claim
in the second case. U.S. Airways objected to the claim and moved for summary judgment. The
bankruptcy court granted the motion, finding plaintiff’s claim was barred by the discharge in the
first bankruptcy case. The district court affirmed. Id.
On appeal, the Fourth Circuit held that Holcombe had a claim as of March 18, 2003 and
that her claim was properly discharged as of that date. Id. at 427-28. Employing the conduct test
set forth in Grady, the court found that all of the important events giving rise to Holcombe’s
reasonable accommodation claim occurred prior to the confirmation of the reorganization plan.
369 F. App’x at 428. The court rejected Holcombe’s argument that her claim is a “continuing
violation,” one that “accrued pre-confirmation and has persisted into the post-confirmation
period.” Id. at 429. Importantly for purposes of the instant case, it held that while her claim as
to pre-confirmation discriminatory actions did not survive the 2003 discharge, any claims arising
from allegedly discriminatory acts committed by defendant post-confirmation were not
discharged and remained open for adjudication.8 Id. at 428, 429.
With this framework in mind, the court turns to the issue of whether Sprint has a claim
that arose prior to the confirmation of the Chapter 11 reorganization plan and was therefore
discharged in bankruptcy.
8
Because Grady dealt solely with the applicability of the automatic stay, the relevant date for determining whether a
claim existed was the date of the bankruptcy petition. In Holcombe, the issue was dischargeability, so the relevant
date was the date of the confirmation of the reorganization plan. Indeed, the Bankruptcy Code specifies that the
confirmation date is the relevant date for determining whether a claim has been discharged. 11 U.S.C.
§ 1141(d)(1)(A). In the instant case, the allegations raised in the Second Amended Complaint stem from
overcharges assessed between 2007 and 2009, well after both the bankruptcy petition was filed and the
reorganization plan confirmed.
7
B.
Pursuant to the Fourth Circuit’s conduct test, a claim arises when the conduct giving rise
to the alleged liability occurred.9 Concord West of the Ashley Homeowners’ Ass’n v. J.A.
Jones, Inc., No. 3:09-cv-00182-GCM, 2010 WL 148432, at *1 (W.D.N.C. Jan. 12, 2010)
(quoting In re Piper Aircraft Corp., 58 F.3d 1573, 1577 (11th Cir. 1995) (citing Grady, 839 F.2d
at 199)). In order to determine whether Sprint’s claim arose pre- or post-bankruptcy, the court
must determine what conduct gave rise to NTELOS’ liability.
The Communications Act requires NTELOS to file with the FCC and keep open for
public inspection “schedules showing all charges for itself and its connecting carriers for
interstate and foreign wire or radio communication[s],” which are known as tariffs. 47 U.S.C.
§ 203(a). NTELOS is liable if it charges, demands, collects or receives a “greater or less or
different compensation” than that set forth in the applicable tariff on file. 47 U.S.C. § 203(c).
On September 18, 2002, NTELOS concurred in the ICORE Tariff, which, according to Sprint,
provides only for billing at flat DTT rates. Pl.’s Second Am. Compl., Dkt. # 67, at ¶¶ 11, 15, 17,
27. Sprint alleges that between 2002 and 2009 NTELOS billed Sprint at higher, usage-based
TST rates in violation of the ICORE Tariff, Section 6.1.3(A)(2). Pl.’s Second Am. Compl., Dkt.
# 67, at ¶¶ 16, 26, 28-30. Sprint asserts that this billing practice has resulted in monthly
overcharges, and each of these overcharges gives rise to a separate claim against NTELOS.
While claims to overcharges assessed prior to confirmation of the reorganization plan may have
9
Having rejected the “accrual test” articulated in Frenville, most circuits have adopted either the conduct test or
what has been referred to as the “prepetition relationship test.” See, e.g., In re Piper Aircraft Corp., 58 F.3d 1573
(11th Cir. 1995) (adopting a slightly modified version of the prepetition relationship test). The court notes that at
least one district court within the Fourth Circuit has applied what appears to be a “joint prepetition relationship and
conduct test regime,” finding the prepetition test to be a threshold inquiry that allows for analysis under the conduct
test. Concord West of the Ashley Homeowner’s Ass’n v. J.A. Jones, Inc., No. 3:09-cv-00182-GCM, 2010 WL
148432, at *2-3, 3 n.3 (W.D.N.C. Jan. 12, 2010). In the instant case, the court need not decide whether to apply a
strict conduct test or a hybrid prepetition relationship / conduct test as did the court in Concord West. Sprint and
NTELOS plainly had a prepetition relationship. See Pl.’s Second Am. Compl., Dkt. # 67, at ¶ 24. Thus, the court’s
analysis will focus solely on the conduct test.
8
been discharged (and certain others perhaps barred by the statute of limitations, see note 2,
supra), Sprint asserts its claims to refunds for the nearly $4 million in overpayments made
between July 21, 2007 and October 31, 2009 survive bankruptcy. The court agrees.
The Bankruptcy Code defines a “claim” as a “right to payment.” 11 U.S.C. § 101(5)(A).
Sprint has no right to payment unless and until it is overcharged by NTELOS in violation of the
applicable tariff. Until Sprint receives a bill from NTELOS, it does not know whether it has
been charged correctly or incorrectly under the tariff. Sprint’s right to repayment for
overcharges assessed by NTELOS between July 2007 and October 2009 arose at the time Sprint
was billed for services rendered during that period.
NTELOS argues Sprint knew or should have known as early as 2002 that NTELOS was
billing Sprint incorrectly and that the conduct would continue. NTELOS contends that its
conduct should have been foreseeable, suggesting the claims were part of a continuing course of
conduct dating back pre-bankruptcy to 2002, when it first failed to switch Sprint to DTT rates
after adoption of the ICORE Tariff, and continuing through 2009. Similar arguments were made
and rejected in both Holcombe and O’Loghlin v. County of Orange. Holcombe, 369 F. App’x at
428 n.2, 429 (rejecting Holcombe’s theory that her ADA claim was a single, unitary “continuing
violation” claim that accrued pre-confirmation and persisted into the post-confirmation period);
O’Loghlin v. Cnty. of Orange, 229 F.3d 871, 874-75 (9th Cir. 2000) (reversing district court’s
holding that second and third denials of accommodation were “inevitable consequence” of the
first denial, rather than actionable continuing violations of the ADA, and holding county liable
for post-discharge conduct that violated the statute).
Even if Sprint should have known in 2002 that NTELOS was billing incorrectly, it does
not change the fact that, under the Bankruptcy Code, Sprint has a separate right to payment every
9
time NTELOS bills Sprint in contravention of the tariff. The fact that Sprint did not notice it was
being overcharged until 2009 is inapposite for purposes of this analysis.10
While the court recognizes that questions of when a cause of action accrues for purposes
of bankruptcy and when the statute of limitations begins to run are “two separate and distinct
issues aimed at very different problems,” In re Swift, 129 F.3d 792, 796 (5th Cir. 1997), it is
worth examining how courts and regulatory agencies have treated the issue of overcharges in the
statute of limitations context. In determining when a statute of limitations begins, courts have
treated the duty to make monthly payments for telecommunications services like an installment
contract and held that a separate cause of action arises on the date each payment is missed, even
if those installments stem from a services agreement between the parties. See MFS Int’l, Inc. v.
Int’l Telcom Ltd., 50 F. Supp. 2d 517, 524-25 (E.D. Va. 1999) (citing MCI Telecomm. Corp. v.
Teleconcepts, Inc., 71 F.3d 1086 (3d Cir. 1995)). The FCC took a similar approach to a case
involving overcharges, Tele-Valuation, Inc. v. American Telephone & Telegraph Co., 73
F.C.C.2d 450 (1979). In Tele-Valuation, plaintiff was hired as a telecommunications consultant
by Wilson Freight Co. In the course of that employment, Tele-Valuation uncovered mistakes in
10
Any seeming injustice that may result from allowing Sprint to proceed with this cause of action after failing to
notice these monthly overcharges for seven years is offset by the fact that, at best, Sprint will only be able to recover
damages stemming from overcharges assessed between July 2007 and October 2009, as any claims it has to refunds
for overpayments made after confirmation of the reorganization plan but prior to 2007 are barred by the statute of
limitations. The FCC aptly noted in Tele-Valuation, Inc. v. Am. Tel. & Tel. Co., 73 F.C.C.2d 450, 452 (1979), that
at the point a customer receives its bill for services, the customer:
may review the charges, compare them with the appropriate tariffs, question the
carrier, or take any other steps necessary to detect and remedy errors. This
places a burden of prompt detection of overcharges on the party with the
greatest incentive to do so and penalizes dilatory detection, thereby guarding
against later attempts to recover for stale claims. Through the exercise of
diligence the customer may prevent loss; he therefore is held knowledgeable at
the time he is notified of his charges.
Sprint’s failure to carefully inspect its bills limits its damages claim in this case to just over two years of
overcharges.
10
the bills it received from AT&T for its leased private line network, some of which dated back
over a decade. AT&T refunded only $3,000 of the $17,700 Tele-Valuation claimed was owed,
arguing the remaining claims had been extinguished as a matter of law by the running of the
statute of limitations as set forth in 47 U.S.C. § 415(c). Id. The FCC held that while the
Communications Act itself does not define the point of accrual of a cause of action:
[I]n the analogous case of an action for damages, the point has
been determined to be when the carrier does the unlawful act or
fails to do what is required. We believe the same rationale governs
in the case of overcharges and that, as a general proposition, the
point of accrual should be fixed as the time the customer receives a
bill for services.
Id. at 452. Thus, the FCC found that the statute of limitations in effect at the time each particular
bill was rendered governed plaintiff’s claims. Id. at 453.
Although the statute of limitations issue is distinct from the one currently before the
court—namely, when Sprint’s claims accrued for purposes of bankruptcy—the answer to both
questions happens to be the same in this case. The court finds no reason to treat overcharges
differently for purposes of this analysis. Sprint’s right to payment, its claim as defined in the
Bankruptcy Code, arose each time it was billed for services rendered at a rate in contravention of
the tariff and in violation of 47 U.S.C. § 203(c). Those claims that arose pre-bankruptcy have
been discharged; those that arose post-bankruptcy remain viable.
NTELOS argues that the act giving rise to its liability was not the rendering of the bill but
the failure to switch Sprint to DTT billing upon adoption of the ICORE Tariff in 2002— an act
which undoubtedly occurred pre-bankruptcy. NTELOS points to the expansive definition of
“claim” in the Bankruptcy Code and to the court’s holding in Grady that the first conduct giving
rise to a claim establishes whether it arose pre- or post-petition, irrespective of any post-petition
injuries that might stem from that conduct. NTELOS’ theory of the case is that its failure to
11
switch Sprint to DTT billing in 2002 is the first conduct and the resulting monthly overcharges
are simply the injuries stemming from that conduct.
Despite NTELOS’ reliance on Grady, the instant case is factually distinguishable. Grady
involved a tort claim, and it was clear that the act giving rise to liability—the insertion of the
Dalkon Shield—occurred pre-petition. The issue in Grady was, in fact, whether plaintiff’s claim
for purposes of bankruptcy arose when the act giving rise to liability was performed or whether it
arose when the harm caused by those acts manifested. Grady argued she could not have sued
defendant until she knew the nature of her injuries, because the relevant state law held a cause of
action did not accrue until that point. 839 F.2d at 201 n.4. The Fourth Circuit rejected that
argument, holding the Bankruptcy Code, rather than state law, dictates when a claim arises.
Here, the issue in dispute is the actionable conduct itself—what gave rise to NTELOS’
liability? The answer is NTELOS’ billing at a rate different than that set forth in the tariff. See
47 U.S.C. § 203(c). NTELOS billed Sprint for services rendered at the TST rate, rather than the
DTT rate Sprint asserts is required under the tariff, on a monthly basis between 2002 and 2009.
The adoption of the ICORE Tariff did not trigger NTELOS’ alleged liability; its failure to bill
Sprint at a rate in accordance with that tariff did.
Unlike Grady, this is not a case where post-bankruptcy injuries naturally flowed from
pre-bankruptcy conduct. Instead, separate violations of the Communications Act occurred both
pre- and post-bankruptcy, giving rise to separate claims. As the case law makes clear, those
claims stemming from post-bankruptcy violations survive, regardless of whether they are similar
to the pre-bankruptcy claims. See Holcombe, 369 F. App’x at 428-29 (holding any allegedly
discriminatory acts that occurred after the reorganization plan was confirmed were not
discharged in bankruptcy and remained viable claims); O’Loghlin, 229 F.3d at 874-75 (holding
12
the county liable for post-discharge violations of the ADA despite the fact that similar predischarge violations were not viable).
Consider the case of In re Rosenfeld, 23 F.3d 833 (4th Cir.), cert. denied, 115 S. Ct. 200,
reh’g denied, 115 S. Ct. 622 (1994). Rosenfeld acquired shares of River Place East Housing
Corporation, a housing cooperative association, as well as a possessory interest in a River Place
apartment, in 1983. Id. at 835. A covenant running with the land required owners to pay
association dues; assessments were made annually and each owner was required to pay onetwelfth of his annual assessment each month of the fiscal year. Rosenfeld ceased paying his
dues. He filed for Chapter 7 bankruptcy protection in October 1990 and in February 1991 was
granted a discharge, which included $2,300 in pre-petition assessment of River Place dues.
River Place then instituted a separate state court proceeding against Rosenfeld seeking dues from
November 1, 1990 through April 30, 1992. Rosenfeld filed a motion for contempt in bankruptcy
court, arguing his discharge extinguished any liability for both pre-petition and post-petition
cooperative assessments. Id.
The bankruptcy court in Rosenfeld held that the act giving rise to River Place’s right to
payment was Rosenfeld’s contract to purchase his cooperative interest in 1983. As such, the
bankruptcy court considered the debt to be pre-petition and held it was discharged, even though
some of the dues payments were not owed until the period following the filing of the petition.
Id. at 836. The district court, however, reversed the decision of the bankruptcy court, finding the
post-petition assessments were not discharged. The Fourth Circuit affirmed.
The Fourth Circuit recognized that “[t]he question of whether a bankruptcy discharge
encompasses post-petition assessments has been addressed in the context of condominium
association and homeowners’ association dues with inconsistent results.” Id. The Fourth Circuit
13
declined to follow a line of cases holding that an association’s right to payment of dues arises
when the contract is made and is contingent on the debtor’s continued ownership of the property.
Id. Instead, the Fourth Circuit, like the district court below, relied on a line of cases holding that
an association’s claim for post-petition dues does not arise until the dues are assessed. Id. at 837.
The Fourth Circuit found that “Rosenfeld’s obligation to pay the assessments arose from his
continued post-petition ownership of the property and not from a pre-petition contractual
obligation. . . . River Place’s right to payment for post-petition assessments did not arise prepetition and was not extinguished by Rosenfeld’s bankruptcy discharge.” Id. The Fourth Circuit
specifically noted that its holding in Grady did not require a contrary result:
Mrs. Grady’s claim alleged a tort and arose from the insertion of
the Dalkon Shield, which occurred pre-petition. River Place’s
claim is for assessments to cover expenses incurred during
Rosenfeld’s post-petition ownership of real property. Grady deals
with a claim arising from a pre-petition tort, while this case
involves a breach of a covenant running with the land that occurred
post-petition, and we find Grady is clearly distinguishable.
Id.
The district court in Zeitler v. Martel, 255 B.R. 172 (E.D.N.C. 1999), rejected an
argument similar to the one advanced by plaintiff in Rosenfeld. The parties in Zeitler divorced
in 1983 and pursuant to the dissolution decree, Zeitler was obligated to pay Martel a portion of
his retirement benefits, which amount was due and payable at the time he began receiving such
benefits. Id. at 175. Zeitler retired in 1993 and immediately began receiving benefits but did not
pay any portion of those benefits to Martel. Martel learned of Zeitler’s retirement in 1994 and
thereafter instituted state court proceedings as a result of Zeitler’s failure to comply with the
dissolution decree. Id. The matter was stayed, however, upon Zeitler’s petition for bankruptcy
14
protection filed March 29, 1996. Id. at 175-76. Martel instituted an adversary proceeding in the
bankruptcy case. Id. at 174.
The issue before the district court was whether the bankruptcy court erred in finding not
dischargeable Martel’s claims to post-petition retirement benefits Zeitler would receive in the
future.11 Id. at 176. Zeitler argued that the definition of “claim” pursuant to 11 U.S.C. § 101(5)
was to be interpreted broadly in light of Grady and the Fourth Circuit’s conduct test. Id. at 177.
He asserted that his 1993 retirement and his subsequent failure to pay Martel were the relevant
conduct, both of which occurred pre-petition. Id. The district court found this argument
unpersuasive. It held that:
The conduct necessary under Grady was appellant’s failure to pay
appellee upon receipt of his monthly pension payments. As to the
payments yet to be received, they are claims to arise in the future at
the time the payment is received by appellant and not paid to the
appellee. The Bankruptcy Court, although not calling it such,
correctly applied the “conduct test” to hold that appellee’s claims
on post-petition payments received by appellant and her claims on
those payments to be received in the future are non-dischargeable.
Id. at 177-78.
Likewise, in the case of In re Camellia Food Stores, Inc., 287 B.R. 52 (E.D. Va. 2002),
the court held that any claim for payment of additional—or refund of excess—monthly insurance
premiums stemming from a 2001 insurance contract arose post-petition. In Camellia, the
Pennsylvania Manufacturers’ Association Insurance Company (“PMA”) provided insurance to
Camellia Food Stores for the years 1995-2001. Id. at 55. The policies expired at each year’s end
and had to be renewed. Estimated “deposit” premiums were paid to PMA on the first day of
every month to cover that month’s installment payment for insurance coverage, and PMA would
11
The bankruptcy court found that Martel’s claim to $18,000, representing her portion of the pre-petition retirement
payments Zeitler received but did not pay her, was dischargeable. Martel did not appeal this decision. 255 B.R. at
177 n.1.
15
later calculate and adjust the amount of premiums owed. If Camellia had overpaid premiums for
the year, PMA would owe Camellia a “return premium,” and if Camellia underpaid, it would
owe PMA an “additional premium.” Id.
The parties entered into a worker’s compensation insurance contract on December 28,
2000, and coverage began on January 1, 2001. Id. at 57. Four days later, on January 5, 2001,
Camellia filed for Chapter 11 bankruptcy protection. Id. The question before the court was
whether any claim concerning the 2001 insurance premiums arose pre-petition or post-petition.
Citing the Fourth Circuit’s decision in Grady, the court held that:
[U]nder the conduct test, PMA’s right of payment arises upon its
offering continued insurance coverage to Camellia for 2001; quite
simply, if PMA stopped covering Camellia’s worker’s
compensation claims, Camellia would not need to pay PMA’s
premiums. Therefore, any claim PMA or Camellia possesses for
the 2001 insurance premiums is a post-petition claim since such
coverage occurred post-petition.12
Id. at 57-58 (internal citations omitted).
Rosenfeld, Zeitler and Camellia support the finding that Sprint’s claims for overpayments
did not arise until overcharges were assessed and overpayments made. Sprint’s right to payment
did not arise upon adoption of the ICORE Tariff in 2002, just as the right to payment in
Rosenfeld did not stem from the 1983 purchase contract and the right to payment in Camellia did
not stem from execution of the 2001 insurance contract. Likewise, Sprint’s right to payment did
not arise upon NTELOS’ failure to switch to DTT billing after adopting the tariff in 2002, just as
the court in Zeitler held that Martel’s right to payment did not arise as of the date of Zeitler’s
retirement and his subsequent failure to pay Martel. Instead, the relevant conduct under Grady is
12
The court held that the only exception to this finding would be the premium paid for the first four days of 2001,
which likely arose pre-petition. However, because the parties presented no evidence as to the per-day amount of the
2001 premiums, the court had no choice but to include the premium paid for the first four days of 2001 with the rest
of the 2001 premiums. 287 B.R. at 58-59.
16
NTELOS’ monthly billing at rates exceeding those allowed by the ICORE Tariff for services
rendered well after the bankruptcy concluded.
This holding is not inconsistent with the holdings in In re Leckie Smokeless Coal
Company, 99 F.3d 573 (4th Cir. 1996) and In re Thompson, 182 B.R. 140 (E.D. Va. 1995), aff’d,
92 F.3d 1182 (4th Cir. 1996) (unpublished table decision), on which NTELOS relies. Applying
the Grady conduct test, the courts in Leckie and Thompson found that the claims arose prepetition; however, the relevant conduct in both of those cases is distinguishable from the conduct
at issue here.
In Leckie, certain coal operators with liabilities under the Coal Act, the enactment of
which created a Plan and Fund to provide benefits to retiring mine workers, filed petitions for
bankruptcy and asked the bankruptcy court to declare that purchasers of their assets would not be
liable as successors in interest for their financial obligations to the Plan and Fund. 99 F.3d at
575-76. The Plan and Fund argued that the court lacked subject matter jurisdiction over the
matter because they did not have “claims” as defined in the Bankruptcy Code. Id. at 580.
Specifically, they contended that since future premiums had not yet been assessed, the premiums
did not exist, the Plan and Fund could not assert claims to the premiums, and the court could not
issue orders for those premiums. The Fourth Circuit rejected this argument and held that the
Plan and Fund indeed had claims in bankruptcy. Id. at 581. The court found that the enactment
of the Coal Act gave rise to the coal operators’ liability for future premiums, and that conduct
occurred pre-petition. Id. at 580. Indeed, the coal operators’ liability for future premiums was
fixed at the time they filed their bankruptcy petitions; pursuant to the Coal Act, even if the
operators had ceased mining operations to pursue an entirely different enterprise, they still would
have been liable for future Coal Act premiums, simply by virtue of the passage of the Act. Id. at
17
581 n.9. As such, the relevant conduct in Leckie clearly differs from the relevant conduct in the
instant case. NTELOS’ liability was not fixed pre-petition as was the coal operators’ in Leckie;
rather, NTELOS’ liability stems from each overcharge assessed against Sprint. Some of that
allegedly erroneous billing occurred post-bankruptcy. Once NTELOS began billing at a rate that
comported with the tariff, NTELOS’ liability—and Sprint’s right to payment—ceased.
The relevant conduct in Thompson is also distinguishable. In Thompson, the court held
that a police officer’s right to payment of retirement benefits, and the Retirement Board’s right to
collect overpayments made to the officer, both arose prior to the filing of the officer’s Chapter 7
bankruptcy petition. Thompson joined the police force in 1969 and, after sustaining a workrelated injury, began receiving disability benefits in 1973. 182 B.R. at 144. In 1987, Thompson
pled guilty to a drug conspiracy, and the Retirement Board later determined that he had earned
over $6 million in unreported income from these illegal activities between 1974 and 1986. Id. at
145. As such, the Board began to suspend its monthly disability payments to Thompson in order
to collect the overpayments it made to him during that period. Id. at 146. When Thompson
became eligible to receive regular retirement benefits on January 1, 1994, following 25 years of
service to the police force, the Board sought to withhold these benefits as well. Thompson filed
a petition for relief under Chapter 7 of the Bankruptcy Code on December 29, 1993 and
commenced an adversary proceeding against the Board, arguing that any withholding of his
disability and retirement benefits violated the automatic stay. The Board counterclaimed.
One issue before the court was whether the Board had a right to a set-off, which required
a finding of “mutual claims that arose before the commencement of the bankruptcy case.” Id. at
152. Having found the Board’s right to collect overpayments from Thompson was indeed a
“claim” as defined in the Bankruptcy Code, id. at 151, the court then determined that both the
18
Board’s and Thompson’s claims arose pre-petition. The court held that “[t]he Board’s claim is
based on the overpayments it made prepetition,” id., and that “Thompson’s right to payment for
retirement benefits arose when he joined the police department in 1969, and thus became a
participant in the plan.” Id. at 153. The fact that Thompson had to obtain 25 years of service
was merely a contingency. As such, the Board had a right to set-off. Id.
Much like in the instant case, the conduct relevant to the Board’s claim in Thompson was
its overpayment of benefits between 1974 and 1986. But unlike in the instant case, the entirety
of those overpayments was made pre-petition. The relevant conduct giving rise to Thompson’s
claim also is distinguishable. Thompson’s right to payment of benefits arose from his
employment, which began in 1969. Here, by contrast, Sprint’s right to repayment stems from
overcharges assessed in violation of the tariff between 2007 and 2009, years after the bankruptcy
concluded.
While the purpose of bankruptcy is to give the debtor a “fresh start,” “[a] ‘fresh start’
means only that; it does not mean a continuing license to violate the law.” O’Loghlin, 229 F.3d
at 875. Because the overcharges alleged in Sprint’s Second Amended Complaint were assessed
by NTELOS post-bankruptcy, Sprint’s claims were not discharged and its cause of action
remains viable. As such, NTELOS’ Motion for Summary Judgment (Dkt. # 50) will be
DENIED.
III.
NTELOS alternatively argues that this case should be stayed and referred to the FCC
under the doctrine of primary jurisdiction. The doctrine of primary jurisdiction allows a court to
stay or dismiss a case without prejudice to give the parties a reasonable opportunity to seek an
administrative ruling on “some issue within the special competence of an administrative
19
agency.” Reiter v. Cooper, 507 U.S. 258, 268 (1993). The doctrine “allows a federal court to
refer a matter extending beyond the ‘conventional experiences of judges’ or ‘falling within the
realm of administrative discretion’ to an administrative agency with more specialized experience,
expertise, and insight.” Nat’l Commc’ns Ass’n v. Am. Tel. & Tel. Co., 46 F.3d 220, 222-23 (2d
Cir. 1995) (quoting Far East Conference v. United States, 342 U.S. 570, 574 (1952)).
“Specifically, courts apply primary jurisdiction to cases involving technical and intricate
questions of fact and policy that Congress has assigned to a particular agency.” Id. (citing Goya
Foods, Inc. v. Tropicana Prods., Inc., 846 F.2d 848, 851 (2d Cir. 1988)). “Generally speaking,
the doctrine is designed to coordinate administrative and judicial decision-making by taking
advantage of agency expertise and referring issues of fact not within the conventional experience
of judges or cases which require the exercise of administrative discretion.” Envtl. Tech. Council
v. Sierra Club, 98 F.3d 774, 789 (4th Cir. 1996) (citing United States v. W. Pac. R.R. Co., 352
U.S. 59, 64 (1956)). By dividing decision-making authority, the doctrine serves to promote
“proper relationships between the courts and administrative agencies charged with particular
regulatory duties.” W. Pac., 352 U.S. at 63. It also serves judicial economy because the dispute
may be decided by the administrative agency and obviates the need for court intervention. See
Ryan v. Chemlawn Corp., 935 F.2d 129, 131 (7th Cir. 1991).
Although “‘[n]o fixed formula exists for applying the doctrine of primary jurisdiction,’”
Envtl. Tech. Council, 98 F.3d at 789 (quoting W. Pac., 352 U.S. at 64), courts frequently employ
a four factor test, as follows:
(1)
Whether the question at issue is within the conventional
experience of judges or whether it involves technical or policy
considerations within the agency’s particular field of expertise;
(2)
Whether the question at issue is particularly within the
agency’s discretion;
20
(3)
Whether there exists a substantial danger of inconsistent
rulings; and
(4)
Whether a prior application to the agency has been made.
Nat’l Commc’ns Ass’n, 46 F.3d at 222; Cent. Tel. Co. of Va. v. Sprint Commc’ns Co. of Va.,
759 F. Supp. 2d 772, 786 (E.D. Va. 2011). The court must also balance the advantages of
applying the doctrine against the potential costs resulting from complications and delay in the
administrative proceedings. Ricci v. Chi. Mercantile Exch., 409 U.S. 289, 321 (1973).
NTELOS argues that this dispute properly should be resolved by the FCC lest the court
“become embroiled in the technical aspects” of tariff construction. Access Telecomm. v. Sw.
Bell Tel. Co., 137 F.3d 605, 609 (8th Cir. 1998). NTELOS points out that the ICORE Tariff is
more than 500 pages long and has over 400 sections, and is comprised of many industry terms
and acronyms that make it difficult to understand. NTELOS contends that resolving this dispute
will require the court to construe various technical terms that have particular connotations and
meanings in the telecommunications industry, including whether Sprint properly ordered DTT
services under the terms of the ICORE Tariff, industry guidelines and standards. NTELOS urges
the court to consider this issue against the backdrop of years of local transport restructuring by
the FCC and suggests that the FCC is in the best position to assess how the ICORE Tariff should
be interpreted in light of rulings involving other similar tariffs.
NTELOS asserts that the definitional sections in the ICORE Tariff relied upon by Sprint
are identical to those found in another tariff used widely in the industry, the National Exchange
Carriers Association Tariff (“NECA Tariff”), yet Sprint’s construction of the ICORE Tariff’s
terms runs contrary to the way the same provisions of the NECA Tariff are interpreted
throughout the industry. In particular, Sprint argues from §§ 2.6 and 6.1.3.(A)(2) & (3) that the
21
ICORE Tariff only permits NTELOS to charge a DTT rate for certain service segments. While
the definitional test appears to support such a construction, the NECA Access Charge Handbook,
pertaining to identical sections of the NECA Tariff, appears to support the contrary position, i.e.,
that an IXC such as Sprint can order and be provided switched access services by a LEC such as
NTELOS on a TST basis. As a result, NTELOS argues that adoption of Sprint’s position by the
court would result in inconsistent applications of identical terms in the ICORE and NECA
Tariffs, likely to cause widespread confusion across the industry.
Sprint argues that NTELOS has waived its primary jurisdiction argument by waiting so
long to raise the issue in this case. Sprint posits that this case does not present any complicated
or technical issues beyond the ken of the court and that this case may be decided based on the
plain meaning of the ICORE Tariff under the filed rate doctrine. Sprint contends that the
unambiguous terms of the ICORE Tariff do not allow NTELOS to charge Sprint for TST
services for the segments at issue in this case regardless of what local access services were
ordered by Sprint. Sprint argues that the filed rate doctrine, undeniably strict in application, does
not allow NTELOS to charge Sprint a rate not spelled out in its filed tariff. Finally, Sprint argues
that the interests of justice are not served by delaying this matter any further to allow the FCC to
weigh in on the dispute.
On one hand, the core issue in this case seems relatively straightforward: Do the
definitional sections of the ICORE Tariff allow NTELOS to charge the higher TST rates for
Sprint calls traversing the segments of the NTELOS system at issue?13 On its face, § 2.6 of the
ICORE Tariff defines these segments as being DTT and § 6.1.3(A)(2) provides that a DTT rate
applies for such a communications path. Consistently, § 6.1.3(A)(3) states that the TST rate
13
Sprint identifies those segments as the segment from the Roanoke Serving Wire Center to the Waynesboro End
Office and the segment from the Roanoke Serving Wire Center to the NTELOS Tandem.
22
applies to a different communications path, that of the segment between the tandem and the end
office. Because the DTT rate is the only rate that applies to the segments in question, Sprint
argues that this case presents no technical or policy issues warranting a referral for a factual
determination by the FCC.
On the other hand, many other provisions of the ICORE Tariff support NTELOS’
argument that an IXC such as Sprint must specify and order the local access services it requires.
The expert reports filed by NTELOS in opposition to the motion for summary judgment recount
the regulatory history of Local Transport Restructuring overseen by the FCC over the past two
decades. In his expert report, NTELOS expert Jeffrey W. Reynolds charts the FCC’s
involvement in this complicated and technical restructuring process back to 1992.14 Reynolds
states that the FCC clearly placed the responsibility for ordering Direct Trunked Transport
services on IXCs, such as Sprint, while at the same time leaving them with the option of
continuing to use Tandem Switched Transport service. Reynolds Report, Dkt. # 63-2, at ¶ 19.
Reynolds notes that the FCC only allowed non-Tier 1 LECs, such as NTELOS, to file tariffs for
DTT upon receipt of a bona fide request for DTT. Id. at ¶ 20. It is undisputed that no such
request was made by Sprint until November 2009.
The expert reports filed by NTELOS suggest that the switch from TST to DTT services
was not a simple matter of just changing the rate as Sprint’s motion proffers. Rather the services
provided are inherently different. For example, NTELOS states that under TST, the local
exchange carrier has the burden of ensuring that it has adequate capacity to handle the long
14
Reynolds traces the FCC’s oversight of this process back to its First Transport Order issued in 1992, which his
Expert Report quotes as follows: “The rate structure and pricing of switched transport are the keystone of a
regulatory structure designed to promote competition for interstate switched transport and interexchange service and
to encourage efficient use of the access network, thereby promoting economic investment and innovation.”
Reynolds Report, Dkt. # 63-2, at ¶¶ 14, 15 (quoting In the Matter of Transport Rate Structure and Pricing, CC
Docket No. 91-213, FCC 92-442, 7 FCC Rcd. 7006 (October 16, 1992)).
23
distance carrier’s traffic, while under DTT the burden shifts to the long distance carrier to make
sure it orders sufficient capacity to handle all of its traffic.
NTELOS explains further that the ICORE Tariff places the obligation on Sprint to tell
NTELOS what services it wants to order. Chapter 5 of the ICORE Tariff, entitled Access
Ordering, spans 27 pages and provides detailed ordering requirements. The local access services
order form, termed an Access Service Request (“ASR”), provides for no less than 47 different
valid configurations under which a customer may order switched access service. Without an
order from Sprint, NTELOS asserts that it had no way to know which configuration Sprint
sought and that the provision of DTT services without an ASR requesting the same was
practically and technically impossible.
Both Sprint and NTELOS argue that a portion of § 5.2.1 of the ICORE Tariff, specifying
the ordering requirements for switched access service, supports their position. Section 5.2.1
itself is seven pages long, and each party focuses on the first paragraph of this section, which
states as follows:
5.2.1 Switched Access Service
When ordering Switched Access service, the customer must
specify the directionality of the service and whether the service is
to be provided as (1) Direct Trunked Transport from the serving
wire center to the end office or (2) Direct Trunked Transport from
the serving wire center to a tandem which connects with Tandem
Switched Transport from the tandem to the end office. When all or
a portion of service is ordered as Direct Trunked Transport, the
customer must specify the type and quantity of Direct Trunked
Transport facility (e.g., Voice Grade, High Capacity DS1 or DS3,
or Synchronous Optical Channel OC3 or OC12) and the hubs or
ADM equipped wire centers involved.
Sprint argues that the first sentence of this section unambiguously supports its position that the
ICORE Tariff only allows NTELOS to provide and charge Sprint for DTT services between the
24
serving wire center and the end office or tandem. To be sure, the fact that this sentence only
mentions DTT services supports Sprint’s construction. At the same time, however, this sentence
does not clearly state that DTT service is the only type of service that could be provided. Other
passages in § 5.2.1 appear to suggest that TST services can be ordered. For example, the very
next sentence, which opens with the predicate that “[w]hen all or a portion of the service is
ordered as Direct Trunked Transport,” plainly suggests that a portion of the order can specify
TST. TST is also mentioned on the next page of § 5.2.1, which provides “[w]hen a customer has
both Tandem Switched Transport and Direct Trunked Transport at the same end office, the
customer will be provided Alternate Traffic Routing as set forth in Section 6.4.6(C) following.”15
Other sections of the ICORE Tariff make clear the obligation of the IXC to tell the LEC
what services it wants in an ASR. For example, ICORE Tariff § 2.1.4 requires that the IXC
provide reasonable notice of the services required. Section 5.1 states that “[t]he customer shall
provide to the Telephone Company the order information required in Section 5.2,” and § 6.1.2
provides that “Switched Access Service is ordered under the Access Order provisions set forth in
Section 5.2.” Further, § 6.1.3(A) of the ICORE Tariff requires the long distance carrier, when
ordering DTT, to specify “the type of Direct Trunked Transport and whether it will overflow to
Tandem Switched Transport when service is directly routed to an end office.” These sections
plainly place the burden on Sprint to order the services is needs and raise questions as to whether
its “one rate fits all” argument squares with the all of the terms of the ICORE Tariff and the way
the industry has operated under it and similar tariff provisions.
It is clear, therefore, that the ICORE Tariff required Sprint to order what local access
services it wanted to purchase from NTELOS. Sprint argues that regardless of its obligation to
15
The court appreciates that this sentence could be construed consistent with Sprint’s argument, as it does not
dispute that NTELOS’ billing of TST services between the NTELOS tandem and the end office was correct.
However, this sentence is not limited to that scenario and is, frankly, as clear as mud.
25
order, there was only one type of service that the ICORE Tariff allowed it to order and that the
filed rate doctrine requires NTELOS to refund Sprint for monies paid in excess of the DTT rate.
The manner in which these two parties operated for seven years and other indicia of
industry practice suggests otherwise. To be sure, the filed rate doctrine does not allow Sprint and
NTELOS to agree to a rate other than that set forth in the tariff. See, e.g., Maislin Indus. U.S.,
Inc. v. Primary Steel, Inc., 497 U.S. 116, 126 (1990); D.S. Swain Gas Co., Inc. v. Dixie Pipeline
Co., 911 F.2d 721, 1990 WL 112071, at *2 (4th Cir. 1990) (unpublished table opinion); MCI
WorldCom Network Servs., Inc. v. Paetec Commc’ns, Inc., No. Civ.A.04-1479, 2005 WL
2145499, at *3-5 (E.D. Va. Aug. 31, 2005). The purpose of the doctrine is to prevent price
discrimination among customers. This case does not present circumstances, however, of the two
parties acting in a manner to skirt the tariff to benefit one customer. Rather, the parties, acting at
arm’s length, operated for seven years with Sprint paying NTELOS the per-minute, per-mile rate
for TST services. Given the large amount of money involved, the fact that Sprint ordered and
paid for TST services for such a long period of time suggests that the issue is not as clear cut as
Sprint contends. Were it as clear as Sprint maintains, one cannot help but wonder why it took
Sprint so long to request a refund of the claimed overcharge.
In addition to the custom and practice of these two parties over the seven years between
2002 and 2009, NTELOS offers evidence that the custom and practice of the industry in general
is consistent with its view that the ICORE Tariff allowed it to provide and bill Sprint for TST
services. As detailed in the expert report of Gary M. Zingaretti, others in the industry have
interpreted identical language in the widely used NECA Tariff to allow a long distance carrier to
“use Tandem Switched Transport service as its primary form of transport in lieu of Direct
Trunked Transport.” See NECA Access Charge Handbook, § 6, at p. 6-5, attached as Ex. GMZ-
26
4 to Expert Report of Gary M. Zingaretti (Dkt. # 65-3). As Zingaretti explains, the NECA
Access Charge Handbook provides guidance to more than 1,100 local exchanges subject to the
NECA Tariff. NTELOS argues that Sprint’s construction of the ICORE Tariff to require DTT
services and rates is inconsistent with the way the industry has operated under identical
provisions of the NECA Tariff. NTELOS highlights the risk of inconsistent applications of
similar tariff language as a significant factor in justifying a reference to the FCC.
The court agrees. Indeed, application of the National Communications factors in this
case supports a reference to the FCC. First, the court believes that the process and requirements
for ordering switched access services involves technical considerations within the FCC’s
particular field of expertise. Over the past two decades, the FCC has been dealing with local
transport restructuring and is well-equipped to assess the technical requirements of what Sprint
ordered and what NTELOS provided and the ordering process by which those services were to
be requested. The ordering strictures of the ICORE Tariff alone run 27 pages, and detailed
technical issues concerning the requirements of the ordering process are best first directed to the
FCC. Plainly, whether NTELOS was allowed to provide and bill Sprint for DTT services in the
absence of an order for such services calls for the guidance of the FCC as to the operation of the
FCC-approved ICORE Tariff in the regulatory framework constructed by the FCC for the
provision of such services. Second, this issue falls squarely within the FCC’s discretion. Third,
the court is particularly concerned by the fact that identical provisions of the NECA Tariff are
interpreted by the industry in a manner different from that advocated by Sprint, thus raising the
substantial danger of inconsistent rulings on identical provisions of parallel tariffs. The concern
over inconsistent rulings compels the court to conclude that the expertise and knowledge of the
27
FCC as to how the industry interprets similar tariff provisions and operates in practice is critical
to the proper resolution of the present dispute.
Another substantial reason motivating the court to refer this matter to the FCC is the
practical and technical impossibility argument raised by NTELOS. NTELOS argues that the
ICORE Tariff requires it to provide services ordered by Sprint, and that it cannot read Sprint’s
mind and guess at the services to be provided. NTELOS’ expert Reynolds states:
Absent a valid ASR from Sprint for DTT billing NTELOS had no
basis for switching Sprint to DTT and was unable to anticipate and
provision the DTT network configuration and transport element
Sprint desired. The presence of a valid and correct ASR has
implications not only for access billing but also for the proper
provisioning of the network facility to be utilized by an IXC.
Without Sprint communicating the type of DTT billing
arrangement, NTELOS has no way of knowing these parameters.
Reynolds Report, Dkt. # 63-2, at ¶ 25. This makes sense to the court as well. In short, this case
turns on the technical considerations associated with the obligation of Sprint to order DTT
services under the ICORE Tariff. Such “technical considerations are best resolved, in the first
instance, by the FCC, the agency with both the expertise in these technical issues and the
mandate to elucidate and implement the Act.” Advamtel, LLC v. Sprint Commc’ns Co., L.P.,
125 F. Supp. 2d 800, 805 (E.D. Va. 2001). Finally, the court does not believe the fact that this
matter has not yet been presented to the FCC diminishes the benefit of obtaining the benefit of its
knowledge and experience on this highly complex and technical issue.
The court frames the issue for reference as follows: Whether under the FCC regulatory
framework, the terms of the ICORE and similar tariffs, and industry custom and practice,
NTELOS was permitted to provide and charge Sprint for the TST service Sprint ordered during
the 2007-09 period in question? To be sure, there is no formal referral mechanism by which a
court can on its own authority demand or request a determination from an agency. Reiter v.
28
Cooper, 507 U.S. 258, 268 n.3 (1993). Rather, the process is somewhat loose, resulting in a stay
of these proceedings so as to give the parties an opportunity within which to apply to the FCC for
its views on the issue raised herein. Id. (citing United States v. W. Pac. R. Co., 352 U.S. 59, 64
(1956); Great Am. Tank Car Corp. v. El Dorado Terminal Co., 308 U.S. 422, 433 (1940); and
Mitchell Coal & Coke Co. v. Pa. R. Co., 230 U.S. 247, 267 (1913)).
The court recognizes that a referral of this question to the FCC may result in some
additional delay of this matter. Given how long it has taken Sprint to raise this issue, however,
the court believes that any attendant delay will be more than offset by the technical knowledge
and industry experience brought to bear by the FCC as to the factual issues concerning how the
industry operates with regard to the ordering of switched access services and particularly with
regard to whether the interpretation of the ICORE Tariff posed by Sprint comports with industry
practice. To minimize the impact of this delay, however, the stay will be of limited duration.
The case will be stayed for eight months only, until May 1, 2013. If, by that time, the FCC has
not ruled on the issue referred to it, a trial addressing all remaining questions, including those
referred to the FCC, will proceed in this court.
IV.
For these reasons, NTELOS’ motion for summary judgment (Dkt. # 50) is DENIED and
its motion to stay and refer to the FCC (Dkt. # 64) is GRANTED. Because this matter will be
referred to the FCC, the court need not consider the merits of Sprint’s motion for summary
judgment, and that motion (Dkt. # 57) will be DENIED at this time.
29
An appropriate Order will be entered.
Entered: July 26, 2012
/s/ Michael F. Urbanski
Michael F. Urbanski
United States District Judge
30
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.