ORDER granting 33 CSC's Motion to Dismiss with leave to amend within 10 days of this order; denying 36 CSC's Motion for Protective Order by Judge James L. Robart.(MD)

Download PDF
1 2 3 4 5 6 7 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE 8 9 10 GUST H. BARDY, CASE NO. C13-0778JLR Plaintiff, 11 12 v. 13 ORDER GRANTING MOTION TO DISMISS CARDIAC SCIENCE CORP., Defendant. 14 15 Before the court is Defendant Cardiac Science Corporation’s (“CSC”) motion to 16 dismiss Plaintiff Dr. Gust H. Bardy’s complaint pursuant to Federal Rule of Civil 17 Procedure 12(b)(6). (Mot. (Dkt. # 33).) CSC and Dr. Bardy collaborated for several 18 years in researching and developing medical devices, but the relationship eventually 19 soured. CSC and Dr. Bardy’s collaboration was governed by a contract, and Dr. Bardy 20 now alleges that CSC breached that contract. Dr. Bardy alleges five causes of action: 21 two for breach of contract, one for promissory estoppel, one for unjust enrichment, and 22 one for declaratory judgment. In this motion, CSC moves to dismiss all five causes of ORDER- 1 1 action, arguing a different theory of dismissal for each. The court considers each 2 argument in turn and, having considered the pleadings and held oral argument, and 3 finding all of CSC’s arguments to be meritorious, GRANTS CSC’s motion and 4 DISMISSES Dr. Bardy’s complaint. 5 6 I. BACKGROUND Both Dr. Bardy and CSC work in the field of heart disease treatment. Dr. Bardy is 7 a cardiologist who has experience designing devices to treat and manage irregular 8 heartbeat conditions and diseases (also called “cardiac arrhythmias”). (First Am. Compl. 9 (Dkt. # 29) ¶ 2.) Dr. Bardy describes himself as an “entrepreneurial cardiologist” with 10 experience designing and executing clinical trials for heartbeat-monitoring devices and 11 conducting research, development, and commercialization for those devices and related 12 software. (Id.) CSC is a corporation headquartered in Wisconsin that develops, 13 manufactures, and markets heart-related medical devices such as automated external 14 defibrillators, electrocardiograph devices, and similar devices. (Id. ¶ 3.) CSC has 15 “substantial business activities” in King County, Washington. (Id.) 16 Dr. Bardy and CSC signed an agreement to collaborate in December 2009 titled 17 “Collaboration and Consulting Agreement” (hereinafter referred to as “the Agreement”). 18 (Id. ¶ 9.) The purpose of the Agreement was to “form a collaboration and consulting 19 agreement to design, develop, manufacture, commercialize, and use medical devices and 20 diagnostic technologies.” (Id.) Under the Agreement, CSC would provide office space 21 and resources to Dr. Bardy and pay him an annual salary. (Id. ¶ 10.) In return, Dr. Bardy 22 ORDER- 2 1 would conduct research and attempt to develop medical devices that could be 2 commercialized by CSC. (Id.) 3 The collaboration yielded a product called the “mySense Monitor.” (Id. ¶ 20.) 4 The mySense Monitor is a wearable electrocardiograph monitor about the size of a large 5 band-aid. (Id.) It continuously monitors and records the electrical activity of the 6 cardiovascular system and heart and transmits the data to its associated software for 7 review and analysis. (Id.) Dr. Bardy designed and developed this product, which he 8 claims “represents a significant clinical and cost improvement” over prior technology. 9 (Id. ¶ 21.) He also obtained United States Food and Drug Administration (“FDA”) 10 approval for the product. (Id. ¶ 20.) 11 However, according to Dr. Bardy, CSC did not do enough to develop the product 12 and bring it to market. (Id. ¶¶ 24-51.) Dr. Bardy alleges that CSC “failed to take critical 13 and necessary steps for the development of the mySense Monitor” and that, as a result, 14 the product still is not commercially available. (Id. ¶ 24.) Specifically, Dr. Bardy alleges 15 that CSC failed to pay, or made late payments to, numerous people hired to develop the 16 product, including the main clinical trial doctor, the law firm hired to protect the 17 associated intellectual property rights (“IPR”), the regulatory affairs consultant, the 18 contract manufacturer, and others. (Id. ¶¶ 25, 27-28.) In addition, Dr. Bardy alleges that 19 CSC failed to provide development services such as software support, legal services, and 20 marketing. (Id. ¶¶ 26, 29, 31.) Dr. Bardy alleges that this conduct breached the 21 Agreement. (Id. ¶¶ 65-81.) CSC, for its part, believes that it “has not yet been able to 22 define a business model that will result in an acceptable return on investment.” (Id. ¶ 33.) ORDER- 3 1 CSC terminated the Agreement on April 9, 2013, (id. ¶ 45), and Dr. Bardy filed 2 this complaint against CSC shortly thereafter. (See Not. of Removal (Dkt. # 1).) The 3 complaint was originally filed in King County Superior Court, but CSC removed it to this 4 court. (Id.) CSC now moves to dismiss the complaint in its entirety under Federal Rule 5 of Civil Procedure 12(b)(6). (See Mot.) 6 II. ANALYSIS 7 A. Legal Standard on a Rule 12(b)(6) Motion to Dismiss 8 Under Federal Rule of Civil Procedure 12(b)(6), a court should dismiss a 9 complaint if it fails to state a claim upon which relief can be granted. Fed. R. Civ. P. 10 12(b)(6). In determining whether to grant a Rule 12(b)(6) motion, the court must accept 11 as true all “well-pleaded factual allegations” in the complaint. Ashcroft v. Iqbal, 556 U.S. 12 662, 679 (2009). Dismissal under Rule 12(b)(6) is appropriate where the complaint lacks 13 sufficient facts to support a cognizable legal theory. Balistreri v. Pacifica Police Dep’t, 14 901 F.2d 696, 699 (9th Cir. 1990). To sufficiently state a claim and survive a motion to 15 dismiss, the complaint “does not need detailed factual allegations” but the “[f]actual 16 allegations must be enough to raise a right to relief above the speculative level.” Bell Atl. 17 Corp. v. Twombly, 550 U.S. 544, 555 (2007). The complaint must contain “sufficient 18 factual matter, accepted as true, to state a claim to relief that is plausible on its face.” 19 Iqbal, 556 U.S. at 663 (internal quotation marks omitted); see also Telesaurus VPC, LLC 20 v. Power, 623 F.3d 998, 1003 (9th Cir. 2010). The court is not bound to accept as true 21 labels, conclusions, formulaic recitations of the elements, or legal conclusions couched as 22 factual allegations. Twombly, 550 U.S. at 555 (citing Papasan v. Allain, 478 U.S. 265, ORDER- 4 1 286 (1986)). As the Supreme Court said in Iqbal, a complaint must do more than tender 2 “‘naked assertions’ devoid of ‘further factual enhancement.’” Iqbal, 556 U.S. at 678 3 (quoting Twombly, 550 U.S. at 557). 4 B. Breach of Contract Claims 5 Dr. Bardy’s primary claim is that CSC breached the Agreement by failing to 6 develop and commercialize the mySense Monitor. (Am. Compl. ¶¶ 65-81.) He alleges 7 that the Agreement required CSC to provide resources and make “commercially 8 reasonable efforts” to develop and commercialize the product, and that CSC failed to do 9 that in a variety of ways. (Id. ¶¶ 67-68, 70, 72.) Further, he alleges that CSC breached 10 the Agreement by failing to protect the IPR associated with the mySense Monitor. (Id. 11 ¶¶ 70-71, 73.) Dr. Bardy alleges two different causes of action for breach of contract— 12 one for injunctive relief, and a second for damages. (See id. ¶¶ 65-81.) 13 CSC moves to dismiss both. (Mot. at 9-12.) CSC argues that Dr. Bardy’s breach 14 of contract claims are barred by a provision in the Agreement. (Id.) Indeed, there is a 15 provision in the Agreement that says, explicitly, that development and commercialization 16 will be undertaken in the “sole discretion” of CSC and that CSC will not be liable for 17 failing to develop and commercialize products or have any obligation to do so: 18 19 20 21 The Development, manufacture, marketing and commercialization of Collaboration Products and the sale, licensing and other disposition of Collaboration Technology and Collaboration IPR, as the case may be, will be guided and undertaken by CSC in its sole discretion. CSC will not have any obligation to, and will not have any liability on account of any delay or failure to, Develop, manufacture, market or commercialize any Collaboration Products or to sell, license or otherwise dispose of any Collaboration Technology or Collaboration IPR. 22 ORDER- 5 1 (Am. Compl. Ex. A § 5.12.) CSC argues that Dr. Bardy’s breach of contract claims 2 should be dismissed with prejudice because they are based on conduct that falls under the 3 scope of this clause. (Mot. at 9-12.) 4 The court agrees. All of Dr. Bardy’s breach of contract claims are based on one of 5 two theories: first, that CSC failed to make commercially reasonable efforts to develop 6 and commercialize the mySense Monitor, (Am. Compl. ¶¶ 24-26, 28-42, 49, 56-58), and 7 second, that CSC failed to protect the IPR associated with the mySense Monitor. 8 (Compl. ¶¶ 27, 47-51.) Both of these theories are expressly precluded by the terms of the 9 Agreement. With respect to development and commercialization, there is no doubt that 10 the Agreement eliminates any obligation on CSC’s behalf to develop and commercialize 11 Collaboration Products when it says: “CSC will not have any obligation to, and will not 12 have any liability on account of any delay or failure to, Develop, manufacture, market or 13 commercialize any Collaboration Products.” (Am. Compl. Ex. A § 5.12.) Thus, Dr. 14 Bardy’s first theory cannot form the basis of a viable breach of contract claim. With 15 respect to IPR, there is another clause in the Agreement that says explicitly that “each 16 party . . . will have no obligation, to apply for, register, prosecute, perfect, maintain or 17 enforce any of IPR [sic].” (Id. § 6.6.) Thus, it is clear that CSC had no obligation to 18 protect IPR. (See id.) There can be no breach of contract claim based on obligations that 19 CSC explicitly does not have. Thus, Dr. Bardy may not proceed under either of these 20 theories. 21 In response, Dr. Bardy makes a creative, but ultimately misguided argument. He 22 argues that the court must “read the contract as a whole and harmonize seemingly ORDER- 6 1 conflicting provisions so as to give effect to all provisions.” (Resp. (Dkt. # 34) at 8.) He 2 argues that the overriding purpose of the Agreement is to “facilitate the parties’ joint 3 efforts to develop and commercialize medical devices and diagnostic technologies and 4 services,” and that the Agreement must be interpreted to effect this purpose. (Id.) He 5 argues that the exclusions quoted above are “isolated provisions” that the court may 6 ignore if they conflict with the overriding purpose of the Agreement. (Id. at 9-11.) Dr. 7 Bardy offers an alternative reading of the Agreement that emphasizes the fact that the 8 parties were required to “use commercially reasonable efforts and diligence” in carrying 9 out their obligations under the Agreement. (Id. at 10-11.) Under this reading, Dr. Bardy 10 argues that he can proceed under a breach of contract theory because he alleges that CSC 11 did not make commercially reasonable efforts to develop and commercialize the mySense 12 Monitor or protect Collaboration IPR. (Id.) 13 This argument may appear coherent at first glance, but accepting it would require 14 ignoring the actual terms of the Agreement. The Agreement carefully lays out the 15 obligations undertaken by each party. CSC’s obligations were to provide office space 16 (Am. Compl. Ex. A § 2.1), to pay Dr. Bardy an annual cash retainer (id. § 3.3), to repay 17 Dr. Bardy’s Reimbursable Expenses (id. § 3.4), to provide at least $500,000.00 per year 18 in cash funding (id. § 4.1), to provide two full time staff members (id. § 4.2), and to 19 engage in various cooperative behaviors (see, e.g., id. § 5.4, 5.8, 5.9), among other things. 20 The duties of each party are carefully articulated, and there is no generalized duty, or 21 even a hint of one, to develop or commercialize products or bring products to market. 22 There is nothing in the language or structure of the Agreement to suggest that its specific ORDER- 7 1 exclusion of such a duty should be ignored to achieve the Agreement’s overall purpose. 2 Specific provisions of a contract control over more general terms. Feibusch v. Integrated 3 Device Tech., Inc. Emp. Ben. Plan, 463 F.3d 880, 885-86 (9th Cir. 2006); Wright v. 4 Safeco Ins. Co. of Am., 109 P.3d 1, 8 (Wash. Ct. App. 2004). Missions, goals, and 5 objectives do not outweigh specific contract terms. And while it is true that the 6 Agreement’s objectives include “the identification of devices . . . for Development and 7 commercialization or other offering by CSC . . . ,” this general statement of the parties’ 8 objectives does not give CSC an obligation to develop and commercialize products. Cf. 9 Wash. Crab Producers, Inc. v. Mosbacher, 924 F.2d 1438 (Wash. 1990). Indeed, the 10 Agreement seems to contemplate the opposite—that CSC has “sole discretion” with 11 respect to development and commercialization and that “CSC will not have any 12 obligation to, and will not have any liability on account of any delay or failure to, 13 Develop, manufacture, market or commercialize any Collaboration Products.” (Id. 14 § 5.12.) In short, there is no support for Dr. Bardy’s assertion that the overriding purpose 15 of the Agreement was to obligate CSC to develop and commercialize products. 16 It also makes no sense to argue that CSC failed to make “commercially reasonable 17 efforts” to develop and commercialize the mySense Monitor and to protect associated 18 IPR. The Agreement only requires the parties to “use commercially reasonable efforts 19 and diligence with respect to the performance of their respective obligations under 20 the . . . Agreement . . . .” (Id. § 5.2.) The Agreement clearly states that CSC had no 21 obligation to develop or commercialize products, or to protect any IPR. (Id. §§ 5.12, 22 6.6.) Again, a mission, goal, or objective does not equate to an obligation, particularly ORDER- 8 1 where the contract specifically disclaims that same obligation. (Id. §§ 5.12, 6.6.) Dr. 2 Bardy’s argument is not persuasive when considered in light of the actual terms of the 3 Agreement. 4 Dr. Bardy makes one more argument that the court also rejects, although not in its 5 entirety. Dr. Bardy argues that “Collaboration Plans and Budgets” contemplated by the 6 Agreement create enforceable obligations that override the contract’s clear terms. (Mot. 7 at 13-14.) Dr. Bardy advances two theories in support of this argument: first that the 8 Collaboration Plans and Budgets amended the Agreement, and second that the 9 Collaboration Plans and Budgets are actually part of the Agreement. (Mot. at 13-14.) It 10 does appear that the agreement contemplated that the parties would create Collaboration 11 Plans and Budgets. (See Am. Compl. Ex. A §§ 5.2, 5.6.) However, Dr. Bardy has not 12 alleged either of his two theories with enough specificity to meet his pleading obligations 13 under Iqbal and Twombly. See Iqbal, 556 U.S. at 678; Twombly, 550 U.S. at 557. With 14 respect to his first theory, the Agreement allows the parties to modify its terms, but also 15 states that “[n]o modification of this Agreement will be binding on either Party unless in 16 writing and signed by an authorized representative of each Party.” (Am. Compl. Ex. A 17 § 13.7.) Dr. Bardy has not plausibly alleged that the parties modified the Agreement by a 18 signed writing. The only specific allegation he makes with respect to modification is that 19 he received an email from CSC CEO Neal Long representing that CSC would “get My 20 Sense [sic] into the market.” (Am. Compl. ¶ 83.) This is obviously not a writing signed 21 by both parties, and the court cannot reasonably infer from this email that a signed 22 writing exists. Dr. Bardy has also not alleged that the Collaboration Plans and Budgets ORDER- 9 1 are signed writings. (See Compl.) With respect to the second theory, Dr. Bardy has not 2 alleged anything that he believes is contained in the Collaboration Plans or Budgets. (See 3 Compl.)1 Specifically, he has not alleged that there is anything in them that would 4 override the parties’ specific agreement that CSC would have no obligation to 5 commercialize and develop Collaboration Products. Absent such specific allegations, he 6 has not stated a plausible claim upon which relief may be granted. See Iqbal, 556 U.S. at 7 678; Twombly, 550 U.S. at 557. 8 In light of the above, the court GRANTS CSC’s motion to dismiss this claim and 9 DISMISSES Dr. Bardy’s breach of contract claims. 10 However, Dr. Bardy’s last argument convinces the court that it should provide 11 limited leave to amend with respect to this claim. Leave to amend is to be freely given 12 when justice so requires. Fed. R. Civ. P. 15(a). When a defendant moves to dismiss 13 under Federal Rule of Civil Procedure 12(b)(6), “a district court should grant leave to 14 amend even if no request to amend the pleading was made, unless it determines that the 15 pleading could not possibly be cured by the allegation of other facts.” Cook, Perkiss & 16 Liehe v. N. Cal. Collection Serv., 911 F.2d 242, 247 (9th Cir. 1990). Here, it is possible 17 that Dr. Bardy’s pleading could be cured by the allegation of other facts—namely, the 18 existence of a signed writing between the parties modifying the Agreement. 19 20 1 At oral argument, Dr. Bardy’s counsel claimed that this was because Dr. Bardy was not in possession of the Collaboration Plans and Budgets. This may be true, but according to the 21 terms of the Agreement, Dr. Bardy was instrumental in creating the Collaboration Plans and Budgets. (See Am. Compl. §§ 5.5-5.6.) Thus, he must have some idea what is contained in 22 them. ORDER- 10 1 Accordingly, the court grants Dr. Bardy leave to amend within ten days of the date of this 2 order. The court will not entertain an amended complaint with respect to the theories 3 described above other than a modification theory. 4 C. Promissory Estoppel Claim 5 Next, the court considers Dr. Bardy’s promissory estoppel claim. Dr. Bardy 6 claims that CSC CEO Neal Long represented to him, in an email, that CSC would “get 7 My Sense [sic] into the market.” (Am. Compl. ¶ 83.) He alleges the remaining elements 8 of promissory estoppel as well: that he reasonably relied on this representation by not 9 attempting to exclude the mySense Monitor from the collaboration agreement, that he 10 suffered damages, and that “[i]njustice can be avoided only by enforcing CSC’s 11 promise . . . .” (Id. ¶¶ 83-86.) 12 CSC moves to dismiss this claim. (Mot. at 12-13.) CSC argues that the claim 13 must be dismissed because a contract governs the parties’ dispute, thereby precluding a 14 claim for promissory estoppel. (Id.) The court agrees. 15 CSC is right on the law. “[T]he doctrine of promissory estoppel does not apply 16 where a contract governs” the conduct at issue. Spectrum Glass Co., Inc. v. Pub. Util. 17 Dist. No. 1 of Snohomish Cnty., 119 P.3d 854, 861 (Wash. Ct. App. 2005) (citing Klinke 18 v. Famous Recipe Fried Chicken, Inc., 616 P.2d 644, 648 n.4 (Wash. 1980)); see also 19 Fawn Lake Maint. Comm’n v. Abers, 202 P.3d 1019, 1024 (Wash. Ct. App. 2009); Akmal 20 v. Cingular Wireless, Inc., No. C06-748JLR, 2007 WL 1725557 (W.D. Wash. June 8, 21 2007), aff’d, 300 F. App’x 463 (9th Cir. 2008); Westcott v. Wells Fargo Bank, N.A., 862 22 F. Supp. 2d 1111, 1116 (W.D. Wash. 2012). ORDER- 11 1 CSC is right on the facts too. The Agreement plainly covers the conduct that 2 forms the basis of Dr. Bardy’s estoppel claim. The Agreement governs the parties’ 3 responsibilities vis-à-vis development and commercialization of Collaboration Products. 4 (Id. Ex. A § 5.12.) Specifically, the Agreement says that development and 5 commercialization will be “guided and undertaken by CSC in its sole discretion” and that 6 CSC will have no obligation to develop or commercialize products. (Id.) There can be 7 no doubt that the Agreement reaches the subject of Dr. Bardy’s promissory estoppel 8 claim and that, accordingly, Dr. Bardy cannot make a claim for promissory estoppel. 9 Dr. Bardy raises two counterarguments, both of which are unpersuasive. (See 10 Resp. at 16-17.) First, he argues that he is permitted to plead a promissory estoppel claim 11 in the alternative, citing Flower v. T.R.A. Indus., Inc., 111 P.3d 1192, 1201 (Wash. Ct. 12 App. 2005). This misses the point. Dr. Bardy is indeed permitted to plead a promissory 13 estoppel claim in the alternative, like in Flower, in case the contract is found to be 14 unenforceable. See Flower, 111 P.3d at 1201. But here, no one is arguing that the 15 Agreement is unenforceable. (See Am. Compl. ¶ 66.) Where there is a valid, enforceable 16 contract governing the parties’ dispute, there can be no claim for promissory estoppel. 17 Spectrum Glass, 119 P.3d at 861. Second, Dr. Bardy argues that, even where there is a 18 valid contract, a “later inconsistent representation” can form the basis of a promissory 19 estoppel claim, citing Kuest v. Regent Assisted Living, Inc., 43 P.3d 23, 31-32 (Wash. Ct. 20 App. 2002). Dr. Bardy’s citation to Kuest is misplaced, and his argument based on Kuest 21 fails. In Kuest, the “later inconsistent representation” in question formed the basis for a 22 theory of contract modification that rested on promissory estoppel principles, not a ORDER- 12 1 freestanding cause of action for promissory estoppel. Id. at 30-31. Here, there is no 2 doubt that Mr. Long’s alleged later inconsistent representation did not modify the 3 Agreement, as discussed above. The court rejects this argument. For the reasons discussed above, the court GRANTS CSC’s motion to dismiss Dr. 4 5 Bardy’s promissory estoppel claim. The court dismisses this claim with prejudice, 6 finding that “the pleading could not possibly be cured by the allegation of other facts.” 7 Cook, Perkiss & Liehe, 911 F.2d at 247. 8 D. Unjust Enrichment Claim 9 Next, the court considers Dr. Bardy’s unjust enrichment claim. This claim is 10 based on an incident where Dr. Bardy paid money out of his own pocket to a doctor who 11 was working on the mySense Monitor. (Am. Compl. ¶ 89.) He alleges that he “delivered 12 valuable goods to CSC” by paying the doctor “at a critical time in the development of the 13 mySense Monitor when CSC’s failure to timely pay the trial doctor threatened FDA 14 approval of the mySense Monitor.” (Id. ¶ 89-90.) As a result, he claims that CSC has 15 been unjustly enriched. (Id. ¶ 92.) 16 CSC moves to dismiss this claim. (Mot. at 13-14.) CSC argues that the law does 17 not allow a claim for unjust enrichment because the Agreement covers the parties’ 18 dispute over commercialization, development, and IPR. (Id.) 19 CSC is again right on the law. A party cannot bring an action for unjust 20 enrichment where a valid written agreement covers the parties’ dispute. Westcott, 862 21 F. Supp. 2d at 1116-17; Chandler v. Wash. Toll Bridge Auth., 137 P.2d 97, 103 (Wash. 22 1943) (“A party to a valid express contract is bound by the provisions of that contract, ORDER- 13 1 and may not disregard the same and bring an action on an implied contract relating to the 2 same matter, in contravention of the express contract.”); Wash. Ass’n of Child Care 3 Agencies v. Thompson, 660 P.2d 1129, 1132 (Wash. Ct. App. 1983) (“[T]he rule of law 4 generally applicable is that . . . each party is bound by the terms of that contract and may 5 not bring an action relating to the same matter on a theory of ‘contract’ implied by law, in 6 contravention of the express contract.”); MacDonald v. Hayner, 715 P.2d 519, 522-23 7 (Wash. Ct. App. 1986) (same). 8 CSC is again right on the facts too. The Agreement governs the parties’ dispute 9 over whether Dr. Bardy should be reimbursed for his out-of-pocket payment to a doctor. 10 Specifically, the Agreement sets forth a procedure under which Dr. Bardy may recover 11 “Reimbursable Expenses.” (Am. Compl. Ex. A § 3.4; see also id. § 1 (defining 12 “Reimbursable Expenses”).) For all other expenses, the Agreement states that Dr. Bardy 13 “will not enter into any contract, agreement, or other commitment, or incur any obligation 14 or liability, in the name or otherwise on behalf of CSC.” (Id. § 3.5(a).) This brings Dr. 15 Bardy’s decision to pay the trial doctor out of his own pocket within the scope of the 16 Agreement. As such, it cannot be the basis for an unjust enrichment claim. Westcott, 862 17 F. Supp. 2d at 1116-17. 18 Dr. Bardy makes only one argument to the contrary, and that argument fails. (See 19 Resp. at 17-19.) Dr. Bardy argues that his payment to the doctor is “removed from the 20 contract’s subject matter” and therefore may support an unjust enrichment claim. (Id.) 21 Dr. Bardy is correct that if the parties’ dispute is “removed from the confines of the 22 express contract,” an action in unjust enrichment is not precluded. Pierce County v. ORDER- 14 1 State, 185 P.3d 594, 618-19 (Wash. Ct. App. 2008) (citing Auburn Mech., Inc. v. Lydig 2 Const., Inc., 951 P.2d 311, 315 (Wash. Ct. App. 1998)). However, as explained above, 3 the payment to the doctor is not removed from the confines of the Agreement. Indeed, 4 the Agreement directly addresses the question. (See Am. Compl. Ex. A §§ 1, 3.4, 3.5(a).) 5 Thus, the court rejects Dr. Bardy’s argument. For the reasons discussed above, the court GRANTS CSC’s motion to dismiss Dr. 6 7 Bardy’s unjust enrichment claim. The court dismisses this claim with prejudice, finding 8 that “the pleading could not possibly be cured by the allegation of other facts.” Cook, 9 Perkiss & Liehe, 911 F.2d at 247. 10 E. Declaratory Judgment Claim 11 Last, the court considers Dr. Bardy’s claim for declaratory judgment. Dr. Bardy 12 asks the court to declare that the non-compete and non-solicit clauses contained in the 13 Agreement are unenforceable. (Am. Compl. ¶¶ 59-64.) He alleges that the non-compete 14 clause is “unreasonable” and that he is entitled to a declaration that it is unenforceable “as 15 a result of CSC’s breaches of the agreement.” (Id. ¶ 61-63.) CSC moves to dismiss this 16 claim, arguing that it is conclusory and relies on an invalid theory of breach. (Mot. at 17 12.) 18 The court agrees that, as currently pleaded, the complaint does not state a plausible 19 claim that the non-compete clause is unenforceable. In general, Washington courts will 20 enforce covenants not to compete if they are reasonable and lawful. Emerick v. Cardiac 21 Study Center, Inc., P.S., 286 P.3d 689, 692 (Wash. Ct. App. 2012). To determine if a 22 non-compete clause is unreasonable, Washington courts consider three factors: (1) ORDER- 15 1 whether the restraint is necessary to protect the employer’s business or goodwill; (2) 2 whether it imposes on the employee any greater restraint than is reasonably necessary to 3 secure the employer’s business or goodwill; and (3) whether enforcing the covenant 4 would injure the public through loss of the employee’s service and skill to the extent that 5 the court should not enforce the covenant, i.e., whether it violates public policy. Id. 6 (citing Perry v. Moran, 748 P.2d 224, 228 (Wash. 1987).) Dr. Bardy’s complaint does 7 not allege facts pertinent to these factors beyond its assertion of breach of contract, which 8 the court has rejected. (See Am. Compl. ¶¶ 59-64.) Instead, the complaint merely recites 9 that the non-compete clause is “unreasonable.” (Id. ¶ 61.) The court is not bound to 10 accept as true labels, conclusions, formulaic recitations of the elements, or legal 11 conclusions couched as factual allegations. Twombly, 550 U.S. at 555. A complaint 12 must do more than tender “‘naked assertions’ devoid of ‘further factual enhancement.’” 13 Iqbal, 556 U.S. at 678 (quoting Twombly, 550 U.S. at 557). 14 Thus, the court GRANTS CSC’s motion to dismiss this claim and DISMISSES the 15 claim without prejudice. Here, it is possible that the defects in the pleading could be 16 cured by amendment. See Cook, Perkiss & Liehe, 911 F.2d at 247. Accordingly, the 17 court grants Dr. Bardy leave to amend this claim within ten days of the date of this order. 18 If Dr. Bardy does not file an amended complaint within ten days, the court will dismiss 19 this claim with prejudice. 20 21 III. CONCLUSION For the foregoing reasons, the court GRANTS CSC’s motion to dismiss (Dkt. 22 # 33), DISMISSES Dr. Bardy’s claim for declaratory judgment and breach of contract ORDER- 16 1 without prejudice and with leave to amend within ten days of the date of this order, and 2 DISMISSES the remainder of Dr. Bardy’s claims with prejudice. In addition, the court 3 DENIES CSC’s pending motion for protective order as moot2 (Dkt. # 36). 4 Dated this 10th day of October, 2013. 5 7 A 8 JAMES L. ROBART United States District Judge 6 9 10 11 12 13 14 15 16 17 18 19 20 21 2 CSC’s motion for protective order requests that the court stay discovery while the court considers this motion to dismiss. (See Mot. for P.O. (Dkt. # 36).) The court has now ruled on 22 the motion to dismiss, making the motion for protective order moot. ORDER- 17

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?