Alaskan Protein Recovery, LLC et al v. PureTek Corporation
Filing
39
ORDER granting Puretek's 11 Motion to Compel Arbitration; denying pltfs' 14 Motion to Amend ; terminating Puretek's 16 Motion to Dismiss; Case stayed pending arbitration by Judge Richard A Jones.(RS)
HONORABLE RICHARD A. JONES
1
2
3
4
5
6
7
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF WASHINGTON
AT SEATTLE
8
9
10
ALASKA PROTEIN RECOVERY, LLC, et
al.,
Plaintiffs,
11
12
13
ORDER
v.
PURETEK CORPORATION,
Defendant.
14
15
16
CASE NO. C13-1429
I. INTRODUCTION
This matter comes before the court on three motions. Defendant Puretek
17
Corporation has moved to compel arbitration of this entire dispute. Plaintiffs Alaska
18
Protein Recovery, LLC (“APR”), and Trident Seafoods Corporation (“Trident”) have
19
moved to dismiss Puretek’s counterclaims for failure to state a claim. Plaintiffs have also
20
asked for leave to amend their complaint to add Barry Pressman as a Defendant. For the
21
reasons stated herein, the court GRANTS Puretek’s motion to compel arbitration (Dkt.
22
# 11) and STAYS this action pending arbitration. The court DENIES Plaintiffs’ motion
23
to amend. Dkt. # 14. Because this dispute will be resolved in arbitration, the court need
24
not decide Plaintiffs’ motion to dismiss Puretek’s counterclaims, and the clerk shall
25
TERMINATE that motion. Dkt. # 16.
26
27
28
ORDER – 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
II. BACKGROUND
APR extracts oil from salmon and purifies it; Puretek manufactures, bottles, and
markets over-the-counter nutritional supplements. In January 2009, they entered a
“Supply Agreement” that provided, in essence, that APR would supply salmon oil,
Puretek would package it in bottled capsules and sell it to large retailers like Costco, and
the parties would share profits and costs. The Supply Agreement had a 20-year term,
although it permitted either party to terminate the Agreement for cause. Among the
Agreement’s acknowledged causes for termination was a party’s inability to pay its debts.
According to APR, by April 2011 Puretek had fallen almost $600,000 behind in
Supply Agreement payments. On April 5, 2011, APR gave Puretek a notice of default
citing both the $600,000 debt and unspecified “misrepresentations surrounding its nonpayment” of the debt. Amend. Compl. ¶ 11.
That the parties entered the Supply Agreement and APR gave an April 2011 notice
of default is about the only aspect of this dispute that they can agree on. Indeed, APR
apparently disagrees even with itself about what happened after it gave its notice of
default. The court will consider those disagreements later. The court begins its attempt
to unravel the events leading to this lawsuit by recounting the facts as APR alleges them
in its complaint.
On the same April 2011 day that it issued its notice of default, APR claims that
Puretek and it entered into a written “Interim Agreement.” Amended Compl. ¶ 12. The
Interim Agreement, which is not part of the record before the court, allegedly
acknowledged Puretek’s debt to APR and permitted Puretek to reinstate the Supply
Agreement if it paid the debt within 60 days. Id. The court can only guess as to why the
parties entered the Interim Agreement, as the Supply Agreement itself permitted Puretek
to cure its default within 60 days.
According to APR, it and Puretek entered yet another written agreement on May
27, 2011, the “Interim Agreement Amendment No. 1.” Amended Compl. ¶ 13. The
27
28
ORDER – 2
1
Interim Agreement Amendment No. 1 is also not a part of the record before the court.
2
APR says that it includes Puretek’s acknowledgement that the Supply Agreement had
3
terminated for cause (even though fewer than 60 days had passed from APR’s notice of
4
default) as well as Puretek’s acknowledgment that it had abandoned virtually all rights
5
accruing to it under the Supply Agreement. Id. The Interim Agreement Amendment No.
6
1 apparently established a new relationship between the parties, one that was terminable
7
for breach on three days’ notice or for any reason at all on ten day’s notice. Id.
8
9
10
APR also asserts that it “reconfirmed” that the Supply Agreement had terminated
on June 10, 2011, because Puretek had yet to pay its debt. Amended Compl. ¶ 14.
For reasons no one explains, APR terminated Interim Agreement Amendment
11
No. 1 in August 2013. Amended Compl. ¶ 16. By that time, APR had been acquired by
12
Trident. Id. ¶ 15 (“Trident acquired a 100 percent ownership interest in APR as of
13
January 2012.”). APR and Trident assert that Trident acquired “all rights under contracts
14
involving APR,” and that “[a]ll of APR’s business activity [since Trident’s January 2012
15
acquisition] has been conducted under Trident’s name.” Id. ¶ 3. APR also asserts,
16
however, that it continues to operate as a standalone entity even though it is wholly
17
owned by Trident. Lane Decl. (Dkt. # 7) ¶ 2.
18
Puretek allegedly responded to the August 2013 termination of the Interim
19
Agreement Amendment No. 1 by “asserting to some or all purchasers of the fish oil
20
capsules, that Trident/APR had wrongly terminated the contract and/or violated the terms
21
of the APR/[Puretek] Agreement(s), and that PTC possesses and/or has an ownership
22
interest, or joint ownership interest, in certain intellectual and physical property.”
23
Amended Compl. ¶ 17. According to APR, Puretek made these representations in an
24
effort to induce customers to stop doing business with APR. Id. The court has no idea
25
what “intellectual property” Puretek has allegedly claimed an interest in. The Supply
26
Agreement designates APR’s “Pure Alaska Omega” brand as licensed intellectual
27
property, but is otherwise wholly generic as to the parties’ intellectual property. As to
28
ORDER – 3
1
physical property, APR alleges that Puretek still has more than 10 million salmon oil
2
capsules in its possession, and that it has refused APR’s requests to account for it.
3
APR and Trident filed this suit asking only for declaratory judgment. They ask
4
the court to declare which of the contracts between the parties have been properly
5
terminated, what their continuing legal obligations arising from those contracts are, who
6
owns the unspecified intellectual property, and what should become of the inventory in
7
Puretek’s possession. Plaintiffs do not explain why Trident is a party to this suit. There
8
is no allegation that Trident itself has entered any contract with Plaintiff, or that the
9
declarations Plaintiffs request would impact Trident (as opposed to Trident’s wholly-
10
owned subsidiary, APR). Plaintiffs also ask for a declaration as to “[w]hether, and if so,
11
to what extent, the dispute between Trident/APR and [Puretek] is subject to arbitration.”
12
Amended Compl. ¶ V(1)(a).
13
Arbitration is also the subject of what Puretek has denominated a counterclaim,
14
which requests that the court order arbitration of this dispute. The Supply Agreement has
15
a clause requiring arbitration of “[a]ny dispute, claim or controversy arising out of or
16
relating to this Agreement . . . .” According to APR, the Interim Agreement and the
17
Interim Agreement Amendment No. 1 also contain arbitration clauses, although the court
18
can only guess at the terms of those clauses. Amend. Compl. ¶ 22. Puretek does not
19
explicitly admit that the subsequent agreements contain arbitration clauses, but it insists
20
that this dispute is arbitrable in its entirety. Answer ¶ 22.
21
In addition to requesting arbitration, Puretek asserts an omnibus counterclaim for
22
“Breach of Contract & Legal Duties,” as well as a counterclaim invoking the Washington
23
Consumer Protection Act. Puretek notes, however, that its counterclaims are merely
24
“three general categories of counterclaims that Puretek will pursue in this case if its
25
pending Motion to Compel Arbitration . . . is not granted.” Answer at p. 6-7.
26
Now before the court are Puretek’s motion to compel arbitration, APR’s and
27
Trident’s motion to dismiss Puretek’s counterclaims, and APR’s and Trident’s motion to
28
ORDER – 4
1
amend their complaint. Plaintiffs want to add Puretek President Barry Pressman as a
2
Defendant, solely because Mr. Pressman personally guaranteed Puretek’s debts. The
3
court can only guess as to which debts Mr. Pressman allegedly guaranteed, because the
4
guaranty Plaintiffs provided in connection with their motion to amend is undated and
5
Plaintiffs provide no information about when Mr. Pressman executed it. The guaranty
6
states that Mr. Pressman entered it “[a]s an inducement to APR to enter into the attached
7
agreement,” but the court has no idea what agreement Mr. Pressman is referring to.
III. ANALYSIS
8
9
The Federal Arbitration Act (“FAA”), which the parties agree applies in this case,
10
declares that arbitration agreements “shall be valid, irrevocable, and enforceable, save
11
upon such grounds as exist at law or in equity for the revocation of any contract.” 9
12
U.S.C. § 2. The FAA embodies a “liberal federal policy favoring arbitration
13
agreements,” Moses H. Cone Mem. Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 24
14
(1983), a policy that incorporates state law regarding “validity, revocability, and
15
enforceability of contracts generally.” Perry v. Thomas, 482 U.S. 483, 472 n.9 (1987);
16
see also First Options of Chicago, Inc. v. Kaplan, 514 U.S. 938, 944 (1995) (“When
17
deciding whether the parties agreed to arbitrate a certain matter . . . , courts generally . . .
18
should apply ordinary state-law principles that govern the formation of contracts.”).
19
Although, the FAA does not supersede generally applicable state contract law, it does
20
“create a body of federal substantive law of arbitrability,” which requires the court to
21
resolve “any doubts concerning the scope of arbitrable issues . . . in favor of arbitration,
22
whether the problem at hand is the construction of the contract language itself or an
23
allegation of waiver, delay, or a like defense to arbitrability.” Moses H. Cone Mem.
24
Hosp., 460 U.S. at 24-25.
25
The court’s first task is to determine whether the disputes before it are within the
26
scope of the arbitration agreement. Mitsubishi Motors Corp. v. Soler Chrysler-Plymouth,
27
Inc., 473 U.S. 614, 626 (1985). That is a cumbersome task here for two reasons. First,
28
ORDER – 5
1
the parties have revealed the terms of only one of the three arbitration clauses that apply
2
in this case, the clause in the Supply Agreement. Second, whereas APR and Trident used
3
their complaint to describe a series of three written agreements that governed APR’s
4
relationship with Puretek from 2009 to 2013, APR used its opposition to the motion to
5
compel arbitration to assert, for the first time, that “[a]ll written agreements between APR
6
and Puretek have been terminated since 2011 and the parties have been operating under
7
an oral month-to-month arrangement.” Pltfs.’ Opp’n (Dkt. # 16) at 5. APR supports that
8
statement with a declaration from its CEO, who declares that all of the parties’ written
9
agreements “concluded in 2011,” and that any later commerce between the parties was
10
“pursuant to oral, month-to-month” arrangements. Lane Decl. (Dkt. # 17) ¶ 17. If APR’s
11
disagreement with the allegations of its own complaint were material to the court’s
12
disposition of the arbitration issue, the court would order APR to file an amended
13
complaint in which it decided which of its versions of events was accurate. The court
14
concludes, however, that APR’s disagreement with itself makes no difference in the
15
court’s assessment of arbitrability.
16
The court can be certain that the parties agreed in the 2009 Supply Agreement that
17
“[a]ny dispute, claim or controversy arising out of or relating to this Agreement” is
18
arbitrable; and that language is more than broad enough to encompass this dispute. When
19
parties “intend to include a broad arbitration provision, they provide for arbitration
20
‘arising out of or relating to’ the agreement.” Cape Flattery Ltd. v. Titan Maritime, LLC,
21
647 F.3d 914, 922 (9th Cir. 2011); see also Chiron Corp. v. Ortho Diagnostic Sys., Inc.,
22
207 F.3d 1126, 1131 (9th Cir. 2000) (describing clause covering any claim “arising out of
23
or relating to the validity, construction, enforceability or performance of this Agreement”
24
as “broad and far reaching”); Britton v. Co-Op Banking Group, 4 F.3d 742, 745 (9th Cir.
25
1993) (observing that phrase “arising out of or relating to this Agreement or the breach
26
thereof” is “routinely used in many securities and labor agreements to secure the broadest
27
possible arbitration coverage”). Even if the court assumes that the parties’ subsequent
28
ORDER – 6
1
written agreements contained narrower arbitration clauses, or even if the court assumes
2
(in line with APR’s second version of events) that there were no subsequent written
3
agreements, all of the parties’ current disputes either arise out of or relate to the Supply
4
Agreement. The Supply Agreement had a 20-year initial term; Puretek disputes whether
5
APR validly terminated it. Thus, according to Puretek, the Supply Agreement is still in
6
force, and all of the parties’ disagreements are either directly governed by that
7
Agreement’s terms or related to the Agreement. The parties unmistakably agreed to
8
arbitrate, at a minimum, questions related to the Supply Agreement’s termination, and
9
APR seeks answers to those questions in the form of a declaratory judgment. Even if
10
APR validly terminated the Supply Agreement, the written or oral contracts that followed
11
either arise out or relate to the Supply Agreement. But for Puretek’s alleged default in
12
the Supply Agreement, the subsequent agreements would never have existed. See
13
PowerAgent Inc. v. Elec. Data Sys. Corp., 358 F.3d 1187, 1193-94 (9th Cir. 2004)
14
(affirming arbitrability of dispute involving oral agreements stemming from a written
15
agreement with an arbitration clause).
16
APR’s requests for declaratory judgment all arise out of or relate to the Supply
17
Agreement. The court cannot declare which of the parties’ contracts are still in force,
18
what their continuing obligations are, who owns intellectual property referenced in the
19
Supply Agreement, or what should become of the inventory in Puretek’s possession
20
without reference to the Supply Agreement. In order to decide if APR is correct that later
21
agreements have superseded the Supply Agreement, the court must determine if the
22
Supply Agreement is still in force.
23
Puretek’s counterclaims, however inartfully pleaded, also arise out of or relate to
24
the supply agreement. Puretek alleges that APR violated the Supply Agreement by
25
coercing it to enter other agreements that were inconsistent with its terms. Its
26
counterclaims arise from breach of the Supply Agreement as well as tortious actions
27
relating both to the Agreement and to the intellectual property referenced in that
28
ORDER – 7
1
Agreement. Its raises no new allegations to support its Consumer Protection Act claim, it
2
merely asserts that APR’s conduct related to or arising out of the Supply Agreement is a
3
violation of that statute.
4
The court does not suggest that an agreement to arbitrate in one contract
5
irrevocably binds the parties to arbitration in all subsequent contracts between them.
6
Parties are free to agree later not to arbitrate their disputes; but there is no evidence that
7
the parties reached such an agreement in this case. The strong federal policy in favor of
8
arbitration dictates the court’s conclusion that the parties’ business arrangements
9
following the alleged termination of the Supply Agreement are nonetheless within the
10
11
scope of the Supply Agreement’s broad arbitration clause.
Plaintiffs offer other arguments to avoid arbitration, but they fare no better. They
12
contend that Trident was never a party to any contracts with Puretek, and thus did not
13
agree to arbitrate. If Trident was never a party to any contracts with Puretek, why is it a
14
plaintiff in this lawsuit? The court is not at all convinced that Trident has any place in
15
this dispute. If Trident does have a place in this dispute, it is because (as it admits) it
16
“acquired all of APR’s rights in contracts and business relationships,” Amended Compl.
17
¶ 4. Trident does not explain how it can acquire all of APR’s contractual rights while
18
avoiding APR’s contractual duty to arbitrate. Washington courts, like federal courts,
19
have recognized that both equitable estoppel and “normal contract and agency principles”
20
permit signatories to arbitration agreements to compel arbitration against nonsignatories
21
in some circumstances. McClure v. Davis Wright Tremaine, 890 P.2d 466, 467 (Wash.
22
Ct. App. 1995); see also Murphy v. DirecTV, Inc., 724 F.3d 1218, 1232 (9th Cir. 2013)
23
(applying California agency law). Washington courts recognize that parent companies
24
can be bound to the arbitration agreements of their subsidiaries. Townsend v. Quadrant
25
Corp., 224 P.3d 818, 829 (Wash. Ct. App. 2009) (“When the charges against a parent and
26
subsidiary are based on the same facts . . . and are inherently inseparable, a court may
27
order arbitration of claims against the parent even though the parent is not a party to the
28
ORDER – 8
1
arbitration agreement.”), aff’d by 268 P.3d 917 (Wash. 2012). Here, Trident is not a
2
proper party to this dispute, or it is a proper party solely by virtue of its parent-subsidiary
3
relationship with APR, or it is the successor to APR’s contractual obligation to arbitrate.
4
Assuming it has a place in this lawsuit at all, it cannot escape the arbitration clause.
5
APR also cannot escape arbitration by amending its complaint to assert claims
6
against Mr. Pressman. Those claims are based entirely on Mr. Pressman’s guaranty of
7
Puretek’s debts, and those debts arise out of the Supply Agreement for the reasons the
8
court has already stated. Although the parties decline to reveal what written agreement
9
Mr. Pressman’s guaranty was appended to, they agree that all of the written agreements
10
they entered had arbitration clauses. Mr. Pressman may well have intended that disputes
11
arising from his guaranty would be arbitrable. The court cannot decide that question on
12
the record before it. Even if Mr. Pressman could not bind APR to arbitrate its claims
13
against him, the court could not ignore that those claims depend entirely on the outcome
14
of the arbitrable claims over Puretek’s debt. Thus, even if APR were not obligated to
15
arbitrate those claims, the court would stay their consideration until the arbitration had
16
concluded.
17
This dispute is arbitrable in its entirety, and there is therefore no reason for the
18
court to consider APR’s motion to dismiss Puretek’s counterclaims. Whether those
19
claims are properly pleaded, they arise out of or relate to the Supply Agreement. They
20
are thus arbitrable. Puretek must now state those claims in arbitration, where federal
21
pleadings standards are presumably inapplicable. An arbitrator, not this court, must
22
decide whether Puretek has adequately articulated its claims against APR.
23
There is also no reason for the court to permit APR to amend its complaint to add
24
Mr. Pressman as a Defendant. APR can decide whether it wishes to name Mr. Pressman
25
as a defendant in arbitration. Mr. Pressman is apparently willing to consent to that
26
arbitration, even if he might have the option to refuse. Even if the arbitration does not
27
formally decide any dispute between APR and Mr. Pressman, the court expects that the
28
ORDER – 9
1
arbitration (which will determine Puretek’s debts to APR) will essentially dispose of
2
APR’s claims based on Mr. Pressman’s guaranty. If not, APR is free to raise those
3
claims in a later lawsuit, or to renew its motion to amend in this court after arbitration.
4
The court finds no reason to permit APR to add him as a Defendant now.
5
Because this dispute is arbitrable in its entirety, the court must stay this action
6
pending the outcome of the arbitration. 9 U.S.C. § 3. Plaintiffs are responsible for
7
updating the court on the status of the arbitration.
IV. CONCLUSION
8
9
For the reasons previously stated, the court GRANTS Puretek’s motion to compel
10
arbitration (Dkt. # 11) and STAYS this action pending arbitration. The court DENIES
11
Plaintiffs’ motion to amend. Dkt. # 14. Because this dispute will be resolved in
12
arbitration, the court need not decide Plaintiffs’ motion to dismiss Puretek’s
13
counterclaims, and the clerk shall TERMINATE that motion. Dkt. # 16.
14
Plaintiffs must update the court on the status of the arbitration on June 15 and on
15
the 15th day of every second month thereafter, and must notify the court promptly of any
16
resolution of the arbitration.
17
DATED this 16th day of May, 2014.
18
A
19
20
The Honorable Richard A. Jones
United States District Court Judge
21
22
23
24
25
26
27
28
ORDER – 10