Puget Soundkeeper Alliance v. Rainier Petroleum Corporation
Filing
29
ORDER granting in part and denying in part pltf's 15 Motion for Partial Summary Judgment by Judge Ricardo S Martinez.(RS)
1
2
3
4
5
6
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF WASHINGTON
AT SEATTLE
7
8
9
10
11
Case No. C14-831RSM
PUGET SOUNDKEEPER ALLIANCE,
Plaintiff,
12
13
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S
MOTION FOR PARTIAL SUMMARY
JUDGMENT
v.
RAINIER PETROLEUM CORPORATION,
14
15
16
Defendants.
I.
INTRODUCTION
17
This matter comes before the Court on Plaintiff Puget Soundkeeper Alliance
18
(“Soundkeeper”)’s Motion for Partial Summary Judgment, Dkt. #15. Soundkeeper argues that
19
20
21
Defendant Rainier Petroleum Corporation (“Rainier”) has violated the Clean Water Act
(“CWA”) by violating certain terms and conditions of National Pollutant Discharge
22
Elimination System (“NPDES”) General Permits. Specifically, Soundkeeper accuses Rainier
23
of exceeding benchmarks for zinc and copper in the stormwater discharge at its Facility in
24
25
26
Seattle, failing to submit annual reports for 2013 and 2014, failing to monitor discharges from
the Facility in seventeen quarters from the past six years, failing to monitor discharge from
27
three of the four discharge points at its Facility, failing to conduct and document monthly
28
inspections for permit compliance, failing to complete Level 1 Corrective Action when
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 1
1
required, contributing to violations of water quality standards in the Duwamish Waterway, and
2
having several deficiencies in its Stormwater Pollution Prevention Plan (“SWPPP”). See id.
3
Rainier opposes this motion in part, arguing that the facts, taken in a light most favorable to
4
Rainier as the non-moving party, do not support summary judgment. Dkt. #23. Rainier does,
5
6
7
however, concede liability as to certain issues. See id. Soundkeeper’s Motion is partial in
nature; Plaintiff deliberately omits certain claims and the determination of any remedy. See
8
Dkt. #15 at 2.1
9
argument is not necessary, the Court agrees with Plaintiff in part, and GRANTS IN PART their
10
Having reviewed the parties’ briefing, and having determined that oral
Motion as detailed below.
11
II.
12
BACKGROUND
A. The Rainier Facility
13
14
Rainier operates a 1.53-acre marine fueling, service, and storage facility located on
15
Colorado Avenue and South Spokane Street in Seattle, Washington (the “Facility”). Dkt. #4 at
16
2, Dkt. #9-1 at 1. At the Facility, Rainier “engage[s] in industrial activity, including storage
17
18
and distribution of lubricating oil.” Dkt. #1 at ¶30; Dkt. #4 at ¶30. The Facility “includes two
19
warehouses with indoor bulk petroleum tanks, a covered loading dock, three bulk storage areas
20
and three rail sidings.” Dkt. #9-1 at 1. “The area between the two warehouses [and in front of
21
one of them] is completely paved…. [with] four storm drains.” Dkt. #25-1 at 8. The Facility
22
23
24
25
has a Storm Drainage System made up of four catch basins which tie into an eight inch
discharge on the south side of the property…. [which] ultimately drains to the Duwamish East
Waterway.” Dkt. #9-1 at 19; see also Dkt. #25-1 at 10.
26
B. Rainier’s NPDES Permits and 2010 SWPPP
27
28
1
As such, any attempt by Defendant in its Response to circumscribe Plaintiff’s remedies, e.g. characterizing its
violations as administrative in nature, see Dkt. #23 at 17, is not properly before the Court at this time.
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 2
Pursuant to the Clean Water Act, explained in greater detail below, the Washington
1
2
State Department of Ecology (“Ecology”) granted Rainier coverage under the General Permits2
3
for this Facility under NPDES Permit Number WAR005619. Dkt. #1, ¶ 29; Dkt. #4, ¶ 29. On
4
May 17, 2010, Rainier submitted a Stormwater Pollution Prevention Plan (“SWPPP”) to
5
6
7
Ecology pursuant to Permit requirements. See Dkt. #25-1. Rainier’s SWPPP includes a
Facility description, general location map, site map, description of Rainier’s “Stormwater
8
Pollution Prevention Team,” description of the Facility’s industrial activity and associated
9
pollutants, areas on site where potential spills or leaks could occur, various “Best Management
10
11
12
Practices” for reducing or containing stormwater pollution, a sampling plan, and “Worksheets
for Development of the SWPPP.” Id. at 2. The SWPPP states that the Facility’s “Regular
13
Business Hours” are “24 hours per day, 7 days per week, 365 days per year.” Id. at 8. The
14
SWPPP contains a “Certification Form” which was signed by Daniel C. Kovacich, vice
15
president, on July 12, 2010. Id. at 46.
16
III.
DISCUSSION
17
A. Legal Standard on Summary Judgment
18
19
Summary judgment is appropriate where “the movant shows that there is no genuine
20
dispute as to any material fact and the movant is entitled to judgment as a matter of law.” Fed.
21
R. Civ. P. 56(a); Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247 (1986). Material facts are
22
23
24
those which might affect the outcome of the suit under governing law. Anderson, 477 U.S. at
248. In ruling on summary judgment, a court does not weigh evidence to determine the truth of
25
the matter, but “only determine[s] whether there is a genuine issue for trial.” Crane v. Conoco,
26
2
27
28
Ecology regulates industrial discharges of stormwater through “general permits,” which cover a large number of
similar dischargers under a single NPDES permit. Dkt. #19-2 at 9; See also Envtl. Def. Ctr., Inc. v. EPA, 344 F.3d
832, 853 (9th Cir. 2003). Three iterations of Ecology’s Industrial Stormwater General Permit are of relevance to
Soundkeeper’s Motion—the “2002 General Permit” in effect from 2002 through 2009, the “2010 General Permit”
that took effect on January 1, 2010, and the “2015 General Permit” that took effect January 2, 2015. Dkt. #15 at 4.
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 3
1
2
Inc., 41 F.3d 547, 549 (9th Cir. 1994) (citing Federal Deposit Ins. Corp. v. O’Melveny &
Meyers, 969 F.2d 744, 747 (9th Cir. 1992)).
3
A factual dispute is “genuine” if the evidence is such that reasonable persons could
4
disagree about whether the facts claimed by the moving party are true. Aydin Corp. v. Loral
5
6
7
Corp., 718 F.2d 897, 902 (9th Cir. 1983). “[T]he issue of material fact required . . . to be
present to entitle a party to proceed to trial is not required to be resolved conclusively in favor
8
of the party asserting its existence; rather, all that is required is that sufficient evidence
9
supporting the claimed factual dispute be shown to require a jury or judge to resolve the
10
11
12
parties’ differing versions of the truth at trial.” First Nat. Bank of Ariz. v. Cities Serv. Co., 391
U.S. 253, 288-89, 88 S. Ct. 1575, 20 L. Ed. 2d 569 (1968). However, the “party opposing
13
summary judgment must direct [the court's] attention to specific, triable facts,” S. Cal. Gas Co.
14
v. City of Santa Ana, 336 F.3d 885, 889 (9th Cir. 2003), and the reviewing court is “not
15
required to comb through the record to find some reason to deny a motion for summary
16
judgment,” Carmen v. San Francisco Unified Sch. Dist., 237 F.3d 1026, 1029 (9th Cir. 2001)
17
18
(quoting Forsberg v. Pac. Nw. Bell Tel. Co., 840 F.2d 1409, 1418 (9th Cir. 1988)). The Court
19
must nevertheless draw all reasonable inferences in favor of the non-moving party.
20
O’Melveny & Meyers, 969 F.2d at 747, rev’d on other grounds, 512 U.S. 79 (1994).
21
22
23
24
See
B. Clean Water Act Background
The Clean Water Act, 33 U.S.C. §§ 1251-1376, aims to restore and maintain the
“chemical, physical and biological integrity of [the] Nation's waters.” 33 U.S.C. § 1251(a). To
25
achieve these desirable goals, the Act “establishes a comprehensive statutory system for
26
controlling water pollution.” Ass'n to Protect Hammersley v. Taylor Res., 299 F.3d 1007, 1009
27
(9th Cir. 2002) (citing Nat'l Wildlife Fed'n v. Consumers Power Co., 862 F.2d 580, 582 (6th
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 4
1
Cir. 1988)). This system includes the use of National Pollutant Discharge Elimination System
2
(“NPDES”) permits “for regulating discharges of pollutants into waters of the United States.”
3
Id.
4
5
6
7
Under the Clean Water Act, the “discharge of any pollutant” from a “point source” into
navigable waters of the United States is unlawful unless the discharge is made according to the
terms of an NPDES Permit obtained from either the United States Environmental Protection
8
Agency (“EPA”) or from an authorized state agency. Ass'n to Protect Hammersley, 299 F.3d at
9
1009 (citing 33 U.S.C. §§ 1311(a), 1342; Comm. to Save Mokelumne River v. E. Bay Mun. Util.
10
11
12
13
Dist., 13 F.3d 305, 308 (9th Cir. 1993)). In Washington State, the Department of Ecology
(“Ecology”) is authorized by the EPA to administer the Clean Water Act's NPDES program.
Ass'n to Protect Hammersley, 299 F.3d at 1009-10.
14
The Clean Water Act explicitly allows private citizens to bring enforcement actions
15
against any person alleged to be in violation of federal pollution control requirements. Id. at
16
1012 (citing 33 U.S.C. § 1365(a)(1); Friends of the Earth, Inc. v. Laidlaw Envtl. Servs., 528
17
18
U.S. 167, 174-75, 145 L. Ed. 2d 610, 120 S. Ct. 693 (2000)). This right of private suit is
19
subject to express procedural prerequisites: At least sixty days before filing a suit, the
20
prospective citizen plaintiff must provide notice of the alleged violation to the EPA, the State
21
where the alleged violation occurs, and the alleged violator. Id. (citing 33 U.S.C. § 1365(a)(1)).
22
23
24
C. Standing
Despite conceding that summary judgment is warranted as to certain of Soundkeeper’s
25
claims, Rainier in its Response, appears to challenge Soundkeeper’s standing to bring this
26
lawsuit. See Dkt. #23 at 18-23. However, as Soundkeeper correctly notes on Reply, “while
27
[Rainier] takes issue with two of Soundkeeper’s three standing declarants, Rainier has not
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 5
1
disputed Mr. Lee Moyer’s standing. An organization has standing to sue on behalf of its
2
membership if it has ‘at least one member with standing’ in his own right.” Dkt. #27 at 11
3
(quoting Food & Commercial Workers v. Brown Grp., Inc., 517 U.S. 544, 555 (1996) and
4
citing Rumsfeld v. Forum for Academic & Instit. Rights, Inc., 547 U.S. 47 n.2, 126 S. Ct. 1297
5
6
7
(2006) (“[T]he presence of one party with standing is sufficient to satisfy Article III's case-orcontroversy requirement.”); Bd. of Natural Res. of the State of Wash. v. Brown, 992 F.2d 937,
8
942 (9th Cir. 1993) (“If any of these [plaintiffs] has standing, we may reach the merits without
9
considering whether the other two also have standing.”)). Soundkeeper also argues that it has
10
11
12
“standing in its own right,” citing Havens Realty Corp. v. Coleman, 455 U.S. 363, 378 (1982).
This again is not disputed by Rainier. Although it is not clear if this issue is even properly
13
before the Court, Soundkeeper has adequately shown that it does have standing to bring this
14
lawsuit. The Court need not address Rainier’s other arguments about opinion and hearsay
15
testimony to rule on this Motion.
16
D. Notice
17
18
Under the Clean Water Act, "No action may be commenced… prior to sixty days after
19
the plaintiff has given notice of the alleged violation (i) to the Administrator [of the
20
Environmental Protection Agency], (ii) to the State in which the alleged violation occurs, and
21
(iii) to any alleged violator of the standard, limitation or order…” 33 U.S.C. §1365(b)(1).
22
23
24
Rainier argues that Soundkeeper failed to comply with the CWA’s notice requirement as
to this claim because notice that Rainier discharged stormwater with elevated levels of zinc and
25
copper “each and every day during the last five years on which there was 0.1 inch or more of
26
precipitation,” along with a chart of precipitation for the area, was insufficient notice. Dkt. #23
27
at 9. Rainier argues that “the notice must specify the non-compliance and date(s) of the
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 6
1
violation,” citing Washington Trout v. McCain Foods, 45 F.3d 1351, 1352 (9th Cir. 1995). In
2
Reply, Soundkeeper points to Waterkeepers N. Cal. v. AG Industrial Mfg., Inc., 375 F.3d 913,
3
917-18 (9th Cir. 2004) where the Ninth Circuit held that notice alleging the defendant violated
4
the CWA by discharging contaminated storm water “during at least every rain event over 0.1
5
6
7
inches” was “sufficiently specific to inform [AG Industrial] about what it is doing wrong.”
Waterkeepers went on to hold that CWA plaintiffs are “not required to include any rain tables,”
8
listing such dates, and a notice letter that does “provide notice of several exact dates of alleged
9
discharge violations” is adequate. Id. at 918. The Court finds Waterkeepers to be on point, and
10
11
12
13
14
15
16
Soundkeeper’s argument the more persuasive. Soundkeeper’s notice of sampling and reporting
violations was sufficient.
E. Violations of Rainier’s NPDES General Permits
a. Exceeding Benchmarks for Zinc and Copper in Stormwater Discharge
Soundkeeper alleges that Rainier has exceeded allowable discharges of zinc and copper
pollutants, as explained by Plaintiff’s expert Richard R. Horner, Ph.D:
17
18
19
20
21
22
23
24
25
26
27
14.
The Permits under which Rainier Petroleum has operated
since 2005 set a benchmark concentration for zinc in stormwater
discharges at117 μg/L. The facility exceeded the benchmark in six
of the 14 samples analyzed from the first quarter of 2005 through
the fourth quarter of 2014, with a maximum concentration of 302
μg/L in the second quarter of 2012. Zinc concentrations in these
six samples were substantially higher than the zinc water quality
criteria for the Lower Duwamish River, which are 90 μg/L (acute)
and 81 μg/L (chronic), and even more elevated above the average
ambient zinc concentration measured in the river, 2.94 μg/L.
15.
The Permits under which Rainier Petroleum has operated
since 2010 set a benchmark concentration for copper in stormwater
discharges at14 μg/L. The firm has analyzed copper in only three
samples under these permits, two of which exceeded the
benchmark. Copper concentrations in the two samples were
substantially higher than the copper water quality criteria for the
Lower Duwamish River, which are 4.8 μg/L (acute) and 3.1 μg/L
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 7
(chronic), and even more elevated above the average ambient
copper concentration measured in the river, 0.810 μg/L.
1
2
3
4
Dkt. #18 at 6. The source of this zinc and copper is believed to be from the tires and brake pads
used by trucks on the Facility.3 The specific quarters where Rainier’s discharge exceeded
5
benchmarks for zinc and copper are listed in Table 1 in Soundkeeper’s Motion. See Dkt. #15 at
6
10. This Table indicates that Rainier exceeded the benchmark for Zinc in the 4th Quarter of
7
2009 and 2nd Quarter of 2012, and exceeded the benchmark for Copper in the 2nd Quarter of
8
2012, 3rd Quarter of 2013, and 1st Quarter of 2015. Id.
9
Rainier admits and acknowledges that it discharged excess zinc and copper during the
10
11
4th Quarter of 2009, 2nd Quarter of 2012, and 3rd Quarter of 2013, and states that it “is willing to
12
pay a penalty for these violations.” Dkt. #23 at 11. Rainier’s does not mention the excess
13
reading of zinc from the 1st Quarter of 2015.
14
The Court finds that Rainier exceeded the benchmark for Zinc in the 4th Quarter of 2009
15
16
and 2nd Quarter of 2012, and exceeded the benchmark for Copper in the 2nd Quarter of 2012, 3rd
17
Quarter of 2013, and 1st Quarter of 2015. These discharges have led to certain violations of the
18
General Permits below.
19
b. Annual Reporting Failures
20
Rainier admits and acknowledges that Soundkeeper “is entitled to summary judgment”
21
22
on its failure to submit annual reports for 2013 and 2014. Dkt. #23 at 10.
23
c. Failures to Sample and Report Stormwater Discharges
24
25
26
27
28
3
In response to this lawsuit, Rainier commissioned a report by Harbor Consulting Engineers, Inc. (“Harbor
Consulting”) to examine potential stormwater pollutants at the Facility. See Dkt. #9-1. According to this report,
“[i]t was indicated in the Annual Report that the contamination was most likely originating from the tires and brake
pads of the numerous trucks that enter the site. Harbor concurs with this assessment…” Id. at 3.
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 8
Soundkeeper alleges that Rainier failed to collect stormwater samples and report these
1
2
samples to Ecology as required under the NPDES General Permits.4 Dkt. #15 at 12. According
3
to the report Rainier had commissioned by Harbor Consulting, “Rainier has not historically
4
collected and analyzed stormwater samples during every calendar quarter as required under the
5
6
7
[NPDES] Permit.
Instead it appears that samples have only been collected if there was
stormwater discharged on the day when sampling was scheduled. As a result, the stormwater
8
sampling record is incomplete over the last several years…” Dkt. #9-1 at 3. According to
9
Soundkeeper’s expert Dr. Horner, Rainier failed to report in the following quarters: “one in
10
11
12
2005; two each in 2006, 2007, 2008, and 2009; all four quarters in both 2010 and 2011; three
each in 2012, 2013, and 2014; and at least the first quarter of 2015.” Id. at 5.
13
Rainier appears to concede that it did fail to sample in most of these quarters. Se Dkt.
14
#23 at 6. However, Rainier argues that During the 3rd Quarter of 2011 and 3rd Quarter 2012,
15
Rainier submitted Discharge Monitoring Reports that state no sample was collected because no
16
stormwater was discharged during normal working hours due to no rain falling during either
17
18
quarter. Dkt. #23 at 6. Rainier’s argument has two components: a question of fact exists as to
19
whether it rained sufficiently during those quarters, and a question of fact exists as to whether
20
that rain fell during the Facility’s normal business hours. The Court will address each in turn.
21
1. Measurable Rainfall
22
Plaintiff’s expert Dr. Horner opines that “any precipitation event larger than 0.10 inch
23
24
in 24 hours is very likely to produce a stormwater runoff discharge.” Dkt. #18 at 5. Dr. Horner
25
bases this belief on his “knowledge of stormwater hydrology” and “documented evidence… for
26
the Rainier Petroleum site, on the basis of sufficient runoff occurring to take a sample on either
27
28
4
See Conditions S4 and S5 in the 2002 General Permit, Dkt. #19-2 at 26-28, 39; Conditions S4 and S9 in the 2010
General Permit, Dkt. #19-3 at 22, 38; and Conditions S4 and S9 in the 2015 General Permit, Dkt. #19-4 at 25, 45.
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 9
1
May 24 or 25, 2012, when, respectively, 0.01 and 0.04 inch of rain fell.” Id. Rainier responds
2
by arguing that “[t]here is no evidence establishing that 0.1 inch was sufficient to create a
3
discharge.” Dkt. #23 at 7. Later, Rainier argues that “the evidence, viewed in the light most
4
favorable to Rainier, suggests an excess discharge does not always occur with 0.1-inch of rain,”
5
6
7
8
9
10
11
12
and cites to “Kovacich Decl. ¶6,” which states simply “Attached hereto as Attachment D are
true and correct copies of Rainier’s Discharge Monitoring Reports from 2010 to present.” Dkt.
#23 at 9; Dkt. #25 at 2.
The Court is not required to comb through 40 pages of discharge monitoring reports to
find evidence that contradicts Soundkeeper’s argument. See Carmen, 237 F.3d at 1029. The
“party opposing summary judgment must direct [the court's] attention to specific, triable facts,”
13
S. Cal. Gas Co., 336 F.3d at 889. Rainier has failed to meet this summary judgment standard.
14
The Court thus finds no genuine issue of material fact as to this issue and concludes that any
15
precipitation event larger than 0.1 inch is sufficient for taking a sample.
16
2. The Facility’s Regular Business Hours
17
18
Plaintiff alleges that the Facility is operated 24 hours per day, 7 days per week, 365
19
days per year, pointing to Rainier’s own explicit language in its SWPPP. See Dkt. #25-1 at 8.
20
Defendant acknowledges that this is what its SWPPP states, but responds by arguing that the
21
Facility is actually only “staffed and operational” from “7:00 AM to 3:30 PM Monday through
22
23
24
Friday.” Dkt. #25 at 2. Rainier “acknowledges revisions are needed to its SWPPP, including
an update of its Facility hours.” Dkt. #23 at 7. Rainier raises this issue to argue that “per the
25
plain language of the Permit, Rainier cannot be required to sample discharges outside normal
26
business hours or when its Facility is not active or staffed.” Id.
27
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 10
1
The Court notes the audacity of Rainier listing its “Regular Business Hours” as
2
continuous, i.e. 168 hours per week, in its 2010 SWPPP filing with Ecology, then simply
3
stating in a declaration, filed in the heat of litigation on the very issues the SWPPP was meant
4
to address, that its business hours are actually limited to 42.5 hours per week. However, for the
5
6
7
8
9
10
11
12
purposes of this summary judgment Motion, the Court must take Rainier’s newly declared
assertion of its business hours as sufficient to establish a question of fact absent any evidence
that this declared statement is false.
In sum, summary judgment on Soundkeeper’s claim that Rainier violated the NPDES
General Permits by failing to sample stormwater discharge is appropriate for all claimed
quarters except the 3rd Quarter of 2011 and 3rd Quarter 2012 because a question of fact exists as
13
to whether it rained more than 0.1 inch during the Facility’s normal business hours at any point
14
in those quarters.
15
16
d. Failure to Sample from 3 out of 4 Discharge Points
Soundkeeper alleges that even when Rainier sampled stormwater, it did so at only one
17
18
discharge point when the Facility has four discharge points. Dkt. #15 at 13. Rainier does not
19
dispute this fact, arguing instead that its sampling is otherwise sufficient under the permit.
20
However, the 2010 and 2015 General Permits require Rainier to sample each point of discharge
21
unless the SWPPP adequately justifies that non-sampled discharges are “substantially identical”
22
23
24
to those that are sampled. Dkt. #19-3 at 21-23; Dkt. #19-4 at 24-25. Rainier concedes that its
SWPPP does not include the language “substantially similar” and agrees that it needs to revise
25
its SWPPP. Dkt. #23 at 6. Rainier thus concedes that its sampling of only one of its discharge
26
points prior to this lawsuit was not justified under its SWPPP, even if the sampling could be
27
justified under a properly drafted SWPPP. Summary judgment as to this claim is appropriate.
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 11
e. Failure to Conduct Monthly Inspections
1
2
Soundkeeper alleges that Rainier has failed to conduct monthly inspections as required
3
under the 2010 and 2015 General Permits. Dkt. #15 at 14-15 (citing Dkt. #19-3 at 34; Dkt. #19-
4
4 at 41).
5
6
7
As evidence for the failure to conduct these inspections, Soundkeeper cites to
Rainier’s own consultant report and Rainier’s failure to produce these reports in response to
discovery requests. Dkt. #9-1 at 4 (Harbor Consulting Report stating “Monthly Inspection
8
Reports were not available”); Dkt. #19 at 4; Dkt. #19-11 at 10-11, 14-15 (discovery requesting
9
“all inspection reports”).
10
11
12
In Response, Rainier attempts to dodge the issue by arguing “While Rainier may not
have prepared a formal inspection report that is up to [Soundkeeper’s] standards, this is not the
13
same as Rainier failing to inspect its Facility.” Dkt. #23 at 10. Rainier cites to monthly
14
inspection reports for 2014 and 2015. Dkt. ##25-7; 25-8. These reports appear to conform to
15
requirements of the General Permits, but contain certain procedural errors, e.g. the signer of
16
each report fails to check the box certifying “[t]he facility is in compliance with the terms and
17
18
19
conditions of the SWPPP and the Industrial Stormwater General Permit.” See id. Rainier does
not provide any monthly inspection reports for 2010 through 2013.
20
Soundkeeper argues that these monthly inspection reports were never produced in
21
discovery and moves to strike under Rule 37 (c)(1). Having examined Soundkeeper’s discovery
22
23
24
requests and the Harbor Consulting report, the Court finds that the failure to disclose these
reports in discovery cannot be substantially justified given the clear language of Soundkeeper’s
25
discovery requests and cannot be deemed harmless because the disclosure comes after Plaintiff
26
has filed this Motion and after the close of discovery. Soundkeeper’s failure to supplement its
27
earlier discovery response with these reports is inexcusable given the comment from the Harbor
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 12
1
Consulting Report that monthly inspection reports were not available. Even if the Court were to
2
consider this evidence, the Court would still find that Rainier’s failure to certify each and every
3
monthly report would constitute a violation of the General Permits. Dkt. #19-3 at 35; Dkt. #19-
4
4 at 41-42 (“The Permitttee shall ensure each inspection report… includes… Certification and
5
6
7
8
9
10
11
12
signature…”). The Court finds that Rainier has violated the NPDES General Permits by failing
to conduct and properly document monthly inspections of the Facility.
f. Failure to Conduct Level 1 Corrective Actions
Soundkeeper alleges that Rainier failed to conduct “five Level 1 Corrective Actions”
when it sampled discharge and the sample exceeded benchmarks under the NPDES General
Permits. Dkt. #15 at 15-16. These specific samples were in the 4th Quarter of 2009, the 2nd
13
Quarter of 2012, the 3rd Quarter of 2013, and the 1st Quarter of 2015. Id. at 16-18. Rainier
14
does not dispute that it failed to initiate Level 1 Corrective Action in 2009. Dkt. #23 at 1.
15
Summary judgment is appropriate for this violation. The parties appear to acknowledge that
16
Rainier took some corrective action in 2012 by conducting vacuum sweeping, but Rainier
17
18
acknowledges that it failed to revise its SWPPP as required by the General Permit under
19
Condition S8.B.1.c. Id. at 11; Dkt. #19-3 at 36. Rainier does not dispute that it failed to initiate
20
Level 1 Corrective Action in 2013. Dkt. #23 at 11. Summary judgment is appropriate for this
21
violation. The parties appear to acknowledge that Rainier took some corrective action in 2015
22
23
24
25
26
by increasing the frequency of its Facility sweeping, but Rainier fails to mention revising its
SWPPP as required by the General Permit under Condition S8.B.1.c. Id. at 11; Dkt. #19-3 at
36. Summary judgment is appropriate for this violation.
g. Violating Water Quality Standards for the Duwamish Waterway
27
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 13
1
Soundkeeper alleges that Rainier’s discharge contributed to a violation of the surface
2
water quality standards or sediment management standards for the Duwamish waterway in
3
violation of the NPDES General Permits. Dkt. #15 at 19 (citing Condition S7 from Dkt. #19-2
4
at 43, and Conditions S3.A.1-2.b, and S10 from Dkt. #19-3 at 14, 41-42 and from Dkt. #19-4
5
6
7
at 16, 49). In support of this claim, Soundkeeper reiterates the now established fact that Rainier
exceeded its zinc and copper benchmarks in stormwater discharge, and argues that the zinc and
8
copper concentrations in these discharges were substantially higher than the surface water
9
quality standards for these toxic metals, citing to their expert Dr. Horner. Dkt. #15 at 19. Dr.
10
11
12
Horner further declares that discharging copper and zinc can negatively affect the receiving
water environment “through their toxic effects on aquatic life” and can accumulate in the
13
receiving water sediments and that in his expert opinion “Rainier Petroleum’s stormwater
14
discharges have contributed to the elevated sediment metal concentrations responsible for these
15
listings.” Dkt. #18 at 7-8.
16
In Response, Rainier argues that it is not disputing that it exceeded benchmarks for zinc
17
18
and copper, but disputes the extent to which its discharges could have affected the waterways in
19
question.
See Dkt. #23 at 11-13.
The Court finds that Rainier has technically violated
20
provisions S3, S7, and S10 of the applicable General Permits cited by Soundkeeper. The issue
21
of the extent or effect of these violations is not before the Court and remains for trial.
22
23
24
h. Deficiencies in Rainier’s SWPPP
1. Site Map
25
Soundkeeper alleges that Rainier’s SWPPP is deficient because its site map fails to
26
identify: drainage areas for each discharge point, each sampling location by unique identifying
27
number, the areas of pollutant contact associated with specific industrial activities, and surface
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 14
1
water locations. Dkt. #15 at 21. Rainier largely ignores these criticisms, instead pointing to
2
several places in its SWPPP where storm drains are mentioned, and highlighting Appendix A
3
(“Schematic Flow Drawing”) where catch basins are labeled as well as their drainage flow and
4
“their intersection with the King County Mainline, Combined Mainline, Sanitary Mainline, and
5
6
7
Drainage Mainline.” Dkt. #23 at 5.
The NPDES General Permits contain specific requirements for the SWPPP site map.
8
See, e.g., Dkt. #24-1 at 14. The site map “shall” identify, inter alia: all stormwater drainage and
9
discharge structures, the stormwater drainage areas for each stormwater discharge point off-site
10
11
12
with a unique identifying number for each, each sampling location by unique identifying
number, paved areas and buildings, areas of pollutant contact (actual or potential) associated
13
with specific industrial activities, surface water locations, and lands and waters adjacent to the
14
site that may be helpful in identifying discharge points or drainage routes. Id. at 14-15. If this
15
was not clear enough, the instructions listed in the SWPPP form used by Rainier clearly state
16
“[i]dentify all points of discharge to surface water, storm sewers…. Identify each sampling
17
18
location by its unique identifying number such as A1, A2, etc. Include these sampling locations
19
on site map.”
20
information in an additional Schematic Flow Drawing of its catch basins, there can be no
21
dispute that the site map it submitted with its SWPPP technically fails to identify drainage areas
22
23
24
Dkt. #25-1 at 22.
Although Rainier has provided some of the required
for each discharge point, each sampling location by unique identifying number, the areas of
pollutant contact associated with specific industrial activities, and surface water locations as
25
required under the NPDES General Permits. See Dkt. #25-1 at 29-30. The Court finds that
26
Rainier’s site map is in violation of the General Permits.
27
2. Sampling Plan
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 15
1
Soundkeeper alleges that the SWPPP is deficient because its sampling plan fails to
2
identify three of the Facility’s four discharge locations as sampling points and fails to include
3
documentation as to why each discharge point is not sampled. Dkt. #15 at 21. Indeed, although
4
the SWPPP clearly indicates that the Facility has four storm drains, Dkt. #25-1 at 8, and four
5
6
7
catch basins, id. at 10, the SWPPP’s sampling plan has a table of “Discharge Locations” with
only one discharge location listed, id. at 22. The instructions clearly state “[i]dentify all points
8
of discharge to surface water, storm sewers…” Id. Rainier’s single discharge location is
9
identified as “Northeast Catch Basin…. Storm drain outside Spokane St. warehouse.” Id.
10
11
12
13
Rainier’s SWPPP fails to include documentation as to why each discharge point is not sampled.
The Court finds that Rainier’s sampling plan is in violation of the General Permits.
3. Employee Training Plan
14
Soundkeeper alleges that the SWPPP is deficient because it fails to contain an employee
15
training plan that includes (1) an overview of the SWPPP and how employees make a difference
16
in complying with the SWPPP and preventing stormwater contamination and (2) an annual log
17
18
of the dates on which specific employees received the training. Id. at 21-22. These are required
19
under the General Permit. See Dkt. #19-3 at 19. In Response, Rainier argues that its SWPPP
20
does include a section describing employee training and stating that a record of employee
21
training is kept in individual employees’ personnel files. Dkt. #23 at 16. Rainier further argues
22
23
24
that the employee records are incorporated by reference into its SWPPP. Id.
The Court finds that the employee training plan found in Rainier’s SWPPP fails to
25
conform to the requirements of the General Permits by failing to cover an overview of the
26
SWPPP and how employees make a difference in complying with the SWPPP. The fact that
27
Rainier’s employee personnel files may effectively “log” the training at issue creates a question
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 16
1
2
of fact as to whether Rainier’s failure to include a single log in the SWPPP constitutes a
violation.
3
4
5
6
7
4. Signature
Soundkeeper alleges that the SWPPP is deficient because “it was not signed and
certified as the General Permit required at the time Soundkeeper filed suit.” Dkt. # 15 at 22.
Soundkeeper offers no further explanation of this allegation in its Motion, except to cite to its
8
Request for Admission No. 40, which reads, “Admit that as of June 6, 2014, your most recent
9
SWPPP for the site was not signed and certified in accordance with Condition G2 of the 2010
10
11
12
13
ISGP,” and to which Rainier objected and responded “…admit as to the Spokane Street Facility.
Defendant denies the Colorado Street Facility is subject to the NPDES Permit requirements.”
Dkt. #19-10 at 6.
14
In Response, Rainier points to the fact that Rainier’s 2010 SWPPP contains a
15
“Certification Form” which was signed by Daniel C. Kovacich, vice president, on July 12,
16
2010. Dkt. #25-1 at 46. Rainier argues that this satisfies the signature requirement, and it does
17
18
19
20
appear to satisfy the instructions provided with the SWPPP. See id.
In its Reply, Soundkeeper does not address this claim except in footnote. This footnote
states, in its entirety:
21
Finally, Rainier Petroleum admitted in response to Rule 36
requests for admissions that its SWPPP was not signed and
certified as the General Permit required at the time Soundkeeper
filed suit. Tonry Decl., Ex. 10 at 24 (Response to Request No. 40).
This fact is conclusively established and Rainer cannot dispute this
admission now, particularly because Soundkeeper would be
prejudiced by withdrawal since the discovery cutoff has passed.
See F.R.C.P. 36(b).
22
23
24
25
26
27
Dkt. #27 at 8.
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 17
The parties argue past each other like ships in the night. Soundkeeper cites to an
1
2
Admission that Rainier failed to sign a 2014 version of the SWPPP. Rainier does not address
3
this Admission, instead pointing out that it did sign the 2010 version of the SWPPP.
4
Soundkeeper replies via footnote saying “Rainier cannot dispute this admission now.”
5
6
7
Soundkeeper has the burden in this Motion, and has failed to explain why the signature of Mr.
Kovacich on the 2010 SWPPP is legally insufficient. Soundkeeper has failed to adequately
8
explain to the Court the relevance of a 2014 version of the SWPPP, or the relevance of Rainier’s
9
distinction between the Colorado Site versus the Spokane Site. Rainier is not required to
10
11
12
13
disentangle these facts to respond to this Motion. The Court finds issues of fact precluding
summary judgment as to this claim.
F. Number of Violations
14
As stated above, Rainier is responsible for dozens of violations of the NPDES General
15
Permits. Rainier contends that its violations fall into two categories, discharge violations and
16
“administrative violations,” and that “The Ninth Circuit does not administer a penalty for each
17
18
day of a violation for non-discharge violations.” Dkt. #23 at 17. In support of its contention,
19
Rainier cites to a single unpublished case from a district Court in California, San Francisco
20
Baykeeper v. Tidewater Sand & Gravel Co., 1997 U.S. Dist. LEXIS 22602 *39 (N.D. Cal.
21
1997).
22
23
24
Rainier’s summary of the CWA and Ninth Circuit law is inaccurate. As Plaintiff points
out, the CWA itself states “[a]ny person who violates… any permit condition… in a permit
25
issued under section 1344 of this title by a State… shall be subject to a civil penalty not to
26
exceed $25,000 per day for each violation.” 33 U.S.C. §1319(d). It seems clear that the CWA
27
contemplates a penalty for each day of a violation for “any permit condition.” The case cited
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 18
1
by Rainier does not truly dispute this notion. San Francisco Baykeeper states that “it makes no
2
difference in terms of the statute whether or not ongoing violations are tallied as separate daily
3
violations. Regardless of how the violations are counted, the Court may take into account the
4
duration of the violations at the penalty phase of the case.” Id.
5
6
7
The Ninth Circuit has applied a penalty for each day of a non-discharge violation in
CWA cases. See Natural Res. Def. Council v. Sw. Marine, Inc., 236 F.3d 985, 1001 (9th Cir.
8
2000); Borden Ranch P’ship v. United States Army Corps of Eng’rs, 261 F.3d 810, 817-18 (9th
9
Cir. 2001). In Natural Res. Def. Council v. Sw. Marine, Inc., the Ninth Circuit upheld a penalty
10
11
12
assessment for each of the 799 days the defendant failed to maintain and implement an
adequate SWPPP. See Sw. Marine, Inc., 236 F.3d 985, 999, 1002. Ninth Circuit case law and
13
the language of the statute itself are clear—each violation listed in this Order is a separate
14
violation, and if the Court were to address penalties for these violations, it would consider the
15
number of days these violations continued.
16
IV.
CONCLUSION
17
18
Having reviewed the relevant pleadings, the declarations and exhibits attached thereto,
19
and the remainder of the record, the Court hereby finds and ORDERS that Plaintiff’s Motion
20
for Partial Summary Judgment, Dkt. #15, is GRANTED IN PART as follows:
21
22
23
24
a. Rainier violated Condition S9.B of the 2010 General Permit by failing to
complete and submit annual reports for 2013 and 2014. Each year that
Rainier failed to submit an annual report constitutes a separate violation.
25
b. Rainier violated Conditions S4 and S5.A of the 2005 General Permit and
26
Conditions S4.B and S9.A of the 2010 and 2015 General Permits by failing
27
to sample and report stormwater discharges by:
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 19
1
i. failing to collect and report a quarterly discharge sample at any of its
2
discharge locations during fifteen of the seventeen claimed quarters
3
within the statute of limitations period; a question of fact exists as to
4
the 3rd Quarter of 2011 and 3rd Quarter 2012; each quarter that
5
6
7
Rainier failed to conduct these samples properly constitutes a
separate violation;
8
ii. failing to collect samples and report quarterly discharges from three
9
of its four catch basins each quarter; each quarter that Rainier failed
10
11
12
to conduct these samples properly constitutes a separate violation.
c. Rainier violated Condition S7 of the General Permits by failing to conduct
13
and properly document monthly permit compliance inspections. Each month
14
that Rainier failed to properly conduct and document these inspections
15
constitutes a separate violation.
16
d. Rainier failed to complete Level 1 Corrective Action requirements triggered
17
18
under the Condition S4.C of the 2002 General Permit and S8.B of the 2010
19
and 2015 General Permits for: excess zinc in the fourth quarter of 2009,
20
excess zinc and copper in the 2nd Quarter of 2012, excess copper in the 3rd
21
Quarter of 2013, and excess copper in the 1st Quarter of 2015. Each instance
22
23
24
that Rainier failed to properly complete Level 1 Corrective Action
constitutes a separate violation.
25
e. Rainier violated Condition S7 from the 2002 General Permit and Conditions
26
S3.A.1-2.b and S10 from the 2010 and 2015 General Permits by discharging
27
stormwater that contributes to violations of water quality standards, and by
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 20
1
failing to implement a stormwater pollution prevention plan (SWPPP) that
2
specifies best management practices that ensures against such discharges.
3
Each discharge constitutes a separate violation.
4
5
6
7
f. Rainier violated the 2010 and 2015 General Permits by failing to prepare,
implement, and revise as necessary a complete and accurate stormwater
pollution prevention plan (SWPPP). Specifically, the SWPPP contains:
8
i. a deficient site map as described in this Order;
9
ii. a deficient sampling plan as described in this Order;
10
11
12
13
iii. a deficient employee training plan as described in this Order.
Rainier violated the General Permits for each day its stormwater pollution
prevention plan has had these deficiencies.
14
15
DATED this 5 day of October 2015.
16
17
18
19
A
RICARDO S. MARTINEZ
UNITED STATES DISTRICT JUDGE
20
21
22
23
24
25
26
27
28
ORDER GRANTING IN PART AND
DENYING IN PART PLAINTIFF’S MOTION
FOR PARTIAL SUMMARY JUDGMENT - 21