Aguayo-Becerra v. Ash Grove Cement Company et al
Filing
98
ORDER granting Defendant's 89 Motion for Summary Judgment signed by U.S. District Judge John C Coughenour. (TH)
THE HONORABLE JOHN C. COUGHENOUR
1
2
3
4
5
6
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF WASHINGTON
AT SEATTLE
7
8
9
SALOMÉ AGUAYO-BECERRA,
10
Plaintiff,
v.
11
CASE NO. C15-1561-JCC
ORDER ON MOTION FOR
SUMMARY JUDGMENT
FLSMIDTH, INC., a Delaware company,
12
13
Defendant.
14
15
This matter comes before the Court on Defendant FLSmidth, Inc.’s (“FLS”) motion for
16
summary judgment (Dkt. No. 89) and motion to strike (Dkt. No. 95). Having thoroughly
17
considered the parties’ briefing and the relevant record, the Court hereby GRANTS the motions
18
for the reasons explained herein.
19
I.
BACKGROUND
20
Plaintiff Salome Aguayo-Becerra sustained serious injuries when he attempted to take a
21
cement sample by inserting his hand into a maintenance port on an operating screw conveyor at
22
Ash Grove Cement Company (“Ash Grove”). (Dkt. No. 17 at 3–4.) The port was located on the
23
side of a horizontal screw conveyor, connected to an upper conveyer by a vertical transfer chute.
24
(See Dkt. No. 89 at 8.) The correct sampling port was located above the subject port on the side
25
of the chute. (Id.) Plaintiff brought this product liability suit against Ash Grove and the parties
26
who designed and manufactured the screw conveyor. (Dkt. Nos. 1-1 at 4, 5–6; 38 at 4–17.) Ash
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 1
1
Grove was dismissed under the parties’ arbitration agreement. (Dkt. No. 12.) After further
2
discovery, all defendants other than FLS were voluntarily dismissed. (Dkt. Nos. 17, 37, 57, 87.)
3
FLS and its subcontractors designed, supplied, and installed a new cement production
4
line at Ash Grove between 1989 and 1993. (Dkt. No. 80 at 2–3.) FLS project drawings did not
5
include the port into which Plaintiff inserted his hand. (See Dkt. Nos. 89 at 3, 92 at 3.) Nor did
6
the drawings show the transfer chute and sampling port currently located above the subject port.
7
(Dkt. No. 93-7 at 2.) However, Plaintiff asserts that FLS deviated from its original design and
8
added the chute and ports during plant construction. (Dkt. No. 92 at 1, 10.) FLS maintains that
9
the port did not exist when it completed construction at Ash Grove and moves for summary
10
judgment on this basis. (Dkt. No. 89 at 3.)
11
II.
DISCUSSION
12
A.
FLS’s Motion to Strike
13
As an initial matter, the Court will address FLS’s motion to strike Plaintiff’s expert, Alan
14
Werner’s, November 13, 2017 declaration. (Dkt. No. 95 at 2.) This declaration is attached as an
15
exhibit to Plaintiff’s response to FLS’s summary judgment motion. (Dkt. No. 93-18.)
16
Absent a stipulation or court order, expert disclosures must be made at least 90 days
17
before trial. Fed. R. Civ. P. 26(a)(2)(D)(i). Disclosure of an expert witness “must be
18
accompanied by a written report” containing “a complete statement of all opinions the witness
19
will express . . . .” Id. 26(a)(2)(B). The 90-day deadline does not apply if the disclosure “is
20
intended solely to contradict or rebut evidence on the same subject matter identified by [another
21
party’s expert]” and occurs “within 30 days after the other party’s disclosure.” Id.
22
26(a)(2)(D)(ii). “If a party fails to provide information . . . as required by Rule 26(a) . . . [it] is
23
not allowed to use that information . . . to supply evidence on a motion . . . unless the failure was
24
substantially justified or is harmless.” Id. 37(c)(1).
25
26
Werner’s November 13, 2017 declaration was not timely disclosed. Trial in this case is
set for January 29, 2018. The declaration contains new observations and opinions implicating
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 2
1
FLS and not raised in Werner’s July 2017 declaration. (Compare Dkt. No. 93-18 with Dkt. No.
2
93-5.) Plaintiff disclosed new opinions in response to a dispositive motion, not to rebut evidence
3
identified within the prior 30 days. See Fed. R. Civ. P. 26(a)(2)(D); (Dkt. No. 92 at 9). 1
4
Late disclosure of Werner’s declaration was neither justified nor harmless. Werner
5
inspected the Ash Grove plant on October 4, 2017, and Plaintiff could have disclosed new
6
opinions based on this inspection within the 90-day window, as required by Rule 26(a). (See Dkt.
7
No. 92 at 9.) Plaintiff’s late disclosure limited FLS’s ability to depose Werner and to rebut
8
opinions contained in the new declaration.
9
10
For the foregoing reasons, the Court GRANTS FLS’s motion to strike (Dkt. No. 96 at 2).
Werner’s November 13, 2017 declaration (Dkt. No. 93-18) is hereby STRICKEN.
11
B.
12
A Court shall grant summary judgment if the movant shows there is no genuine dispute
Summary Judgment
13
as to any material fact, and the movant is entitled to judgment as a matter of law. Fed. R.
14
Civ. P. 56(a). The moving party has the initial burden of production to demonstrate the absence
15
of any genuine issue of material fact. Fed. R. Civ. P. 56(a); see Devereaux v. Abbey, 263 F.3d
16
1070, 1076 (9th Cir. 2001) (en banc). To carry this burden, the moving party need not introduce
17
affirmative evidence but may simply point to the absence of evidence supporting the nonmoving
18
party’s case. Fairbank v. Wunderman Cato Johnson, 212 F.3d 528, 532 (9th Cir. 2000).
19
“If the moving party shows the absence of a genuine issue of material fact, the
20
nonmoving party must ‘set forth specific facts’ that show a genuine issue for trial.” Leisek v.
21
Brightwood Corp., 278 F.3d 895, 898 (9th Cir. 2002) (citing Celotex Corp. v. Catrett, 477 U.S.
22
317, 323-24 (1986)). A plaintiff must “produce at least some significant probative evidence
23
tending to support” allegations in the complaint. Smolen v. Deloitte, Haskins & Sells, 921 F.2d
24
25
26
1
FLS’s April 2017 responses to interrogatories put Plaintiff on notice that FLS denies
designing or installing the subject port and chute. A September 29, 2017 deposition of Garry
Silver raised the issue of his design for “covers” added during plant construction. Werner opines
on these issues for the first time in his November 13, 2017 declaration. (See Dkt. No. 95 at 5–6.)
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 3
1
959, 963 (9th Cir. 1990). A court must grant summary judgment if, “after an adequate time for
2
discovery,” a party “fails to make a showing sufficient to establish the existence of an element
3
essential to that party’s case, and on which that party will bear the burden of proof at trial.”
4
Celotex Corp., 477 U.S. at 322.
5
6
7
C.
Plaintiff’s Product Liability Claims
1. Washington Product Liability Act
The Washington Product Liability Act (“WPLA”) is the exclusive remedy for product
8
liability claims under Washington law. Washington Water Power Co. v. Graybar Elec. Co., 774
9
P.2d 1199, 1203-04 (Wash. 1989). The WPLA imposes liability on a manufacturer for a
10
claimant’s harm proximately caused by a product “not reasonably safe. . . at the time of
11
manufacture,” due to design defect or inadequate warnings. Wash. Rev. Code § 7.72.030(1)
12
(emphasis added). Alternatively, a manufacturer can be held liable for harm proximately caused
13
by a product “not reasonably safe in construction” if, “when the product left the control of the
14
manufacturer, [it] deviated in some material way from the design specifications.” Id.
15
§ 7.72.030(2) (emphasis added). The WPLA defines “manufacturer” as a “product seller who
16
designs, produces, makes, fabricates, constructs, or remanufactures the relevant product or
17
component part of a product before its sale.” Id. § 7.72.010(2). Here, to prevail on its WPLA
18
claim, Plaintiff must show that FLS designed, made, constructed, or oversaw the installation of
19
the subject port that caused his injury.
20
21
2. Evidence That FLS Designed, Made, or Installed the Subject Port
FLS carries its initial burden of showing the absence of any genuine factual dispute over
22
whether it was responsible for the subject port. FLS points to the absence of evidence that it
23
designed or installed the subject port and presents evidence that the port was not part of its
24
original design or added during plant construction. (Dkt. Nos. 89 at 5–9, 17–19; 90-3 at 11–13.)
25
This showing shifts the burden to Plaintiff to produce “some significant probative evidence” to
26
support its allegations to the contrary. See Leisek, 278 F.3d at 898; Smolen, 921 F.2d at 963.
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 4
1
Plaintiff supports its claim by piecing together inferences drawn from depositions and
2
declarations of FLS’s 30(b)(6) witness, Steve Harrington, FLS engineer Garry Silver, and Ash
3
Grove employee, Michael Begley. Harrington testified that an instruction on FLS’s design to
4
“field fit as necessary” indicated that “tweaks” to the design may be made during project
5
installation. (Dkt. No. 93-6 at 8.) Silver testified that, as a new engineer, he was assigned to
6
design a cover for the “shaft and the miltronics motion sensor” on the end of a screw conveyor.
7
(Dkt. No. 92 at 8–9.) The cover was an in-the field addition not in original project designs. (Id.)
8
Silver faxed his design to project leaders before leaving the worksite. (Id.) Finally, Begley
9
testified that adding the chute and ports after initial installation would have been a large project
10
requiring a change in the incline of a heavy conveyor. (Dkt. No. 93-14 at 4.) Begley declared that
11
after a “diligent search” he found no record of such a project at Ash Grove. (Dkt. No. 97-7 at 2–
12
3.) Plaintiff argues that from this evidence, a reasonable juror could infer that the port was added
13
during construction. Plaintiff’s operative theory is that FLS misunderstood Silver’s design and
14
implemented it by installing the subject port—and assumedly the adjacent chute, hopper, and
15
sampling port also absent from original project drawings. (See Dkt. No. 92 at 7–18.)
16
Plaintiff’s suggested inferences are contradicted by evidence regarding FLS’s installation
17
of the plant machinery. Harrington oversaw FLS’s project at Ash Grove and was the last
18
engineer onsite. (Dkt. No. 95 at 10.) He testified that the subject ports and chute did not exist
19
when FLS left the plant. (Dkt. Nos. 93-6 at 6, 95 at 10.) Plaintiff’s only response is that
20
Harrington is “not to be believed.” (Dkt. No. 92 at 18.) FLS also provides evidence that it
21
installed an automated sampling system at Ash Grove that is no longer in operation. (Dkt. No. 89
22
at 15.) With this system in place, there would have been no need for a manual sampling port at
23
the time of construction. (Id.) Furthermore, FLS offers evidence rebutting Plaintiff’s theory that
24
Silver’s design was implemented as the subject port: an attestation by Harrington that, under his
25
supervision, Silver’s cover design was implemented as intended, and photographs showing the
26
covers installed on 11 conveyors not at issue in this suit. (Dkt. Nos. 97 at 4, 97-4.) Finally, FLS
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 5
1
points out that Plaintiff relies solely on Begley’s personal search to establish that Ash Grove has
2
no record of installation of the subject port; Plaintiff did not depose or serve discovery on Ash
3
Grove. (Dkt. No. 95 at 11.)
4
Plaintiff fails to make a showing sufficient to establish that FLS designed, made, or
5
installed the subject port—an essential element of his case for which he will bear the burden of
6
proof at trial. See Celotex Corp., 477 U.S. at 322. Conclusory statements and unsupported
7
conjecture are not enough to survive summary judgment. Hernandez v. Spacelabs Medical Inc.,
8
343 F.3d 1107, 1112 (9th Cir. 2003).
9
3. Plaintiff’s Strict Liability Argument
10
Plaintiff appears to argue in the alternative that he need not establish FLS’s responsibility
11
for the subject port for the Court to apply strict liability. He reasons that strict liability apportions
12
the cost of an injury to a manufacturer and does not require a plaintiff to prove fault. (Dkt. No.
13
92 at 14) (citing generally Martin v. Abbott Labs, 689 P. 2d 368 (Wash. 1984)). Plaintiff’s
14
argument for strict liability relies on the following facts: (1) FLS was in the chain of distribution
15
and installed the original screw conveyor, (2) Plaintiff was not at fault, and (3) Plaintiff has
16
uncovered no evidence “that anybody else [was] subsequently responsible.” (Dkt. No. 92 at 5, 6,
17
22.)
18
These facts are not sufficient to establish strict liability under Washington law. Plaintiff
19
relies on cases holding distributors strictly liable based on pre-WPLA law. See Seattle-First Nat.
20
Bank v. Taubert, 542 P.2d 774, 776 (Wash. 1975); Zamora v. Mobil Oil Corp., 704 P.2d 584,
21
588 (Wash. 1985). These cases also involved products that were defective when they passed
22
through distributors’ hands. Id. Plaintiff additionally cites tobacco and asbestos cases to argue for
23
a diminished need to prove causal responsibility and the ability to establish that a product was
24
defective by showing it did not conform to consumer safety expectations. (Dkt. No. 92 at 13.)
25
(citing generally Falk v. Keene Corp., 782 P.2d 974 (Wash. 1989); Lockwood v. A C & S, 744
26
P.2d 605 (Wash. 1987)). But none of these cases, or others Plaintiff cites, remove a claimant’s
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 6
1
burden to show that the defendant designed, made, or constructed a defective product or that the
2
defect existed when the product left the defendants’ control.
3
Strict liability under the WPLA still requires Plaintiff to establish that FLS was involved
4
in the design or installation of the subject port that caused his injury or that the port existed when
5
the screw conveyor left FLS’s control.
6
III.
7
8
9
CONCLUSION
For the foregoing reasons, Defendant FLSmidth’s motion to strike (Dkt. No. 95) and
motion for summary judgment (Dkt. No. 89) are GRANTED.
DATED this 30th day of November 2017.
A
10
11
12
John C. Coughenour
UNITED STATES DISTRICT JUDGE
13
14
15
16
17
18
19
20
21
22
23
24
25
26
ORDER ON MOTION FOR SUMMARY
JUDGMENT
C15-1561-JCC
PAGE - 7