Fish, LLC v. Harbor Marine Maintenance & Supply, Inc.

Filing 53

ORDER granting in part and denying in part Plaintiffs' 39 Motion for Partial Summary Judgment; denying Defendant's 46 Motion to Withdraw Admissions. Defendant's counter-claim for breach of contract is dismissed, as is Defendant's affirmative defense of failure to state a claim. All remaining claims and defenses will be resolved at trial. Signed by U.S. District Judge John C Coughenour. (TH)

Download PDF
THE HONORABLE JOHN C. COUGHENOUR 1 2 3 4 5 6 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE 7 8 9 FISH, LLC, et al., 10 CASE NO. C17-0245-JCC Plaintiffs, ORDER v. 11 HARBOR MARINE MAINTENANCE & SUPPLY, INC., 12 13 Defendant. 14 15 This matter comes before the Court on Plaintiffs’ motion for partial summary judgment 16 17 18 19 20 21 22 23 24 25 26 (Dkt. No. 39) and Defendant’s motion to withdraw admissions (Dkt. No. 46). Having thoroughly considered the parties’ briefing and the relevant record, the Court finds oral argument unnecessary and hereby GRANTS in part and DENIES in part Plaintiffs’ motion (Dkt. No. 39) and DENIES Defendant’s motion (Dkt. No. 46) for the reasons explained herein. I. BACKGROUND Unless otherwise indicated, the following facts are uncontroverted. Zane White and his limited liability company, Fish LLC (collectively “Plaintiffs”), engaged Defendant to upgrade the engines on Plaintiffs’ vessel and make other repairs. (Dkt. No. 39 at 3.) Defendant brought the vessel ashore and replaced the engines at its boat yard, but did not finish the job on land. (Id. at 6.) It launched the vessel and towed it to Plaintiffs’ boathouse on November 3, 2015, intending ORDER C17-0245-JCC PAGE - 1 1 to finish the job on-site. (Dkt. No. 40-7 at 2–3.) The vessel sank in the boathouse on or about 2 November 22, 2015 before any additional work could be performed. (Dkt. No. 39 at 8.) 3 No one witnessed the vessel sink. Holly James, an independent boat detailer, testified that 4 she entered the boathouse on the evening of Friday November 20th to return items to Mr. White. 5 (Dkt. No. 45-1 at 32.) She observed the vessel floating at its normal position in the water without 6 the bilge pump running. (Id. at 33, 34.) Two days later, Port of Everett personnel discovered the 7 vessel sunken in the boathouse. (Dkt. No. 40-16 at 5.) Zane White was out of state throughout 8 this period and has no personal knowledge regarding the sinking. (Dkt. Nos. 39 at 15, 44 at 4.) 9 Plaintiffs bring claims for breach of a bailment agreement, breach of contract, breach of 10 the implied warranty of workmanlike performance, and negligence and/or gross negligence. 11 (Dkt. No. 14 at 4–7.) Defendant counter-claims for breach of contract, alleging Plaintiffs failed 12 to pay amounts owing for the work it did on the vessel before it sunk along with the salvage and 13 storage services Defendant rendered after the vessel sunk. (Dkt. No. 15 at 8–9.) Trial in this 14 matter is scheduled to begin June 4, 2018. (Dkt. No. 16.) 15 Plaintiffs now move for partial summary judgment. (Dkt. No. 39.) They ask the Court to: 16 (1) find that Defendant is liable as a matter of law for all but Plaintiffs’ negligence claims, (2) 17 dismiss some of Defendant’s affirmative defenses, and (3) dismiss Defendant’s counter-claim. 18 (Id. at 1.) By separate motion, Defendant asks the Court to withdraw certain admissions it made 19 by virtue of an untimely response to Plaintiffs’ second request for admissions. (Dkt. No. 46.) 20 II. DISCUSSION 21 A. Legal Standard 22 Pursuant to Rule 56 of the Federal Rules of Civil Procedure, “[t]he court shall grant 23 summary judgment if the movant shows that there is no genuine dispute as to any material fact 24 and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). In making such 25 a determination, the Court must view the facts and inferences to be drawn therefrom in the light 26 most favorable to the nonmoving party. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247–50 ORDER C17-0245-JCC PAGE - 2 1 (1986). Once a motion for summary judgment is properly made and supported, the opposing 2 party “must come forward with specific facts showing that there is a genuine issue for trial.” 3 Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986). Material facts are 4 those that may affect the outcome of the case, and a dispute about a material fact is genuine if 5 there is sufficient evidence for a reasonable jury to return a verdict for the non-moving party. 6 Anderson, 477 U.S. at 248–49. Ultimately, summary judgment is appropriate only against a party 7 who “fails to make a showing sufficient to establish the existence of an element essential to that 8 party’s case, and on which that party will bear the burden of proof at trial.” Celotex Corp. v. 9 Catrett, 477 U.S. 317, 324 (1986). 10 B. 11 Plaintiffs move for summary judgment on their claim that Defendant breached the Breach of Bailment Agreement 12 bailment agreement. (See generally Dkt. No. 39.) A bailment is created when property is 13 delivered to and accepted by a recipient with the implied promise that the property will be 14 returned once the purpose of the bailment has been fulfilled. 19 WILLISTON ON CONTRACTS 15 § 53:2 (4th ed.) (May 2017 update). “It has long been established that the law of bailment is 16 applicable to suits for damages to or loss of a vessel that has been left with another for purposes 17 of repair.” Goudy & Stevens, Inc. v. Cable Marine, Inc., 924 F.2d 16, 18 (1st Cir. 1991) (citing 18 Buntin v. Fletchas, 257 F.2d 512, 513 (5th Cir. 1958)). Further, if a bailor demonstrates that a 19 bailee had exclusive possession of property and then returned the property damaged, a 20 presumption of negligence attaches. Natl. Liab. & Fire Ins. Co. v. R & R Marine, Inc., 756 F.3d 21 825, 832 (5th Cir. 2014). To overcome this presumption, the bailee must make an affirmative 22 showing that it either exercised reasonable care or that its negligence was not the proximate 23 cause of the damage. Id. 24 It is undisputed that Plaintiffs delivered the vessel to Defendant in a seaworthy condition. 25 (See generally Dkt. Nos. 39, 44.) At issue are the remaining elements. The Court finds Defendant 26 presents sufficient evidence to create genuine of fact regarding whether the bailment terminated ORDER C17-0245-JCC PAGE - 3 1 prior to the sinking and whether Defendant’s actions were the proximate cause of the damage. 2 1. Termination of the Bailment 3 Defendant alleges Plaintiffs instructed it to move the vessel to the boathouse, thereby 4 terminating the bailment. (Dkt. No. 44 at 14); (see Dkt. No. 45-1 at 11, 17) (supporting testimony 5 from Defendant’s representative and one of its employees). The Court must accept this testimony 6 as true. See Anderson, 477 U.S. at 247–50 (1986) (a court must view all facts and inferences in 7 favor of the nonmoving party when considering a motion for summary judgment). This is 8 sufficient to create a genuine issue for trial. 9 10 2. Proximate Cause The report 1 from the salvage crew who refloated the vessel after it sunk indicated that a 11 fitting for a through-hull valve normally plumbed to a bait well pump (but disconnected by 12 Defendant while work was to be performed) was at or below the water line and that the valve 13 was in the open position. (Dkt. No. 41-1.) This allowed water to run directly into the bilge. (Id.) 14 Michael McGlenn, the surveyor for Plaintiffs’ insurer, concluded that this caused the sinking. 15 (Dkt. No. 40-16 at 7.) He theorized that Defendant left the through-hull valve open. (Dkt. No. 16 45-1 at 7.) He believes that for some period of time the bilge pumps may have kept up with the 17 flow. (Id.) Eventually, the pumps would have been unable to do so. (Id.) Once this happened, the 18 vessel would dip as it takes on water. (Id.) Eventually, it would dip to the point that the water 19 line would be above two unplugged fittings leading to disengaged engine exhaust pipes, higher 20 up on the hull. (Dkt. No. 40-16 at 7.) Once this happened, the sinking would be “fast and 21 complete.” (Id.) 22 23 Lynne Reister, the surveyor for Defendant’s insurer, generally agreed with Mr. McGlenn’s findings. (See Dkt. No. 40-17 at 5.) But she disagreed in critical areas. She notes that 24 25 26 1 Defendant asserts the salvage crew’s communication of its findings is hearsay. (Dkt. No. 44 at 19–20.) But since it can be reduced to an admissible form at trial through testimony the Court will consider it. Fraser v. Goodale, 342 F.3d 1032, 1036 (9th Cir. 2003). ORDER C17-0245-JCC PAGE - 4 1 the salvage crew did not “fully dewater” the vessel after raising it and, as a result, it would have 2 been below its “normal static position.” (Dkt. No. 45-1 at 60.) While the fitting leading to the 3 open through-hull valve was at or below the water line at this lower position, it would not have 4 been at its normal position. (Id. at 59.) Further, she contends that if the fitting were at or below 5 the water line with the valve open, “water would have been shooting from the open spud” and 6 this would be plainly evident upon a cursory inspection. (Id. at 59–60.) Fred Low, one of 7 Defendant’s employees, indicated that when the vessel was launched he “looked at every inch of 8 the boat that was available to be seen, and there was no water coming into the boat, and I 9 checked it multiple times.” (Id. at 53.) Mr. Low also testified that he “checked on [the vessel] 10 every morning and every afternoon” while it was in the boathouse, except for a long weekend, 11 and found no water in the vessel. (Id. at 54.) Ms. Reister also noted that Defendant’s practice is 12 “to close all valves” before launch. (Id. at 60.) Lauren Bivens, Defendant’s representative, 13 confirmed this practice. (See id. at 18). Mr. Low also testified that he personally checked the 14 valve when the vessel first went into the water. (See id. at 53) (“I can guarantee that I checked 15 that when it first went into the water.”). 16 The vessel stayed afloat in the boathouse for approximately nineteen days: November 3– 17 November 22. (Dkt. Nos. 39 at 8, 40-7 at 2–3.) After it sank, the valve was found in the open 18 position and the garage-style doors for the boathouse were wide open. (Dkt. No. 40-16 at 5.) 19 Defendant speculates that Ms. James, who saw the boat floating at its normal position two days 20 earlier, may have inadvertently left the boathouse’s door open. (Dkt. No. 44 at 17.) Defendant 21 further speculates that someone may have entered the boathouse and opened the valve and/or 22 turned off the bilge pumps. (Id.) Alternatively, the open garage-style door may have exposed the 23 vessel to winter weather, which could have rocked it to the point that water came into contact 24 with the through-full fitting. (Dkt. No. 44 at 17.) “Rank speculation” is insufficient to avoid 25 summary judgment. McSherry v. City of Long Beach, 584 F.3d 1129, 1138 (9th Cir. 2009). But 26 this is more than rank speculation. These are reasonable inferences that may be drawn from the ORDER C17-0245-JCC PAGE - 5 1 evidence presented. See Anderson, 477 U.S. at 247–50 (Court must draw inferences in 2 Defendant’s favor). Therefore, Defendant presents sufficient evidence to create a genuine issue 3 for trial. 4 Accordingly, the Court DENIES summary judgment on Plaintiffs’ bailment claim. 5 C. 6 Plaintiffs also move for summary judgment on their breach of contract and breach of the 7 implied warranty of workmanlike performance claims. (See generally Dkt. No. 39.) They bring 8 the claims based on Defendant’s failure to return the vessel in a repaired, upgraded, and 9 seaworthy condition. (Dkt. No. 14 at 4–6.) Defendant did not directly address Plaintiffs’ breach Breaches of Contract and the Warranty of Workmanlike Performance 10 of contract or breach of workmanlike performance claims when it responded to Plaintiffs’ 11 summary judgment motion. (See generally Dkt. No. 44.) Therefore, Plaintiffs urge the Court to 12 treat the facts supporting these claims as undisputed and grant summary judgment. (Dkt. No. 48 13 at 2–3) (citing Fed. R. Civ. P. 56(e)(2–3)). But Defendant provides evidence supporting its 14 allegation that Plaintiffs instructed Defendant to return the vessel unfinished and that 15 Defendant’s actions were not the proximate cause of the vessel’s sinking. See supra part II.B. 16 This evidence is as relevant for Plaintiffs’ breach of contract and breach of warranty claims as it 17 is for Plaintiffs’ bailment claim. Accordingly, the Court DENIES summary judgment on 18 Plaintiffs’ breach of contract and breach of the implied warranty of workmanlike performance 19 claims. 20 D. Affirmative Defenses 21 In addition, Plaintiffs move to dismiss the following affirmative defenses: comparative 22 fault, third-party fault, and failure to state a claim. (Dkt. No. 39 at 22–24.) 2 As to comparative 23 fault, Defendant presents evidence that Zane White instructed it to launch the vessel and that Mr. 24 White made no arrangements to check on the vessel while it was in the boathouse. (See Dkt. No. 25 2 26 Plaintiffs also moved the Court to dismiss the affirmative defense of waiver. (Id.) Defendant since withdrew that defense. (Dkt. No. 44 at 2.) ORDER C17-0245-JCC PAGE - 6 1 45-1 at 11, 17, 23–24) (supporting testimony from Defendant’s representative and one of its 2 employees that Mr. White told Defendant to launch the vessel because he was anxious to take it 3 fishing). For purposes of the instant motion, the Court must assume these facts to be true. 4 Anderson, 477 U.S. at 247–50 (1986). As to third-party fault, Defendant presents evidence that 5 the valve at issue was closed when Defendant launched it, that Ms. James was the last known 6 person to visit the boathouse, and that the boathouse’s garage-style door was wide open when the 7 vessel was discovered sunken with the valve open. (Dkt. Nos. 40-16 at 5; 45-1 at 32–34, 53.) 8 Accordingly, Plaintiffs’ motion to dismiss Defendant’s comparative and third-party defenses is 9 DENIED. 10 Finally, failure to state a claim is not a proper affirmative defense. Kaiser v. CSL Plasma 11 Inc., 240 F. Supp. 3d 1129, 1134 (W.D. Wash. 2017). It should be brought by motion, and the 12 time to do so has lapsed. (See Dkt. No. 16.) Accordingly, Plaintiffs’ motion to dismiss 13 Defendant’s failure to state a claim defense of is GRANTED. 14 E. 15 Defendant alleges Plaintiffs still owe it $75,304 ($58,651 for parts/services before the 16 vessel sunk and $16,653 after it sunk) and that Plaintiffs’ failure to pay represents a breach of 17 contract. (Dkt. No. 40-24 at 2.) Plaintiffs move for summary judgment, alleging no amount 18 remains outstanding. (Dkt. No. 39 at 20.) Before addressing Plaintiffs’ summary judgment 19 motion (Id.), the Court must resolve Defendant’s motion to withdraw its admissions (Dkt. No. 20 46). Defendant’s Admissions & Breach of Contract Claim 21 Plaintiffs served the following requests for admissions on December 21, 2017: 22 REQUEST FOR ADMISSION NO. 8: Admit [Defendant] wrote off or otherwise credited $58,651.00 of the balance of the [vessel] repairs, upgrades, and improvements as indicated in Exhibit 1. 23 24 25 26 REQUEST FOR ADMISSION NO. 9: Admit no amounts remain owing on plaintiffs’ account relating to the August 2015–November 2015 [vessel] project, including amounts claimed for repairs, upgrades, improvements, lay days, salvage efforts, and storage. ORDER C17-0245-JCC PAGE - 7 1 (Dkt. No. 40-22 at 2.) Defendant’s response was due January 25, 2018. Id., Fed. R. Civ. P. 2 36(a)(3), as modified by Fed. R. Civ. P. 6(a)(1)(C), 6(d). Defendant served its response, denying 3 the admissions, on February 5, 2018. (Dkt. No. 40-23.) In its untimely response, Defendant 4 explained that any credit was “upon the advice of its outside accounting firm” and should not be 5 “properly construed as a credit.” (Id.) But because the response was untimely, it is deemed 6 admitted, absent relief from the Court. Fed. R. Civ. P. 36(a)(3), (b). Defendant moves to 7 withdraw these admissions. (See generally Dkt. No. 46.) 8 9 The Court may permit withdrawal of an admission, but only if withdrawal would promote the presentation of the case on the merits and not prejudice the party obtaining the admission. 10 Fed. R. Civ. P. 36(b). For these purposes, prejudice is defined as “the difficulty a party may face 11 in proving its case.” Conlon v. U.S., 474 F.3d 616, 622 (9th Cir. 2007). But even if the two-prong 12 test is met, the Court may still elect not to allow withdrawal, based on other considerations. 13 Conlon v. U.S., 474 F.3d 616, 624–25 (9th Cir. 2007). 14 Here, withdrawing the admission would promote the presentation of the case on the 15 merits. Absent withdrawal, Defendant’s admission is fatal to $58,651 of its counter-claim. (Dkt. 16 No. 46 at 4.) However, withdrawal would prejudice Plaintiffs. While Defendant’s response was 17 only ten-days late, the impact of the delay was significant, as the discovery deadline passed the 18 day before Defendant served its responses. (Dkt. No. 16). As a result, Plaintiffs could not seek 19 additional discovery based on Defendant’s denial. Further, even if Plaintiffs would not suffer 20 prejudice, Defendant does not allege that its oversight was due to good cause. (See Dkt. No. 46 at 21 3) (noting that responsibility for the tardy response “rests entirely with the undersigned 22 counsel”). 23 Accordingly, Defendant’s motion to withdraw its admissions is DENIED. 24 The only remaining amount left on Defendant’s counter-claim is the $16,653 in costs and 25 fees Defendant charged for the salvage and storage of the vessel after it sank. (Dkt. No. 39 at 20.) 26 Plaintiffs assert this amount was fully paid by Plaintiffs’ insurer. (Id.) In support, Plaintiffs ORDER C17-0245-JCC PAGE - 8 1 present an accounting entry from Defendant’s records showing that this amount was received 2 and credited to Mr. White’s account. (Dkt. No. 40-21.) Defendants point to no evidence 3 disputing this payment. (See generally Dkt. No. 44 at 24.) Instead, Defendant argues the 4 evidence lacks foundation. (Id.) But Defendants ignore the admission of its representative that 5 this amount was paid and credited to Plaintiffs’ account. (See Dkt. No. 40-20 at 8–9.) 6 Accordingly, the Court GRANTS summary judgment to Plaintiffs on Defendant’s counter- 7 claims, which are dismissed with prejudice. 8 III. 9 CONCLUSION For the foregoing reasons, Defendant’s motion to withdraw admissions (Dkt. No. 46) is 10 DENIED and Plaintiffs’ summary judgment motion (Dkt. No. 39) is GRANTED in part and 11 DENIED in part. Defendant’s counter-claim for breach of contract is dismissed, as is 12 Defendant’s affirmative defense of failure to state a claim. All remaining claims and defenses 13 will be resolved at trial. 14 15 DATED this 16th day of April 2018. A 16 17 18 John C. Coughenour UNITED STATES DISTRICT JUDGE 19 20 21 22 23 24 25 26 ORDER C17-0245-JCC PAGE - 9

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?