Port of Ridgefield v. Union Pacific Railroad Company

Filing 170

FINDINGS OF FACT AND CONCLUSIONS OF LAW; signed by Judge Ronald B. Leighton. (DN)

Download PDF
HONORABLE RONALD B. LEIGHTON 1 2 3 4 5 6 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT TACOMA 7 8 9 PORT OF RIDGEFIELD, a Washington municipal corporation, 10 12 FINDINGS OF FACT AND CONCLUSIONS OF LAW Plaintiff, v. 11 CASE NO. CV14-6024RBL UNION PACIFIC RAILROAD COMPANY, a Delaware corporation, 13 Defendant. 14 15 16 Following the bench trial in this matter beginning November 26, 2018 to December 19, 2018, the Court makes the following Findings of Fact and Conclusions of Law: 17 I. 18 19 20 21 22 23 24 1. FINDINGS OF FACT From 1964 to 1993, Pacific Wood Treating (“PWT”) operated a wood pressure- treating facility and manufacturing facility on the Lake River Industrial Site (“LRIS”) in Ridgefield, Clark County, Washington. 2. The LRIS is generally located at 111 West Division Street in Ridgefield, Washington. Itis bounded on the east by a Burlington Northern Santa Fe Railroad (“BNSF”) main line, on the west by a portion of Lake River, on the north by Carty Lake and the Ridgefield FINDINGS OF FACT AND CONCLUSIONS OF LAW - 1 1 National Wildlife Refuge, and on the south by the Port’s marina property, Railroad Overpass 2 property and a portion of McCuddy’s Marina. The larger Site is “defined by the extent of 3 contamination caused by the release of hazardous substances at the Site,” and includes an off- 4 property area to the east of the BNSF main line. 5 3. PWT’s operations included pressure-treating wood with oil-based solutions 6 containing creosote, pentachlorophenol (“PCP”), and chromated copper arsenate (“CCA”), 7 which is a mixture of copper, chromium and arsenic. 8 9 10 11 4. PWT and its parent company Niedermeyer-Martin declared bankruptcy and ceased operations in August 1993. PWT’s president Edward Niedermeyer, also declared bankruptcy. He is now deceased. 5. The Port owned, and leased to PWT during 1964-1993, 24 acres of the LRIS. 12 PWT owned 11.4 acres of the LRIS during its operations. The Port acquired this land in the PWT 13 bankruptcy. The City of Ridgefield (“City”) owned, and leased to PWT during 1964-1993, 14 approximately 0.5 acres of the LRIS. The Port acquired this land in 2010. Union Pacific owned, 15 and leased to PWT during 1964-1993, approximately 2 acres at the LRIS. The Port acquired this 16 land in May 2013. The Port also owns the Railroad Avenue properties (.62 acre), Marina 17 property (1 acre) and the Railroad overpass property (1.35 acres). 18 6. PWT’s operations on the properties it leased from the Port’s (and City) included 19 the following: “retorts” used for chemically treating lumber and poles, a drip pad, untreated 20 wood storage areas, treated lumber storage and shipping areas, a truck scale, rail spur and tram 21 tracks, an unlined surface impoundment, a concrete pond, a French drain, a sludge incinerator, 22 and, beginning in the 1980s, a wastewater treatment plant. These areas were later designated as 23 Cells 1 and 2 in an Ecology Agreed Order. Cell 4, also known as the North Pole Yard, was used 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 2 1 for debarking poles and storing untreated and treated poles. Cells 1, 2 and 4 are all located north 2 of Division Street at the Site. 3 7. Union Pacific owned and leased to PWT an approximately two-acre parcel. It is 4 located at the southeastern portion of the Site, south of Division Street. It comprises 5 approximately 24 percent of the South Pole Yard (later designated Cell 3). This parcel was used 6 for storing untreated scaffolding planks, a rail spur and, beginning in about 1968, areas for 7 storing and shipping treated poles, an office, and tram tracks. A drip trough was installed on this 8 property in 1988. 9 8. The Port owned the remainder of Cell 3 and leased it to PWT from 1964-1993. It 10 included an area for inspecting newly-treated poles, areas for storing treated poles and lumber, a 11 barge loading ramp, and storing discarded scraps of treated wood. 12 13 14 9. Former PWT employees testified that the most contaminated part of the Site was the area of the retorts and drip pad, on the Port- and City-owned portions of the Site. 10. Most of the contamination at the Site occurred during the “Vietnam Order.” This 15 was an intense 2-3 year period of operations in the mid-1960s, during which PWT supplied 16 treated lumber and plywood to the federal government for construction projects in Vietnam. This 17 contamination occurred primarily in the retort, drip pad and yard areas of Cells 1 and 2 (the Port 18 and City property). This finding is based on the testimony of former PWT employees, and is 19 corroborated by aerial photographs, imagery analysis and other evidence. 20 11. During the Vietnam Order, wood treating operations were 24/7. Treated lumber 21 was loaded directly on trucks in Cell 2, which then left the Site still dripping chemicals. Division 22 Street—the truck route from the Site through the residential neighborhood to the east—was wet 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 3 1 with chemicals, and the drip pad and adjacent yard area in Cell 2 were so saturated that the 2 chemicals caused PWT employees’ boots to deteriorate. 3 12. Trucks or barges transported Vietnam Order products to nearby seaports for 4 shipment to Vietnam. Trucks were loaded near the drip pad and “yard” in Cell 2 (the Port’s 5 property), and barges were loaded in the western portion of Cell 3 (also the Port’s property). 6 13. During the Vietnam Order, the tram tracks did not extend from the Cell 2 drip pad 7 to the Union Pacific property on Cell 3. Nor was that property used for the storage or shipment 8 of treated wood products. Those uses of those areas began in about 1968. 9 14. Deliveries of wood treating chemicals, raw wood and other freight during the 10 Vietnam Order, and thereafter, occurred by truck or by rail on the spur near the retorts and tank 11 farm in Cell 2 (the Port’s property). (Dep. Designation at 25:15-28:9 (Foster); 12/6/18 Tr. at 12 30:14-34:8, 35:7-36:6 (Ryf); 12/6/18 Tr. at 86:12-89:20 (Carel)). 13 15. After the Vietnam Order, PWT expanded and diversified its operations to include 14 fabrication of laminated beams, guitar backs and other types of untreated wood products. It 15 constructed new fabrication facilities on the western portion of Cell 2, and hired additional 16 personnel to operate the new facilities. 17 16. After the Vietnam Order, PWT began to use the South Pole Yard (Cell 3), 18 including the Union Pacific property, for inspecting, sorting and shipping treated poles. Poles 19 were taken from the North Pole Yard (Cell 4) to the retorts on trams and treated. They were 20 allowed to remain on the drip pad outside the retorts until they cooled and the chemicals were 21 absorbed. The poles would then be transported to an inspection area in the western portion of 22 Cell 3 (the Port’s property) before storage throughout Cell 3. 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 4 1 17. According to former PWT employees, the inspection area was the most visibly 2 contaminated part of Cell 3 but, overall, Cell 3 (including the Union Pacific property) was much 3 less contaminated than the tank farm, retort, drip pad and yard areas in Cells 1 and 2. 4 18. Throughout PWT’s operations, it stored and shipped treated lumber (as opposed 5 to poles) primarily from the “yard,” southwest of the retorts and north of Division Street on the 6 Port’s property in Cell 2. Lumber was delivered to the yard by truck or rail, treated in the retorts, 7 and (after the Vietnam Order) allowed to remain on the drip pad outside the retorts until it cooled 8 and the chemicals were absorbed. The treated lumber would then be stored in areas of the yard 9 west of the drip pad, on Cell 2, before being loaded on trucks in that area for shipment offsite. 10 19. According to the former PWT employees, there was little drippage from treated 11 lumber or poles after the Vietnam Order, although some chemical spills occurred, primarily in 12 the retort area in Cells 1 and 2. 13 20. According to the former PWT employees, there was no significant tracking of 14 chemicals by vehicles within the Site after the Vietnam Order but, as former PWT 15 Environmental Manager Bryant Adams, Ph.D. explained, any tracking of chemicals that did 16 occur was from the retort area to the Union Pacific property. 17 21. Ecology Cleanup Project Manager Craig Rankine similarly testified that any 18 tracking would have been from areas of higher contamination to less impacted areas, not the 19 other way around, and that any tracking from Cell 3 did not cause additional remediation 20 requirements or costs elsewhere at the Site 21 22 22. Union Pacific expert witnesses Robert Sterrett, Ph.D. (Itasca), and Mark Larsen (Anchor QEA) similarly testified that concentrations of PCP, arsenic and dioxin in soil samples 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 5 1 taken at the Site do not support vehicle tracking from the former Union Pacific property causing 2 any additional remediation requirements or costs elsewhere at the Site. 3 23. The Port’s consultant and expert witness, Jim Maul, acknowledged at trial that, 4 despite working on the Site for more than 20 years none of Maul Foster & Alongi (“MFA”) 5 reports referenced vehicle tracking from the former Union Pacific property causing 6 contamination elsewhere at the Site. He testified that there is “no way of knowing” the extent of 7 any contribution, and that he did not develop the tracking theory until after he learned of 8 Ecology’s proposed de minimis settlement with Union Pacific. 9 24. The BNSF main line and rail spurs in Cell 2 were used for delivering and 10 shipping freight, chemicals, and untreated and treated lumber products. After the Vietnam Order, 11 the rail spur on the Union Pacific property in Cell 3 was used to ship treated poles from the Site. 12 The Port and its other customers and lessees also used the BNSF main line and rail spurs in Cells 13 2 and 3. 14 25. It is undisputed that BNSF and Union Pacific provided freight services at the Site 15 as common carriers. Neither the Port nor Union Pacific was an operator at the Site as that term is 16 used under MTCA. 17 26. PWT provided $1,787,334.00 to the EPA for cleanup activities and for natural 18 resource damage assessment and restoration. These funds were placed in an EPA Drip Pad Trust 19 Fund account. After PWT’s bankruptcy, these funds were transferred to Ecology, and ultimately 20 were made available to the Port for investigation or cleanup of the Site. 21 22 27. Following PWT’s bankruptcy, the Port leased portions of the Site to new commercial/industrial tenants. The Port also rented the Union Pacific property, and subleased it 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 6 1 to commercial/industrial tenants. During this period, the Port paid its lease payments to Union 2 Pacific with Ecology remedial action grants. 3 28. Ecology issued a PLP status letter to the Port dated July 15, 1996, pursuant to 4 RCW 70.105D.040, 70.105D.020(21), and WAC 173-340-500. On August 6, 1996, the Port 5 voluntarily waived its rights to notice and comment and accepted Ecology’s determination that 6 the Port is a PLP under RCW 70.105D.040. 7 8 9 29. On September 23, 1996, the Port entered into the first of three Agreed Orders with Ecology, accepting responsibility for Site investigation and remedial action. 30. In January 1997, Ecology provided the Port with the first of ten grants for 10 remedial action costs. Ecology also provided no interest loans (most of which were later 11 forgiven), for total funding of more than $80 million—the largest in MTCA history. 12 31. Ecology was motivated to provide this funding due to the extent and cost of the 13 required remediation, the Port’s inability to pay, the City’s and County’s economically 14 disadvantaged status, the potential for economic redevelopment, and the opportunity to 15 implement an innovative technology—steam enhanced remediation (“SER”)—that might be 16 used at other MTCA sites. 17 32. From 1993 – 2013, the Port received 10 separate grant and loan packages from 18 Ecology totaling $81,058,537, including Ecology’s “Hammer Fund” grant. The grants and 19 forgiven loans were funded through the State Toxics Control Account, which is in turn funded by 20 hazardous waste fees paid by industry, not individual taxpayers. 21 33. Of the $81,058,537 in Ecology funding, $18,963,490 was originally provided as 22 no-interest loans. At the Port’s request, Ecology has forgiven $14,563,268 of this original loan 23 obligation. 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 7 1 34. The Port remains obligated to repay only $4,400,222 in Ecology loans. These 2 loans have not been forgiven, but are 0% interest loans with repayment terms of 44 and 45 years. 3 The Port does not have to begin re-paying these loans until 2020 and 2021. The payments begin 4 at approximately $35,000 annually, and increase to $50,000 annually, but most of the balance is 5 due in large balloon payments in 2063 and 2064, if they are not between now and then. 6 7 8 9 10 35. Ecology did not condition its grants or loans (or the forgiveness of some of those loans) on the Port bringing a MTCA contribution action against Union Pacific. 36. Ecology issued a PLP status letter to the City on April 3, 1997. It notified the City that it had determined the City was a PLP on May 6, 1997. (Def. Ex. A-50; Pl. Ex. 6 at 10:1-6) 37. The Port received insurance proceeds and coverage settlements totaling about 11 $5,380,000.00. $1,930,000 came from PWT insurance policies assigned to the Port by PWT’s 12 bankruptcy estate. The insurance money went to the Port because it was performing cleanup at 13 the Site. The Port’s Executive Director, Brent Grening, signed an affidavit claiming the Port 14 needed the proceeds because they were the Port’s only source of cleanup money. Grening 15 testified at trial that the money was used to stabilize the Port’s finances. 16 38. The Port and Ecology entered into Agreed Orders in 1996, 2001, and 2014. The 17 Port accepted responsibility for remediation action, and Ecology agreed to provide grants and 18 loans to fund investigation and contamination remediation at the Site. 19 39. The Port performed interim remedial actions consistent with the 2001 Agreed 20 Order. These work plans were specific to the cells described in that Order, including Cell 3. That 21 work was completed by 2013. 22 23 40. Extensive soil and groundwater contamination was found in Cells 1 and 2, extending to depths exceeding 60 feet. As a result of this contamination, the Port implemented 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 8 1 SER, excavated more than 6,200 cubic yards of contaminated soil, and remediated sediments in 2 Lake River North and Carty Lake, and engaged in other remedial measures. Approximately $50- 3 55 million was spent on SER alone during the remediation of Cells 1 and 2 at the Site. These 4 severe impacts were caused by source areas in Cells 1 and 2 (the Port and City property), not by 5 contamination originating at the Union Pacific property, or other areas of Cell 3. 6 41. By contrast, the Cell 3 contamination required no groundwater remediation, and 7 required excavation of only 463 cubic yards of shallow soil contamination on the Union Pacific 8 property. Sediment remediation associated with Cell 3 in Lake River South was also much more 9 limited, less costly than, and distinguishable from remediation of sediments associated with Cell 10 11 12 13 2 in Lake River North. 42. Ecology estimated the total cost of remedial action for Cell 3 and related sediments at approximately $2,974,000. 43. Off-Site remediation consists of soil excavation and landscape restoration at 14 properties with dioxin concentrations exceeding Ecology’s prescribed clean-up level. These 15 properties are principally located along routes trucks historically used when leaving the Site. 16 44. On-site sources of dioxin—including the hog fuel boiler, diesel exhaust emissions 17 from trains on the BNSF main line and diesel machinery, and dust emissions—contributed only 18 negligibly to off-site dioxin, or these sources did not match the spatial pattern of dioxin off- 19 site. The prevailing (and highest velocity) winds at the Site are from the north, so if wind-blown 20 dust contributed to off-site contamination, the highest concentrations would be south of the 21 Site. However, sampling south of Cell 3 did not show elevated concentrations of dioxin. 22 23 45. The evidence demonstrates that trucks leaving PWT’s property during PWT’s operations were the primary source of dioxin in the off-site neighborhood. Again, according to 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 9 1 former PWT employees, trucks were loaded with treated lumber in Cell 2 (the Port’s property) 2 during the Vietnam Order, and PWT continued to load them there for the remainder of its 3 operations. 4 46. Union Pacific stepped up to the plate early in the remedial action history, 5 providing technical and financial support for Site investigation and remediation pursuant to a 6 Funding and Participation Agreement (“FPA”) with the Port beginning in 2002. The FPA 7 provided a “final allocation” focused on Cell 3, because that portion of the Site was owned partly 8 by the Port and partly by Union Pacific. 9 47. Pursuant to the FPA, the Port received funding and technical support from Union 10 Pacific totaling $1.78 million, including $861,000 in direct payments to the Port. Grening 11 testified that Union Pacific’s funding was used for remedial action costs, and he and MFA 12 Project Engineer Steve Taylor acknowledged that Union Pacific’s consultants’ technical support 13 was in connection with remedial action work by the Port and its own consultants. 14 48. In exchange for Union Pacific’s financial and technical support, and subject to 15 completion of a remedial investigation/feasibility study (“RI/FS”), the FPA required the Port to 16 “support and cooperate” with Union Pacific’s efforts to obtain a “comfort letter” from Ecology, 17 or to “negotiate a cash-out Consent Decree for the entire Site with Ecology.” At the same time, 18 however, the FPA reserved to the Port the right to bring a MTCA contribution action against 19 Union Pacific. 20 21 49. On May 29, 2013, the Port purchased Union Pacific’s property at the Site by under threat of condemnation. The Port used Ecology grant money for a portion of the sale price. 22 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 10 1 50. A final RI/FS was issued in July 2013, following completion of remedial actions 2 in Cells 1, 2, 3 and 4. It identified additional requirements for sediment remediation in Lake 3 River, ongoing monitoring, and other matters. 4 51. The Port and the City entered into a Consent Decree with Ecology, which was 5 approved by Clark County Superior Court on November 5, 2013. That Consent Decree 6 documented the remedial actions and addressed remaining issues at the Site. 7 8 9 52. Ecology named Union Pacific a PLP on November 6, 2013, the day after the Consent Decree between the Port, Ecology and the City was approved in state court. 53. Ecology had provided notice of its intent to name Union Pacific as a PLP on 10 September 13, 2013, as a former owner of a portion of the Site. The proposed PLP findings were 11 based on evidence that “UPRR owned approximately 2.08 acres” at the PWT Site, that “[t]he 12 UPRR property was used for limited storage and loading rail cars with treated wood products,” 13 and that “[w]ood treating solutions dripped from treated wood products stored and handled at the 14 UPRR property after it was removed from pressure treating vessels. A drip trough was used to 15 recover excess wood treating solution liquid was located on the property.” 16 54. Union Pacific responded to Ecology (through counsel) on October 24, 2013, 17 noting that “[s]ince 2002, Union Pacific has actively cooperated with the [Port] regarding 18 investigation and remediation activities[,] . . . provided significant funding for performance of 19 both the RI/FS and the interim remedial action at Cell 3[,] . . . [and] provided extensive 20 technical input to the Port.” Union Pacific expressly reserved all rights and defenses, including 21 divisibility of harm, and requested a meeting to discuss “working with Ecology to resolve all 22 potential claims against Union Pacific at the Site.” 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 11 1 2 3 55. Ecology representatives met with Union Pacific representatives on November 20, 2013, to discuss resolution of potential claims relating to the Site. 56. On February 25, 2014, Union Pacific proposed a de minimis settlement with 4 Ecology, pursuant to Policy 520B. Policy 520B, authorized by RCW 70.105D.040(4)(a), enables 5 Ecology to enter into cash-out settlements with PLPs that are found to have a de minimis 6 contribution to contamination, relative to other PLPs at the site, and to obtain funding that can 7 only be used for that site. 8 57. Ecology thoroughly evaluated Union Pacific’s de minimis settlement proposal 9 over a period of more than a year, including reviewing site history, areas of contamination, 10 remedial action requirements and costs, and the criteria specified for de minimis settlements 11 under Policy 520B. Ecology’s Toxics Cleanup Program Southwest Regional Manager Rebecca 12 Lawson took the lead on the evaluation, consulting with Rankine and receiving Pendowski’s 13 review and approval of proposed Ecology determinations, in coordination with Assistant 14 Attorney General Ivy Anderson. Lawson had been overseeing remedial actions, funding and 15 related matters concerning the PWT Site for more than 12 years. Anderson had more than 24 16 years of environmental investigation and remediation experience with Ecology at the time she 17 performed the evaluation. 18 58. As part of the evaluation, Ecology received information from the Port about 19 funding that had been provided by Union Pacific, and information from Port consultant Maul 20 Foster concerning environmental conditions relating to the former Union Pacific property, in 21 addition to input from Rankine. 22 23 59. On April 8, 2015, Ecology found that Union Pacific met the Policy 520B criteria for a de minimis settlement, including a determination that Union Pacific’s contribution at the 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 12 1 Site was “minimal in amount and toxicity.” Ecology had been overseeing Site remediation and 2 funding for more than 20 years at the time it made this finding. 3 4 5 60. Ecology had authority and discretion to make de minimis settlement findings under MTCA and Policy 520B. 61. On September 29, 2015, Ecology reached a “final decision” to for a cash-out 6 settlement with Union Pacific under Policy 520B, for an agreed payment of $2,264,037. The 7 settlement was subject to negotiation and court approval of a consent decree. 8 9 62. Ecology’s de minimis settlement analysis reflects the divisibility of Cell 3 from the rest of the Site, conservatively allocating 50% of Cell 3 and Lake River South remediation 10 costs to Union Pacific, even though the geographical area of the Union Pacific property was only 11 24% of Cell 3 It also included a premium for Lake River South since, at that time, remediation 12 there had not been completed. Remediation of Lake River sediments has now been completed 13 and the costs did not exceed Ecology’s estimate. 14 63. The proposed settlement terms also allocated a 1.4% share to Union Pacific for 15 the Site-wide investigation and the off-property remediation, and included a 100% premium for 16 the off-property area, again because that remediation had not been completed. Evaluation of a 17 new off-property area east of Cell 2 is now underway. Remaining investigation and remediation 18 of the off-property area is not expected to exceed Ecology’s estimate by the 100% premium 19 contemplated by the de minimis settlement. 20 64. Furthermore, the evidence shows that, to the extent the off-property 21 contamination was principally caused by trucks leaving the Site while still dripping during the 22 Vietnam Order, such trucks left from the Port’s property on Cell 2, not the Union Pacific 23 property. This evidence further supports Ecology’s de minimis finding and proposed settlement. 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 13 1 65. The Port neither supported nor cooperated with Union Pacific’s proposed de 2 minimis settlement with Ecology. Instead, the Port filed this contribution action in opposition to 3 Union Pacific’s proposed settlement. The Port filed this lawsuit against Union Pacific before 4 Ecology had responded to Union Pacific’s proposal. 5 66. Pendowski and Lawson were surprised and puzzled by the Port’s opposition to the 6 proposed settlement, given the $81 million in funding provided to the Port by Ecology and the 7 fact that the settlement would benefit the Site. They disagreed with the Port’s opposition, and 8 continue to disagree with the Port’s opposition to this day. 9 67. Among other actions, the Port opposed and sought to undermine Union Pacific’s 10 efforts to proceed negotiate a Consent Decree through lobbying and political pressure on 11 Ecology, directly and through state legislators and the Washington Public Port Association, to 12 withdraw from the agreement on settlement terms and to not proceed with negotiations for a 13 consent decree documenting the proposed settlement. 14 68. 15 “on hold.” 16 69. The Director of Ecology subsequently decided to put Consent Decree negotiations Ecology officials have testified that, although consent decree negotiations remain 17 on hold, they stand by their finding that Union Pacific is entitled to de minimis contribution 18 status, and that $2,264,037 is the appropriate amount for Union Pacific to pay to resolve its 19 liability for the Site. 20 70. In the November 2013 Consent Decree with the Port and the City, Ecology 21 reserved its right to pursue “cost recovery against PLPs not a party to the Consent Decree.” 22 Ecology officials also acknowledged Ecology’s authority under RCW 70.105D.050(8) to bring 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 14 1 an enforcement action to recover “funds expended under the state and local toxics control 2 accounts,” which were the source of Ecology’s funding of the Port’s remedial actions. 3 71. However, Ecology elected instead to consider Union Pacific’s eligibility for a de 4 minimis settlement and, subject to that determination of eligibility, reach a settlement that would 5 provide funding to directly benefit the Site, pursuant to Policy 520B. 6 72. The Court finds that Ecology properly considered the evidence and relative 7 remedial costs, and properly applied Policy 520B criteria, in finding on April 8, 2015, that Union 8 Pacific’s contribution to the Site was minimal in amount and toxicity and that Union Pacific was 9 entitled to a de minimis settlement. 10 73. The Court finds that Ecology properly considered the evidence and relative 11 remedial costs, and properly applied Policy 520B criteria, in determining on September 29, 2015, 12 that $2,264,037 was the appropriate amount for Union Pacific to pay in the proposed de minimis 13 settlement. 14 74. The Court recognizes that Ecology officials testifying at trial stand by their 15 finding that Union Pacific is entitled to a de minimis settlement and the monetary amount. These 16 findings by Ecology are entitled to deference by the Court. Evidence introduced at trial provides 17 additional support for Ecology’s findings. As noted above, between 1993-2013 the Port received 18 10 separate grant and loan packages from Ecology totaling $81,058,537, including Ecology’s 19 Hammer Fund grant. The grants and forgiven loans were funded through the State Toxics 20 Control Account, which is in turn funded by hazardous waste fees paid by industry, not 21 individual taxpayers. 22 23 75. The Port received grant funds from Ecology and other sources to pay for the investigation and remediation of the Site. All of the Ecology grants worked the same way. The 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 15 1 Port did not pay expenses directly. When the Port received an invoice, it submitted it to Ecology 2 for payment from the grant. When the money was disbursed from the grant to the Port to pay the 3 invoice, the Port would make the payment. 4 76. Port employees’ salaries, vacation, health-care and overtime have been paid by 5 Ecology grant money, and Ecology grant money was also applied to the Port’s overhead 6 expenses. The Port also included other overhead expenses directly on grant reimbursement 7 requests and was reimbursed for these overhead expenses. 8 77. In addition to the Ecology grants and forgiven loans, the Port also received other 9 grants, from EPA, Housing and Urban Development and other sources, totaling more than $3.9 10 million. EPA provided $1 million directly to the Site rather than to the Port. The EPA provided 11 the services and managed the funds directly. In total, the Port received approximately 12 $91,206,223 from third party sources to fund the remediation. 13 78. The federal grants received by the Port also allowed for the reimbursement of Port 14 salaries, benefits and vacation time. The Port is under no reimbursement obligation with respect 15 to any federal funds received. The Port received the federal funding specifically for cleanup 16 purposes, but if it were to be awarded damages from Union Pacific (based on these federal 17 expenditures) the Port would be able to use any such recovery for any purpose. 18 79. The Port has not paid for Site investigation or remedial action costs that have not 19 been directly funded or reimbursed by a grant, loan, PWT funds, Union Pacific funds, insurance 20 proceeds or other third-party sources. 21 80. The Port has variously claimed that the total cost of the remediation was 22 $90,269,256 or $90,584,803. But the Port has received over $91,000,000 from third party 23 sources to fund the remediation. 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 16 81. 1 The Port is, at most, obligated to repay Ecology $4.4 million in loans that have 2 not yet come due and, given the no-interest status and small payments until 2063, have a present 3 net value of $630,367. 82. 4 Thus, Union Pacific has paid, and agreed to pay Ecology, a total of more than $4 5 million, which exceeds the $2,974,000 that Ecology estimated as the cleanup costs relating to 6 Cell 3 (only part of which was the former Union Pacific property) and related Lake River 7 sediments. 8 83. 9 The evidence of the extent of contamination and relative remedial action costs and support the conclusion that Cell 3 contamination, including the Union Pacific parcel, was a small 10 fraction of the remedial requirements and costs in the Port and City property in Cells 1 and 2. 11 Extensive soil and groundwater contamination was found in Cells 1 and 2, extending to depths 12 exceeding 50 feet and requiring excavation of more than 5,700 cubic yards of contaminated soil, 13 in addition to operation of the $50-55 million SER system and other remedial measures. The 14 evidence and expert analyses demonstrate, and even Maul agreed, that these severe impacts were 15 caused by source areas within Cells 1 and 2, not the Union Pacific property or other areas of 16 Cell 3. 17 84. By contrast, the evidence has shown that contamination in Cell 3 required no 18 groundwater remediation, and required excavation of only 463 cubic yards of shallow soil on the 19 former Union Pacific property. Surface water and groundwater flows were to the west southwest 20 in Cell 3, away from other areas of the Site. Remediation of sediments associated with Cell 3 in 21 Lake River South was much more limited, less costly than and—as Ecology recognized in 22 adopting the de minimis settlement structure and consistent with MFA reports—distinguishable 23 from remediation of sediments associated with Cell 2 in Lake River North. Of the more than $90 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 17 1 million spent on remedial action at the Site, Ecology estimated the total cost of remedial action 2 for Cell 3 and related sediments as approximately $2,974,000. 3 85. Thus, the Court finds the evidence at trial supports the conclusion that Union 4 Pacific’s contribution at the Site was minimal in remediation requirements and costs, consistent 5 with Ecology’s de minimis determination, and a recognized factor in equitable allocation 6 analysis. 7 86. The Port and Union Pacific also agreed that contamination of Cell 3 and related 8 costs of remediation were distinguishable and divisible from the rest of the Site. The evidence 9 shows that this agreement was motivated by the Port’s interest in expediting remediation for 10 redevelopment of Cell 3, given the limited soil contamination and the absence of groundwater 11 contamination at Cell 3, and by Union Pacific’s interest in avoiding liability for costs relating to 12 the severe soil and groundwater contamination at Cells 1 and 2 and unrelated to Cell 3, including 13 the SER system. 14 87. Port CEO Grening told Union Pacific before the parties entered into the FPA that 15 Union Pacific’s role would be limited to Cell 3. Evidence relating to historical uses and 16 operations, Site characterization, the nature and extent of contamination, and relative costs of 17 remediation, shows Cell 3-related contamination and remediation to be divisible from the rest of 18 the Site. 19 88. Evidence relating to historical uses, operations and Site characterization, 20 including the Port’s consultant’s sampling evidence and reports, also does not support the Port’s 21 theory that vehicle tracking, airborne dust, or other transport or migration of chemicals from Cell 22 3 caused contamination requiring additional remedial actions or costs in other areas of the Site. 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 18 1 2 3 4 5 89. Furthermore, Port representatives agreed with Union Pacific that remediation of Cell 3 was divisible and distinguishable from the rest of the Site. 90. Port CEO Grening wrote: “[t]he SPY should remain divisible from remainder of the Site (assuming water, soil & sediment data is found to support this conclusion [sic]).” 91. The emergence of dioxin as an additional chemical of concern in 2008 did not 6 alter the divisibility of Cell 3 from the rest of the Site. The theory that it did, advanced by Port 7 counsel in opening statement and closing argument, was not supported by the evidence at trial. 8 92. To the contrary, the Port’s consultant and expert Jim Maul acknowledged that the 9 remedial actions already underway in 2008 were completed pursuant to cell-specific work plans, 10 and he could not identify the emergence of dioxin with any additional remediation requirements 11 or costs for the various cells at the Site. 12 93. Ecology officials testified, and Port consultants acknowledged, that a 2010 change 13 in MTCA policy affecting site-wide remedial investigations did not alter remedial actions being 14 performed pursuant to cell-specific work plans. Furthermore, remediation requirements in Cells 15 1 and 2 had nothing to do with dioxin, and the emergence of dioxin as a concern did not require 16 additional remediation in any of the cells. 17 94. The remediation of dioxin contamination in the off-property area east of the Site 18 does not alter the de minimis contribution of Union Pacific or the divisibility of Cell 3. As Dr. 19 Libicki opined, the sampling evidence shows that the higher concentrations of dioxin requiring 20 remediation were along the truck routes leaving the Site, not a more general pattern that would 21 be expected from airborne sources. Former PWT plant manager Ed Ryf and PWT employee 22 Ernest Foster testified that trucks departing with dripping treated lumber during the Vietnam 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 19 1 Order were loaded and left the Site from the Port’s property on Cell 2, and that trucks continued 2 to be loaded with treated lumber and departed from the Port’s property thereafter. 3 95. Indeed, the evidence shows that as these sampling results were developed, 4 Ecology, the Port and Maul Foster all concluded that releases from trucks were the most likely 5 cause of the higher levels of dioxin requiring remediation along truck routes in the off-property 6 area. Maul and Taylor have also acknowledged Maul Foster reports and wind roses showing that 7 prevailing winds were from the north, and that if there were any significant dioxin contamination 8 from airborne dust emissions, elevated dioxin concentrations would be found in samples in the 9 boat launch area to the south of Cell 3; however, elevated levels were not found there. 10 11 12 96. Ecology also agreed that remediation of Cell 3, and related sediments and costs, were divisible from the rest of the Site. 97. To the extent the Port contends that Union Pacific is responsible for PWT’s 13 “orphan share,” the trial testimony of Ecology Statewide MTCA Cleanup Manager Jim 14 Pendowski addressed the issue: We don’t have that term defined, unlike, say, a federal statute. But we use it as our way of looking at – we have a liable party, but they are orphaned financially. They have no resource. In this case, you know, they had no resource available. We stepped in to cover that basically through grants and loans. And we got a cleanup done. [Q: So there is no orphan share?] That’s right. And that’s why we did it. . . . We, through the Port of Ridgefield, stepped in and filled that gap. 15 16 17 18 19 98. Similarly, as stated by Union Pacific allocation expert Rick White, there is no 20 orphan share at the Site: PWT is an orphan party, but there is no orphan share because there was 21 a party to pay the orphan party’s share. 22 23 99. Even if CERCLA orphan share analysis did apply, case law makes it clear that, where there is an “orphan share” asserted in a private contribution action, it must be allocated 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 20 1 equitably among all the parties, with consideration for when and what historical activities 2 occurred to cause contamination, the evolving awareness of environmental issues and pollution 3 prevention requirements over time, and the relative costs for remediation attributable to different 4 areas of a site. The City is among the PLPs subject to this analysis. The City owned 5 approximately 1.9 acres at the Site and leased a portion of this property identified as Cell 1 to 6 PWT for the entire duration of PWT’s operations. Cell 1 included the heavily contaminated tank 7 farm area which, together with the Port’s property on Cell 2, accounted for the vast majority of 8 cleanup costs. 9 100. Additionally, the Port, through the funding it received from Ecology and other 10 third parties, never incurred an portion of an orphan share, yet has realized and will realize 11 substantial economic benefits resulting from the acquisition, remediation, redevelopment, and 12 lease or sale of the Site. 13 101. The existence of prior agreements between parties is recognized as relevant in 14 equitable allocation. 15 102. The parties’ 2002 FPA provided a “final allocation” focused on Cell 3 because 16 that portion of the Site was owned partly by the Port and partly by Union Pacific. Pursuant to the 17 FPA, the Port received funding and technical support from Union Pacific totaling $1.78 million, 18 including $861,000 in direct payments to the Port by Union Pacific. 19 103. In exchange for Union Pacific’s financial and technical support, and subject to 20 completion of the RI/FS, the FPA required the Port to “support and cooperate” with Union 21 Pacific’s efforts to obtain a “comfort letter” from Ecology or to “negotiate a cash-out Consent 22 Decree for the entire Site with Ecology.” 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 21 1 104. However, the Port specifically reserved its rights under MTCA to bring a 2 contribution action. Grening acknowledged that the Port did not “support and cooperate” with 3 Union Pacific’s proposed Consent Decree with Ecology and, in fact, actively opposed it. 4 105. The conduct of parties is recognized as relevant in equitable allocation. 5 106. The FPA contains two inconsistent provisions that in retrospect impact this 6 Court’s view of two equitable factors: (1) prior agreements between the parties, and (2) conduct 7 of the parties. Union Pacific wanted the Port to “support and cooperate” with Union Pacific’s 8 efforts to obtain a “comfort letter” from Ecology or to “negotiate a cash-out Consent Decree for 9 the entire Site with Ecology.” On the other hand, the Port specifically reserved its rights under 10 11 MTCA to bring a contribution action. 107. Other than receiving funding and technical support through the FPA, the Port 12 sought to limit Union Pacific’s involvement until after the Port had obtained grant funding and 13 loan forgiveness from Ecology, an RI/FS had been approved and Site remediation was 14 substantially completed, the Port had acquired the former Union Pacific property, and the Port 15 had obtained its own Consent Decree with Ecology. 16 108. Early in the grant funding program, Port Executive Director Grening noted that 17 “if WDOE management finds out that UPRR is getting involved, DOE will pursue UPRR as a 18 ‘deep pocket’— addition[al] grants & loans for project will be stopped.” 19 109. Years later, in 2013, when Ecology was considering naming Union Pacific as a 20 PLP and the Port was acquiring the Union Pacific property, Ecology noted that “[t]he Port wants 21 to make sure property purchase of right of way land from UP goes through before we muddy the 22 waters with pesky PLP issues.” 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 22 1 110. Ecology Cleanup Project Manager Rankine advised his supervisors on April 8, 2 2013, that Ecology “has not and is not going to list Union Pacific Railroad as a PLP for the PWT 3 site” because “they have been cooperating with cleanup efforts and cost contribution, and 4 declaring them as a PLP at this point would be counterproductive.” Ecology officials 5 subsequently met with Port representatives concerning Union Pacific’s potential PLP status. 6 111. The Port requested that Union Pacific be excluded from meetings with Ecology 7 concerning PLP status and a proposed consent decree with the Port and the City. Although 8 negotiations had been underway for several months, Ecology’s proposed consent decree with the 9 Port and the City was not disclosed publicly (or to Union Pacific) until late July 2013, after the 10 11 Port’s acquisition of Union Pacific’s property. 112. This was consistent with Ecology’s practice of giving notice upon commencement 12 of the public comment and court approval process for consent decrees, not upon commencement 13 of settlement negotiations. It was the same practice followed by Ecology in the settlement 14 negotiations with Union Pacific. However, in the case of Union Pacific, Ecology informed the 15 Port of settlement negotiations as early as November 2013. 16 113. The evidence also supports Union Pacific’s position with respect to Gore factors 17 involving the degree of cooperation by the parties with Federal, State, or local officials, and 18 equitable factors this Court and other courts have recognized concerning: (1) the existence of 19 agreements demonstrating the parties' intent to allocate liability among themselves, (2) the 20 financial benefit that a party may gain from remediation of a site, (3) the potential for windfall 21 double recoveries by a plaintiff, (4) the potential that a plaintiff might make a profit from the 22 cleanup at the expense of another party, and (5) “unclean hands” in excluding another party from 23 active involvement in remedial alternatives and cost-reduction measures. 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 23 1 114. The evidence has shown that, in exchange for Union Pacific’s financial and 2 technical support, and subject to completion of a RI/FS, the FPA required the Port to “support 3 and cooperate” with Union Pacific’s efforts to obtain a “comfort letter” from Ecology or to 4 “negotiate a cash-out Consent Decree for the entire Site with Ecology.” It is undisputed that all 5 Cell 3 remedial actions were completed pursuant to Interim Actions prior to the issuance of the 6 July 2013 RI/FS for the Site. Yet as Grening acknowledged, the Port did not support and 7 cooperate with Union Pacific’s proposed settlement and, instead, actively campaigned against it. 8 9 115. Pendowski and Lawson testified that, despite the Director’s decision to put consent decree negotiations “on hold” due to political pressure, Ecology stands by its April 8, 10 2015 de minimis finding and the September 29, 2015 proposed settlement amount of $2,264,037 11 for Union Pacific. The evidence presented at trial fully supports this finding and dollar amount, 12 based on MTCA allocation principles as well as Policy 520B criteria. 13 14 II. 1. CONCLUSIONS OF LAW The Port brought claims against Union Pacific under MTCA, RCW 70.105D.080, 15 for contribution and declaratory relief relating to past and future costs spent by the Port, and for 16 attorneys’ fees and costs, relating to environmental investigation and remediation of the former 17 PWT Site. 18 2. Union Pacific responded with defenses and counter-claims, including counter- 19 claims for breach of the parties’ FPA, breach of the parties’ PSA, breach of the implied covenant 20 of good faith and fair dealing, and declaratory relief that the Port has not paid its equitable share 21 of remedial action costs at the Site, that Union Pacific has paid more than its equitable share of 22 remedial action costs at the Site, and that the Port is therefore barred from recovery against 23 Union Pacific in this MTCA contribution action. 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 24 1 3. During the period 1964-1993, PWT leased property at the Site from the Port, the 2 City, and Union Pacific. Following PWT’s bankruptcy, Ecology named the Port as a PLP in 3 1996, the City as a PLP in 1997, and Union Pacific as a PLP in 2013, pursuant to MTCA, based 4 on their respective status as an “owner” and lessor of portions of the Site. Like other rail and 5 trucking companies, Union Pacific was also a common carrier of freight to and from the Site. 6 4. Following PWT’s 1993 bankruptcy, and in connection with the PWT bankruptcy 7 settlement, the Port was assigned rights to PWT equipment, facilities, and other interests at the 8 Site. In 1996, the Port signed the first of several Agreed Orders with Ecology, accepting lead 9 responsibility for Site investigation and remediation. The Port subsequently received more than 10 $90 million in grants, loans and other third-party funding for Site investigation and remediation. 11 The Ecology grants did not require actions for reimbursement, and, except for approximately 12 $4.4 million in no-interest loans that are still due and owing. 13 5. Union Pacific and the Port executed the FPA, amended in part in 2011, providing 14 an allocation of certain costs relating to Cell 3, as well as financial and technical support from 15 Union Pacific. Union Pacific spent more than $1.76 million pursuant to the FPA, including 16 $861,000 in direct payments to the Port. 17 6. In consideration of Union Pacific’s financial and technical support, and subject to 18 completion of the RI/FS, the FPA requested the Port to “support and cooperate” with Union 19 Pacific’s efforts to obtain a “comfort letter” from Ecology or to “negotiate cash-out Consent 20 Decree for the entire Site with Ecology.” At the same time the Port reserved the right to pursue a 21 contribution action under MTCA. 22 23 7. The Port and the City entered into a Consent Decree with Ecology concerning remedial actions and responsibilities relating to the Site. Ecology provided public notice of the 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 25 1 proposed Consent Decree but notice was not given upon commencement of settlement 2 negotiations. The Consent Decree was approved by the Clark County Superior Court on 3 November 5, 2013. 8. 4 Shortly after the listing of Union Pacific as a PLP on November 6, 2013, Union 5 Pacific and Ecology engaged in settlement negotiations under Policy 520B. On April 8, 2015, 6 Ecology determined that Union Pacific’s contribution to the Site was minimal in amount and 7 toxicity, and that Union Pacific met the statutory criteria for a de minimis settlement under Policy 8 520B. 9 9. The Court concludes that Ecology was authorized by MTCA to adopt Policy 10 520B, that it has discretion to apply Policy 520B on a case-by-case basis, and that Ecology 11 properly applied Policy 520B criteria in the case of Union Pacific, when it determined on April 12 8, 2015, that Union Pacific’s contribution to the Site was minimal in amount and toxicity, and 13 that it met the statutory criteria for a de minimis settlement under MTCA and Policy 520B. 14 10. The Court further concludes that, on September 29, 2015, Ecology properly 15 determined that Union Pacific’s de minimis liability for the Site was $2,264,037, subject to 16 negotiation and entry of a Consent Decree, in accordance with MTCA and Policy 520B. Union 17 Pacific’s negotiation of the Consent Decree did not proceed due to political pressure on the 18 Director of Ecology by the Port. 19 11. The evidence demonstrated that Union Pacific spent more than $1.78 million on 20 remedial action expenses, pursuant to the FPA, including $861,000 in direct payments to the 21 Port. The evidence has also shown that Union Pacific agreed to pay Ecology an additional 22 $2,264,037 in funding that would directly benefit remedial action costs at the Site and that Union 23 Pacific would have made this payment to Ecology but for the Port’s opposition and successful 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 26 1 lobbying of the Director of Ecology, who directed Ecology to put “on hold” the negotiation of a 2 consent decree to document the de minimis settlement with Union Pacific. 3 12. Thus, the evidence demonstrates that Union Pacific has paid, and agreed to pay 4 Ecology, a total of more than $4 million, which exceeds the $2,974,000 that Ecology estimated 5 as the cleanup costs relating to Cell 3 (only part of which was the former Union Pacific property) 6 and related Lake River sediments. 7 13. The evidence also demonstrates that Ecology has statutory authority under RCW 8 70.105D.050(8) to recover “the expenditure of moneys under the state and local toxics control 9 accounts,” and Ecology reserved its right to pursue “cost recovery against PLPs not a party to 10 this Decree” in its November 2013 Consent Decree with the Port and the City of Ridgefield. 11 However, as Pendowski and Lawson testified, Ecology elected instead to pursue contribution and 12 evaluate Union Pacific’s eligibility for a settlement under Policy 520B–and Union Pacific was 13 found to be eligible–to pursue a settlement that would provide funds to directly benefit remedial 14 action costs at the Site. 15 14. The Court concludes that Ecology’s April 8, 2015 finding that Union Pacific’s 16 contribution at the Site was “minimal in amount and toxicity,” pursuant to Policy 520B, is 17 supported by the evidence and is entitled to deference by the Court. See Douglass v. Shamrock 18 Paving, Inc., 189 Wash.2d 733, 744-46, n. 1 (2017) (courts should “defer to Ecology ‘on 19 technical issues based on Ecology's specialized expertise’” in MTCA matters); see also United 20 States v. W.R. Grace & Co., 429 F.3d 1224, 1227 (9th Cir. 2005) (“considerable deference” to 21 agency determinations under CERCLA). 22 23 15. The Court further concludes, consistent with Douglass, that Ecology’s September 29, 2015 conclusion that $2,264,037 was the appropriate amount for Union Pacific’s contribution 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 27 1 for a cash-out settlement for the Site, pursuant to Policy 520B, is supported by the evidence and 2 entitled to deference by the Court. 16. 3 Although the Court concludes that Ecology properly applied Policy 520B in 4 finding Union Pacific’s contribution to be de minimis and determining the monetary amount for 5 settlement, the Court also performed an evaluation of the evidence under equitable factors 6 otherwise applicable in a MTCA contribution action. The Court concludes, based on this analysis 7 and as set forth in the Findings of Fact, that Union Pacific’s contribution is de minimis, and that 8 Ecology correctly determined the amount Union Pacific should pay to resolve its liability at the 9 Site. 10 17. Under MTCA, “[l]iable persons have a right to seek contribution from other 11 potentially liable persons.” Pope Res., LP v. Washington State Dep't of Nat. Res., 190 Wash.2d 12 744, 750 (2018) (citing RCW 70.105D.080). In allowing such actions, MTCA “instructs the 13 courts to award recovery costs ‘based on such equitable factors as the court determines are 14 appropriate.’” Union Station Assocs., LLC. v. Puget Sound Energy, Inc., 238 F. Supp. 2d 1218, 15 1225 (W.D. Wash. 2002) (citing RCW 70.105D.080). Thus, “Washington courts have used this 16 section to apportion damages equitably, not on a joint and several theory.” Id. While liability 17 under MTCA may be determined with reference to RCW 70.105D.040, “the means for 18 determining recovery and the mechanics of actions among [PLPs] is governed by .080. That 19 section turns to equitable factors to determine contribution, not a full cost recovery scheme.” 20 Union Station, 238 F. Supp. 2d at 1226. 21 18. Washington courts look to federal CERCLA case law to interpret these MTCA 22 provisions. See Dash Point Vill. Assocs. v. Exxon Corp., 86 Wash. App. 596, 607-08, n. 24 23 (1997), amended on denial of reconsideration, 86 Wash. App. 596 (1998). Under CERCLA, “the 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 28 1 court may allocate response costs among liable parties using such equitable factors as the court 2 determines are appropriate.” Boeing Co. v. Cascade Corp., 207 F.3d 1177, 1187 (9th Cir. 2000) 3 (citing 42 U.S.C. § 9613(f)(1)). “This language gives district courts discretion to decide what 4 factors ought to be considered, as well as the duty to allocate costs according to those factors.” 5 Boeing Co., 207 F.3d at 1187. Washington courts similarly “apply a broad range of equitable 6 factors to determine the amount of recovery” under CERCLA and MTCA. Dash Point Vill. 7 Assocs., 86 Wash. App. at 608, fn. 24; RCW 70.105D.080 (“Recovery shall be based on such 8 equitable factors as the court determines are appropriate.”). 19. 9 Within certain bounds, MTCA authorizes the Court to utilize its discretion in 10 determining the equitable factors that are appropriate in allocating remedial action costs 11 attributable to a PLP in a private contribution action. 20. 12 13 which Dash Point noted as follows: 14 (1) the ability of the parties to demonstrate that their contribution to a discharge, release or disposal of a hazardous waste can be distinguished; (2) the amount of the hazardous waste involved; (3) the degree of toxicity of the hazardous waste involved; (4) the degree of involvement by the parties in the generation, transportation, treatment, storage, or disposal of the hazardous waste; (5) the degree of care exercised by the parties with respect to the hazardous waste concerned . . .; and (6) the degree of cooperation by the parties with Federal, State, or local officials to prevent any harm to the public health or the environment. 15 16 17 18 19 20 21 22 23 24 Under both CERCLA and MTCA, the analysis often includes the “Gore Factors,” Id. 21. Courts have also applied the “Torres” categories, which include the extent to which cleanup costs are attributable to wastes for which a party is responsible. See United States v. Davis, 31 F. Supp. 2d 45, 63 (D.R.I. 1998), aff'd, 261 F.3d 1 (1st Cir. 2001); see also Seattle Times Co. v. LeatherCare, Inc., No. C15-1901 TSZ, 2018 WL 3873562, at *46 n. 73 (W.D. Wash. Aug. 15, 2018), appeal filed, No. 18-35773 (9th Cir. Sept. 14, 2018) (applying Torres FINDINGS OF FACT AND CONCLUSIONS OF LAW - 29 1 categories); Arkema, Inc. v. Asarco, Inc., No. C05-5087 RBL, 2007 WL 1821024, at *10 (W.D. 2 Wash. June 22, 2007) (factors included regulatory findings and evidence of historical activities 3 and time periods when contamination occurred). 4 22. The Court concludes, based on the evidence at trial that much of the 5 contamination of the Site and the off-property area occurred during the “Vietnam Order” in the 6 mid-1960s, before the Union Pacific property was being used for storage or shipment of treated 7 wood products. 8 9 23. The Court further concludes, based on the evidence at trial, that remediation of Cell 3 was divisible from the rest of the Site, and that the limited contamination and the cost of 10 remediation was less than $3 million for Cell 3, and related sediments, as compared to more than 11 $85 million for the rest of the Site. 12 24. The Court further concludes, based on the evidence at trial including testimony by 13 Ecology witnesses and acknowledgements by Port experts and consultants, that there was no 14 significant vehicle tracking, airborne dust dispersion, or other transport or migration of 15 contaminants from Cell 3 resulting in additional remedial actions or costs in other areas of the 16 Site or in the off-property area. 17 25. The Court concludes that relating to historical uses and operations, Site 18 characterization data, the nature and extent of contamination, the relative cost of remediation, 19 prior agreements of the parties, and actions by Ecology all show Cell 3-related contamination 20 and remedial action costs to be divisible from the rest of the Site. 21 22 26. The Court finds that the Supreme Court’s criteria for divisibility of a portion of a site under CERCLA. 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 30 1 27. The Court further concludes that the evidence presented at trial is similar but 2 stronger than that in BNSF. Like BNSF, the most severe contamination, the sources of that 3 contamination, and the vastly greater remediation requirements and costs were on Cells 1 and 2, 4 property owned by the Port and formerly owned by the City. Like BNSF, the actual chemical 5 storage, processing, and treatment operations and related releases occurred in Cells 1 and 2, the 6 Port’s property, while Union Pacific’s property was used for storage and shipment of finished 7 products. Like BNSF, the Union Pacific property was not used for treated wood storage for the 8 entire period of PWT operations and, in fact, was not used for treated wood storage during the 9 Vietnam Order, when most of the contamination occurred. And like BNSF, the surface area of 10 Union Pacific property accounted for only a small portion of the Site. Here, however, the parties 11 also agreed on divisibility of Cell 3-related remediation and costs, as did Ecology. Accordingly, 12 and consistent with Ecology’s determination under Policy 520B, Union Pacific’s equitable share 13 is a share of Cell 3-related costs, not a share of costs unrelated to Cell 3. 14 28. The Ninth Circuit recently held in an equitable allocation under CERCLA that 15 “[t]he parties’ prior course of dealings concerning cleanup costs from the same site also 16 constitutes a relevant factor in the allocation analysis,” including the parties’ lengthy course of 17 dealings relating to the site. TDY Holdings, LLC v. United States, 885 F.3d 1142, 1149 (9th Cir. 18 2018). Other courts have similarly held that, in addition to the Gore factors and Torres 19 categories, equitable factors can include (1) the existence of agreements demonstrating the 20 parties’ intent to allocate liability among themselves, (2) the financial benefit that a party may 21 gain from remediation of a site, (3) the potential for windfall double recoveries by a plaintiff, (4) 22 the potential that a plaintiff might make a profit from the cleanup at the expense of another party, 23 and (5) “unclean hands” in excluding another party from active involvement in remedial 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 31 1 alternatives and cost-reduction measures. Seattle Times, 2018 WL 3873562, at *46 n.74, citing 2 Lockheed Martin Corp v. United States, 35 F. Supp. 3d 92, 123-124 (D.D.C. 2014). 3 29. Other federal court have considered similar criteria in assessing equitable factors 4 in a CERCLA allocation analysis. See Halliburton Energy Servs., Inc., v. NL Indus., 648 F. 5 Supp. 2d 840, 863-64 (S.D. Tex. 2009) (parties’ agreements regarding allocation of liability); 6 Litgo N.J., Inc. v. Martin, No. 06-2891 AET, 2011 WL 65933, at *9 (D.N.J. Jan. 7, 2011) 7 (party’s financial benefit from remediation of site); Litgo N.J., Inc., v. Comm’r N.J. Dep’t of 8 Envtl. Prot., 725 F.3d 369, 391 (3d Cir. 2013) (the potential for windfall “double recoveries” by 9 a plaintiff); Friedland v. TIC-The Indus. Co., 566 F.3d 1203, 1207 (10th Cir. 2009) (same); Vine 10 St., LLC v. Keeling ex rel. Estate of Keeling, 460 F. Supp. 2d 728, 765 (E.D. Tex. 2006), rev’d 11 on other grounds sub nom., Vine St., LLC v. Borg Warner Corp., 776 F.3d 312 (5th Cir. 2015) 12 (potential that plaintiff might make a profit on the contamination at the expense of another 13 party); Valbruna Slater Steel Corp. v. Joslyn Mfg. Co., 298 F. Supp. 3d 1194, 1198-1202 (N.D. 14 Ind. 2018) (knowing purchase of contaminated property in a bankruptcy sale, without liability 15 protection, and seeking economic gain from the purchase and remediation of the property). 16 30. The Court concludes that Union Pacific was an owner, lessor, and common carrier 17 of freight, was not an “operator” within the meaning of MTCA, and did not cause contamination 18 at this Site. 19 31. The Court further concludes that the Port acquired the PWT property in the 20 bankruptcy sale, without liability protection, and accepted responsibility for the remedial action 21 through the Agreed Orders with Ecology. 22 23 32. The Court specifically concludes that the Port benefitted from funding from government agencies, insurers, and Union Pacific totaling more than $90 million, including more 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 32 1 than $80 million in grants and loans from Ecology, all but $4.4 million of which have been 2 forgiven, resulting in a Site that is remediated and prepared for redevelopment, leasing, or sale at 3 little or no expense to the Port. As the Court observed during closing arguments at trial, “[t]he 4 Port has achieved their end of restoring the land at relatively modest funds.” 5 33. The Court further concludes that Union Pacific has paid, and agreed to pay 6 Ecology, in an amount roughly equal to the amount still owed by the Port ($4.4 million). 7 Accordingly, the Port cannot recover from Union Pacific in this MTCA contribution action. 8 9 10 11 12 13 34. The Port shall cease any opposition to the de minimis settlement agreement between the Union Pacific and Ecology. The Court will retain jurisdiction for the limited purpose of allowing the completion of the de minimis settlement and consent decree. 35. The financial benefits inured to the Port are not quantifiable and are largely speculative. 36. Currently, the Port owes $4.4 million to Ecology. With the execution of the de 14 mimimis settlement, together with prior expenditures by the Union Pacific, the total obligation to 15 the clean-up approximates $4 million plus. An additional equitable factor is the skill and 16 diligence of the Port and its staff in managing this clean-up effort. 17 18 37. Neither party is a prevailing party in this action. There will not be an award of attorney fees for either party. 19 20 21 22 23 III. JUDGMENT Based on the foregoing Findings of Fact and Conclusions of Law, the Court hereby concludes as follows: 1. Union Pacific is entitled to a judgment that the Port shall take nothing by way of the Complaint or any of the claims stated therein; 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 33 1 2 3 2. Union Pacific is entitled to a judgment that the Complaint and each cause of action contained therein be dismissed with prejudice as to Union Pacific; 3. Union Pacific is entitled to a judgment against the Port on Union Pacific’s counter- 4 claim for a declaration that Union Pacific has no liability to the Port for any remedial 5 action costs that Plaintiff has incurred, or will incur, at the Site; and 6 7 8 9 10 11 12 4. The Port is entitled to judgment that the Union Pacific shall take nothing by way of the breach of contract claims contained in the Counterclaim. 5. The Court retains jurisdiction in this matter until such time as the de mimimis settlement is finalized with a signed Consent Decree and the payment by Union Pacific to Ecology in the amount of $2,264,037. IT IS SO ORDERED. DATED this 7th day of February, 2019. 13 14 A 15 Ronald B. Leighton United States District Judge 16 17 18 19 20 21 22 23 24 FINDINGS OF FACT AND CONCLUSIONS OF LAW - 34

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?