Port of Tacoma v. Burlington Environmental LLC
Filing
57
ORDER. Burlington's motion to stay, Dkt. 44 , is DENIED. General Metals and Occidental's motion to dismiss Burlington's third-party complaint, Dkt. 34 , is DENIED. The third-party defendants' request to sever the claims against them from the Port's claims against Burlington is also DENIED. Signed by Judge Benjamin H. Settle.(CJS)
1
2
3
4
5
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF WASHINGTON
AT TACOMA
6
7
8
PORT OF TACOMA,
9
10
11
v.
14
15
Defendant, Third-Party
Plaintiff,
v.
OCCIDENTAL CHEMICAL
CORPORATION; and GENERAL
METALS OF TACOMA INC.,
16
17
18
19
20
21
22
ORDER
BURLINGTON ENVIRONMENTAL
LLC,
12
13
Plaintiff,
CASE NO. C24-5093 BHS
Third-Party Defendants.
This matter is before the Court on Defendant Burlington Environmental LLC’s
motion to stay, Dkt. 44, and third-party Defendants Occidental Chemical Corporation and
General Metals of Tacoma’s motion to dismiss Burlington’s third-party complaint against
them, Dkt. 34. The Court determines that a stay until the completion of the Remedial
Investigation and Feasibility Study (RI/FS) is not warranted, primarily because the parties
ORDER - 1
1
will have nearly a year between the study’s completion at the end of 2024 and their bench
2
trial in November 2025 to handle its results. Regarding the motion to dismiss, the Court
3
concludes that Burlington’s claims satisfy the strictures of Federal Rules of Civil
4
Procedure 12(b)(6) and 14 and that allowing them to proceed at the same time as the Port
5
of Tacoma’s claims against Burlington avoids duplicative litigation.
6
I.
7
BACKGROUND
This case arises from the Port of Tacoma’s efforts to clean the soil at its “Potter
8
Property” from industrial contaminants. The Potter Property, as well as the surrounding
9
properties in the broader Taylor Way and Alexander Avenue Fill Area (TWAAFA), have
10
a long and complicated history of industrial contamination. As part of its effort to
11
remediate the Potter Property soil, the Port of Tacoma sued Burlington Environmental
12
LLC. Dkt. 1. The Port alleges that hazardous substances migrated from Burlington’s
13
property (Parcel A) to the Potter Property and contaminated the soil. Id. at 11. The Port’s
14
complaint focuses on petroleum-based “Light Non-Aqueous Phase Liquids” (LNAPL)
15
contaminants, which it alleges leaked onto the Potter Property from unlined waste oil pits
16
used by Burlington’s predecessor on Burlington’s property. Id. It seeks cost recovery for
17
remediating the Potter Property Soil, a declaratory judgment under Washington’s Model
18
Toxics Control Act (MTCA), chapter 70A.305 RCW, and a declaratory judgment under
19
28 U.S.C. § 2201. Id. at 1. In terms of declaratory relief, it seeks a declaration “that
20
Burlington is liable for all future remedial action costs incurred by Port to remediate the
21
contamination caused by hazardous substances that have migrated from Parcel A to the
22
Potter Property.” Id. at 11.
ORDER - 2
1
Burlington promptly filed a third-party complaint against General Metals of
2
Tacoma, Inc., and Occidental Chemical Corporation. Dkt. 13. It alleges that the Potter
3
Property contains commingled contamination from hazardous substances including from
4
auto fluff and lime solvent sludge from operations by General Metals and by Occidental’s
5
predecessor. It seeks “current and future remedial action costs associated with the broad
6
‘hazardous substances’ incurred” in remediating the contamination at the Potter Property
7
from General Metals and Occidental. Dkt. 53 at 2 (quoting Dkt. 13, Third-Party
8
Complaint, at 19–20).
9
As the parties litigate, they have been conducting an RI/FS for both the Potter
10
Property and broader TWAAFA site pursuant to a request from Washington State
11
Department of Ecology. The RI/FS seeks to clarify the nature and source of
12
contamination and identify Ecology’s preferred remedial actions to clean the soil. Dkt.
13
45, Gray Decl., ¶¶ 6,7; Id. Ex. B, at 4. The parties expect the entire study will be
14
complete by the end of 2024. Dkt. 44 at 6; Dkt. 49 at 5. Already by late May 2024, the
15
parties had collected nearly all of the data that Ecology requested. Dkt. 45 ¶ 6. The sole
16
data collection work that remained outstanding was for the Potter Property, and it was
17
scheduled 1 to be completed by the end of August 2024. Id. The Potter Property work
18
focuses on assessing “tetrachloroethene (PCE) and trichloroethene (TCE)—chlorinated
19
solvents that are separate from the petroleum LNAPL.” Dkt. 45 ¶ 6; Id. Ex. B, at 4. The
20
21
22
1
As of the time of this order, the record does not provide the results of the Potter
Property samples. No party has filed anything to suggest that the samples were not completed as
scheduled in summer 2024.
ORDER - 3
1
parties have been actively meeting with Ecology at least once a month to discuss the
2
RI/FS, and as of May 2024, they have been “reviewing and discussing potential remedial
3
technologies and alternatives.” Dkt 45 ¶ 7.
4
A bench trial is set to commence in November 2025. Dkt. 48. Burlington filed a
5
motion to stay all proceedings until the completion of the RI/FS. Dkt. 44. Third-party
6
defendants General Metals and Occidental filed a motion to dismiss Burlington’s claims
7
against them. Dkt. 34. For the reasons explained below, both motions are denied.
II. DISCUSSION
8
9
10
11
12
13
14
15
16
17
18
19
20
21
A.
Burlington’s motion to stay proceedings pending completion of the RI/FS is
denied.
Burlington seeks a stay of this case pending completion of the RI/FS . Dkt. 44. As
noted, the parties anticipate the RI/FS will be completed by the end of 2024.
Courts weigh three factors to determine whether to grant a stay: (1) “the
orderly course of justice measured in terms of the simplifying or complicating of the
issues, proof, and questions of law which could be expected to result from a stay”; (2)
“the hardship or inequity which a party may suffer in being required to go forward”;
and (3) “the possible damage which may result from the granting of a stay.” CMAX, Inc.
v. Hall, 300 F.2d 265, 268 (9th Cir. 1962).
Burlington argues that all three factors support a stay here. Dkt. 44. Regarding the
first factor, it asserts that a stay will conserve judicial resources because “the RI/FS will
clarify the nature, extent, and source of contamination and identify Ecology’s preferred
remedial actions, rendering any discovery or litigation about these issues unnecessary.”
22
ORDER - 4
1
Id. at 2. For the second factor, it argues that denying a stay “could prejudice the parties by
2
resulting in inconsistent outcomes.” Id. It explains that the RI/FS “will analyze the extent
3
and nature of other contaminants on the Potter Property in addition to LNAPL,” and that
4
it “may recommend a combined remedy to address multiple contaminants.” Id. It argues
5
that “the current trial schedule does not accommodate the timeline for the approval of the
6
RI/FS” because “Ecology may require revisions or the submittal of additional reports”
7
and therefore “the current discovery deadlines will likely be too close to, or may even fall
8
after Ecology’s approval of the RI/FS.” Dkt. 54 at 8. Finally, regarding the third factor,
9
Burlington argues that a stay will not harm the Port because it asserts the Port’s claims
10
11
primarily concern money damages. Id. at 2–3.
Occidental supports Burlington’s request for a stay. Dkt. 47. It believes that a stay
12
“could help clarify the issues involved in this case, including those raised in the third-
13
party complaint in the event that the Court does not grant the motion to dismiss.” Id. at 2.
14
The Port of Tacoma opposes a stay. Dkt. 49. It asserts that a stay will not aid in
15
judicial economy because the “Court, not Ecology, allocates liability for contamination.”
16
Id. at 3. It refutes Burlington’s argument that the Port seeks primarily money damages
17
and that it therefore will not suffer harm from a stay. It contends that it instead “seeks
18
declaratory relief in the form of a judicial allocation of the parties’ responsibility in
19
percentages – not dollars – for contamination” and argues the RI/FS “will not assist this
20
Court in this task.” Id. at 9. It points to the fact that the property has already been
21
extensively studied and sampled for contamination over the past 40 years to support its
22
ORDER - 5
1
argument that Burlington is needlessly attempting to delay its eventual need to fund a
2
portion of the remediation with its motion to stay. Id. at 2.
3
The Port emphasizes that the timing of the completion of the RI/FS in relation to
4
the trial date weighs against granting a stay. Because there is almost a year between when
5
the study will be completed around December 2024 and when trial starts in November
6
2025, the Port argues Burlington has “plenty of time to evaluate the RI/FS if it wants to
7
do so and provide it to its expert witnesses” without a stay. Id. at 12. The Port asserts that
8
Burlington will have even longer to prepare to address the specific “‘data gaps’ upon
9
which Burlington hinges its motion” because those eight vapor samples of the Potter
10
Property will have been collected in August 2024. Id. at 6. Finally, the Port argues that
11
denying the stay has the added benefit of facilitating more expeditious cleanup because, if
12
the Court decides liability, the cleanup is less likely to be delayed by litigation when the
13
RI/FS is completed. Id. at 4.
14
The Court concludes that on balance, the relevant considerations weigh against a
15
stay until the completion of the RI/FS. First, a stay will not necessarily facilitate an
16
“orderly course of justice.” The primary task before the Court is to determine the
17
percentages of liability that each party bares, if any. Although the Court is not prepared to
18
embrace the Port’s position that the RI/FS will not assist the Court at all in this task, all
19
parties as well as Ecology acknowledge that determining liability is solely within the
20
purview of the Court.
21
The second factor weighs most heavily against a stay. Burlington cannot meet its
22
burden to show that it will suffer “hardship or inequity” if it is required to move forward
ORDER - 6
1
without a stay. See CMAX, Inc., 300 F.2d at 268. It has more than a year before trial to
2
address the eight vapor samples collected in August 2024 that its motion focuses on, and
3
nearly a year before trial to address the complete RI/FS.
4
The third factor, “the possible damage which may result from the granting of a
5
stay,” also weighs against a stay here. CMAX, Inc., 300 F.2d at 268. If the Court grants a
6
stay, it risks delaying action on the coming remediation plan. The parties should have a
7
remediation plan to propose to Ecology by the end of the year. Expeditious resolution of
8
liability allows the parties to act on a remediation plan without the risk of delay from
9
protracted liability litigation. Given the timing of the RI/FS’s completion in relation trial,
10
this case does not present “rare circumstances” that warrant a stay. Landis v. N. Am. Co.,
11
299 U.S. 248, 255 (1936). Burlington’s motion to stay proceedings pending the
12
completion of the RI/FS is DENIED. If Ecology requires follow-up reports to the RI/FS
13
that may impact the liability of the parties in this litigation, Burlington is welcome to file
14
another motion.
15
B.
16
The Third-Party Defendants’ motion to dismiss is denied without prejudice.
Third-party defendants General Metals and Occidental move to dismiss
17
Burlington’s complaint against them pursuant to Federal Rules of Civil Procedure
18
12(b)(6) and 14. Dkt. 34.
19
1.
Rule 12(b)(6) Standard
20
Dismissal under Federal Rule of Civil Procedure 12(b)(6) may be based on either
21
the lack of a cognizable legal theory or the absence of sufficient facts alleged under a
22
cognizable legal theory. Balistreri v. Pacifica Police Dep’t, 901 F.2d 696, 699 (9th Cir.
ORDER - 7
1
1988). A plaintiff’s complaint must allege facts to state a claim for relief that is plausible
2
on its face. Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009). A claim has “facial plausibility”
3
when the party seeking relief “pleads factual content that allows the court to draw the
4
reasonable inference that the defendant is liable for the misconduct alleged.” Id. Although
5
courts must accept as true the complaint’s well-pled facts, conclusory allegations of law
6
and unwarranted inferences will not defeat an otherwise proper Rule 12(b)(6) motion to
7
dismiss. Vasquez v. Los Angeles Cnty., 487 F.3d 1246, 1249 (9th Cir. 2007); Sprewell v.
8
Golden State Warriors, 266 F.3d 979, 988 (9th Cir. 2001). “[A] plaintiff’s obligation to
9
provide the ‘grounds’ of his ‘entitle[ment] to relief’ requires more than labels and
10
conclusions, and a formulaic recitation of the elements of a cause of action will not do.
11
Factual allegations must be enough to raise a right to relief above the speculative level.”
12
Bell Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007) (citations omitted). This requires a
13
plaintiff to plead “more than an unadorned, the-defendant-unlawfully-harmed-me
14
accusation.” Iqbal, 556 U.S. at 678 (citing Twombly, 550 U.S. at 555).
15
When granting a Rule 12(b)(6) motion to dismiss, “a district court should grant
16
leave to amend even if no request to amend the pleading was made, unless it determines
17
that the pleading could not possibly be cured by the allegation of other facts.” Cook,
18
Perkiss & Liehe v. N. Cal. Collection Serv., 911 F.2d 242, 247 (9th Cir. 1990). However,
19
when the facts are not in dispute and the sole issue is whether there is liability as a matter
20
of substantive law, courts may deny leave to amend. Albrecht v. Lund, 845 F.2d 193,
21
195–96 (9th Cir. 1988).
22
ORDER - 8
1
2.
Rule 14 Standard
2
Federal Rule of Civil Procedure 14(a)(1) provides that “a defending party may, as
3
third-party plaintiff, serve a summons and complaint on a nonparty who is or may be
4
liable to it for all or part of the claim against it.” “The crucial characteristic of a Rule 14
5
claim is that [an original] defendant is attempting to transfer to the third-party defendant
6
the liability asserted against him by the original plaintiff.” Stewart v. Am. Int’l Oil & Gas
7
Co., 845 F.2d 196, 200 (9th Cir. 1988) (quoting 6 CHARLES ALAN WRIGHT ET AL.,
8
FEDERAL PRACTICE AND PROCEDURE § 1446, at 257 (1971 ed.)). It is not enough that the
9
third-party claim is “simply related” to the original claim. Id. The purpose of Rule 14 is
10
to avoid duplicative litigation and to encourage judicial efficiency by trying claims
11
against third parties who may be derivatively liable to the original defendant for all or
12
part of the plaintiff’s original claim. See Southwest Admin., Inc. v. Rozay’s Transfer, 791
13
F.2d 769, 777 (9th Cir. 1986).
14
In deciding whether to grant impleader, courts in the Ninth Circuit consider the
15
Irwin factors: “(1) prejudice to the original plaintiff; (2) complication of issues at trial; (3)
16
likelihood of trial delay; and (4) timeliness of the motion to implead.” Jorgensen Forge
17
Corp., 14-cv-1524-JCC, 2015 WL 12030118, at *1 (W.D. Wash, Apr. 21, 2015) (citing
18
Irwin v. Mascott, 94 F. Supp. 2d 1052, 1056 (N.D. Cal. 2000)).
19
3.
Parties’ Arguments and Analysis
20
Third-party defendants General Metals and Occidental urge the Court to dismiss
21
Burlington’s third-party complaint against them. Dkt. 34. They argue the Port’s
22
Complaint against Burlington does not plead contamination at the Potter Property from
ORDER - 9
1
auto fluff or lime waste allegedly associated with them as third-party defendants. They
2
assert that the Port instead “pled a very specific claim” alleging that Burlington is
3
responsible for the costs of cleaning only LNAPL from the soil and only on the Potter
4
property. Id. at 2. To the extent that there is auto fluff or lime waste in the soil in the
5
TWAAFA area outside of the Potter Property, they argue it is irrelevant to the Port’s
6
claims against Burlington and therefore cannot support Burlington’s third-party claims
7
against them. Id. at 3. In sum, they argue that because Burlington’s third-party complaint
8
does not “aver facts to suggest that General Metals or Occidental were responsible for the
9
LNAPL at issue,” the Court should dismiss the third-party complaint. Id. If the Court
10
disagrees and declines to dismiss it, General Metals and Occidental argue that “it should
11
nonetheless order Burlington to amend its Third-Party Complaint to expressly isolate its
12
claims to LNAPL contamination and not auto fluff or lime waste.” Dkt. 56 at 6. Finally,
13
if the Court denies the motion to dismiss the Third-Party Complaint without prejudice,
14
General Metals and Occidental argue it should sever the third-party claims from the
15
Port’s claims against Burlington. Id. at 13.
16
Burlington opposes dismissal or severance of its third-party claims against General
17
Metals and Occidental. Dkt. 53. It argues that the Port seeks relief for remediation of
18
“hazardous substances” at the Potter Property and does not limit its claims against
19
Burlington to LNAPL. Id. at 5. It asserts that the Potter Property contains commingled
20
contamination from hazardous substances including “from auto fluff and lime solvent
21
sludge from operations by General Metals and by Occidental’s predecessor.” Id.
22
Burlington argues further that dismissing its crossclaims would “result in significant
ORDER - 10
1
prejudice to Burlington and a risk of inconsistent decisions if Ecology recommends a
2
combined remedy for the Potter Property to address multiple contaminants, some of
3
which are attributable to Third-Party Defendants.” Id. at 7. Finally, if the Court dismisses
4
the third-party complaint, Burlington seeks leave to amend it. Id. at 11.
5
The Court concludes that Burlington’s third-party complaint against General
6
Metals and Occidental is sufficient under both Rule12(b)(6) and Rule 14. The language
7
of the Port’s complaint against Burlington leaves open the possibility that Burlington
8
could face liability for remediation of hazardous substances beyond LNAPL within the
9
Potter Property. Although the Port’s complaint undoubtably focuses on LNAPL,
10
Burlington correctly observes that the Port did not explicitly rule out liability for
11
contamination from auto fluff or lime waste in its complaint. Indeed, the Port’s complaint
12
acknowledges that Ecology concluded that there are “comingled” hazardous substances
13
in portions of the broader TWAAFA site. Dkt. 1 at 8–9. And Ecology made clear that it
14
believes there is a possibility of comingled contamination on the Potter Property. Dkt. 45
15
at 8. The potential for commingled contamination that could include auto fluff or lime
16
solvent within the Potter Property has yet to be determined. Ecology ordered testing for
17
contaminants there beyond LNAPL. Id. at 3. The Port acknowledged that auto fluff and
18
lime waste had been transported to the TWAAFA site, but denied knowing whether auto
19
fluff and lime waste were deposited on the Potter Property. Dkt. 21 at ¶¶ 15-16, 18 & 23.
20
Again, the record suggests that Ecology should have taken the necessary samples in
21
August 2024. Dkt. 45 ¶¶ 6–7.
22
ORDER - 11
1
At this juncture, allowing the third-party complaint to proceed best serves the
2
purposes of Rule 14 to avoid duplicative litigation and to encourage judicial efficiency.
3
The Port’s complaint seeks remediation for ridding the Potter Property soil of hazardous
4
substances. Dkt. 1 at 11. Adjudicating the claims against General Metals and Occidental
5
who may be derivatively liable to Burlington for part of the Port’s original claims against
6
Burlington best serves the goal of judicial efficiency.
7
The Irwin factors similarly support allowing the third-party claims to proceed.
8
Regarding the first factor—prejudice to the original plaintiff— there is minimal, if any,
9
prejudice to the Port in allowing Burlington to allocate liability for remediation of the
10
Potter Property soil resulting from other hazardous substances. The Port argues in its
11
answer to the third-party complaint “that Burlington should not benefit from its efforts to
12
expand the Port’s case to other properties and different contaminants.” Dkt. 38 at 2. Its
13
preference that its opposing party not “benefit” from third-party claims does not
14
constitute prejudice. Furthermore, its concern that third-party claims would expand the
15
property at issue is baseless. Burlington clarified that it seeks to share remedial action
16
costs with regards to only the Potter Property, not the broader TWAAFA site. Dkt. 53 at
17
7.
18
The second factor—complication of the issues at trial—is, at least partially, a
19
necessary consequence of the third-party claims. Indeed, each contaminant will
20
undoubtably require a unique explanation to the trier of fact. Nevertheless, the core issues
21
underlying the determination of liability for contamination at the Potter Property are the
22
same for all the claims. This factor weighs in favor of impleader.
ORDER - 12
1
The third factor—likelihood of trial delay—does not weigh in favor of dismissal
2
here. Because the parties have more than a year before the trial with the Potter Property
3
samples, there is no credible indication that allowing the third-party claims will delay
4
trial.
5
Finally, all parties concede that the fourth factor—timeliness of the motion to
6
implead—is a non-issue. Burlington did not delay in bringing its third-party claims.
7
For similar reasons, the Court concludes that bifurcation is not warranted under
8
Rule 14(a). Given the common nucleus of facts between the claims, bifurcation would be
9
counterproductive to judicial economy. Allowing all the claims regarding liability for soil
10
contamination at the Potter Property to proceed at the same time regardless of whether
11
those claims are third-party claims or not is the most efficient use of judicial resources in
12
this case. The Court is not persuaded that bifurcation would save time or prevent
13
confusion.
III. ORDER
14
Burlington’s motion to stay, Dkt. 44, is DENIED. General Metals and
15
16
Occidental’s motion to dismiss Burlington’s third-party complaint, Dkt. 34, is DENIED.
17
The third-party defendants’ request to sever the claims against them from the Port’s
18
claims against Burlington is also DENIED.
IT IS SO ORDERED.
19
20
//
21
//
22
//
ORDER - 13
1
Dated this 24th day of September, 2024.
2
A
3
BENJAMIN H. SETTLE
United States District Judge
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
ORDER - 14