R.T. Rogers Oil Company, Inc. v. Zurich American Insurance Company
Filing
52
MEMORANDUM OPINION AND ORDER: That Defendant's 44 Suggestion of Unopposed Motion for Summary Judgment be DENIED and that Defendant's 41 MOTION for Summary Judgment be GRANTED; Further, that the 45 MOTION for Leave to File Respon se to Defendant's Motion for Summary Judgment Out of Time be DENIED and the Defendant's 47 MOTION to Strike and Opposition to Plaintiff's Request for Leave to an Untimely Motion be GRANTED. Lastly, the court ORDERS that any pending motions be TERMINATED AS MOOT and that this matter be DISMISSED and STRICKEN from the docket. Signed by Judge Irene C. Berger on 7/7/2017. (cc: attys; any unrepresented party) (msa)
IN THE UNITED STATES DISTRICT COURT
FOR THE SOUTHERN DISTRICT OF WEST VIRGINIA
BECKLEY DIVISION
R.T. ROGERS OIL COMPANY, INC.,
Plaintiff,
v.
CIVIL ACTION NO. 5:16-cv-01390
ZURICH AMERICAN INSURANCE
COMPANY,
Defendant.
MEMORANDUM OPINION AND ORDER
The Court has reviewed the Defendant’s Motion for Summary Judgment (Document 41)
and Memorandum of Law in Support (Document 42), the Defendant’s Suggestion of Unopposed
Motion for Summary Judgment (Document 44), and the Response of Plaintiff to Defendant’s
Motion for Ruling and Motion for Leave to File Response to Defendant’s Motion for Summary
Judgment Out of Time (Document 45). The Court has also reviewed the Defendant’s Motion to
Strike and Opposition to Plaintiff’s Request for Leave to File an Untimely Motion (Document 47),
the Response of Plaintiff, R.T. Rogers Oil Company, Inc., to Defendant’s Motion to Strike and
Reply to Zurich American Insurance Company’s Opposition to Plaintiff’s Request for Leave to
File Untimely Motion (Document 49), and the Defendant’s Reply in Support of Motion to Strike
and Opposition to Plaintiff’s Request for Leave to File an Untimely Motion (Document 50). For
the reasons stated herein, the Court finds that the motion for summary judgment should be granted.
1
FACTUAL BACKGROUND AND PROCEDURAL HISTORY
Plaintiff R.T. Rogers Oil Company (“Rogers Oil”) initiated this action with a Complaint
(Document 1-1) filed in the Circuit Court of Summers County, West Virginia, on December 14,
2015. The Defendant removed the matter to this Court on February 9, 2016, citing diversity
jurisdiction. The Plaintiff named Zurich American Insurance Company (“Zurich”) as the sole
Defendant in its complaint. The Plaintiff’s claims include a declaration of rights based on an
insurance policy, breach of contract, and statutory bad faith pursuant to West Virginia Code § 3311-4(9).
The Plaintiff is a West Virginia corporation with its principal place of business in Summers
County, West Virginia. Rogers Oil owns and operates various gas stations in southern West
Virginia. Rogers Oil alleges that it and the Defendant were parties to a contract for an insurance
policy wherein Rogers Oil was insured regarding its ownership and operation of underground
storage tanks (“USTs”). Rogers Oil removed one of those USTs located on an insured property,
and, upon removal, the West Virginia Department of Environmental Protection determined that a
release of fuel from that UST into the ground had occurred. Rogers Oil alleges that it reported a
claim to Zurich, but that Zurich refused to fully cover the environmental remediation necessary
after the contaminant release. Zurich moved for summary judgment on February 28, 2017, the
deadline for filing such motions. (See Document 34, granting the parties’ joint motion for
modification of scheduling order and extending the dispositive motions deadline to February 28,
2017.)
The Plaintiff filed no response to the motion for summary judgment within the fourteenday response period. On April 4, 2017, the Defendant filed its suggestion of unopposed motion
2
for summary judgment and moved this Court to enter summary judgment in its favor based on the
Plaintiff’s failure to respond. On that same day, the Plaintiff responded to the suggestion of
unopposed motion and sought leave to file a response to the Defendant’s motion out of time, filing
a response in opposition shortly thereafter on April 7, 2017. On April 13, 2017, Zurich filed a
motion to strike the Plaintiff’s out-of-time response to its motion for summary judgment, asserting
that the Court should not consider the response due its untimeliness and the Plaintiff’s lack of
excusable neglect. Because the Plaintiff’s response to the motion for summary judgment was
filed well beyond the deadline to respond,1 the facts that follow are based exclusively on the
Defendant’s motion and attached exhibits. The facts are, however, described in the light most
favorable to the Plaintiff as the non-moving party.
The Plaintiff obtained an insurance policy issued by the Defendant entitled “Storage Tank
System Third Party Liability and Cleanup Policy.” (Def.’s Mot. for Sum. Judg., Exhibit A.)
(hereinafter, “Policy”) The Policy was a “claims made and reported policy” wherein “claim(s)
must first be made by or against the ‘insured’ during the ‘policy period’ and ‘claim(s)’ must be
reported to [Zurich] during the ‘policy period,’ the automatic extended reporting period or the
extended reporting period, if applicable.” (Id. at 1.) According to the Policy, Zurich agreed to
pay, “on behalf of the ‘insured’ any ‘cleanup costs’ required by ‘governmental authority’ as a
result of a ‘release(s)’ that ‘emanates from’ a ‘scheduled storage tank system(s)’ at a ‘scheduled
location’ that commences on or after the ‘retroactive date’ and is first discovered by the ‘insured’
during the ‘policy period . . . .’” (Id.) The Policy defines scheduled locations as “the property(ies)
designated in the Declarations or by endorsement onto this policy,” and further defines scheduled
1 The Court will more fully discuss the Defendant’s suggestion of unopposed motion for summary judgment and the
Plaintiff’s response thereto supra.
3
storage tank system as “a tank(s) owned or operated by [the insured], including any connecting
piping, ancillary equipment and containment system that is on, within, or under a ‘scheduled
location,’ identified in the Declarations or applicable Endorsement and described in the
Application.”
(Id. at 3.) The Policy includes a policy period of April 1, 2003 to April 1, 2004,
with a retroactive date of February 19, 1994, and further provides that the insured “shall provide
notice to [Zurich] of your intention to perform a voluntary ‘scheduled storage tank system’
removal or replacement.” (Id. at 8 (emphasis added).) Additionally, the Policy contains certain
exclusions. The Policy specifically “does not apply to ‘claims,’ ‘cleanup costs’ or ‘loss(es) based
upon or arising out of: A. any ‘release’ known to an ‘insured’ prior to the effective date of the
‘policy period.’” (Id. at 3.)
Attached to the Policy is a Site Schedule listing different sites owned by the Plaintiff and
covered by the Policy. That Site Schedule lists “Courthouse Service” as covered location number
two with four underground storage tanks. (Id. at 11.) The Courthouse Service Station site is the
site at issue. (Pl.’s Complaint at ¶ 5.) This site has been used as a gasoline station since the
1920s and has had several different underground storage tanks used on the property since that time.
(Def.’s Mot. for Sum. Judg., Exhibit E.)
According to the Plaintiff’s expert witness, previous
USTs were likely the cause of releases of chemicals into the ground investigated by the West
Virginia Department of Environmental Protection (“WVDEP”) in 1996, well before this case.
(Def.’s Mot. for Sum. Judg., Exhibit E; M. Alamong Depo. at 25:10-26:20, 32:2-17 (Document
41-7); J. Newbill Depo. at 12:1-9 (Document 41-8).)
On June 18, 2003, the Plaintiff hired third-party contractor Petrocon to remove the USTs
from the Courthouse Service Station site, including the associated piping and other equipment
4
attached to the tanks. (Pl.’s Complaint at ¶ 5; R. Rogers Depo. at 15:7-21 (Document 41-2).)
Upon removing the tanks, Petrocon also conducted a soil sample from the removal site, as per
WVDEP requirements. (T. Bess Depo. at 18:24-19:6.) Based on the test results from the soil
sample, on July 21, 2003, WVDEP informed the Plaintiff that a petroleum release had occurred
and soil and ground water remediation would be necessary. (Def.’s Mot. for Sum. Judg., Exhibit
L.) The Plaintiff hired consultants Simon & Associates and began investigation and remediation
on the site. (Def.’s Mot. for Sum. Judg., Exhibits C and D.)
On June 24, 2003, six days after the tanks were removed from the site, the Plaintiff notified
Zurich of the removal of the USTs by submitting to Zurich a 48-Hour CST Tank Pull Notification
form. (Pl.’s Complaint at ¶ 5.) Greg Rogers, the owner of R.T. Rogers Oil, testified during his
deposition that, at the time the USTs were removed, he did not believe he needed to give Zurich
notice that the tanks were being removed. (R. Rogers Depo. at 21:13-21.) After removal of the
USTs and before the results of the soil sample tests were obtained, the Plaintiff disposed of the
tanks at the Mercer County Landfill. (T. Bess Depo. at 20:10-20.)
On July 18, 2003, Zurich sent the Plaintiff a correspondence acknowledging its receipt of
the filing of a potential claim surrounding the removal of the USTs. Zurich also informed the
Plaintiff in this correspondence that it retained its own environmental consultant to conduct an
investigation surrounding the issue, and that “[n]othing in this letter, and no actions undertaken by
Zurich to monitor or investigate this incident, should be construed as an admission of coverage or
as a waiver of any defenses available to Zurich.” (Def.’s Mot. for Sum. Judg., Exhibit O.) On
October 10, 2003, the Plaintiff, through its counsel, made an official demand for coverage under
the Policy. The Plaintiff demanded coverage of the full amount of cleanup costs incurred.
5
(Def.’s Mot. for Sum. Judg., Exhibit P.) In response to this demand, and after completing its own
investigation, Zurich informed the Plaintiff by correspondence on May 28, 2004, that it would
cover forty-two percent (42%) of the Plaintiff’s necessary and reasonable cleanup costs incurred
on the site in question. (Def.’s Mot. for Sum. Judg., Exhibit N.) Zurich noted that the Plaintiff’s
consultant’s report itself indicated evidence of historical petroleum leaks on the property that
occurred before the Policy’s retroactive date, and that the Plaintiff failed to give Zurich the
opportunity to assess the removed tanks and attached equipment after filing the claim. Zurich
therefore found that the investigation did not prove that the leaks came exclusively from the
Plaintiff during the policy period. (Id.)
On September 20, 2004, the Plaintiff corresponded with Zurich for a second time, again
requesting that Zurich pay the full amount for the cleanup costs. On November 2, 2004, Zurich
informed the Plaintiffs that its “proposed allocation [of forty-two percent of the cleanup costs] is
fair and reasonable and in accordance with the terms and conditions of the policy in light of the
historical and current information presented.” (Def.’s Mot. for Sum. Judg., Exhibit Q.) Zurich
also stated that it was still willing to pay forty-two percent of the Plaintiff’s cleanup costs related
to the UST removal. (Id.) On September 13, 2005, the Plaintiff submitted a third correspondence,
again requesting Zurich to provide coverage for one hundred percent of the cleanup costs
surrounding the UST removal. (Id.) On January 30, 2006, Zurich responded a third time, stating
that its original May 28, 2004 offer of forty-two percent coverage was fair and reasonable under
the policy and was still being extended to the Plaintiffs. (Id.) On December 14, 2015, more than
twelve years after originally demanding coverage, the Plaintiff filed its complaint in the Circuit
Court of Summers County, West Virginia, seeking a declaration that the Defendant breached the
6
insurance contract and committed statutory bad faith. (Pl.’s Comp. at ¶ 17.) From Zurich’s
January 30, 2006 correspondence with the Plaintiff until the filing of the complaint, Zurich
received no further communication from the Plaintiff. The Plaintiff has not accepted Zurich’s
offer to pay for forty-two percent of the Plaintiff’s cleanup costs, and remediation of the site was
still ongoing at the time the Plaintiff filed its complaint.
STANDARD OF REVIEW
The well-established standard in consideration of a motion for summary judgment is that
“[t]he court shall grant summary judgment if the movant shows that there is no genuine dispute as
to any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P.
56(a)–(c); see also Hunt v. Cromartie, 526 U.S. 541, 549 (1999); Celotex Corp. v. Catrett, 477
U.S. 317, 322 (1986); Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247 (1986); Hoschar v.
Appalachian Power Co., 739 F.3d 163, 169 (4th Cir. 2014). A “material fact” is a fact that could
affect the outcome of the case. Anderson, 477 U.S. at 248; News & Observer Publ’g Co. v.
Raleigh-Durham Airport Auth., 597 F.3d 570, 576 (4th Cir. 2010). A “genuine issue” concerning
a material fact exists when the evidence is sufficient to allow a reasonable jury to return a verdict
in the nonmoving party’s favor. FDIC v. Cashion, 720 F.3d 169, 180 (4th Cir. 2013); News &
Observer, 597 F.3d at 576.
The moving party bears the burden of showing that there is no genuine issue of material
fact, and that it is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(a); Celotex Corp.,
477 U.S. at 322–23. When determining whether summary judgment is appropriate, a court must
view all of the factual evidence, and any reasonable inferences to be drawn therefrom, in the light
most favorable to the nonmoving party. Hoschar, 739 F.3d at 169. However, the non-moving
7
party must offer some “concrete evidence from which a reasonable juror could return a verdict in
his favor.” Anderson, 477 U.S. at 256. “At the summary judgment stage, the non-moving party
must come forward with more than ‘mere speculation or the building of one inference upon
another’ to resist dismissal of the action.” Perry v. Kappos, No.11-1476, 2012 WL 2130908, at
*3 (4th Cir. June 13, 2012) (unpublished decision) (quoting Beale v. Hardy, 769 F.2d 213, 214
(4th Cir. 1985)).
In considering a motion for summary judgment, the court will not “weigh the evidence and
determine the truth of the matter,” Anderson, 477 U.S. at 249, nor will it make determinations of
credibility. N. Am. Precast, Inc. v. Gen. Cas. Co. of Wis., 2008 WL 906334, *3 (S.D. W. Va. Mar.
31, 2008) (Copenhaver, J.) (citing Sosebee v. Murphy, 797 F.2d 179, 182 (4th Cir. 1986). If
disputes over a material fact exist that “can be resolved only by a finder of fact because they may
reasonably be resolved in favor of either party,” summary judgment is inappropriate. Anderson,
477 U.S. at 250. If, however, the nonmoving party “fails to make a showing sufficient to establish
the existence of an element essential to that party’s case,” then summary judgment should be
granted because “a complete failure of proof concerning an essential element . . . necessarily
renders all other facts immaterial.” Celotex, 477 U.S. at 322–23.
DISCUSSION
Zurich asserts that it is entitled to summary judgment concerning the Plaintiff’s breach of
contract claim because no breach of contract has occurred, and the Plaintiff has failed to put forth
any evidence that shows a genuine issue of material fact regarding the alleged breach. Further,
even if an issue of material fact surrounding the alleged breach does exist, Zurich argues that the
applicable statute of limitations for asserting a breach of contract claim has expired and summary
8
judgment in its favor is thus still appropriate. With respect to the Plaintiff’s claims for statutory
bad faith, Zurich again argues that the applicable statute of limitations for any statutory bad faith
claim has lapsed. In addition, Zurich asserts that it is entitled to summary judgment on the
Plaintiff’s declaratory judgment claim because this claim is precluded by the doctrine of laches.
Finally, Zurich asserts that the Plaintiff’s failure to preserve the USTs, after removal for Zurich’s
examination, warrant spoliation sanctions in the form of granting its motion for summary
judgment.2
A. Suggestion of Unopposed Motion for Summary Judgment and Plaintiff’s Response
As noted above, the Plaintiff did not respond to the Defendant’s motion for summary
judgment in a timely manner. Well after the deadline for a response, the Defendant filed a
suggestion of an unopposed motion for summary judgment wherein it moved this Court to enter
summary judgment in its favor based on the Plaintiff’s failure to dispute its factual assertions.
The Plaintiff then responded to this motion by asserting that it missed the deadline for a response
due to excusable neglect, and moved the Court to grant it leave to file a response to the summary
judgment motion out of time. Specifically, the Plaintiff argues that there was a power outage in
counsel’s office on the days immediately following the filing of the Defendant’s motion for
summary judgment, and that Plaintiff’s counsel was then out of town. Plaintiff further asserts
that, due to a “clerical oversight,” the fourteen-day response period in the scheduling order and the
local rules was “overlooked and not scheduled on the calendar of counsel.” (Pl.’s Motion for
Leave to File, ¶ 4 (Document 45).) The Defendant counters that the Plaintiff’s stated reasons for
failing to respond to the summary judgment motion do not constitute excusable neglect, and thus,
2 The Court notes that the Plaintiff’s complaint does not divide its causes of action into separate counts, but simply
lists its relevant causes of action with its demands at the end of the complaint.
9
the Plaintiff’s motion for leave to file should be denied and the Plaintiff’s proposed response
should be stricken.
Zurich’s motion for summary judgment was filed on February 28, 2017, the deadline for
filing such motions under the Court’s First Amended Scheduling Order (Document 34). That
same order further stated that “[a]ny responses shall be served within fourteen (14) days from the
date of service of the motion . . . (PLEASE NOTE THAT ANY RESPONSE OR OTHER
DOCUMENTS FILED AFTER THE DEADLINE FOR FILING, WITHOUT LEAVE OF
COURT, WILL NOT BE CONSIDERED.)” (Document 34, ¶ 2) (emphasis in original.)
Pursuant to Rule 6(b) of the Federal Rules of Civil Procedure, the Court may extend leave to file
after a deadline “on motion made after the time has expired if the party failed to act because of
excusable neglect.” F.R.Civ. P. 6(b)(1)(B). According to the United States Supreme Court, a
court should consider “the danger of prejudice to the [opposing party], the length of the delay and
its potential impact on judicial proceedings, the reason for the delay, including whether it was
within the reasonable control of the movant, and whether the movant acted in good faith” when
determining whether neglect is excusable. Pioneer Inv. Servs. Co. v. Brunswick Assocs. Ltd.
P'ship, 507 U.S. 380, 395, (1993). The Fourth Circuit applied the same standard for excusable
neglect in Agnew v. United Leasing Corporation and determined that it was appropriate to deny
leave to file past a deadline when counsel did so for “mistakenly calendar[ing] the wrong date.”
Agnew v. United Leasing Corp., No. 15-2554, 2017 WL 699105, at *5 (4th Cir. Feb. 22, 2017).
The Fourth Circuit held that “‘run-of-the-mill inattentiveness by counsel’ is not excusable
neglect,” and thus it was not an abuse of discretion to deny a motion for leave to file an untimely
brief. Id.
10
As in Agnew, the Plaintiff’s explanation amounts to the same run-of-the-mill
inattentiveness that does not constitute excusable neglect. The Plaintiff states that its counsel’s
office was without power until March 2, 2017. This still left the Plaintiff twelve (12) additional
days to either file a brief in response to the motion to dismiss or request an extension. The
Plaintiff did neither, however, and continued doing nothing until April 7, 2017, after the Defendant
filed its suggestion. An admitted “clerical error,” as described by the Plaintiff, on the part of
counsel amounts to mere inattentiveness, and the Court therefore finds that the Defendant’s motion
to strike the Plaintiff’s response to the summary judgment motion should be granted. The Court
denies the Plaintiff’s motion for leave to file a response out of time and finds it appropriate to
consider the motion for summary judgment without any response by the Plaintiff.
However, the Court finds that the Plaintiff’s failure to respond does not require entry of
summary judgment absent thorough review and consideration of Zurich’s motion and supporting
evidence. Federal Rule of Civil Procedure 56(e) provides that, if a party fails to address a factual
assertion, the court may “grant summary judgment if the motion and supporting materialsincluding the facts considered undisputed show that the movant is entitled to it.” Zurich, as the
moving party, bears the initial burden of demonstrating that no genuine issue of material fact exists
such that judgment as a matter of law in its favor is appropriate. Even absent a response from the
Plaintiff, the Court must determine whether Zurich has met that burden as to each claim.
B. Breach of Contract and Statute of Limitations
Zurich contends that New York law governs the contract, and that New York’s statute of
limitations on contract claims is six (6) years. Because it informed the Plaintiff on May 28, 2004,
that it would provide coverage at forty-two percent of the cleanup costs, and because the Plaintiff
11
did not file suit alleging breach of contract until December 14, 2015, Zurich argues that New
York’s six-year statute of limitations had lapsed well before the complaint was filed. Zurich
further argues that, even if West Virginia law applies, its ten-year statute of limitations on the
breach of contract action has lapsed.
The Court finds that the Plaintiff’s breach of contract action is precluded by the statute of
limitations. Based on the undisputed language of the insurance contract stating that “the ‘insured’
and we agree that the law of the State of New York shall apply without giving effect to any conflicts
or choice of law principles” concerning any disagreement or dispute as to the meaning of
contractual terms, the Court finds that New York law governs the contract interpretation. (Def.’s
Mot. for Sum. Judg., Exhibit A, at 8.) Pursuant to New York law, “[t]he following actions must
be commenced within six years: . . . 2. an action upon a contractual obligation or liability,
expressed or implied . . . .” N.Y. C.P.L.R. 213(2). Here, the Plaintiff made a demand for
coverage under the Policy on October 10, 2003, and on May 28, 2004, Zurich responded with its
offer of a forty-two percent allocation of coverage of the Plaintiff’s cleanup costs. Rather than
accept Zurich’s offer or challenge it, the Plaintiff merely continued to send Zurich receipts of
remediation costs. The evidence and deposition testimony presented show that the Plaintiff knew
as of May 28, 2004, that Zurich only intended to cover forty-two percent of the UST cleanup costs
under the Policy. Therefore, the statute of limitations to challenge Zurich’s alleged breach of
contract began to run on May 28, 2004. Under New York law, the statute of limitations expired
on May 28, 2010. Because the Plaintiff did not file its complaint until December 14, 2015, the
breach of contract claim is time barred and summary judgment in the Defendant’s favor is
appropriate.
12
The Court further finds that, even if West Virginia law governed the contract, the Plaintiff’s
breach of contract claim would still be barred by the applicable statute of limitations. According
to West Virginia law,
[e]very action to recover money, which is founded upon . . . any contract other than
a judgment or recognizance, shall be brought within the following number of years
next after the right to bring the same shall have accrued . . . if it be upon any other
contract in writing under seal, within ten years; if it be upon . . . a contract in writing,
signed by the party to be charged thereby . . . but not under seal, within ten years .
...
W.Va. Code § 55-2-6. The West Virginia Supreme Court has held that, concerning breach of
contract actions, “the statute of limitations begins to run when the breach of contract occurs or
when the act breaching the contract becomes known.” McKenzie v. Cherry River Coal & Coke
Co., 466 S.E.2d 810, 817 (W.Va. 1995); see also, Heydarian v. JPMorgan Chase Bank, N.A., No.
CIV.A. 3:14-20013, 2015 WL 2183131, at *2 (S.D.W. Va. May 8, 2015) (Chambers, C.J.) (“In a
contract action, the question is when the plaintiff knew, or reasonably should have recognized, that
the contract was breached.”).
The Court finds that there is no dispute as to when the Plaintiff knew of Zurich’s alleged
breach of the insurance contract. The Plaintiff filed a claim with Zurich in July 2003, and on
October 10, 2003, Plaintiff’s counsel sent Zurich an official demand letter demanding one hundred
percent coverage of cleanup costs under the Policy. The Plaintiff received Zurich’s response on
May 28, 2004, wherein Zurich “offer[ed] to provide coverage for an allocated portion of the
eligible costs associated with this claim . . . .”
(Def.’s Mot. for Sum. Judg., Exhibit N.)
Therefore, upon receipt of this correspondence, the Plaintiff knew, or reasonably should have
recognized, that Zurich was allegedly in breach of the insurance contract. Rather than accept the
amount offered by Zurich or notify Zurich that the Plaintiff felt its offer was in breach of the
13
contract, on September 20, 2004, the Plaintiff sent Zurich more invoices and demanded one
hundred percent coverage of cleanup costs under the policy. (Def.’s Mot. for Sum. Judg., Exhibit
Q (“We respectfully request that you provide full coverage for the claim.”)) In response to this
letter, Zurich again notified the Plaintiff on November 2, 2004, that its offer was still to cover
forty-two percent of the cleanup costs and that its position was that this proposed offer was “fair
and reasonable and in accordance with the terms and conditions of the policy in light of the
historical and current information presented.” (Id.)
Based on this evidence, the Court finds that no reasonable person could find that the
Plaintiff was unaware, as of November 2004, that Zurich had denied any coverage above fortytwo percent of the costs under the policy. That denial of coverage constitutes the alleged breach
of the contract, and therefore, there exists no genuine dispute regarding the date of the alleged
breach. However, the Plaintiff still failed to file its lawsuit in a West Virginia state court until
December 14, 2015, more than ten years after it knew, or reasonably should have known, that
Zurich did not intend to meet its demand of full coverage under the policy.3 So, even if West
Virginia law governs the contract, the statute of limitations bars the Plaintiff’s breach of contract
action. Because the Court finds that the Plaintiff’s breach of contract claim is time barred, the
Court need not address Zurich’s argument that no breach of the insurance contract actually
occurred.
3 The Plaintiff could prevail on the statute of limitations issue only if the Court were to disregard the contractually
agreed-to application of New York law and found that the statute of limitations began to run only after the third
exchange of correspondences between the Plaintiff and the Defendant. However, because none of the Plaintiff’s
continued correspondences after Zurich’s initial denial of full coverage were made pursuant to a formal appeals
process, the Court refuses to find that each communication by the Plaintiff consisting merely of additional invoices
should restart the statute of limitations clock.
14
C. Statutory Bad Faith
Zurich next argues that it is entitled to summary judgment on the Plaintiff’s statutory bad
faith claims. Zurich contends that this claim is also time barred pursuant to the one-year statute
of limitations in West Virginia Code § 55-2-12(c). Zurich argues that the one-year statute of
limitations started to run on the date the correspondence denying full coverage was sent to
Plaintiff’s counsel in 2004. Thus, its position is that Plaintiff’s statutory bad faith claim, filed in
December 2015, is time barred.
The West Virginia Unfair Trade Practices Act (“WVUTPA”) prohibits insurers from
engaging in unfair settlement practices with insured parties. W.Va. Code § 33-11-4(9). The
West Virginia Supreme Court has held that “[c]laims involving unfair settlement practices that
arise under the Unfair Trade Practices Act . . . are governed by the one-year statute of limitations
set forth in West Virginia Code § 55-2-12(c).” Syl. Pt. 1, Wilt v. State Auto. Mut. Ins. Co., 506
S.E.2d 608, 608 (W.Va. 1998). Concerning when the statute of limitations begins to run in
WVUTPA cases, the West Virginia Supreme Court has also held that first-party statutory bad faith
claims begin to run “when the insured knows or reasonably should have known that the insurer
refused to defend him or her in an action.” Syl. Pt. 5, Noland v. Virginia Ins. Reciprocal, 686
S.E.2d 23, 25 (W.Va. 2009); see also, Cava v. Nat'l Union Fire Ins. Co. of Pittsburgh, Pa., 753
S.E.2d 1, 7 (W.Va. 2013) (holding that the lower court did not abuse its discretion in applying the
one-year statute of limitations in West Virginia Code § 55-2-12(c) to a statutory bad faith thirdparty complaint that was not derivative of the Plaintiff’s original claim.).
As stated above, Zurich informed the Plaintiff on May 28, 2004, and November 2, 2004,
that it would not agree to provide full coverage under the Policy.
15
The Plaintiff therefore
undoubtedly knew by November 2004 that Zurich would not offer full coverage. Thus, the Court
finds that the Plaintiff’s WVUTPA bad faith claim is time-barred by the one-year statute of
limitations, and summary judgment on Zurich’s behalf is appropriate.
D. Declaratory Judgment and Spoliation Sanctions
Zurich lastly asserts that it is entitled to summary judgment regarding the Plaintiff’s request
for a declaratory judgment that Zurich breached the insurance contract, and further argues that it
should be awarded summary judgment in the form of spoliation sanctions because the Plaintiff
failed to preserve evidence for Zurich to consider. However, because these arguments stem from
the Plaintiff’s breach of contract and WVUTPA bad faith claims, and because the Court has found
that summary judgment on those claims is appropriate, the Court need not address these remaining
arguments.
CONCLUSION
WHEREFORE, after thorough review and careful consideration, the Court ORDERS that
the Defendant’s Suggestion of Unopposed Motion for Summary Judgment (Document 44) be
DENIED and that the Defendant’s Motion for Summary Judgment (Document 41) be GRANTED.
The Court further ORDERS that the Motion for Leave to File Response to Defendant’s Motion
for Summary Judgment Out of Time (Document 45) be DENIED and the Defendant’s Motion to
Strike and Opposition to Plaintiff’s Request for Leave to File an Untimely Motion (Document 47)
be GRANTED.
Lastly, the Court ORDERS that any pending motions be TERMINATED AS MOOT and
that this matter be DISMISSED and STRICKEN from the docket.
16
The Court DIRECTS the Clerk to send a certified copy of this Order to counsel of record
and to any unrepresented party.
ENTER:
17
July 7, 2017