Menominee Indian Tribe of Wisconsin v. US Environmental Protection Agency et al
Filing
42
ORDER denying 34 Motion to Amend Complaint; granting 6 Motion to Dismiss for Failure to State a Claim; 6 Motion to Dismiss for Lack of Jurisdiction; granting 19 Motion to Dismiss. (cc: all counsel) (Griesbach, William)
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF WISCONSIN
MENOMINEE INDIAN TRIBE OF WISCONSIN,
Plaintiff,
v.
Case No. 18-C-108
U.S. ENVIRONMENTAL PROTECTION AGENCY and
UNITED STATES ARMY CORPS OF ENGINEERS,
Defendants,
and
AQUILA RESOURCES INC.,
Intervenor-Defendant.
DECISION AND ORDER DENYING PLAINTIFF’S MOTION TO AMEND
AND GRANTING DEFENDANTS’ MOTIONS TO DISMISS
Plaintiff Menominee Indian Tribe of Wisconsin filed this action for declaratory and injunctive
relief against the United States Environmental Protection Agency and the United States Army Corps
of Engineers (Federal Defendants). The Tribe challenges the Federal Defendants’ refusal to exercise
jurisdiction over a permit submitted pursuant to Section 404 of the Clean Water Act (CWA), 33
U.S.C. § 1344, relating to Intervenor-Defendant Aquila Resources Inc.’s proposal to construct the
Back Forty Mine in Menominee County, Michigan. Instead of the EPA, the Michigan Department
of Environmental Quality (MDEQ) is overseeing the permitting process. In its initial complaint, the
Tribe asserted two separate claims: First, the Tribe claimed that the Federal Defendants had a
mandatory duty under the CWA to assume jurisdiction over the Section 404 permit process, which
the Tribe could enforce pursuant to the CWA’s citizen suit provision, 33 U.S.C. § 1365. Second,
the Tribe claimed that the Federal Defendants’ refusal to assert jurisdiction over the permit process
is arbitrary and capricious in violation of the Administrative Procedure Act (APA), 5 U.S.C.
§ 706(2)(A).
The defendants filed motions to dismiss pursuant to Rule 12(b)(1) for lack of subject matter
jurisdiction and Rule 12(b)(6) for failure to state a claim. The court held oral argument on the
motions on August 1, 2018, and the parties submitted supplemental briefing on the matter. On
September 11, 2018, the Tribe filed a motion to amend the complaint, seeking to add two new
claims. In its proposed amended complaint, the Tribe asserts, first, that the EPA’s withdrawal of its
objections to the permit was arbitrary and capricious and contrary to law under the APA and,
second, that the EPA’s failure to consult with the Menominee Tribe pursuant to the National Historic
Preservation Act (NHPA), 54 U.S.C. § 300101, et seq., before the permit for the mine was issued
was also arbitrary and capricious and contrary to law under the APA. For the reasons explained
below, the motion to amend will be denied, the motions to dismiss will be granted, and the case will
be dismissed.
BACKGROUND
A. Statutory and regulatory background
The Clean Water Act was enacted in 1972 “to restore and maintain the chemical, physical,
and biological integrity of the Nation’s waters.” 33 U.S.C. § 1251(a). Although the Act generally
prohibits the discharge of pollutants into navigable waters without a permit, 33 U.S.C. § 1311(a),
the Secretary of the Army, acting through the Corps, may issue a Section 404 permit for the
discharge of dredged or fill material into navigable waters. § 1344(a). The EPA retains oversight
of the Section 404 permitting program and may veto the Corps’ approval of a permit when the
2
dredged or fill material would have “an unacceptable adverse effect on municipal water supplies,
shellfish beds and fishery areas . . . , wildlife, or recreational areas.” § 1344(c).
Under the Act, a state may request permission from the EPA to administer its own individual
and general permit program for the discharge of dredged or fill material into “navigable waters . . .
other than those waters which are presently used, or are susceptible to use in their natural condition
or by reasonable improvement as a means to transport interstate or foreign commerce . . . including
wetlands adjacent thereto.” § 1344(g)(1). Once the EPA approves a state’s Section 404 permit
program, that state assumes jurisdiction over the permitting process and the federal program is
suspended. § 1344(h). Even with its program suspended, the federal government acts as an
overseer of the state’s process by reviewing any action the state takes with respect to Section 404
permits. § 1344(j).
Pursuant to § 1344(j), the state must provide the EPA with a copy of every permit
application it receives as well as a copy of the permit the state intends to issue. The EPA
Administrator then provides copies of the application to the Corps and notifies the state within 30
days if it intends to comment on the state’s handling of the application. The EPA must submit its
comments to the state within 90 days. Once a state is notified that the EPA intends to comment on
the application, it may not issue a permit until it has received the EPA’s comments or the 90-day
commenting period has passed. If the EPA objects to the application, the state “shall not issue such
proposed permit” and may either issue a revised permit that resolves the EPA’s objections, deny the
permit application, or request a public hearing. Id. Permitting authority only transfers back to the
Corps if the state does not take any action in response to the EPA’s objection. Id. To date, only
Michigan and New Jersey have been federally approved to administer Section 404 permit
3
procedures. The EPA approved Michigan’s Section 404 permit program in 1984, after the Corps
entered into a memorandum of agreement with the state of Michigan on April 3, 1984. See 49 Fed.
Reg. 38,947 (Oct. 2, 1984); ECF No. 23-3.
B. Allegations contained in the complaint
The Menominee Indian Tribe of Wisconsin is a federally-recognized Indian tribe with
ancestral territory spanning the state of Wisconsin as well as parts of Michigan and Illinois. Compl.
¶ 10, ECF No. 1. Although the present-day reservation is located on a tract of land in reserve along
the Wolf River, the Tribe has lived and practiced cultural and religious ceremonies within reservation
lands, ceded lands, and ancestral lands around the Menominee River. Id. ¶¶ 10–11.
Aquila Resources, Inc. applied to the MDEQ for a Section 404 permit to construct the Back
Forty Mine on the banks of the Menominee River in Lake Township, Michigan. Id. ¶ 36. The
MDEQ provided the EPA with a copy of the permit application in May 2016, and the EPA
subsequently notified the MDEQ of its objections to the proposed permit. Aquila withdrew its
application and reapplied for the Section 404 permit on January 17, 2017. Id. ¶¶ 42–43.
On August 18, 2017, Senator Tammy Baldwin of the state of Wisconsin wrote to the Corps,
requesting “that the federal agencies take jurisdiction of the Section 404 permitting for the Mine.”
Id. ¶ 45. The Tribe later wrote to the Corps and the EPA on August 21, 2017, advising the Federal
Defendants that they were the proper authorities over the Section 404 permit. It explained that the
Menominee River is used in interstate commerce, and as a result, the “River and adjacent wetlands
were not and could not be delegated to the State of Michigan in 1984 under 33 U.S.C. § 1344(g)”
because the River is used in interstate commerce. Id. ¶¶ 35, 46.
4
The Corps answered Senator Baldwin’s letter in August 2017 and the Tribe’s in September
2017, expressing that it would not exercise jurisdiction over the Section 404 permit because
Michigan assumed authority over the permitting process. It noted that the EPA would exercise its
authority to review and potentially object to the proposed permit at a later date. Id. ¶ 47. On
October 13, 2017, the EPA offered to consult with the Tribe regarding the Section 404 permit
process. Id. ¶ 48. The Tribe notes that neither response addresses the Menominee River’s status
as an interstate water used for the transport of interstate commerce.
On March 8, 2018, the EPA issued a letter objecting to the MDEQ’s revised proposal. ECF
No. 35-3. In response, Aquila provided information to the EPA related to the objections. In a May
3, 2018 letter to the MDEQ, the EPA noted that the information provided by Aquila resolved a
number of its objections and that a “pathway” existed “for the resolution of EPA’s remaining
objections through MDEQ’s inclusion of specific conditions in a final permit issued by June 6, 2018.”
ECF No. 35-5. On June 4, 2018, the MDEQ issued a permit that the EPA believed satisfied its
remaining objections.
ANALYSIS
A. Motion to amend
The court begins with the Menominee Tribe’s motion for leave to amend the complaint.
After the opportunity to amend the pleadings as a matter of course has passed, a party may amend
a complaint only with the consent of the opposing party or leave of the court. Fed. R. Civ. P. 15(a).
Generally, motions to amend pleadings are treated favorably under Rule 15’s liberal amendment
policy. Id. Leave to amend should be “freely given,” absent considerations such as “undue delay,
bad faith or dilatory motive on the part of the movant, repeated failure to cure deficiencies by
5
amendments previously allowed, undue prejudice to the opposing party by virtue of allowance of the
amendment, and futility of amendment.” Forman v. Davis, 371 U.S. 178, 182 (1962).
The defendants oppose the motion to amend only on the ground that the proposed
amendment to the complaint is futile. An amendment is futile if the amended pleading would not
survive a motion to dismiss. McCoy v. Iberdrola Renewables, Inc., 760 F.3d 674, 685 (7th Cir.
2014). To survive a motion to dismiss, the amended complaint must “contain sufficient factual
matter, accepted as true, to ‘state a claim to relief that is plausible on its face.’” Id. at 685 (quoting
Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009)). Before denying a motion to amend, however, it
should be “clear” that the proposed amended complaint “is deficient” and would not survive such
a motion. Johnson v. Dossey, 515 F.3d 778, 780 (7th Cir. 2008); see Runnion ex rel. Runnion v.
Girl Scouts of Greater Chi. & Nw. Ind., 786 F.3d 510, 519–20 (7th Cir. 2015) (“Unless it is certain
from the face of the complaint that any amendment would be futile or otherwise unwarranted, the
district court should grant leave to amend.” (quoting Barry Aviation Inc. v. Land O’Lakes Mun.
Airport Comm’n, 377 F.3d 682, 687 (7th Cir. 2004))). “The liberal standard for amending under
Rule 15(a)(2) is especially important where the law is uncertain.” Runnion, 786 F.3d at 520. “In
the face of uncertainty, applying the liberal standard for amending pleadings, especially in the early
stages of a lawsuit, is the best way to ensure that cases will be decided justly and on their merits.”
Id. (citing Forman, 371 U.S. at 181–82). The court will analyze each claim in turn.
1. APA claim regarding the EPA’s withdrawal of its objections to the proposed permit
The Tribe asserts in the proposed amended complaint that the EPA’s decision to withdraw
its objections to the assumed Section 404 permit was arbitrary, capricious, and contrary to law under
the APA. The APA authorizes suit by “a person suffering legal wrong because of agency action, or
6
adversely affected or aggrieved by agency action . . . to judicial review thereof.” 5 U.S.C. § 702.
The APA allows a district court to “hold unlawful and set aside” any agency action that is “arbitrary,
capricious, an abuse of discretion, or otherwise not in accordance with law.” § 706(2)(A). The
APA precludes judicial review of agency actions that are “committed to agency discretion by law.”
§ 701(a)(2). The “committed to agency discretion” exception applies only “in those rare instances
where statutes are drawn in such broad terms that in a given case there is no law to apply,” or when
“the statute is drawn so that a court would have no meaningful standard against which to judge the
agency’s exercise of discretion.” Citizens to Pres. Overton Park, Inc. v. Volpe, 401 U.S. 402, 410
(1971) (quotation marks and citations omitted); Heckler v. Chaney, 470 U.S. 821, 830 (1985).
The Tribe asserts that the EPA’s ultimate conduct in withdrawing its objections is judicially
reviewable final agency action that is not committed to agency discretion by law. It maintains that
once the EPA objected and inserted itself into the permitting process, its decision to withdraw the
objections cannot be arbitrary and capricious or contrary to law. The defendants contend that the
EPA’s decision to withdraw its objections is not reviewable because it was an action committed to
the EPA’s discretion.
At issue in this case, then, is whether the EPA’s decision to withdraw its objections to a
Section 404 permit proposal is an action committed to the EPA’s discretion and thus unreviewable
by this court. The Seventh Circuit touched on this issue, albeit in the context of a different
permitting program, in American Paper Institute, Inc. v. United States Environmental Protection
Agency, 890 F.2d 869 (7th Cir. 1989). There, the EPA authorized the Wisconsin Department of
Natural Resources (WDNR) to issue permits to point sources, or pollutant dischargers, in Wisconsin
under the National Pollutant Discharge Elimination System (NPDES), 33 U.S.C. § 1251, et seq. The
7
WDNR proposed to issue thirteen permits to paper and pulp mills in Wisconsin. The EPA notified
the WDNR that it objected to all of the permits proposed, allowed comments on the objections, and
provided a public hearing on the objections. The EPA later modified some of its objections but
reaffirmed its remaining objections to eleven permits. The WDNR subsequently modified the
permits. American Paper Institute and four paper and pulp mill owners challenged the EPA’s
authority to object to the NPDES permits proposed by the WDNR. Am. Paper, 890 F.2d at 872.
The Seventh Circuit held that it lacked subject matter jurisdiction to hear the appeal and
dismissed the petition. Id. at 878. The court noted that, while “EPA objections could arguably be
challenged in district court under the Administrative Procedure Act,” such review is unavailable
because the CWA precludes federal review of state-issued permits and an EPA objection is an
agency action committed to agency discretion. Id. at 875. The court recognized that the CWA
“reflects ‘the desire of Congress to put the regulatory burden on the states and to give the [EPA]
broad discretion in administering the program.’” Id. (alterations in original) (quoting District of
Columbia v. Schramm, 631 F.2d 854, 860 (D.C. Cir. 1980)). Because the CWA “demonstrates an
intent for the EPA and the states to work through differences in permitting decisions, and the EPA
needs a range of discretion to accomplish this goal,” the court concluded “federal courts should leave
EPA with its discretion to review state-issued permits.” Id.
In this case, much like the NPDES permitting program, the state permitting process under
Section 404 gives state officials primary responsibility to review and approve permits and allows the
EPA to exercise broad discretion in overseeing the program, which includes the decision of whether
to object to the permit and withdraw those objections once it determines the objections have been
resolved. Indeed, Section 404 and the EPA’s corresponding regulations do not contain language
8
requiring that the EPA object to or comment on a proposed permit. Although the regulations
indicate that permit objections “shall be based on the Administrator’s determination that the
proposed permit is (1) the subject of an interstate dispute under § 233.31(a) and/or (2) outside
requirements of the Act, these regulations, or the 404(b)(1) Guidelines,” 40 C.F.R. § 233.50(e), the
initial decision to object remains within the Administrator’s discretion. And once the EPA objects,
there is nothing in the CWA or the regulations specifying that the Administrator is stripped of the
discretion to decide whether to later withdraw those objections. In short, the EPA’s discretionary
decision to object and subsequently withdraw those objections is not reviewable under the APA, as
the statute is drawn in such broad terms that there is no clear law to apply and there is no meaningful
standard against which to judge the agency’s exercise of discretion. The Tribe therefore fails to state
a claim upon which relief can be granted, and any amendment to the complaint to add such a claim
would be futile.
2. APA claim regarding the Federal Defendants’ violation of the NHPA
The Tribe’s proposed amended complaint asserts a second claim under the APA, alleging that
the Federal Defendants violated § 106 of the NHPA when they failed to consult with the Tribe. The
APA permits courts to “compel agency action unlawfully withheld or unreasonably delayed.”
5 U.S.C. § 706(1). A claim under § 706(1) can only proceed, however, “where a plaintiff asserts
that an agency failed to take a discrete agency action that it is required to take.” Norton v. S. Utah
Wilderness All., 542 U.S. 55, 64 (2004). The court finds that the Federal Defendants were not
required to consult with the Tribe about the Back Forty Mine Project because § 106 only applies
when a project is federally funded or federally licensed.
The NHPA comprises “a series of measures designed to encourage preservation of sites and
structures of historic, architectural, or cultural significance.” Penn Cent. Transp. Co. v. City of New
9
York, 438 U.S. 104, 108 n.1 (1978). It “requires each federal agency to take responsibility for the
impact that its activities may have upon historic resources, and establishes the Advisory Council on
Historic Preservation . . . to administer the Act.” Nat’l Mining Ass’n v. Fowler, 324 F.3d 752, 755
(D.C. Cir. 2003). Section 106 states:
The head of any Federal agency having direct or indirect jurisdiction over a proposed
Federal or federally assisted undertaking in any State and the head of any Federal
department or independent agency having authority to license any undertaking, prior
to the approval of the expenditure of any Federal funds on the undertaking or prior
to the issuance of any license, shall take into account the effect of the undertaking on
any historic property. The head of the Federal agency shall afford the Council a
reasonable opportunity to comment with regard to the undertaking.
54 U.S.C. § 306108.
The Tribe asserts that the Back Forty Mine Project is an undertaking, noting that the
NHPA’s definition of “undertaking” includes “a project, activity, or program funded in whole or in
part under the direct or indirect jurisdiction of a Federal agency, including . . . those subject to State
or local regulation administered pursuant to a delegation or approval of a Federal agency.” 54
U.S.C. § 300320(4). Even if the Back Forty Mine Project is an “undertaking” as defined by
§ 300320, Section 106 applies only to (1) “any Federal agency having direct or indirect jurisdiction
over a proposed Federal or federally assisted undertaking” and (2) “any Federal department or
independent agency having authority to license any undertaking.” § 306108. Stated differently,
unless a project is federally funded or federally licensed, § 106 does not apply. See Fowler, 324 F.3d
at 760 (Section 106 “applies by its terms only to federally funded or federally licensed
undertakings . . . and not to undertakings that are merely subject to State or local regulation
administered pursuant to a delegation or approval by a Federal agency.” (internal quotation marks
and citations omitted)).
10
The Tribe has not alleged that the Back Forty Mine Project is federally funded or licensed.
To the contrary, the record reflects that the project was proposed by and will be funded by Aquila
and its investors and the state of Michigan has jurisdiction over the Section 404 permitting process.
Because the Back Forty Mine Project is neither federally funded nor federally licensed, the project
has not met the requirements of § 306108. As a result, the court need not decide whether the project
satisfies § 300320’s definition of “undertaking.” See Sheridan Kalorama Historical Ass’n v.
Christopher, 49 F.3d 750, 756 (D.C. Cir. 1995) (“[H]owever broadly the Congress or the ACHP
define ‘undertaking,’” the text of § 106 “still applies by its terms only to federally funded or
federally licensed undertakings.”). The Federal Defendants were therefore not required to initiate
consultation with the Tribe pursuant to § 106. The Tribe has failed to state a claim upon which relief
can be granted as to its NHPA contention, and any amendment to the complaint to add such a claim
would be futile. Accordingly, the motion to amend is denied.
B. Motions to dismiss
In its original complaint, the Menominee Tribe asserts that the Federal Defendants failed to
assume jurisdiction over the Section 404 permit pursuant to the CWA’s citizen suit provision and
that the Federal Defendants violated the APA when they refused to assert jurisdiction over the permit
process. The defendants have moved to dismiss the complaint pursuant to Rule 21(b)(1) for lack of
subject matter jurisdiction and Rule 12(b)(6) for failure to state a claim.
A motion to dismiss under Rule 12(b)(1) challenges the jurisdiction of this court of the
subject matter related in the complaint. Fed. R. Civ. P. 12(b)(1). The plaintiff bears the burden of
establishing that the jurisdictional requirements have been met. Schaefer v. Transp. Media, Inc., 859
F.2d 1251, 1253 (7th Cir. 1988). If material factual allegations are contested, the proponent of
11
federal jurisdiction must “prove those jurisdictional facts by a preponderance of the evidence.”
Meridian Sec. Ins. Co. v. Sedowski, 441 F.3d 536, 543 (7th Cir. 2006). When the moving party
“launches a factual attack against jurisdiction, the district court may properly look beyond the
jurisdictional allegations of the complaint and view whatever evidence has been submitted on the
issue to determine whether in fact subject matter jurisdiction exists.” Apex Digital, Inc. v. Sears,
Roebuck & Co., 572 F.3d 440, 444 (7th Cir. 2009) (internal quotation marks and citations omitted).
A motion to dismiss under Rule 12(b)(6) challenges the sufficiency of the complaint to state
a claim upon which relief may be granted. Fed. R. Civ. P. 12(b)(6). Rule 8 mandates that a
complaint need only include “a short and plain statement of the claim showing that the pleader is
entitled to relief.” Fed. R. Civ. P. 8(a)(2). The Supreme Court has held that a complaint must
contain factual allegations that “raise a right to relief above the speculative level.” Bell Atl. Corp.
v. Twombly, 550 U.S. 544, 555 (2007). While a plaintiff is not required to plead detailed factual
allegations, he or she must plead “more than labels and conclusions.” Id. A simple, “formulaic
recitation of the elements of a cause of action will not do.” Id. In evaluating a motion to dismiss,
the court must view the plaintiff’s factual allegations and any inferences reasonably drawn from them
in a light most favorable to the plaintiff. Yasak v. Ret. Bd. of the Policemen’s Annuity & Benefit
Fund of Chi., 357 F.3d 677, 678 (7th Cir. 2004).
Under the incorporation-by-reference doctrine, a court may consider documents attached to
a Rule 12(b)(6) motion if “they are referred to in the plaintiff’s complaint and are central to his
claim.” Brownmark Films, LLC v. Comedy Partners, 682 F.3d 687, 690 (7th Cir. 2012). In other
words, the parties may submit documents mentioned in the plaintiff’s complaint without converting
the motion to dismiss into a motion for summary judgment. The doctrine “prevents a plaintiff from
12
‘evad[ing] dismissal under Rule 12(b)(6) simply by failing to attach to his complaint a document that
prove[s] his claim has no merit.’” Id. (alterations in original) (quoting Tierney v. Vahle, 304 F.3d
734, 738 (7th Cir. 2002)). With these standards in mind, the court turns to the motions to dismiss.
1. CWA claim
The Menominee Tribe challenges the Federal Defendants’ failure to assume jurisdiction over
the Section 404 permit pursuant to the CWA’s citizen suit provision, 33 U.S.C. § 1365. Section
1365 allows any citizen to “commence a civil action on his own behalf . . . against the Administrator
where there is alleged a failure of the Administrator to perform any act or duty under this chapter
which is not discretionary with the Administrator.” § 1365(a)(2). The CWA defines “Administrator”
as the Administrator of the EPA. § 1251(d) (“Except as otherwise expressly provided in this
chapter, the Administrator of the Environmental Protection Agency (hereinafter in this chapter called
‘Administrator’) shall administer this chapter.”). Because the CWA’s definition of “Administrator”
includes only the Administrator of the EPA and not the Corps or its officials, the Federal Defendants
contend § 1365 does not unequivocally authorize citizen suits against the Corps, and therefore the
Tribe may not maintain its CWA claim against it.
Citing National Wildlife Federation v. Hanson, 859 F.2d 313 (4th Cir. 1988), the
Menominee Tribe asserts that the waiver of sovereign immunity must include the Corps to effectuate
Congress’ intent. In Hanson, a number of environmental groups filed an action under the CWA’s
citizen suit provision, asserting the Corps failed to make a proper wetlands determination. The
government asserted the plaintiffs could not maintain a citizen suit against it under § 1365(a)(2).
The Fourth Circuit held that the EPA and the Corps are proper defendants in CWA citizen suits
alleging violations of the Section 404 permitting process, reasoning that “Congress could not have
13
intended to” consent to a suit against the EPA but not against the Corps when both entities are
responsible for issuing permits under the CWA and enforcing their terms. Id. at 315–16. It
concluded that § 1365(a)(2) should be interpreted in conjunction with “Civil Procedure Rule 20
(joinder) to allow citizens to sue the Administrator and join the Corps when the Corps abdicates its
responsibility . . . and the Administrator fails to exercise the duty of oversight imposed by section
1344(c).” Id. at 316.
While the Seventh Circuit has not yet addressed this issue, a number of courts have rejected
the holding in Hanson and concluded the express terms of § 1365 do not waive the Corps’ sovereign
immunity. For instance, in Preserve Endangered Areas of Cobb’s History, Inc. v. United States
Army Corps of Engineers, the plaintiff brought a citizen suit against the Corps and others,
challenging a proposed highway construction project in Cobb County, Georgia. 87 F.3d 1242 (11th
Cir. 1996). The Eleventh Circuit found that the district court properly dismissed the plaintiff’s claim
against the Corps for lack of jurisdiction. The court observed that the CWA’s citizen suit provision
clearly and unambiguously waives sovereign immunity with respect to the Administrator, but not the
Corps. As a result, the court concluded Congress did not intend to waive sovereign immunity in
regard to CWA citizen suits against the Corps. Id. at 1249.
Similarly, the district court in Cascade Conservation League v. M.A. Segale, Inc., 921 F.
Supp. 692 (W.D. Wash. 1996), concluded that § 1365(a)(2) does not waive the Corps’ sovereign
immunity. It recognized that “construction of a waiver of sovereign immunity begins and ends with
the express terms of the statute. The Court must rely on plain meaning interpretation to the extent
possible, and must resolve any ambiguities against a finding of waiver.” Id. at 697. Under this
principle, the court found that the waiver of sovereign immunity was limited to the Administrator
14
under the clear terms of the statute, and it was “not at liberty to rewrite the statute in accordance
with extrinsic delegations of duty.” Id. at 696. The court therefore concluded that it could not
entertain a CWA citizen suit against the Corps. Id.; see also Walther v. United States, No. 3:15-cv0021-HRH, 2015 WL 9700347, at *6 (D. Alaska July 27, 2015) (“Section 505(a)(2) only waives
sovereign immunity as to the suits against the Administrator. . . . Because Section 505(a)(2) does
not waive immunity for suits against the Corps, the court lacks subject matter jurisdiction over
plaintiff’s CWA claim.”); All. to Save Mattaponi v. U.S. Army Corps of Eng’rs, 515 F. Supp. 2d 1,
6 (D.D.C. 2007) (“Hanson is contrary to a series of other cases. . . . However puzzled the court [in
Hanson] may have been by the statute, and even if the court were correct that ‘Congress cannot have
intended to’ waive sovereign immunity as to EPA but not as to the Corps, Congress’s presumed
intent is not the question when a court interprets a sovereign immunity waiver.”).
I find the reasoning of these cases and the weight of this authority persuasive. “The United
States, as sovereign, is immune from suit save as it consents to be sued . . . and the terms of its
consent to be sued in any court define that court’s jurisdiction to entertain that suit.” United States
v. Sherwood, 312 U.S. 584, 586 (1941). A waiver of sovereign immunity must be clear and
unambiguous. See Lane v. Pena, 518 U.S. 187, 192 (1996) (“A waiver of the Federal Government’s
sovereign immunity must be unequivocally expressed in statutory text.” (citing United States v.
Nordic Vill., Inc., 503 U.S. 30, 33–34 (1992))). A court must narrowly construe a statute waiving
sovereign immunity. See Sossamon v. Texas, 563 U.S. 277, 292 n.10 (2011); United States Dep’t
of Energy v. Ohio, 503 U.S. 607, 614 (1992). Section 1365(a)(2) only contemplates the waiver of
sovereign immunity as to suits against the Administrator of the EPA—it does not clearly and
unambiguously waive immunity for suits against the Corps. Because “a waiver of the Government’s
15
sovereign immunity will be strictly construed, in terms of its scope, in favor of the sovereign,” Lane,
518 U.S. at 192, the court declines to presume that Congress intended something beyond what the
statute states. See Cascade, 921 F. Supp. at 697 (“[C]ourts must assume that a legislature says in
a statute what it means and means in a statute what it says there.” (quoting Conn. Nat’l Bank v.
Germain, 503 U.S. 249, 253–54 (1992))). There is no need to imply a cause of action here because
relief is available to the Tribe under the APA. See Scott v. City of Hammond, Indiana, 741 F.2d 992
(7th Cir. 1984). The court therefore finds that it lacks subject matter jurisdiction over the
Menominee Tribe’s CWA claim against the Corps.
Even if the court had jurisdiction over the Corps, the Tribe’s CWA claim must be dismissed
in its entirety because the Tribe failed to identify a nondiscretionary duty that the Federal Defendants
have not performed as required by § 1365. See 33 U.S.C. § 1365(a)(2) (“[A]ny citizen to commence
a civil action on his own behalf . . . against the Administrator where there is alleged a failure of the
Administrator to perform any act or duty under this chapter which is not discretionary with the
Administrator.”). The Federal Defendants assert that the CWA does not create a mandatory duty
for either the Corps or the EPA to administer the Section 404 permitting program. As an initial
matter, the statute makes clear that the EPA does not have a mandatory duty to assume a permitwriting function under the CWA. Indeed, it is the Secretary of the Corps, not the Administrator of
the EPA, that may issue permits “for the discharge of dredged or fill material into the navigable
waters at specified disposal sites.” § 1344(a). In this case, the Tribe challenges the Corps’ decision
to decline oversight of the permit process for the Back Forty Mine because, in the Corps’ view, it
did not have the jurisdiction to do so. Even if the Corps is mistaken, a citizen suit “cannot be
employed to challenge the substance or content of an agency action.” Scott, 741 F.2d at 996
16
(citation omitted). Thus, any disagreement the Tribe may have with the EPA’s decision to allow
Michigan to assume authority of the Section 404 permitting process would have to be challenged
under the APA, not via citizen suit. In sum, the Menominee Tribe has failed to state a claim under
the citizen suit provision of the CWA.
2. APA claim as to the decision declining to take primary jurisdiction over the permit
The Menominee Tribe also seeks to assert an as-applied challenge under the APA. An asapplied challenge “‘must rest on final agency action under the APA,’ taken within six years of the
filing of the complaint.” Nat’l Wildlife Fed’n v. EPA, 945 F. Supp. 2d 39, 43 (D.D.C. 2013)
(quoting Dunn-McCampbell Royalty Interest, Inc. v. Nat’l Park Serv., 112 F.3d 1283, 1288 (5th
Cir. 1997)); see also 5 U.S.C. § 704 (The APA provides for judicial review of “final agency action
for which there is no other adequate remedy in a court.”). To be “final” and subject to review under
the APA, an agency action must generally satisfy two conditions:
First, the action must mark the consummation of the agency’s decisionmaking
process—it must not be of a merely tentative or interlocutory nature. And second,
the action must be one by which rights or obligations have been determined, or from
which legal consequences will flow.
U.S. Army Corps of Eng’rs v. Hawkes Co., Inc., 136 S. Ct. 1807, 1813 (2016) (quoting Bennett v.
Spear, 520 U.S. 154, 177–78 (1997) (internal quotation marks and citations omitted)).
The Tribe asserts that it may challenge the Federal Defendants’ decision declining to take
primary jurisdiction over the Mine’s Section 404 permit under the APA because the Federal
Defendants’ letters to the Tribe constitute final agency action. On August 21, 2017, the Tribe wrote
a letter to the Corps and the EPA, requesting that the Federal Defendants make a specific formal
determination regarding the jurisdictional status of the wetlands at issue in the permit. It explained
17
that “a thorough review of the current status of interstate commerce on the Menominee River
adjacent to the wetlands at issue, as well as a study of its susceptibility for future use in interstate
commerce, will lead to the conclusion that the CWA does not allow for Michigan’s assumption of
jurisdiction pursuant to § 404(g)(1).” ECF No. 21-7 at 7. The Corps responded to the Tribe’s letter
on September 28, 2017, expressing that, because Michigan assumed jurisdiction over the Section 404
permitting program, the Corps does not have the authority to initiate tribal consultation regarding
Aquila’s permit application as “the conditions required for the Corps to review the application have
not yet occurred.” ECF No. 21-8. The Corps observed that the EPA retains oversight over all
Section 404 permits:
[T]he EPA has authority to object to a project that does not conform to Section 404
and in particular, the 404(b)(1) Guidelines. If the objection is not resolved, and
MDEQ does not deny the permit, Section 404 authority transfers to the Corps.
Id. The EPA responded to the Tribe’s letter on October 13, 2017, offering to consult with the Tribe
regarding the permit process for the proposed Back Forty Mine. ECF No. 21-9.
Although courts have found certain letters constitute final agency action, “agency action that
merely reiterates or affirms an earlier agency decision and does not affect the rights or alter the status
quo of the complaining party is not considered a ‘final agency action.’” Harris v. FAA, 215 F. Supp.
2d 209, 213 (D.D.C. 2002).
In this case, the Federal Defendants’ responses were purely
informational in nature and did not make any factual or legal determinations about the waters at issue
or about jurisdiction. The letters did nothing more than reiterate that the EPA approved Michigan’s
permitting program in 1984 and that the Federal Defendants would not exercise jurisdiction over the
permit as a result. In other words, the Tribe was left with the remedies available to it under
Michigan law.
18
In essence, the Tribe seeks to challenge the underlying EPA decision made in 1984 that
allowed Michigan to assume permitting authority over Section 404 permits related to the Menominee
River. The 1984 decision is the final agency action, not the letters that merely reaffirm that decision.
The Federal Defendants’ letters “tread no new ground. [They] left the world just as [they] found
it, and thus cannot be fairly described as implementing, interpreting, or prescribing new law or
policy.” Clayton Cty., Georgia v. FAA, 887 F.3d 1262, 1267 (11th Cir. 2018) (quoting Indep.
Equip. Dealers Ass’n v. EPA, 372 F.3d 420, 422–25 (D.C. Cir. 2004)); see also Gen. Motors Corp.
v. EPA, 363 F.3d 442, 449–51 (D.C. Cir. 2004) (holding that a letter from an agency that reflected
“neither a new interpretation nor a new policy” did not “impose new obligations”). In short, the
Federal Defendants’ responses do not constitute “final agency action” and are not reviewable by this
court. See Indep. Equip. Dealers Ass’n, 372 F.3d at 428 (finding that EPA letter was not reviewable
agency action when it restated “for the umteenth time” its longstanding interpretation of certain
regulations). The Tribe has therefore failed to state a claim rasing an as-applied challenge under the
APA.
CONCLUSION
For these reasons, the Menominee Tribe’s motion to amend (ECF No. 34) is DENIED, the
Federal Defendants and Aquila’s motions to dismiss (ECF Nos. 6, 19) are GRANTED, and the case
is dismissed. The Clerk is directed to enter judgment accordingly.
SO ORDERED this 19th day of December, 2018.
s/ William C. Griesbach
William C. Griesbach, Chief Judge
United States District Court
19