Wells Fargo Bank, National Association et al v. City of Richmond, California et al

Filing 46

RESPONSE (re 38 MOTION to Dismiss for Lack of Jurisdiction ) filed byDeutsche Bank National Trust Company, Deutsche Bank Trust Company Americas, Wells Fargo Bank, National Association. (Attachments: # 1 Proposed Order)(Tsai, Rocky) (Filed on 8/29/2013)

Download PDF
1 2 3 4 5 6 7 ROCKY C. TSAI (SBN 221452) (rocky.tsai@ropesgray.com) ROPES & GRAY LLP Three Embarcadero Center San Francisco, CA 94111-4006 Telephone: (415) 315-6300 Facsimile: (415) 315-6350 Attorneys for Plaintiffs Wells Fargo Bank, N.A., as Trustee, et al. ADDITIONAL COUNSEL LISTED ON SIGNATURE PAGE 8 9 UNITED STATES DISTRICT COURT 10 NORTHERN DISTRICT OF CALIFORNIA 11 SAN FRANCISCO DIVISION 12 13 14 WELLS FARGO BANK, NATIONAL ASSOCIATION, as Trustee, et al. 15 16 17 18 19 20 21 22 23 24 25 Plaintiffs, v. CITY OF RICHMOND, CALIFORNIA, a municipality, and MORTGAGE RESOLUTION PARTNERS LLC, Defendants. ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) Case No. CV-13-3663-CRB PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS ACCOMPANYING PAPERS: Reply Declarations of John C. Ertman, Esq. and Phillip R. Burnaman, II; [Proposed] Order Honorable Charles R. Breyer 26 27 28 _________________________________________________________________________________________________ PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB TABLE OF CONTENTS 1 Page 2 SUMMARY OF THE ARGUMENT ......................................................................................................... i  3 RULE 12(B)(1) DISMISSAL STANDARD ............................................................................................. 1  4 ARGUMENT .............................................................................................................................................. 1  5 I.  Plaintiffs’ Claims Are Ripe for Review ......................................................................................... 1  6 A.   The Seizure of Loans is not Merely Speculative or Hypothetical .................................... 2  7 B.  Defendants Have Taken Concrete Steps to Implement the Loan Seizure Program ........ 4  8 C.  Defendants’ Conduct Firmly Refutes Their Assertion that Seizure of Loans Through Eminent Domain is Merely Speculative ............................................................ 6  9 10 CONCLUSION ......................................................................................................................................... 10  11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 i PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 TABLE OF AUTHORITIES 2 3 4 5 Page(s) CASES 99 Cents Only Stores v. Lancaster Redevelopment Agency, 237 F. Supp. 2d 1123 (C.D. Cal. 2001) ................................................................................. ii, 2, 3 6 7 8 9 10 11 12 Chertkof v. Mayor & City Council of Baltimore, 497 F. Supp. 1252 (D. Md. 1980) .......................................................................................... 3, 4, 9 Eastern Enterprises v. Apfel, 524 U.S. 498 (1998).................................................................................................................... ii, 9 Employers Insurance of Wausau v. Fox Entertainment Group, Inc., 522 F.3d 271 (2d Cir. 2008) ........................................................................................................... 9 Fed’n of African Am. Contractors v. City of Oakland, 96 F.3d 1204 (9th Cir. 1996) .......................................................................................................... 1 13 14 15 16 17 18 19 Green v. United States, 630 F.3d 1245 (9th Cir. 2011) ........................................................................................................ 1 Hawaii Hous. Auth. v. Midkiff, 467 U.S. 229 (1984).................................................................................................................... ii, 4 In re iPhone Application Litig., 844 F. Supp. 2d 1040 (N.D. Cal. 2012) ......................................................................................... 1 Regional Railroad Reorganization Act Cases, 419 U.S. 102 (1974)......................................................................................................... i, ii, 2, 3, 4 20 21 22 23 24 25 26 27 28 Supreme Court of Virginia v. Consumer’s Union, 446 U.S. 719 (1980)........................................................................................................................ 3 Texas v. United States, 523 U.S. 296 (1998)........................................................................................................................ 9 Thomas v. Anchorage Equal Rights Commn., 220 F. 3d 1134 (9th Cir. 2000) ....................................................................................................... 9 United States v. Sayetsitty, 107 F.3d 1405 (9th Cir. 1997) ........................................................................................................ 8 Wendy’s Int’l Inc. v. City of Birmingham, 868 F. 2d 433 (11th Cir. 1989) ....................................................................................................... 9 ii PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 STATUTES 2 Fed. Rule Civ. Pro. 12(b)(1) ................................................................................................................. 5 3 Cal. Gov. Code § 7267.2....................................................................................................................... 5 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 iii PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 SUMMARY OF THE ARGUMENT 2 Plaintiffs submit this Memorandum in opposition to Defendants’ motion to dismiss 3 Plaintiffs’ Complaint for lack of subject matter jurisdiction (“Dismissal Motion”). Defendants seek 4 dismissal of the Complaint, and oppose Plaintiffs’ Motion for Preliminary Injunction 5 (“PI Motion”),1 based primarily on their improper assertion that Plaintiffs’ challenge to Defendants’ 6 plan to seize certain targeted mortgage loans through Richmond’s eminent domain power is merely 7 “hypothetical” and “speculative” (Def. Mem. at 7) and therefore not ripe for review by this Court. 8 But the evidence – including Richmond’s public statements and internal Richmond and MRP emails 9 and memoranda – is to the contrary, and establishes that Defendants already have taken substantial 10 steps in implementing their Loan Seizure Program in accordance with a pre-determined plan, and 11 have rejected all requests to hold it in abeyance pending this Court’s adjudication of Plaintiffs’ 12 significant constitutional challenges. In the face of that evidence, Defendants rest primarily on the fact that no resolution of 13 14 necessity has yet been approved by the Richmond City Council. But the fact remains that 15 Defendants are proceeding with their Program to seize loans by eminent domain, just as the plan 16 previously adopted by the City Council provides. Although Defendants have now briefed the issue 17 of ripeness multiple times, they have come forward with nothing to contradict Plaintiffs’ evidence 18 that they already have targeted specific loans for seizure, have made offers to acquire those loans 19 under threat of seizure, and are preparing to effectuate those seizures by initiating state court 20 condemnation proceedings. The law is well settled that Plaintiffs need not wait until Defendants complete every step in 21 22 their Loan Seizure Program before seeking injunctive relief in this Court. See Regional Railroad 23 Reorganization Act Cases, 419 U.S. 102, 142 (1974) (holding that the subject of an unconstitutional 24 taking does “not have to await the consummation of threatened injury to obtain preventive relief,” 25 even where the legislative body still “can reject the first plan,” where many of the targeted properties 26 “could be eliminated from the [takings program],” where certain of the program’s terms “remain to 27 1 28 Plaintiffs also are filing simultaneously herewith their Reply Memorandum in further support of Plaintiffs’ PI Motion. (i) PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 be decided,” or where any takings might not occur for many years); see also Hawaii Hous. Auth. v. 2 Midkiff, 467 U.S. 229, 234 (1984) (suit ripe for adjudication after compulsory negotiations, a 3 statutory prerequisite step to condemnation, had occurred, despite the fact that compulsory 4 arbitration, the following prerequisite step, had not); 99 Cents Only Stores v. Lancaster 5 Redevelopment Agency, 237 F. Supp. 2d 1123, 1128 (C.D. Cal. 2001) (holding that action to enjoin 6 eminent domain program was justiciable, despite rescission of Resolutions of Necessity by the city), 7 aff’d in relevant part, appeal dismissed on mootness grounds due to changed facts, 60 Fed. Appx. 8 123 (9th Cir. 2003). Plaintiffs’ constitutional challenges to the Program are thus ripe for review. 9 Indeed, Defendants have, by their very conduct, demonstrated that the seizure of loans from the 10 Plaintiff Trusts is imminent, and that the real purpose of their supposed “ripeness” challenge is to 11 avoid federal court review entirely. 12 Absent prompt federal court review, the Trusts and their investors will suffer immediate 13 harm. The value of their certificates, traded in federally-regulated national securities markets, will 14 fall to reflect the risk that the anticipated income stream from performing loans in the pool targeted 15 for seizure by Richmond (and other municipalities that implement MRP’s Loan Seizure Program) 16 will be stripped from the pools in exchange for a payment worth far less than the income stream that 17 they will generate – less, even, than the foreclosure value of the home securing the loan. This would 18 be an immediate and dramatic reduction in the value of those mortgage securities that could never be 19 compensated through the California eminent domain process. See Eastern Enterprises v. Apfel, 524 20 U.S. 498, 521 (1998) (the Declaratory Judgment Act “allows individuals threatened with a taking to 21 seek a declaration of the constitutionality of the disputed governmental action before potentially 22 uncompensable damages are sustained.”). 23 Plaintiffs’ Reply Memorandum in further support of Plaintiffs’ PI Motion contains a lengthy 24 discussion of the significant harm to the Plaintiff Trusts and their investors absent a Preliminary 25 Injunction. That harm is real and it is imminent, and is “in no way hypothetical or speculative.” 26 Regional Railroad, 419 U.S. at 143. This action is ripe for review now, and this Court should 27 therefore deny the Dismissal Motion in its entirety. 28 (ii) PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 RULE 12(B)(1) DISMISSAL STANDARD 2 Where, as here, a defendant asserts in a Rule 12(b)(1) motion that the allegations contained 3 in a complaint are insufficient on their face to invoke federal jurisdiction, a court will accept all 4 material allegations in the complaint as true and construe them in favor of the nonmovant. See 5 Fed’n of African Am. Contractors v. City of Oakland, 96 F.3d 1204, 1207 (9th Cir. 1996); In re 6 iPhone Application Litig., 844 F. Supp. 2d 1040 (N.D. Cal. 2012) (citing Warth v. Seldin, 422 U.S. 7 490, 501 (1975)).2 “On a motion to dismiss for lack of subject matter jurisdiction under [Rule] 8 12(b)(1), proof of jurisdictional facts may be supplied by affidavit, declaration, or any other 9 evidence properly before the court, in addition to the pleadings challenged by the motion.” Green v. 10 United States, 630 F.3d 1245, 1248 (9th Cir. 2011). Here, the unrefuted evidence submitted by 11 Plaintiffs establishes that this action is ripe and that Defendants’ Dismissal Motion should be denied. 12 13 ARGUMENT I. 14 Plaintiffs’ Claims Are Ripe for Review Defendants have now filed two motions challenging this Court’s jurisdiction to adjudicate 15 Plaintiffs’ constitutional claims. Defendants’ efforts to evade review of the Loan Seizure Program 16 rest, almost exclusively, on their assertion that unless and until the City Council issues a resolution 17 of necessity authorizing the seizure of loans through eminent domain, and Richmond actually begins 18 the process of seizing loans by initiating actions in state court, Plaintiffs’ claims are merely 19 “hypothetical” and “speculative” and are thus unripe for review. Def. Mem at 6. But the only place 20 Defendants refer to the loan seizures in hypothetical terms is in their submissions to this Court. 21 Their published documents, public statements, and internal emails and planning documents confirm 22 that Defendants have been methodically rolling out the Program in accordance with a pre-arranged 23 plan approved by Richmond officials – including targeting 624 specific loans for seizure, sending 24 letters to the owners offering to acquire loans under threat of eminent domain seizure, and making 25 formal offers for those loans amounting to approximately $126 million. Reply Declaration of John 26 2 27 28 To avoid unnecessarily duplicative papers, the facts are set forth fully in Plaintiffs’ Memorandum of Points and Authorities in Support of their Motion for a Preliminary Injunction, to which the Court respectfully is referred. To the extent necessary, relevant facts are also discussed below and in the accompanying Declaration of John C. Ertman. 1 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 C. Ertman in Support of PI Motion (“Ertman Reply Decl.”) ¶¶5–28; Reply Declaration of Phillip 2 Burnaman (“Burnaman Reply Decl.”) ¶ 3. 3 While Defendants ask this Court to believe that they might decide not to adopt a resolution of 4 necessity after all, and to halt the process of seizing loans through eminent domain that is already 5 underway, the City’s internal planning documents tell a different story. They demonstrate that 6 Defendants are proceeding on the basis that the seizures will occur. And while Defendants have 7 now had multiple opportunities to rebut the evidence, they have come forward with no such showing 8 – other than the hollow assertion that the City might still change course and not proceed with the 9 seizure. 10 Tellingly, Defendants have refused to agree to even a brief stay on filing state court 11 condemnation proceedings so that this Court can consider Plaintiffs’ constitutional challenges to the 12 Program – a reasonable request if Defendants were actually entertaining the possibility of foregoing 13 eminent domain seizures. Defendants’ refusal to grant that reasonable request only confirms that 14 Plaintiffs’ claims are justiciable. See 99 Cents Only Stores v. Lancaster Redevelopment Agency, 237 15 F. Supp. 2d 1123, 1128 (C.D. Cal. 2001) (justiciability “heavily” supported by fact that city has 16 “persistently refused to enter into any stipulation agreeing not to condemn 99 Cents’ leasehold 17 interest at Costco’s behest”), aff’d in relevant part, appeal dismissed on mootness grounds due to 18 changed facts, 60 Fed. Appx. 123 (9th Cir. 2003). Under these circumstances, Defendants’ use of 19 eminent domain to seize loans is hardly “hypothetical” and Defendants cannot evade review of 20 Plaintiffs’ constitutional challenges to the Program simply by arguing, in the face of overwhelming 21 evidence to the contrary, that they “might not” go forward with the Program. Def. Mem. at 3. 22 A. The Seizure of Loans is not Merely Speculative or Hypothetical 23 As a threshold matter, Defendants’ effort to pin their entire argument on the absence of a 24 resolution of necessity is based upon a fundamental misapprehension of the applicable legal 25 principles. Those principles do not involve a formulaic inquiry into whether any particular step in a 26 multi-step process has been taken, but whether the evidence reflects that the program has advanced 27 to the stage where the seizure through eminent domain is not merely speculative or hypothetical, 28 thus giving rise to a demonstrable need for federal protection. Indeed, the Supreme Court has 2 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 expressly held that a victim of an unconstitutional eminent domain process does “not have to await 2 the consummation of threatened injury to obtain preventive relief.” Regional Railroad 3 Reorganization Act Cases, 419 U.S. 102, 142 (1974) (emphasis added); see also 99 Cents Only 4 Stores, 237 F. Supp. 2d at 1128 (holding that action to enjoin eminent domain program was 5 justiciable, despite rescission of Resolutions of Necessity by the city). 6 In Regional Railroad, the Court noted that various contingencies had not yet occurred: that it 7 was as possible that “Congress can reject the first plan,” that many of the targeted properties “could 8 be eliminated from the [takings program],” that certain of the program’s terms “remain to be 9 decided,” and that any takings might not occur for many years. Id. at 140-42. Yet despite those 10 possibilities, the Court held, based on the totality of the evidence, that plaintiffs’ constitutional 11 challenge to the takings program was “in no way hypothetical or speculative.” Id. at 143. In so 12 holding, the Court ruled that a district court should exercise its jurisdiction to adjudicate the 13 constitutionality of a takings program promptly, so as to “minimize or prevent irreparable injury.” 14 Id. at 144. 15 Likewise, Chertkof v. Mayor & City Council of Baltimore, 497 F. Supp. 1252 (D. Md. 1980), 16 involved a situation in which the municipality had drawn up an urban renewal plan that included 17 property owned by the defendant. When the municipality sought to have the property appraised, the 18 plaintiff, concerned that the appraisal was a prerequisite to filing a condemnation proceeding in state 19 court, filed an action in federal court asserting that the taking program was unconstitutional and 20 seeking injunctive relief. As in this case, the defendant argued that the case was not ripe because the 21 “mere inclusion of land within an urban renewal area does not amount to exercise of the City’s 22 eminent domain powers.” Id. at 1255. The district court rejected that contention, determining that 23 the harm was not merely speculative and that “objective evidence does indicate a real threat of 24 condemnation.” Id. at 1256. Among other factors, the court noted that City officials had passed a 25 bill “which included plaintiff’s property” as a possible target for seizure, had “circulated memoranda 26 evidencing their intent to acquire plaintiff’s property” and had “evidenced an intent to obtain 27 plaintiff’s property by ‘quick-take.’” Id. Citing the Supreme Court’s decision in Supreme Court of 28 Virginia v. Consumer’s Union, 446 U.S. 719 (1980), the court held that “plaintiff has established the 3 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 existence of a substantial controversy between the parties having adverse legal interests, under 2 circumstances evidencing a demonstrable need for federal protection.” Id. at 1257. See also Hawaii 3 v. Midkiff, 467 U.S. 229, 234 (1984) (suit ripe for adjudication after “compulsory negotiations,” a 4 statutory prerequisite step to condemnation, had occurred, despite the fact that “compulsory 5 arbitration,” the next prerequisite step, had not). 6 Here, as in Regional Railroad, Chertkof, and Midkiff, the unrefuted objective evidence 7 establishes that the threat of condemnation under the Loan Seizure Program that Defendants are 8 already implementing in not merely speculative or hypothetical. Like the appraisals in Chertkof and 9 the compulsory negotiations in Midkiff, the offer letters here are sufficient to show that Defendants 10 have already taken substantial steps towards satisfying the statutory prerequisite to effectuate the 11 unconstitutional seizures.3 Plaintiffs have thus established an acute need for judicial review. 12 Accordingly, this case is ripe. 13 B. 14 Here, Defendants already have taken concrete steps to implement the Loan Seizure Program, 15 Defendants Have Taken Concrete Steps to Implement the Loan Seizure Program including the following:  16 On April 2, 2013, the City Manager of Richmond, William Lindsay, formally recommended 17 that the City Council enter into a partnership with MRP under which MRP would advise Richmond 18 “on the acquisition of mortgage loans through the use of eminent domain.” Declaration of John C. 19 Ertman in Support of PI Motion (“Ertman Moving Decl.”), (Dkt. 9), Ex. H.  20 On the same day, Richmond’s City Council deliberated the proposal at a public hearing and 21 formally voted (6-0 with one member absent) to approve entering into a partnership with MRP for 22 the purpose of seizing loans by eminent domain. See Ertman Reply Decl. ¶ 21; Ertman Moving 23 Decl. Ex H. At that hearing, Mr. Lindsay testified that, under the Program, if there was not a 24 “negotiated purchase” of a targeted mortgage, “the City would be asked to use eminent domain to 25 acquire the mortgage.” Ertman Reply Decl. ¶ 21. In an email to MRP later that day, Mr. Lindsay 26 27 3 28 Here, as in Chertkof and Midkiff, appraisals of the underlying properties have been performed, as stated in the offer letters. 4 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 advised MRP that the City Council had unanimously approved the agreement and that “they gave 2 approval for the program to start.” Id. Ex. G. 3  After the hearing, and pursuant to the City Council vote, Richmond executed a formal 4 Advisory Services Agreement with MRP, which expressly provides that MRP will advise Richmond 5 on “acquiring mortgage loans through the use of eminent domain.” Ertman Moving Decl. Ex. K. 6  On April 8, 2013, Mr. Williams of MRP sent an e-mail to various Richmond officials 7 including Mr. Lindsay, attaching a timeline concerning the Loan Seizure Program. Ertman Reply 8 Decl. Ex. H. A chart along the same lines also was circulated that day. Ertman Reply Decl. Ex. I. 9 These internal planning documents set forth a step-by-step outline of the Program, including the 10 seizure of loans through eminent domain. According to the planning documents, “MRP prepares 11 [the] Resolution of Necessity” which Richmond then “approves.” Id. Exs. H, I. The timeline does 12 not entertain the possibility that the resolution of necessity will not be adopted, nor does it include 13 any contingency plan if that were to occur. 14  The planning documents and other MRP materials reflect that once the resolution of 15 necessity is adopted, Richmond will quickly file actions in state court to seize loans by eminent 16 domain using California’s “Quick Take” procedure. Ertman Moving Decl. Ex. D at 3; Ertman Reply 17 Decl. Exs. H, I. 18  On July 31, 2013, Richmond extended offer letters to trustees and servicers with respect to a 19 first wave of 624 targeted loans. Ertman Moving Decl. Ex. A; Declaration of Kevin Trogdon 20 (“Trogdon Decl.”), (Dkt. 12), Ex. B; Declaration of Ronaldo Reyes (“Reyes Decl.”), (Dkt. 13), Ex. 21 1. Those offer letters are a prerequisite step to seizing property under California eminent domain 22 law. See Cal. Gov. Code § 7267.2 (before adopting a resolution of necessity, “the public entity shall 23 establish an amount that it believes to be just compensation therefor, and shall make an offer to the 24 owner or owners of record to acquire the property for the full amount so established”). The offer 25 letters seek to acquire the loans at deeply discounted prices, and advise that Richmond could seize 26 the targeted loans if the offers are not accepted. Ertman Moving Decl. Ex. A at 2 (“in the event that 27 negotiations fail to result in agreement,” Richmond could “decide[] to proceed with the acquisition 28 5 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 of the Loans through eminent domain”); Trogdon Decl. Ex. B at 2; Reyes Decl. Ex. 1 at 2. The offer 2 letters set a deadline of August 13, 2013 for responding – a little more than two weeks ago.  3 As Defendants are aware, at least some of the trustees, including the Plaintiffs, have already 4 responded to the offer letters with written rejections, noting among other things that the trusts could 5 not legally sell loans to Richmond and MRP, and thus setting the predicate for Defendants to seize 6 the loans through the Loan Seizure Program. Ertman Reply Decl. Ex. AA. Plaintiffs are not aware 7 of any servicer or trustee having accepted any offer, and Defendants’ opposition papers are tellingly 8 silent about the responses to their offers.  9 Richmond/MRP’s offers for the 624 loans amounted to approximately $126 million, and did 10 not contain a financing contingency.4 Internal MRP/Richmond documents, obtained through a 11 Public Records Act request, reflect that as of May 17, 2013 at least $46 million (and possibly much 12 more) in financing has already been arranged for the acquisition of the targeted loans by Richmond. 13 Ertman Reply Decl. Ex. O. The foregoing evidence establishes that Richmond has taken substantial steps in 14 15 implementing the Program, and that the threat of loan seizures is “in no way speculative or 16 hypothetical.” C. 17 Defendants’ Conduct Firmly Refutes Their Assertion that Seizure of Loans Through Eminent Domain is Merely Speculative 18 Not only have the Defendants proceeded to roll out their Program to an extent that makes this 19 20 action, and Plaintiffs’ PI Motion, ripe for review, but their conduct, including their submissions to 21 this Court, confirms their publicly stated intention to proceed with eminent domain seizures. First, as already demonstrated, the offer letters sent by Richmond are not merely hypothetical 22 23 – they are real; they involve many loans in the Plaintiff Trusts; and preliminary analysis confirms 24 that they are fully in accord with the Program’s ultimate goal of seizing loans at a steep discount 25 through eminent domain, so that they can be flipped for a profit to MRP and its investors. 26 27 4 28 The absence of the financing contingency in the offer letters appears to indicate that MRP has assembled the entire financing of approximately $126 million. 6 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB Second, the fact that the overwhelming majority of loans included in the first wave are 1 2 performing loans confirms that the only purpose of the offer letters is as a predicate for eminent 3 domain seizure. Because the trusts in which the loans are held are organized as Real Estate 4 Mortgage Investment Conduits, or “REMICs,” they are prohibited from selling the loans to 5 Richmond, a fact the Defendants and their consultant, Professor Hockett, openly acknowledge. See 6 Hockett Decl. ¶ 9 (the loans are not saleable because they are “locked up” in PLS trusts); Ertman 7 Moving Decl. Ex. D (MRP FAQ Sheet), at 3 (“Private securitization trusts hold approximately $ 1.4 8 trillion of loans; we could offer to buy their underwater loans, but their trust agreements forbid them 9 to voluntarily sell the loans.”); Ertman Reply Decl. Ex. F (“Securitization agreements and tax laws 10 prohibit the sale of PLS mortgages except when the mortgages are condemned.”). Thus, there is 11 simply no purpose for issuing offer letters to purchase these performing loans, except the statutory 12 prerequisite for seizing them pursuant to the Program, as threatened in the “offer” letters themselves. Third, the fact that Defendants have already secured financing to acquire the first wave of 13 14 loans confirms that the financing is for the purpose of acquiring loans through eminent domain 15 because the vast majority of the loans – the performing ones – cannot be acquired through voluntary 16 sale.5 Fourth, Defendants’ assertion that they are simply seeking to acquire the loans on a 17 18 “voluntary” basis is belied by their own statements to the contrary. Although internal 19 Richmond/MRP talking points reflect an effort to be secretive about the use of eminent domain – 20 e.g., “We don’t want to emphasize too much the eminent domain issue because we know it is very 21 controversial and we don’t really want to tip our hands to the opposition” (Ertman Reply Decl. Ex. J) 22 – the Mayor and others have nevertheless repeatedly and publicly declared their intention to proceed 23 with seizures through eminent domain. The many statements to this effect are too numerous to list 24 here and, accordingly, are set forth in the accompanying Ertman Declaration. However, it is 25 noteworthy that, on the very day that Plaintiffs filed their ex parte motion in which they represented 26 to this Court that they might not proceed with eminent domain seizures, Richmond’s Mayor 27 5 28 Internal correspondence between Richmond and MRP indicates that the first set of offers is an initial set and that more are to follow. Ertman Reply Decl. Ex. M. 7 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 arranged a media event at Plaintiff Wells Fargo’s offices in San Francisco where she publicly 2 declared that she was “absolutely not backing down” from the Program. Id. Ex. V (Mayor of 3 Richmond “said that the city will not be dissuaded from its plan to use eminent domain to seize 4 underwater mortgages.”). Defendants’ assertion that such public statements are no substitute for action by the City 5 6 Council, Def. PI Op. Mem. at 6, misses the point. The statements stand in stark contrast to the 7 conclusory assertions made in Defendants’ court submissions and constitute strong evidence of 8 Defendants’ actual intent. See, e.g., United States v. Sayetsitty, 107 F.3d 1405, 1415 (9th Cir. 1997) 9 (affirming use at trial of admissions from which intent could be inferred).6 Fifth, as previously discussed in the context of Defendants’ improper ex parte motion, 10 11 Plaintiffs have offered to extend the briefing schedule and the hearing date for the PI Motion if 12 Defendants would agree to hold off on proceeding with state court condemnation proceedings until 13 the Court has an opportunity to rule. Such an agreement would allow for an opportunity following 14 the City Council’s decision on adopting a resolution of necessity for the Court to rule on the PI 15 Motion, thus eliminating Defendants’ supposed ripeness concerns. Defendants have flatly refused 16 this offer, further indicating that they are proceeding according to their plan for seizing the loans – 17 i.e., to commence state court condemnation proceedings immediately after adopting a resolution of 18 necessity. PI Motion. Ertman Reply Decl. ¶¶ 29–32. Defendants apparently believe that once in 19 state court they will be better positioned to argue against federal court jurisdiction (and perhaps 20 preclude this Court’s scrutiny of the Program entirely). Defendants have, by their conduct, demonstrated that the seizure of loans from the Plaintiff 21 22 Trusts is not merely theoretical and speculative. If anything is speculative here it is Defendants’ 23 assertion in their papers that seizure through eminent domain is merely “one potential solution” that 24 Defendants are considering. Def. Mem. at 1. In reality, such eminent domain seizures are the very 25 core of the Program which Defendants are in the process of implementing. Plaintiffs need not await 26 Defendants’ adoption of a resolution and the initiation of state court condemnation proceedings 27 6 28 Defendants’ assertion that the Mayor is only one vote on the City Council also misses the point, as the City Council already has voted to adopt the Loan Seizure Program, and the Mayor is continuously promoting the Loan Seizure Program on the City’s behalf. Ertman Reply Decl. ¶¶ 20–28. 8 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 before seeking this Court’s review. Plaintiffs have established a “demonstrable need for federal 2 protection” and their claims therefore are ripe for review. Chertkof, 497 F. Supp. at 1257; 3 Employers Insurance of Wausau v. Fox Entertainment Group, Inc., 522 F.3d 271, 278 (2d Cir. 2008) 4 (holding that in determining ripeness, “courts should focus on the practical likelihood that the 5 contingencies will occur.”).7 The ripeness of this controversy is further demonstrated by the fact that, absent prompt 6 7 federal court review, the Trusts and their investors will suffer immediate harm as soon as Richmond 8 files is state eminent domain action. See Eastern Enterprises v. Apfel, 524 U.S. 498, 521 (1998) (the 9 Declaratory Judgment Act “allows individuals threatened with a taking to seek a declaration of the 10 constitutionality of the disputed governmental action before potentially uncompensable damages are 11 sustained.”). The value of their certificates, traded in federally-regulated national securities markets, 12 will fall to reflect the risk that the anticipated income stream from performing loans in the pool 13 targeted for seizure by Richmond (and other municipalities that implement MRP’s Loan Seizure 14 Program) will be stripped from the pools in exchange for a payment worth far less than the income 15 stream that they will generate – less, even, than the foreclosure value of the home securing the loan. 16 See Declaration of Phillip Burnaman (“Burnaman Moving Decl.”), (Dkt. 11), ¶ 43; Burnaman Reply 17 7 18 19 20 21 22 23 24 25 26 27 28 The cases relied upon by Defendants actually support Plaintiffs’ position that their claims are ripe for review. For example, Texas v. United States, 523 U.S. 296 (1998), involved a voting rights case where Texas had not “pointed to any particular school district” which might fall under the provision at issue. Similarly, in Thomas v. Anchorage Equal Rights Commn., 220 F. 3d 1134, 1260 (9th Cir. 2000), the landlords seeking to challenge a regulation could not establish that they were a potential target of the regulation or that anyone in government had ever heard of them before they brought suit. Here, by contrast to the theoretical or speculative risk of harm addressed by the Courts in Texas and Thomas, Defendants have already expressly targeted specific loans held by Plaintiffs and have already taken the predicate steps towards eminent domain seizure. Defendants’ reliance on Wendy’s Int’l Inc. v. City of Birmingham, 868 F. 2d 433 (11th Cir. 1989), is similarly misplaced, as in that case the court determined that the plaintiffs had not alleged a “manifest threat of condemnation.” There, the takings program still required several steps before property could be seized, which, at a minimum, would take a year or more to satisfy: the developer was required to negotiate in “good faith” with the landowners and to offer each the fair market value of the property as determined by an independent appraiser, a process that was required to last at least eight months, after which the city would be required to negotiate for the property over the course of a four month period. Id. at 436. Thus, there was a delay of at least a year before the city could “exercise its eminent domain power.” Id. Here, unlike Wendy’s (which noted that “ripeness must be decided on a case-by-case basis,” id. at 436, 437 n.7), a “manifest threat” exists, as Richmond could exercise its eminent domain powers almost immediately: within the 15-day notice period for the hearing on necessity. 9 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB 1 Decl. ¶¶ 26, 32. This would be an immediate and dramatic reduction in the value of those mortgage 2 securities that could never be compensated through the California eminent domain process. Indeed, 3 Richmond is a test case for MRP’s Program, and if Richmond is permitted to condemn loans through 4 eminent domain, more municipalities will undoubtedly follow suit, exponentially magnifying this 5 irreparable harm. See Burnaman Moving Decl. ¶ 66. 6 Because the harm to the Plaintiff Trusts and their investors is imminent, this action is ripe for 7 review now. As discussed in Plaintiffs’ Reply Memorandum, the imminent harm to Plaintiffs would 8 be irreparable and fully warrants the issuance of a preliminary injunction. CONCLUSION 9 10 For the foregoing reasons, Defendants’ Dismissal Motion should be denied. 11 12 DATED: August 29, 2013 Respectfully submitted, 13 14 By: /s/ Rocky C. Tsai ______________________________________ 15 20 Thomas O. Jacob (SBN 125665) tojacob@wellsfargo.com WELLS FARGO & COMPANY Office of General Counsel 45 Fremont Street, Twenty-Sixth Floor MAC A0194-266 San Francisco, CA 94105 Telephone: (415) 396-4425 Facsimile: (415) 975-7864 21 Attorney for Wells Fargo Bank 16 17 18 19 ROPES & GRAY LLP Attorneys for Plaintiffs Rocky C. Tsai (SBN 221452) (rocky.tsai@ropesgray.com) ROPES & GRAY LLP Three Embarcadero Center San Francisco, CA 94111-4006 Telephone: (415) 315-6300 Facsimile: (415) 315-6350 22 John C. Ertman (john.ertman@ropesgray.com) (Pro hac vice applications pending) Lee S. Gayer (lee.gayer@ropesgray.com) Evan P. Lestelle (evan.lestelle@ropesgray.com) ROPES & GRAY LLP 1211 Avenue of the Americas New York, NY 10036-8704 Telephone: (212) 596-9000 Facsimile: (212) 596-9090 23 24 25 26 27 28 10 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB Douglas H. Hallward-Driemeier (douglas.hallward-driemeier@ropesgray.com) (Pro hac vice application pending) ROPES & GRAY LLP One Metro Center 700 12th Street, NW Suite 900 Washington, DC 20005-3948 Phone: 202-508-4600 1 2 3 4 5 Daniel V. McCaughey (daniel.mccaughey@ropesgray.com) Nick W. Rose (nick.rose@ropesgray.com) ROPES & GRAY LLP 800 Boylston St. Boston, MA Phone: 617-951-7000 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11 PLAINTIFFS’ MEMORANDUM IN OPPOSITION TO DEFENDANTS’ MOTION TO DISMISS; Case No. CV-13-3663-CRB

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?