State of California et al v. United States Department of Transportation et al

Filing 1

COMPLAINT for Declaratory and Injunctive Relief against All Defendants ( Filing fee $ 400, receipt number 0971-13366068.). Filed byState of California, California High-Speed Rail Authority. (Attachments: #1 Civil Cover Sheet)(O'Grady, Sharon) (Filed on 5/21/2019)

Download PDF
Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 1 of 20 1 2 3 4 5 6 7 8 XAVIER BECERRA Attorney General of California PAUL STEIN Supervising Deputy Attorney General ANNA T. FERRARI (SBN 261579) Deputy Attorney General SHARON L. O’GRADY (SBN 102356) Deputy Attorney General 455 Golden Gate Ave., Suite 11000 San Francisco, CA 94102 Telephone: (415) 510-3834 Fax: (415) 703-1234 E-mail: Sharon.OGrady@doj.ca.gov Attorneys for Plaintiffs State of California and California High-Speed Rail Authority 9 IN THE UNITED STATES DISTRICT COURT 10 FOR THE NORTHERN DISTRICT OF CALIFORNIA 11 12 13 14 15 Plaintiffs, COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF 16 v. 17 18 19 20 21 22 Case No. STATE OF CALIFORNIA; and CALIFORNIA HIGH-SPEED RAIL AUTHORITY, UNITED STATES DEPARTMENT OF TRANSPORTATION; ELAINE L. CHAO, in her official capacity as Secretary of the Department of Transportation; THE FEDERAL RAILROAD ADMINISTRATION; RONALD L. BATORY, in his official capacity as Administrator of the Federal Railroad Administration, Defendants. 23 . 24 25 26 27 28 1 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 2 of 20 1 2 INTRODUCTION 1. The State of California and the California High-Speed Rail Authority 3 (“Authority”) bring this action for declaratory and injunctive relief challenging the Federal 4 Railroad Administration’s decision to terminate and de-obligate nearly $1 billion in federal grant 5 funding for the California high-speed rail project. The high-speed rail project, the first of its kind 6 in United States history, is a critical part of California’s long-term strategic planning, not only to 7 address critical transportation needs, but also greenhouse gas emissions and climate change. 8 9 10 11 2. The Authority and the Federal Railroad Administration (“FRA”) have been collaborating for over a decade on this historic program, and the State has committed billions of dollars to it. 3. California has performed its obligations on the project, and construction is well- 12 advanced, furthering the goal of the Congressional appropriation that funds the grant—to fund 13 cooperative agreements for the development of segments or phases of intercity or high-speed rail 14 corridors. 15 4. In the last year, however, the FRA has stopped cooperating on the project, 16 including refusing to process important environmental clearances, and to count hundreds of 17 millions of dollars in state-funded expenditures toward California’s obligation to provide 18 matching funds under the grant. 19 5. On February 19, 2019—one day after California and fifteen other states filed suit 20 to invalidate President Trump’s declaration of emergency at the southern border—President 21 Trump tweeted that the suit was led by California, “the state that has wasted billions of dollars on 22 their out of control Fast Train, with no hope of completion.” One minute later, he tweeted that 23 the “failed Fast Train project in California . . . is hundreds of times more expensive than the 24 desperately needed Wall.” Later that same day, in a curt, three-page letter, the FRA abruptly 25 notified the Authority of its intent to terminate the grant agreement. 26 6. On May 16, 2019, the FRA carried out its threat and announced its “final decision” 27 to terminate the grant and de-obligate the remaining funding. The FRA also signaled its intent to 28 reallocate the money to other inter-city rail projects. 2 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 3 of 20 1 7. The FRA did not make any of the efforts at conciliation or compliance required by 2 its own procedures and policies, and its 25-page termination letter set out a raft of detailed 3 allegations about the Authority’s supposed non-compliance with the grant agreement that it did 4 not include in its notice or elsewhere, and that the Authority had no opportunity to rebut before 5 the FRA took action. 6 8. FRA’s sudden decision to terminate the grant in violation of its own procedures 7 and policies was arbitrary and capricious, an abuse of discretion, and contrary to law, and 8 threatens to wreak significant economic damage on the Central Valley and the State. 9 9. For these reasons, and those discussed below, the Court should vacate and set 10 aside the FRA’s action terminating the grant and de-obligating nearly $1 billion in federal 11 funding for the project. The Court also should enjoin Defendants from re-obligating and 12 distributing these funds to any other recipient, or from otherwise transferring the funds. 13 JURISDICTION, VENUE, AND INTRA-DISTRICT ASSIGNMENT 14 10. This Court has subject matter jurisdiction under 28 U.S.C. sections 1331 and 2201. 15 11. An actual, present, and justiciable controversy exists between the parties within the 16 meaning of 28 U.S.C. section 2201(a), and this Court has authority to grant declaratory and 17 injunctive relief under 28 U.S.C. sections 2201 and 2202. 18 12. Venue is proper in this judicial district under 28 U.S.C. section 1391(e), because 19 this is a civil action in which Defendants are agencies of the United States or officers of such an 20 agency, no real property is involved in this action, and Plaintiff the State of California resides in 21 this judicial district. 22 13. Assignment to the San Francisco Division of this District is proper pursuant to 23 Civil Local Rule 3-2(c)-(d) and 3-5(b) because Plaintiff State of California, by and through its 24 Attorney General, maintains an office in San Francisco. 25 26 27 28 PARTIES I. PLAINTIFFS 14. The State of California, represented by and through its Attorney General, is a sovereign State of the United States of America. 3 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 4 of 20 1 15. The California High-Speed Rail Authority is an instrumentality of the State of 2 California, which is responsible for developing and constructing a high-speed rail system in 3 California. The Authority is also the grantee under grants from the federal government for 4 constructing new intercity or high-speed rail corridors and for planning future high-speed rail 5 services. 6 16. The State and the Authority have standing to bring this action due to the loss of 7 federal grant funds caused by Defendants’ wrongful conduct, the resulting delay in development 8 of the California high-speed rail system, and the consequent reduction in economic activity and 9 development in the Central Valley of California, one of the nation’s most economically distressed 10 regions. 11 II. 12 13 DEFENDANTS 17. Defendant United States Department of Transportation (“DOT”) is the federal agency to which Congress has appropriated the grant funds at issue in this case. 14 18. Defendant Elaine L. Chao is the Secretary of DOT, oversees the DOT, and is 15 responsible for the actions and decisions challenged in this action. Defendant Chao is sued in her 16 official capacity. 17 19. 18 Defendant Federal Railroad Administration (“FRA”) is an agency within DOT which Congress has charged with disbursing and overseeing the grant funds at issue in this case. 19 20. Defendant Ronald L. Batory is the Administrator of the FRA and is responsible for 20 the actions and decisions challenged in this action. Defendant Batory is sued in his official 21 capacity. 22 23 24 BACKGROUND I. CALIFORNIA’S HIGH-SPEED RAIL PROGRAM 21. Developing a high-speed rail system has been a long-range strategic goal of 25 California, supported by both Republican and Democratic Governors, for more than three 26 decades. 27 28 22. In 1993, under Governor Pete Wilson, the California Intercity High Speed Rail Commission was established to investigate the feasibility of high-speed rail in California, and 4 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 5 of 20 1 concluded that a high-speed rail system in California was technically, environmentally and 2 economically feasible. Three years later, in 1996, the Legislature passed, and Governor Pete 3 Wilson signed into law, the High-Speed Rail Act, which established the Authority to continue the 4 Commission’s work in planning and developing a high-speed rail system. Cal. Pub. Util. Code 5 § 185000 et seq. 6 23. In 2008, the Legislature passed, Governor Schwarzenegger signed, and the voters 7 approved Proposition 1A, the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st 8 Century. Proposition 1A envisions a system of high-speed rail trains stretching from San 9 Francisco through Los Angeles to Anaheim and eventually to Sacramento and San Diego. 10 Proposition 1A divides this system into two phases, the first of which is to connect San Francisco 11 with Los Angeles and Anaheim on a route through the Central Valley. Proposition 1A also 12 contemplates that the first phase will be built in corridors and smaller “usable segments.” 13 Id. §§ 2704.04(b)(2), 2704.08(a), (c)(1), (d). 14 24. Proposition 1A authorizes the issuance of $9.95 billion in general obligation bonds 15 to jump-start construction of the high-speed rail system. Cal. Sts. & Hy. Code § 2704.04(b). It 16 provides, however, that, except for certain specified costs such as preliminary engineering 17 activities, bond proceeds may not be used for more than 50 percent of the total cost of 18 construction for each corridor or usable segment of the high-speed rail system. Id. 19 § 2704.08(a), (g). 20 25. In 2014, the California Legislature provided the Authority with a continuing 21 source of revenue for the high-speed rail system by allocating to the system 25 percent of the 22 revenues from the State’s auction of greenhouse gas emissions allowances. 23 26. The high-speed rail system contemplated by these enactments is a critical element 24 in meeting the State’s growing transportation demand, especially for intercity transportation. The 25 interstate highway system, commercial airports, and the conventional passenger rail system 26 serving the intercity travel market are operating at or near capacity. In many California regions, 27 freeway and airport expansion is not viable because of existing land use constraints. And where 28 freeway and airport expansion may be viable in other parts of the state, it would nevertheless 5 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 6 of 20 1 require enormous public investments for maintenance and expansion to meet existing demand and 2 future growth that far exceed the cost of high-speed rail. 3 27. California’s high-speed rail system is also critical to the State’s environmental and 4 climate change goals. The system’s trains will be powered by electricity, in contrast to airplanes 5 and most automobiles. The system will improve air quality by reducing vehicle miles travelled 6 by automobile and airplane, thereby reducing criteria pollutant emission from the transportation 7 sector. In addition, as the California Legislature has found, the high-speed rail system “will 8 contribute significantly toward the goal of reducing emissions of greenhouse gas and other air 9 pollutants” and will provide “the foundation for a large-scale transformation of California’s 10 transportation infrastructure” by reducing millions of vehicles miles travelled by automobile and 11 reducing the demand for air travel. Senate Bill 862 (2014). 12 28. California’s high-speed rail system is also an essential strategy for efficient 13 transportation energy use. A trip on the high-speed rail system would use one-third the energy of 14 a similar trip by air and one-fifth the energy of a trip made by car. 15 29. The economic benefits from high-speed rail system construction are significant. 16 An analysis prepared for the Treasury Department estimates net economic benefits from the 17 California high-speed rail project of between $130.3 and $260.6 billion. The project has 18 employed more than 36,000 people to date and is projected to employ, either directly or 19 indirectly, 100,000 people in the Central Valley. It will also help the Central Valley become 20 more accessible to the State’s major metropolitan areas, thus increasing the economic stimulus. 21 II. 22 THE GRANTS FROM THE FEDERAL RAILROAD ADMINISTRATION 30. In February 2009, Congress enacted the American Recovery and Reinvestment 23 Act, Public Law 111-5 (“ARRA”). ARRA provided $8 billion for high-speed rail and intercity 24 passenger rail projects, but required that FRA obligate the funds no later than September 30, 25 2012, Pub. L. No 111-5, 123 Stat. at 208, and that grant monies be expended by September 30, 26 2017. 27 28 31. In 2009, Congress passed the Consolidated Appropriations Act, 2010, Pub. Law 111-117, 123 Stat. 3057 (“2010 Appropriations Act”), which provided additional funding for the 6 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 7 of 20 1 2 3 development of segments or phases of intercity or high-speed rail corridors. A. 32. The ARRA Grant In 2010, the Authority applied for grants under ARRA for infrastructure and track 4 for three portions—the northern, southern, and Central Valley segments—of the first phase of 5 California’s high-speed rail system. 6 33. FRA approved one portion of the application—the Central Valley segment—and 7 awarded the Authority a grant ultimately totaling about $2.5 billion. Although ARRA did not 8 require grantees to contribute their own funding, California offered to spend one dollar of its own 9 for every dollar in federal funding it received, using Proposition 1A bond proceeds as the source 10 of state funds. The agreement that FRA and the Authority executed on September 20, 2010 11 (“ARRA Grant Agreement”) required this state-federal match as a condition of the grant. 12 34. Although the ARRA Grant Agreement covered preliminary engineering and 13 environmental work in support of the entire 520-mile segment between San Francisco and Los 14 Angeles and Anaheim, it provided construction funding for only an initial 115-mile portion of 15 infrastructure and track on the segment in the Central Valley, spanning from North of Bakersfield 16 to Fresno (the “Project”). 17 35. The ARRA Grant Agreement does not contain a time-is-of-the-essence clause. 18 Nor does it create a construction time line or otherwise set a deadline for completing the San 19 Francisco to Anaheim phase of the high-speed rail system. 20 36. The scope of work in the ARRA Grant Agreement includes ten tasks, which, in 21 addition to planning and environmental work, encompass construction of infrastructure and track 22 (but not procurement of rolling stock or electrification) on the span from north of Bakersfield to 23 Madera. 24 37. The ARRA Grant Agreement also provides for extensive oversight by FRA, 25 including approval of all written agreements with (i) railroads owning property on which the 26 Project would be built, (ii) owners of infrastructure on which the Project would be built, and 27 (iii) the operator of any passenger service benefiting from the Project. The Agreement also 28 requires FRA approval for, among other things, the Authority’s project management plan, project 7 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 8 of 20 1 environmental reviews, preliminary engineering documents, final design documents, and Design 2 Build Program Plan. 3 38. Finally, the ARRA Grant Agreement provides that grant funds are to be disbursed 4 as reimbursements for payments previously made by the Authority. In addition, the Agreement 5 permits FRA to authorize a disbursement only if the Authority is (a) “complying with its 6 obligations under [the] Agreement” and (b) “making adequate and timely progress toward Project 7 completion.” 8 B. 9 39. The FY 10 Grant In 2010 and 2011, FRA awarded the Authority two additional grants, both under 10 the 2010 Appropriations Act, totaling $928,620,000: an award of $715 million requiring a 11 30 percent match, and an award of a little more than $213 million requiring a 20 percent match. 12 Proposition 1A bond proceeds were again to provide the source of California’s matching funds. 13 14 15 40. On November 18, 2011, FRA and the Authority executed an agreement concerning these grants (“FY 10 Grant Agreement”). 41. The FY 10 Grant Agreement was intended to provide funds to complete the 16 Project funded by the ARRA Grant Agreement, and the statement of work in the FY 10 Grant 17 Agreement therefore includes six tasks identical to six of the ten tasks in the statement of work in 18 the ARRA Grant Agreement. 19 42. The FY 10 Grant Agreement also contains many other provisions of the ARRA 20 Grant Agreement, including those requiring FRA oversight and approval. Like the ARRA Grant 21 Agreement, the FY 10 Grant Agreement does not contain a time-is-of-the-essence clause, a 22 construction timeline or a completion deadline for the San Francisco to Anaheim phase of the 23 high-speed rail system. 24 III. CALIFORNIA’S COMPLIANCE WITH THE GRANT AGREEMENTS AND SUBSTANTIAL PROGRESS ON THE PROJECT 25 43. Since executing the ARRA Grant Agreement and the FY 10 Grant Agreement, the 26 Authority has made substantial progress on the Project. 27 28 8 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 9 of 20 1 44. Over 90 percent of the design work on the Project has been completed, and 2 82 percent of the rights of way needed for the Project have been obtained and delivered to the 3 Authority’s contractors. 4 5 45. State Route 99, the main highway through the Central Valley, has been realigned, and the realignment of other roads and utilities is in progress. 6 46. Over 44 miles of grading and embankment work is either finished or in progress. 7 47. Two overhead crossings, a bridge, and a viaduct have been completed; two other 8 viaducts as well as a trench in Fresno are in progress; and abutments for bridges are being 9 constructed. 10 48. In total, there are more than 24 active or completed construction sites in the 11 Central Valley, and the Project is currently employing more than 2,600 workers in the Central 12 valley, engaging 500 small businesses, and has generated nearly $7.2 billion in economic output. 13 49. As required by the ARRA statute, the Authority spent all of its ARRA funds by 14 September 30, 2017, and having already spent $970 million in state funds, the Authority is well 15 on its way to matching the $2.5 billion in ARRA funds spent on the Project (after which it will 16 draw on the FY 10 Grant Agreement monies). In addition, the State has committed an additional 17 $3.1 billion in funding toward the Project. 18 50. The FRA has closely monitored the Authority’s performance under the ARRA 19 Grant Agreement. Among other things, the Authority has provided regular reports and updates 20 allowing the FRA to verify that the Authority is in compliance with a variety of grant 21 requirements. In addition, FRA and the Authority have annually conducted a Site Monitoring 22 Review designed to provide the Authority and FRA an opportunity to review issues that have 23 arisen over the previous year and address any ongoing or anticipated future needs and concerns. 24 51. In spite of this close monitoring, the FRA has only once issued a finding 25 demanding corrective action from the Authority. This occurred in 2014, and the Authority 26 promptly implemented a corrective action plan, which resolved the matter. 27 28 52. FRA repeatedly has recognized that the Authority was complying with the ARRA Grant Agreement and making substantial progress on the Project. 9 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 10 of 20 1 53. As noted above, under the ARRA Grant Agreement, the FRA is permitted to 2 release funds only if it finds that the Authority is “complying with its obligations under [the 3 ARRA] Agreement,” and “making adequate and timely progress toward Project completion.” 4 54. Far from withholding funds based upon any failure to comply or make substantial 5 progress, from March 2011 through September 2017, the FRA approved 459 separate 6 disbursements totaling $2.5 billion. 7 IV. 8 THE FEDERAL RAILROAD ADMINISTRATION’S PRIOR COOPERATIVE APPROACH 55. Major infrastructure projects face challenges at every stage—from planning, 9 funding, environmental review, and acquisition of private property to the physical challenges of 10 construction—that cannot be fully predicted or addressed until they occur. Consequently, such 11 projects require the cooperation and patience of numerous agencies. 12 56. Until the recent change in administration, the Authority and FRA enjoyed such 13 cooperation, and they collaborated effectively toward their common goal of achieving the first 14 true high-speed rail system in the United States. 15 57. Recognizing the need for flexibility, both the ARRA Grant Agreement and the 16 FY 10 Grant Agreement permit amendments, and in fact the ARRA Grant Agreement was 17 amended six separate times and the FY 10 Grant Agreement once. 18 58. For example, in 2012, after litigation challenging California’s ability to use 19 Proposition 1A bond proceeds on the Project was filed, FRA and the Authority amended the 20 ARRA Grant Agreement to allow a tapered match payment arrangement whereby the federal 21 ARRA funds would be used first until fully expended, after which the State would spend its funds 22 until the federal expenditures are fully matched. 23 59. In late 2013, while the same litigation was on appeal, FRA and the Authority also 24 agreed to slow down Project construction, pending the results of the appeal or access to 25 alternative state matching funds. And in 2014, with Proposition 1A bond proceeds still tied up in 26 litigation, the California Legislature allocated to the Authority 25 percent of the revenues from 27 the State’s auction of greenhouse gas emissions allowances, so that the Authority would have 28 another source of State funds available for matching the federal grant funds. 10 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 11 of 20 1 60. In 2016, FRA and the Authority amended the ARRA Grant Agreement to extend 2 the Project performance period from September 2017 to December 2022, and in 2017, they 3 similarly amended the FY 10 Grant Agreement to extend the project performance period to 4 December 2022. The amendments also extended the length of the segment by approximately 2.5 5 miles to the north to allow better connectivity to the Madera Amtrak station used for intercity 6 passenger train travel between Sacramento and Bakersfield. 7 61. The Authority is lead agency on obtaining state environmental clearances under 8 the California Environmental Quality Act (“CEQA”), Cal. Pub. Res. Code § 2100 et seq., while 9 FRA is lead agency on obtaining federal environmental clearances under the National 10 Environmental Policy Act (“NEPA”), 42 U.S.C. § 4321 et seq. Assignment of FRA’s NEPA 11 responsibilities to the Authority would be more efficient because the environmental process 12 involves a single NEPA/CEQA document. Between mid-2017 and August 2018, the parties 13 worked together on the steps needed to effectuate the assignment. 14 62. FRA and the Authority also worked closely between 2012 and late 2018 to come 15 up with an acceptable intrusion barrier between the tracks used by freight trains and the high- 16 speed rail tracks in the Central Valley, to prevent derailed freight trains from intruding into the 17 Authority’s trackway and to prevent errant passenger trains from intruding into the trackway used 18 by freight trains. 19 V. 20 21 22 THE RECENT CHANGE IN THE FEDERAL RAILROAD ADMINISTRATION’S APPROACH 63. Beginning in 2018, however, FRA effectively ceased cooperating on the Grant Agreements. 64. For example, the Authority is informed and believes, and thereupon alleges, that 23 FRA’s monitoring report for 2017 was completed on or about February 12, 2018, the date shown 24 on the report. FRA, however, did not provide the report to the Authority until June of 2018. 25 Similarly, FRA completed its 2018 site visit in November, 2018, but has still not provided the 26 Authority with its 2018 monitoring report. 27 28 65. FRA also has ceased to cooperate in the environmental review process. All steps for securing assignment of FRA’s NEPA responsibilities to the Authority had been completed by 11 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 12 of 20 1 June 2018, and FRA ostensibly continued to work toward implementation as late as August 2018, 2 but FRA never executed the assignment, despite the fact that FRA management orally assured the 3 Authority that there was no policy disagreement about the NEPA assignment and that approvals 4 of the assignment were imminent. 5 6 66. clearance work on the Project. 7 8 To make matters worse, in September 2018, FRA ceased all environmental 67. As a result, the Authority’s efforts to obtain NEPA environmental clearances have ground to a halt. 9 68. In addition, as of February 18, 2019, FRA had cancelled all previously scheduled 10 meetings with the Authority, declined to attend any meetings scheduled by the Authority, and 11 stopped responding to communications from the Authority. 12 VI. 13 14 15 THE EXPANDED CENTRAL VALLEY CONSTRUCTION PLAN 69. Since 2014, the Authority has been considering a plan to expand construction in Central Valley. 70. The ARRA Grant Agreement and the FY 10 Grant Agreement authorize the use of 16 federal grant money to construct a 119-mile segment from Madera to a point approximately 17 15 miles north of downtown Bakersfield. 18 71. The expanded construction plan under consideration would extend the segment by 19 52 miles so that it would reach north from Madera to Merced and south into downtown 20 Bakersfield. 21 22 23 72. This expanded construction plan would tie together three of the largest cities in the Central Valley, three major universities, and three of California’s fastest growing counties. 73. The expanded construction plan also would provide transit connectivity in the 24 north with the Altamont Corridor Express and Amtrak trains traveling to Sacramento and the Bay 25 Area, as well as connectivity in the south to bus services from Bakersfield to Los Angeles. The 26 plan is consistent with the California State Rail Plan released by the California Transportation 27 Agency in 2018. 28 74. California currently is responsible for all Project costs in excess of the federal 12 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 13 of 20 1 grant funds and the state’s matching funds combined. If the decision is made to expand to 2 downtown Bakersfield, California would be responsible for those additional costs, as well, 3 bringing its share of the total cost of the expanded Project to 82 percent. 4 75. On February 12, 2019, Governor Newsom delivered the State of the State address 5 to the California Legislature, and in that address, he endorsed the expanded Central Valley 6 construction plan. 7 76. The Governor announced that his administration would adopt a pragmatic 8 approach with an immediate focus on completing a high-speed rail link between Merced and 9 Bakersfield, stating that “we’ll connect the revitalized Central Valley to other parts of the state.” 10 77. At the same time, Governor Newsom confirmed that he shared the ambitious 11 vision for high-speed rail of his predecessors Governors Brown and Schwarzenegger, and would 12 finish environmental work for the entire Phase 1, San Francisco to Los Angeles area segment. 13 78. Also on February 12, Brian Kelly, the Chief Executive Officer of the Authority, 14 confirmed in a news release the Authority’s commitment to: (i) getting high-speed rail operating 15 in the Central Valley; (ii) completing the environmental work state-wide; (iii) continuing the 16 Authority’s investments in the Bay Area and Anaheim portions of the high-speed rail system; and 17 (iv) pursuing additional funding for future project expansion. 18 VII. TERMINATION OF THE FY 10 GRANT AGREEMENT 19 79. In addition to endorsing the expanded Central Valley construction plan, in his 20 State of the State address Governor Newsom challenged President Trump’s claim that there was 21 an emergency at the border between the United States and Mexico. “The border ‘emergency,’” 22 the Governor said, “is a manufactured crisis.” Declaring that “California will not be part of this 23 political theater,” Governor Newsom announced that two-thirds of the California National Guard 24 forces currently on the border would be redeployed to assist Cal Fire in preparing for fire season 25 and to boost the National Guard’s statewide Counterdrug Task Force. 26 80. The next day, on February 13, 2019, President Trump inaccurately tweeted that 27 “California has been forced to cancel the massive bullet train project” and that “[t]hey owe the 28 Federal Government three and a half billion dollars. We want that money back now.” 13 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 14 of 20 1 81. That same day Governor Newsom clarified that the high-speed rail project had not 2 been “cancelled,” and affirmed that California is “building high-speed rail, connecting the Central 3 Valley and beyond.” 4 82. Five days later, on February 18, 2019, California led a coalition of 16 states in 5 filing a lawsuit challenging President Trump’s declaration of an emergency at the border and his 6 announcement that he would use funds not appropriated by Congress for the border wall to 7 construct portions of the wall for which Congress had denied appropriations requests. 8 9 83. The following morning, on February 19, 2019, President tweeted a response directly linking the border wall litigation with California’s high-speed rail project: “[a]s I 10 predicted, 16 states, led mostly by Open Border Democrats and the Radical Left, have filed suit 11 in, of course, the 9th Circuit! California, the state that has wasted billions of dollars on their out 12 of control Fast Train, with no hope of completion, seems in charge!” 13 84. One minute later, President Trump tweeted that “[t]he failed Fast Train project in 14 California, where the cost overruns are becoming world record setting, is hundreds of times more 15 expensive than the desperately needed Wall.” 16 85. Later that same day, in a three-page letter FRA notified the Authority of its intent 17 to terminate the FY 10 Grant Agreement effective March 5, 2019, and to de-obligate the funds 18 immediately after that. A true and correct copy of the notice of termination letter is attached 19 hereto as Exhibit A and incorporated herein by this reference. 20 86. The letter asserted four grounds for termination. First, it asserted that California 21 has failed to make required expenditures based on its supposed failure to meet contribution rates 22 described in its quarterly Funding Contribution Plan. Second, it asserted that the FRA had 23 determined that the Authority would not complete the Project by 2022 based on the reports from 24 the Authority’s Board of Directors. Third, it asserted that the Authority had failed to submit 25 critical grant deliverables. Fourth, it asserted that the Authority had failed to take appropriate 26 corrective action. 27 87. 28 The FRA’s letter asserted as well that there had been “a significant change in the State of California’s plans for its high-speed rail,” and that in the State of the State address, 14 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 15 of 20 1 Governor Newsom “presented a new proposal that represents a significant retreat . . . and 2 frustrates the purpose for which Federal funding was awarded (i.e., an initial investment in the 3 larger high-speed rail system).” 4 88. The FRA gave the Authority two weeks to respond to the assertions in its letter. In 5 addition, FRA stated that it was “exploring all available legal options, including termination of 6 [the ARRA Grant Agreement] and the recovery of the Federal funds expended under” that 7 agreement. 8 89. 9 10 11 The Authority timely responded to FRA’s notice of intent to terminate on March 4, 2019. A copy of the Authority’s response letter is attached hereto as Exhibit B and incorporated herein by this reference. 90. The Authority’s response included a detailed, point-by-point refutation of the 12 assertions in the FRA’s letter. For example, the Authority’s response showed that California had 13 accepted a much higher matching percentage, nearly 50 percent of the total Project cost, than 14 ordinarily required for railroad construction grants, and the expanded Central Valley construction 15 plan endorsed by Governor Newsom would increase California’s share of the cost to over 70 16 percent. As of December 2018, the Authority already had submitted for FRA approval $970 17 million in state-funded invoiced expenditures, which is 39 percent of California’s $2.5 billion 18 match requirement, even though only 26 percent of the period for making these expenditures had 19 expired. 20 91. The Authority’s response also showed that the notice’s assertion the Authority will 21 not complete the Project by December 31, 2022 contradicts the Board of Directors reports upon 22 which the FRA purported to rely. Those reports in fact project that most work on the Project will 23 be completed by March 2022, and the four remaining tasks will be completed by the end of that 24 year. The response also showed that there is no time-is-of-the-essence clause in the ARRA Grant 25 Agreement and that failure to meet the December 31, 2022 deadline would not be a material 26 breach of the Agreement. 27 28 92. The Authority’s response showed as well that the Authority has made substantial submissions to the FRA and, far from finding these submissions inadequate, FRA implicitly 15 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 16 of 20 1 acknowledged their sufficiency by making 459 payments under the ARRA Grant Agreement 2 through September 2017. The response also showed that the FRA has issued only one demand 3 for corrective action, and the Authority took that action in 2014. 4 93. Finally, the Authority’s response showed that Governor Newsom’s plan was not 5 new and that it did not retreat from or frustrate the ultimate goal of California’s high-speed rail 6 system. To the contrary, Governor Newsom endorsed a plan that expands the construction 7 project authorized by the ARRA Grant Agreement and FY 10 Grant Agreement and that furthers 8 the overall goal of the high-speed rail program by ensuring that the first segment will provide 9 tangible benefits to the region and transportation connectivity both north and south. 10 94. Nevertheless, on May 16, 2019, FRA sent a letter to the Authority that announced 11 its “final decision . . . that [FRA] has, effective today, terminated the [FY 10 Grant Agreement].” 12 (A copy of FRA’s letter is attached hereto as Exhibit C and incorporated herein by this reference.) 13 95. In sharp contrast to its earlier notice letter, which devoted only a single paragraph 14 to the supposed failure to submit grant deliverables, the termination letter makes the failure to 15 submit grant deliverables the primary ground for termination and devotes over a dozen full pages 16 to discussing the issue. While the notice letter refers vaguely to “over 40 reports and 17 deliverables,” without specifying any particular deliverable or deficiency, the termination letter 18 discusses in detail a long list of supposed problems with various reports, budgets, and other 19 documents. 20 96. The termination letter also finds that the Authority will not complete the Project by 21 2022. It does not dispute, however, that the Authority reports cited in the notice letter show 22 completion by that date. Instead, the FRA purports to base its final termination decision on an 23 “independent assessment, including its risk analysis,” that was not previously disclosed. 24 Moreover, the termination letter discloses only the supposed results of that analysis, not the 25 analysis itself. 26 97. The termination letter also finds that the Authority has not achieved its necessary 27 contribution rates, based largely on the fact that “to date” the FRA has not accepted all of the 28 expenditures submitted by the Authority. 16 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 17 of 20 1 98. Finally, the termination letter accuses California of retreating from a “foreseeable 2 statewide HSR system,” though it acknowledges that this retreat “may not, standing alone, 3 constitute a violation of the FY10 Agreement.” 4 99. The final decision stated that FRA will “deobligate the $928,620,000 in funding 5 obligated by the FY 10 Agreement,” and that it plans to award the “deobligated FY10 6 Appropriation funds” to other inter-city passenger rail projects. 7 VIII. THE FRA’S DEPARTURE FROM ORDINARY AGENCY PRACTICE 8 9 10 11 100. The FRA’s final decision to abruptly terminate the FY 10 Grant, rather than work with the Authority and impose graduated sanctions as needed in an attempt to secure compliance, was a sharp departure from ordinary agency practice. 101. At the time the FY 10 Grant Agreement was executed, DOT regulations provided 12 that the remedies imposed for non-compliance with a grant or cooperative agreement should be 13 “appropriate in the circumstances” and range from “[t]emporarily withholding cash payments 14 pending correction of the deficiency” to more serious measures such as disallowing the use of 15 funds and matching credit for “all or part of the cost of the activity not in compliance,” to “wholly 16 or partly suspend[ing] the current award” or “withholding future awards.” 49 C.F.R. 17 § 18.43(a)(1)-(5). 18 102. DOT’s Financial Assistance Guidance Manual (“DOT FAGM”), issued March 19 2009, similarly provided that ‘[e]nforcement measures should match the seriousness of the 20 problem,” that the agency official “should apply sound judgment in determining what 21 enforcement measures are appropriate for a situation,” and suggested escalating sanctions if 22 needed to secure compliance rather than termination. 23 103. Effective December 26, 2014, the federal government adopted uniform remedies 24 provisions for DOT and other agencies that administer federal grants. Under these regulations, 25 when a grantee fails to comply with the terms and conditions of an award, the awarding agency 26 may “impose additional conditions.” Additional actions, such as suspension or termination, may 27 be taken only “if noncompliance cannot be remedied by imposing additional conditions.” 28 2 C.F.R. § 200. 17 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 18 of 20 1 104. In 2016, DOT published a Financial Assistance Manual, which states that, after 2 identifying a material violation of a grant or cooperative agreement and attempting resolution, the 3 FRA/DOT should work with “Senior Management” and specified others within the agency “to 4 determine the appropriate course of action.” In addition, if preliminary measures fail to bring a 5 recipient into compliance, the recipient generally will not be terminated immediately; instead, it 6 will be suspended and given an opportunity to take appropriate corrective action. However, “[i]f 7 the deficiencies are not corrected during the suspension period, or when the deficiencies are so 8 egregious that an end to the grant is the only appropriate option, the [agency] should determine 9 whether to proceed with termination.” 10 105. DOT practice, consistent with the DOT Manual, is to address grant compliance 11 issues with escalating sanctions. That process starts with providing assistance, and if such 12 assistance does not resolve the problem, notifying the grant recipient of a need for corrective 13 action. Only if these measures are not successful, and the grantee fails to take corrective action, 14 is the harsher remedy of suspension considered. The draconian measure of termination is 15 appropriate only in the most egregious circumstances. 16 106. The termination letter does not explain why the FRA decided to depart from 17 ordinary agency practicing in terminating the FY 10 grant without imposing lesser sanctions first. 18 Nor does the letter explain why the FRA terminated the grant now, even though the FRA is not 19 scheduled to use those funds until it has completed its required matching of the ARRA grant 20 funds. 21 CLAIM FOR RELIEF 22 Administrative Procedure Act 23 24 25 107. Plaintiffs State of California and the Authority incorporate the allegations of the preceding paragraphs by reference. 108. The Administrative Procedure Act, 5 U.S.C. § 706, authorizes this Court to set 26 aside agency action that is arbitrary, capricious, an abuse of discretion, or otherwise not in 27 accordance with law. 28 109. FRA’s decision to terminate the FY 10 Grant Agreement and de-obligate the funds 18 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 19 of 20 1 awarded under the Agreement it is contrary to its policies, procedures, and regulations, as well as 2 its ordinary practices, which require that FRA first work with a grantee to address any non- 3 compliance and, if that fails, proceed to issue a demand for corrective action, before it considers 4 suspension, much less termination of a grant. Moreover, the FRA’s termination letter failed to 5 provide any explanation for departing from its policies and ordinary practices. 6 110. Defendants’ rationale for terminating the FY 10 Grant Agreement is also 7 inconsistent with the parties’ performance and course of dealings under the Agreement, including 8 but not limited to the fact that, prior to the change in presidential administrations, FRA had 9 consistently determined that the Authority was in compliance with the ARRA Grant Agreement 10 (and by extension, the FY 10 Grant Agreement, which does not even kick in until the State has 11 finished matching the ARRA grant funds). 12 111. Plaintiffs are informed and believe and thereupon allege that Defendants’ 13 termination decision was not based on an examination of the relevant data, and that Defendants 14 did not provide or articulate a satisfactory explanation for their action, including a rational 15 connection between the facts found and the choice made. Rather, the decision was precipitated 16 by President Trump’s overt hostility to California, its challenge to his border wall initiatives, and 17 what he called the “green disaster” high-speed rail project. 18 112. Defendants’ unilateral decision to terminate the FY 10 Grant Agreement and to 19 refuse to continue the cooperative work on the Project also is directly contrary to the statutory 20 requirement and congressional mandate that the Secretary “make grants for high-speed rail 21 projects . . . and capital investment grants to support intercity passenger rail service.” Pub. Law 22 11-117, 123 Stat. at p. 3056 (Dec. 16, 2009). FRA’s termination of the FY 10 Grant Agreement 23 will cause significant damage to the only true high-speed rail project being developed in the 24 United States. 25 113. Accordingly, the Court should set aside the FRA’s termination decision and 26 preliminarily and permanently enjoin Defendants from re-obligating or otherwise transferring the 27 funds to other activities, programs, or recipients. 28 19 Complaint for Declaratory and Injunctive Relief Case 3:19-cv-02754-JD Document 1 Filed 05/21/19 Page 20 of 20 1 2 3 4 PRAYER FOR RELIEF WHEREFORE, the Authority respectfully requests that this Court enter judgment in its favor, and grant the following relief: 1. That the Court issue a judicial declaration that Defendants’ decision to terminate 5 the FY 10 Grant Agreement was arbitrary, capricious, an abuse of discretion, or otherwise not in 6 accordance with law; 7 2. That the Court enter a judgment setting aside the termination decision; 8 3. That the Court enter a preliminary injunction, followed by a permanent injunction, 9 10 11 12 enjoining Defendants from re-obligating the grant funds to another grantee or otherwise transferring the funds; and That the Court grant such other relief as the Court may deem just and proper. Dated: May 21, 2019 Respectfully submitted, 13 XAVIER BECERRA Attorney General of California PAUL STEIN Supervising Deputy Attorneys General ANNA T. FERRARI Deputy Attorney General 14 15 16 /s/ Sharon L. O’Grady SHARON L. O’GRADY (SBN 102356) Deputy Attorney General 455 Golden Gate Avenue, Suite 11000 San Francisco, CA 94102 Telephone: (415) 510-3834 Fax: (415) 703-1234 E-mail: Sharon.OGrady@dj.ca.gov Attorneys for Plaintiffs State of California and California High-Speed Rail Authority 17 18 19 20 21 22 23 24 25 26 27 28 20 Complaint for Declaratory and Injunctive Relief

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?