In Re: Methyl Tertiary Butyl Ether ("MTBE") Products Liability Litigation
Filing
3808
FILING ERROR - WRONG EVENT TYPE SELECTED FROM MENU - MOTION for Partial Summary Judgment Memorandum of Law on Plaintiffs' Claim for Primary Restoration at the Ridgewood Trial Site. Document filed by Shell Oil Company. Responses due by 11/1/2013 (Attachments: #1 Supplement Rule 56.1 Statement of Material Facts)(Wallace, Richard) Modified on 10/2/2013 (db).
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF NEW YORK
IN RE METHYL TERTIARY BUTYL ETHER
PRODUCTS LIABILITY LITIGATION
This document pertains to:
New Jersey Department of Environmental
Protection, et al. v. Atlantic Richfield Co., et al.,
No. 08 Civ. 312
Master File No. 1:00 – 1898
MDL 1358 (SAS)
M21-88
MEMORANDUM OF LAW IN SUPPORT OF SHELL’S MOTION
FOR PARTIAL SUMMARY JUDGMENT ON PLAINTIFFS’ CLAIM
FOR PRIMARY RESTORATION AT THE RIDGEWOOD TRIAL SITE
SEDGWICK LLP
2900 K Street, NW
Harbourside, Suite 500
Washington, DC 20007
(202) 204-1000
Attorneys for Defendants Shell Oil Company, Shell Oil
Products Company LLC, Shell Trading (US) Company,
Equilon Enterprises LLC, and Motiva Enterprises LLC
TABLE OF CONTENTS
I.
INTRODUCTION ........................................................................................................ 1
II.
UNDISPUTED FACTS ................................................................................................ 2
A.
Shell Has Remediated the Ridgewood Site to the Satisfaction of NJDEP ................... 2
B.
Plaintiffs’ Expert Brown Opines that More “Investigation” May Be Needed.............. 6
III.
ARGUMENT ................................................................................................................ 8
A.
B.
Plaintiffs Cannot Prove Primary Restoration Damages at the Ridgewood Site ......... 10
C.
IV.
Summary Judgment Standard ....................................................................................... 9
Mr. Brown’s Report Is Insufficient To Raise a Genuine Issue of Material Fact
Showing a Need for Primary Restoration at the Ridgewood Trial Site ...................... 14
CONCLUSION ........................................................................................................... 15
TABLE OF AUTHORITIES
Cases
Anderson v. Liberty Lobby, Inc., 477 U.S. 242 (1986) ................................................................... 9
Barnes Group v. United States, 872 F.2d 528 (2d Cir. 1989)....................................................... 10
Caldwell v. Haynes, 136 N.J. 422 (N.J. 1994) .............................................................................. 10
California v. Kinder Morgan Energy Partners, No. 07-CV-1883-MMA (WVG),
2013 U.S. Dist. LEXIS 10503 (S.D. Cal. 2013) ....................................................................... 11
Carroll v. Lytton Sys., No. B-C-88-253, 1990 U.S. Dist LEXIS 16833 (W.D.N.C. 1990) .......... 11
Celotex Corp. v. Catrett, 477 U.S. 317 (1986) ............................................................................... 9
City of Fresno v. Chevron U.S.A., Inc., MDL 1358, 04 Civ. 4973,
2013 WL 4830965 (S.D.N.Y. Sept. 10, 2013).................................................................... 11, 14
Finn v. N.Y. State Office of Mental Health-Rockland Psychiatric Ctr.,
489 Fed. App’x 513 (2d Cir. 2012)............................................................................................. 9
Froom v. Perel, 377 N.J. Super. 298 (N.J. App. Div.), certif. denied, 185 N.J. 267 (2005) ........ 11
Gioia v. Forbes Media LLC, 501 Fed. App’x 52 (2d Cir. 2012) .................................................... 9
In re Kimber Petroleum Corp., 110 N.J. 69 (N.J. 1988) .............................................................. 12
Kelly v. Berlin, 300 N.J. Super. 256 (N.J. App. Div. 1997).......................................................... 11
Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574 (1986)...................................... 9
New Jersey Tpk Auth. v. PPG Indus., Inc., 197 F.3d 96 (3rd Cir. 1999) ....................................... 11
NJDEP v. Essex Chem. Corp., No. A-004478-10T2, 2012 WL 913042, *7
(N.J.A.D. Mar. 20, 2012) ................................................................................................... passim
NJDEP v. Union Carbide Corp., Docket No. MID-L-5632-07
(N.J. Super. Ct. Mar. 29, 2011.)............................................................................................ 9, 13
Point Productions, A.G. v. Sony Music Entertainment, Inc.,
215 F. Supp. 2d 336 (S.D.N.Y. 2002)....................................................................................... 10
Rivera v. Rochester Genesee Regional Transp. Auth., 702 F.3d 685 (2d Cir. 2012) ..................... 9
Robinson v. Allstate Ins. Co., 508 Fed. App’x 7 (2d Cir. 2013) ............................................. 10, 13
Scotto v. Almenas, 143 F.3d 105 (2d Cir. 1998) ........................................................................... 10
Zalaski v. City of Bridgeport Police Dep’t, 613 F.3d 336 (2d Cir. 2010) ...................................... 9
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page ii
Defendants Shell Oil Company, Shell Oil Products Company LLC, Shell Trading (US)
Company, Equilon Enterprises LLC, and Motiva Enterprises LLC (“Shell”), submit this
memorandum of law in support of their motion for partial summary judgment on Plaintiffs’
claim for what they call “primary restoration” damages at the Ridgewood Trial Site.
I.
INTRODUCTION
Gasoline constituents, including MTBE, were first detected in the soil and groundwater at
the Ridgewood Site in 1987. Since then, Shell has worked at the direction of NJDEP to
investigate and remediate the Site, including the station and surrounding areas. Shell has
performed all the work NJDEP has required, including active remediation for many years, and
the installation of more than 80 monitoring and extraction wells. In 2009, NJDEP approved
shutdown of the active remediation systems and directed Shell to undertake Monitored Natural
Attenuation (“MNA”), which involves testing samples from numerous existing monitoring wells
at and around the Site and reporting the results periodically. In late 2012, the active remediation
equipment was removed. Shell continues to monitor existing wells. The remediation branch of
NJDEP has not required more than that.
Now, based on a claim for what they call “primary restoration,” Plaintiffs seek a
judgment against Shell for the costs of additional investigation that an outside expert from
California, Anthony Brown, recommended in this case, consisting of installing and sampling
more monitoring wells, which Mr. Brown says would cost another $1.3 million. To repeat,
NJDEP has not directed Shell to perform this work. To the contrary, this additional
“investigation” is unnecessary under the NJDEP cleanup standards. Yet Plaintiffs say Shell
should have to pay $1.3 million in “damages” because that is what their expert says this
investigation work would cost -- if it were ever done.
This claim is legally untenable for two main reasons: First, Plaintiffs admit they cannot
prove a need for “primary restoration” that would support a claim for damages. Rather, the most
Plaintiffs can allege is that the additional “investigation” which Mr. Brown recommends “may”
uncover an injury (which is highly speculative at best, particularly since there is no indication
Plaintiffs would even conduct the “investigation” if awarded the “damages” they seek, and in
any event would not do so until after trial). Even Mr. Brown acknowledges the investigation
might be fruitless, as he candidly admits that the prior remediation and current monitoring “may”
be sufficient and, at present, he cannot recommend any additional remediation. Second, the
claim cannot survive as a form of “primary restoration” damages because mere investigation
would not “restore” anything. New Jersey courts have made clear that damages for “primary
restoration” may be recoverable if, but only if, NJDEP can show that additional restoration is
necessary to protect flora, fauna or human health, safety or welfare. Mere “investigation” cannot
meet that standard. Shell is therefore entitled to partial summary judgment on the claim for
“primary restoration” damages at the Ridgewood Site.
II.
UNDISPUTED FACTS
A. Shell Has Remediated the Ridgewood Site to the Satisfaction of NJDEP
In 1987, a release of gasoline including MTBE was detected at the Ridgewood Site.
Additional releases were reported in the ensuing years, most recently in 1998. MTBE from the
Site allegedly impacted three wells owned by the Village of Ridgewood, and Shell settled claims
of the Village in the 1990s by paying for treatment on those wells. MTBE has not been detected
in those wells above the State MCL since 1998, and has not been detected at any level
whatsoever since 2008. (See Shell Defendants’ Rule 56.1 Statement of Material Facts (the “R.
56.1 Statement”) ¶¶ 7, 8.)
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 2
Shell accepted responsibility for discharges at the Site and has worked at the direction of
NJDEP to remediate the Site and surrounding areas. The remediation, which has been extensive,
is essentially complete. Shell installed and operated two active remediation systems, and
installed more than 80 monitoring and extraction wells throughout the area. (R. 56.1 Statement
¶¶ 9, 19, Davies Exh. 2.) By 2009, NJDEP determined that Shell had achieved full control of
the plume, that no further investigation or remediation was needed, and that ongoing monitoring
of existing wells is all that is necessary.
At various points in the past, particularly in the 1990s, Shell and its consultants took issue
with some of NJDEP’s demands. In 2000, NJDEP issued an Administrative Order and Notice of
Civil Administrative Penalty Assessment against Shell for the Ridgewood Site. In 2007, NJDEP
and Shell entered into an Administrative Consent Order which settled NJDEP’s claims for
alleged violations or shortcomings in the remedial work at Ridgewood, as well as NJDEP’s
claims for its oversight costs and a penalty. (R. 56.1 Statement ¶ 6, Wallace Exh. 5.)
The former NJDEP case manager assigned to the Ridgewood Site, Donna Plummer,
testified in this case about Shell’s remediation. She stated that her goal at this and other sites is
to “protect municipal wells and clean up contaminated sites as quickly as possible.” (R. 56.1
Statement ¶ 40, Wallace Exh. 6, Mar. 14, 2012 Deposition of Donna Plummer, at 439:18-23.)
She had directed the remediation of the Ridgewood Site from 1988 to 2006. (R. 56.1 Statement
¶ 441, Wallace Exh. 6, at 69:6-17.) In 2006, NJDEP approved a final Remedial Action
Workplan for the Site. ((R. 56.1 Statement ¶ 41, Wallace Exh. 6, at 70-71.) She testified that
Shell had installed enough wells to delineate contamination, and had achieved the goals of
controlling the plume and reducing the levels of contamination, all by 2006 when NJDEP
approved the final Remedial Action Workplan. (R. 56.1 Statement ¶ 43, Wallace Exh. 6, at 70-
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 3
72, 126, 193-94, 205-06.) Ms. Plummer also testified that Shell was “very responsive” to
NJDEP’s requests to conduct investigation and remediation. (R. 56.1 Statement ¶ 44, Wallace
Exh. 6, at 126.)
In the final plan, NJDEP approved the program of Monitored Natural Attenuation or
MNA off-site, directing that the program include background monitoring points, source area
monitoring points, compliance monitoring points, and sentinel wells. The NJDEP specified
which of the existing wells to include in the monitoring program. The NJDEP did not request
any further investigation or the installation of additional wells. (R. 56.1 Statement ¶¶ 32, 33, 36,
Davies Exh. 2.) Active remediation systems continued to operate on-site at the station property
until 2009, at which point NJDEP also approved shutdown of those systems. (Id. ¶¶ 10, 20-23.)
Coincidentally, in 2009, New Jersey enacted the Site Remediation Reform Act
(“SRRA”), which changed the way NJDEP directs remediation projects. Previously, NJDEP’s
Site Remediation Program (“SRP”) provided direct oversight of the cleanup of contaminated
sites, and needed to approve work plans, progress reports, and remedial actions before they could
be implemented. With the passage of the SRRA, NJDEP effectively privatized much of this
function. Under SRRA, the party responsible for the cleanup of a contaminated site must hire
and pay for an independent Licensed Site Remediation Professional or “LSRP,” and that LSRP is
responsible for applying the NJDEP standards for directing the investigation and remediation of
the site. LSRPs have the authority under the SRRA to conduct investigations, approve remedial
alternatives, and determine when remedial action is complete. (Id. ¶ 13, Declaration of Julian
Davies ¶ 3.) As NJDEP put it, the LSRPs “‘step into the shoes’ of the Department … to oversee
the remediation of contaminated sites in most instances.” (R. 56.1 Statement ¶ 14, Davies Exh.
1, NJDEP SRP, Overview of the LSRP Program, April 2011.).
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 4
Julian Davies is the LSRP for the Ridgewood Site, and has been since 2010. In a
declaration submitted with this motion, Mr. Davies describes in detail the responsibilities of a
LSRP and the standards that LSRPs must apply. In brief, they are subject to a strict code of
ethics and very specific standards that are set forth in the SRRA and NJDEP regulations, all
aimed at assuring they protect human health and the environment. (R. 56.1 Statement ¶¶ 15-18,
Davies Declaration ¶¶ 4-9.)
By the time Mr. Davies was assigned to be the LSRP for the Ridgewood Site in 2010, the
NJDEP SRP had already approved of the final Workplan in 2006 which required only
monitoring and no further active remediation off-site, and had approved shutdown of the on-site
active remediation systems in 2009, and reiterated that approval in 2010. (R. 56.1 Statement ¶¶
22, 23, 27, Davies Exh. 2.) In 2012, in his role as LSRP, Mr. Davies approved the permanent
shutdown and removal of the active remediation equipment on-site. (R. 56.1 Statement ¶ 26,
Davies Declaration ¶ 13, Davies Exh. 2.) Mr. Davies determined that annual sampling of 18
groundwater wells should continue as part of the MNA program and that annual sampling of
these wells was appropriate for purposes of protecting flora, fauna, public health, safety and the
environment in the vicinity of the Ridgewood Site. Mr. Davies did not determine, in his role as
LSRP, that any additional investigation or new monitoring wells were necessary or appropriate.
(R. 56.1 Statement ¶ 33, Davies Declaration ¶ 16.)
More than 50 monitoring wells are still in place at and around the Ridgewood Site.
Approximately 85 wells have been installed at and around the Site at one time or another, some
of which are located as far as 1,200 feet from the station itself. More than 2,000 groundwater
samples from those wells have been collected and analyzed for up to 15 different chemical
constituents during the course of the 25-year investigation and remediation. Additional sampling
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 5
data have also been collected from the Village of Ridgewood Water Department supply wells.
(R. 56.1 Statement ¶ 39, Davies Declaration ¶ 17.) The investigation has been thorough, and
certainly sufficient to meet NJDEP standards.
B. Plaintiffs’ Expert Brown Opines that More “Investigation” May Be Needed
One of Plaintiffs’ experts, Anthony Brown, a California hydrogeologist, has opined that
additional investigation should be conducted to determine whether more remediation “may” be
needed. He offers the following opinions, among others, about the Ridgewood Site:
13.
“Remediation performed to date may have effectively addressed on-site
groundwater contamination.” …
18.
“Additional on-site remediation of groundwater is possibly required.”
19.
“Additional off-site remediation of groundwater may be required. … The most
recent contaminant concentrations detected off-site would not warrant the
implementation of an off-site groundwater remediation system. However,
based upon the results of additional investigation, particularly in the transmissive
Z4 bedrock unit, an off-site groundwater remediation system may be required.”
(R. 56.1 Statement ¶ 46, Wallace Exh. 8, Revised Site Summary, ID # 11346 Shell Service
Station #138490, Jan. 2013, §10, p. 56.) (emphasis added).
Despite some 25 years of investigation and remediation, and the contrary determinations
by the NJDEP case manager and the LSRP, and despite his own view that recent data “would not
warrant” any additional remediation, Mr. Brown opines that more investigation “may” indicate
that more remediation “may be required.” Notably, Mr. Brown recommends additional active
remediation at all but two of Plaintiffs’ 10 Trial Sites, Ridgewood and one other. Revised Brown
Expert Report, Jan. 2013, § 1.8, p. 15 (Wallace Exh. 7 at 15) (“Monitoring only is recommended
for two plaintiffs’ trial sites (… Ridgewood; and … Manalapan…)”). Hence, the material facts
presented here, where Plaintiffs seek “primary restoration” damages for mere investigation, are
unique to the Ridgewood Site and possibly one other.
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 6
Mr. Brown opines that the further investigation he suggests should involve installing 18
new wells, and then monitoring those wells for five years, which he says would cost more than
$1.3 million. Revised Cost Summary, ID # 11346 Shell Service Station #138490, Jan. 2013, § A,
pp. 1-4, Jan. 2013 (Wallace Exh. 8.)
Mr. Brown does not disagree with NJDEP’s approval of the shutdown of the active
remediation systems at the Ridgewood Site. (R. 56.1 Statement ¶ 53, Wallace Exh. 11, June
3,2013 Brown Depo. 881:19-22.) Mr. Brown is not a LSRP. R. 56.1 Statement ¶ 54, Wallace
Exh. 11, May 28, 2013 Brown Depo. 68:25-69:2.) No one indicated to Mr. Brown that the
LSRP’s work at the Ridgewood Site had been inadequate. (R. 56.1 Statement ¶ 55, Wallace Exh.
11, 898:12-20.) Mr. Brown never made any attempt to discuss the Ridgewood Site with the
LSRP for the Site. (R. 56.1 Statement ¶ 56, Wallace Exh. 11, June 3, 2013 Brown Depo. 880:2225.)
Mr. Brown does not and cannot identify any cleanup or removal costs necessary to
accomplish “primary restoration” at the Ridgewood Trial Site. Instead, he merely states that
“[t]he need for remediation would be reevaluated … as additional data are generated from the
proposed site investigations.” Revised Brown Expert Report, Jan. 2013, § 1.8, p. 15 (Wallace
Exh. 7). Neither Mr. Brown nor Plaintiffs identify when this “reevaluation” would take place.
Given that Plaintiffs are seeking an award of damages for additional investigation in the initial
focus trial, that “reevaluation” presumably would have to take place after the trial has concluded
– that is if Plaintiffs conduct any investigation at all with the money they seek to recover. 1
1
There is reason to doubt whether Plaintiffs would ever do the investigation Mr. Brown
proposes. NJDEP Deputy Commissioner Irene Kropp testified that NJDEP’s Office of Natural
Resource Recovery (“ONRR”) has recovered money for natural resource damages in the past,
but to her knowledge NJDEP has never used the money for remediation: “I think primarily the
money that ONRR, whatever you call it, received through natural resource damage claims was
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 7
Mr. Brown concedes that he does not have any evidence that the MNA program currently
in place at the Ridgewood Site is inappropriate or insufficient, or that anything more is required:
[T]he current off-site contaminant concentrations in groundwater do not justify
implementation of an active remediation system. Additional investigation
proposed at these sites may indicate that off-site remediation of groundwater
contamination is required. However, until such time, the MNA alternative is
effective in the short-term, and may be effective in the long-term….
Feasibility Study, Nov. 2012, § 4.1.2, p. 19 (Wallace Exh. 9). At three other trial sites in this
case, Plaintiffs performed “limited additional site investigations” during discovery to determine
whether remediation to achieve primary restoration was necessary. The Ridgewood Site was not
among them. See Revised Brown Expert Report, Jan. 2013, § 1.9, p. 16 (Wallace Exh. 7). Thus,
Plaintiffs could have done more investigation themselves to determine if real “restoration” work
is required at Ridgewood, but they did not. As Mr. Brown acknowledged in his report, current
evidence would not “warrant” or “justify” additional active remediation at Ridgewood. In
essence, then, the “primary restoration” damages Plaintiffs seek from Shell would amount to a
fund for a post-trial fishing expedition to search for evidence of a natural resource injury that
they admit they cannot prove now.
III.
ARGUMENT
Plaintiffs claim they are entitled to recover damages under the New Jersey Spill
Compensation and Control Act (the “Spill Act”) for “primary restoration,” which they define as
the “cost to restore all MTBE contaminated waters of the State to their pre-discharge condition.”
(NJDEP 4th Am. Compl. ¶¶ 1, 6; Wallace Exh. 10 (Brown Rebuttal Rpt. Attachment D.) They
also seek other damages at the Ridgewood Site, including some oversight costs (most of which
spent on projects and acquisitions. I’m not aware of when we’ve gone back in and said to
somebody we’re taking your NRD contribution and moving your site from cleanup standards to
predischarge, if that’s your question.” Deposition of Irene Kropp, June 6, 2013, at 224:9-17
(Wallace Exh. 6).
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 8
Shell already paid) and damages for alleged “lost use” of water (despite Shell having paid for
treatment of the Ridgewood water supply already). This motion challenges only the claim for
alleged “primary restoration” damages.
New Jersey law is clear that NJDEP bears the burden of proving the need for primary
restoration. NJDEP v. Essex Chem. Corp., No. A-004478-10T2, 2012 WL 913042, *7 (N.J.A.D.
Mar. 20, 2012); NJDEP v. Union Carbide Corp., Docket No. MID-L-5632-07 (N.J. Super. Ct.
Mar. 29, 2011.)(Wallace Exh. 12.) Plaintiffs cannot meet that burden.
A. Summary Judgment Standard
Summary judgment is appropriate where the moving party shows “that there is no
genuine dispute as to any material fact and [that the party is] entitled to judgment as a matter of
law.” Rivera v. Rochester Genesee Regional Transp. Auth., 702 F.3d 685, 693 (2d Cir. 2012)
(quoting Fed. R. Civ. P. 56(c)). “A genuine dispute exists if the evidence is such that a
reasonable [trier of fact] could return a verdict for the nonmoving party.” Finn v. N.Y. State
Office of Mental Health-Rockland Psychiatric Ctr., 489 Fed. App’x 513, 514 (2d Cir. 2012)
(quotation marks omitted). “Only disputes over facts that might affect the outcome of the suit
under the governing law will properly preclude the entry of summary judgment.” Anderson v.
Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). “The moving party bears the burden of
establishing the absence of any genuine issue of material fact.” Zalaski v. City of Bridgeport
Police Dep’t, 613 F.3d 336, 340 (2d Cir. 2010) (citing Celotex Corp. v. Catrett, 477 U.S. 317,
322 (1986)). To defeat a motion for summary judgment, however, the non-moving party “‘must
do more than simply show that there is some metaphysical doubt as to the material facts,’” Gioia
v. Forbes Media LLC, 501 Fed. App’x 52, 54 (2d Cir. 2012) (quoting Matsushita Elec. Indus.
Co. v. Zenith Radio Corp., 475 U.S. 574, 586–87 (1986)), and “‘may not rely on conclusory
allegations or unsubstantiated speculation.’” Robinson v. Allstate Ins. Co., 508 Fed. App’x 7, 9
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 9
(2d Cir. 2013) (quoting Scotto v. Almenas, 143 F.3d 105, 114 (2d Cir. 1998)). A motion such as
this seeking to limit damages is properly “treated as a motion for partial summary judgment.”
Point Productions, A.G. v. Sony Music Entertainment, Inc., 215 F. Supp. 2d 336, 340 (S.D.N.Y.
2002), citing Barnes Group v. United States, 872 F.2d 528, 532 (2d Cir. 1989).
B. Plaintiffs Cannot Prove Primary Restoration Damages at the Ridgewood Site
Plaintiffs offer nothing but unsubstantiated speculation that the Ridgewood Site “may”
someday require some unspecified form of remediation based on future test results from new
monitoring wells that Mr. Brown recommends, and they seek the estimated costs to drill and test
such wells. The wells and testing that Mr. Brown recommends would do nothing to restore any
natural resource or to protect flora, fauna or human health, safety or welfare. Mr. Brown’s report
fails to establish the need for “primary restoration” and fails to identify any restoration work
beyond mere investigation. Plaintiffs’ failure to support their primary restoration claim with
admissible evidence entitles Shell to summary judgment on that claim.
NJDEP’s ability to sue for so-called Natural Resource Damages or “NRD” such as
“primary restoration” is not without limits.2 When the State brings a civil action, including an
action under the Spill Act, it bears the burden of proving every element of its claim, particularly
the alleged damages. NJDEP v. Essex Chem. Corp., 2012 WL 913042 at *7 (“plaintiffs’ role as
trustees of the State’s resources and their responsibilities under the Spill Act did not relieve them
of their burden of proof on the issues of damages”) (citing Caldwell v. Haynes, 136 N.J. 422, 436
(N.J. 1994), which held that “[g]enerally, plaintiffs have the burden of proving damages”). Cf.
2
The term “primary restoration” does not appear at all in the Spill Act. Several times Mr.
Brown quotes an NJDEP regulation (N.J.A.C. 7:26C-6.5) that uses the term “primary and
compensatory restoration damages” and misleadingly attributes the quotation to the Spill Act.
See, e.g., Brown Rebuttal Rpt. Attachment A, at 4 (Wallace Exh. 10). Even the cited regulation
does not define the term, and that regulation does not concern recoverable damages, but rather
addresses the scope of final remediation documents and covenants not to sue.
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 10
New Jersey Tpk Auth. v. PPG Indus., Inc., 197 F.3d 96, 106 (3rd Cir. 1999) (rejecting state
authority’s attempt to relieve its burden to prove causation under the Spill Act).
Summary judgment is appropriate where a plaintiff fails to meet its burden to prove an
element of its claim. E.g., New Jersey Tpk. Auth., 197 F.3d at 112. Expert testimony is required
on any issue which is beyond the “common knowledge of lay persons.” Froom v. Perel, 377
N.J. Super. 298, 318 (N.J. App. Div.), certif. denied, 185 N.J. 267 (2005); Kelly v. Berlin, 300
N.J. Super. 256, 268 (N.J. App. Div. 1997) (expert evidence required on the issue of damages
where “laypersons do not have the knowledge, from their common experience, to evaluate and
determine damages in a case of this kind”). In particular, a matter that involves a “complex
scientific issue such as the migration of chemicals through land” requires expert evidence if the
plaintiff is to meet its burden. California v. Kinder Morgan Energy Partners, No. 07-CV-1883MMA (WVG), 2013 U.S. Dist. LEXIS 10503, at *28 (S.D. Cal. 2013); Carroll v. Lytton Sys.,
No. B-C-88-253, 1990 U.S. Dist LEXIS 16833, *132 (W.D.N.C. 1990). Cf. City of Fresno v.
Chevron U.S.A., Inc., MDL 1358, 04 Civ. 4973, 2013 WL 4830965, *9, *18 (S.D.N.Y. Sept. 10,
2013) (granting summary judgment on some of plaintiff’s claims partly because plaintiff failed
to designate an expert on the fate and transport of chemicals and hence could not prove
causation).
Natural resource damages for primary restoration are not recoverable solely because a
release has taken place at a site. Rather, if NJDEP can recover “primary restoration” damages at
all, it must show that existing contamination at a site poses a risk to flora, fauna, or to human
health, safety or welfare. Essex Chem. Corp., 2012 WL 913042, at *7. Likewise, NJDEP would
have to establish that a proposed “primary restoration” plan is justified and necessary. Id.;
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 11
accord In re Kimber Petroleum Corp., 110 N.J. 69, 85-86 (N.J. 1988) (DEP directive to a
responsible party to pay for cleanup and removal costs must be reasonable).
The Essex Chemical case is particularly instructive. In that case, NJDEP unsuccessfully
sought to recover primary restoration damages for a site where, like here, the defendant
acknowledged responsibility for contamination and had been remediating the site for years at the
direction of NJDEP’s Site Remediation Program or SRP. There, Essex Chemical had
implemented a remediation program with SRP’s oversight and approval for more than two
decades. 2012 WL 913042, at *7. Nevertheless, NJDEP’s Office of Natural Resource
Restoration or ONRR sued claiming the remediation was insufficient and particularly that it was
taking too long. NJDEP, as in this case, hired an outside expert to identify additional, more
aggressive remediation measures and to estimate the costs of those measures. It sued to recover
those costs as “primary restoration” damages. Id. NJDEP failed to show that the additional,
costly measures its expert specified were necessary to protect flora, fauna or public health, safety
or welfare; that the benefits of the additional measures would justify the costs; or that it would be
harmful to permit Essex to continue with the remedial plan that the SRP had agreed was
sufficient. Id. at *8. The Appellate Division held:
The trial court recognized the State’s unique role under the Spill Act and plaintiffs’ right
to seek natural resource damages for contamination resulting from the discharge of
hazardous substances. The trial court correctly determined, however, that plaintiffs’ role
as trustees of the State’s resources and their responsibilities under the Spill Act did not
relieve them of their burden of proof on the issue of damages.
Thus, plaintiffs were required to establish by a preponderance of the credible evidence
that their expedited remediation plan should be implemented rather than Essex’s plan. As
the trial court found, plaintiffs failed to do so. Plaintiffs did not show that there was a
need to restore the properties to pre-discharge conditions within ten years, particularly
when there was no evidence showing that the hazardous substances remaining on the
properties were causing harm to any of the flora and fauna or posed any threat to the
public health, safety or welfare.
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 12
Id. at *7 (citations omitted); see also NJDEP v. Union Carbide Corp., Docket No. MID-L-563207 (N.J. Super. Ct. Mar. 29, 2011) (Wallace Exh. 12) (NJDEP must show why it should be
entitled to faster, more thorough cleanup or more stringent cleanup standards than those endorsed
by the SRP).
Here, Plaintiffs’ claim for “primary restoration” damages is even more meritless, since
they seek costs not for additional or alternative remediation, but for mere investigation. They
admit that additional remediation is not “warranted” or “justified” based on existing data (which
are extensive, to say the least). Almost by definition, a claim for mere investigation cannot
satisfy the requirement of proof that the relief sought must be necessary to protect flora, fauna or
public health, safety or welfare.
Like Essex Chemical, Shell has worked closely with the SRP and LSRP for the
Ridgewood Site to develop and implement remedial plans for more than 20 years. Unlike in the
Essex case, active remediation has been completed at the Ridgewood Site and, with the
permission of NJDEP, all active remediation equipment has already been removed from the Site.
Plaintiffs offer no evidence that low levels of MTBE that remain at the Ridgewood Site pose any
threat to flora, fauna, or public health, safety or welfare, much less that active remediation is
necessary to avert such a threat. Moreover, unlike in the Essex case, NJDEP does not even have
an alternative restoration plan here. The additional investigation Mr. Brown proposes would not
result in any restoration whatsoever. What is more, as Mr. Brown effectively concedes, the
additional investigation might not uncover any future need for additional remediation, and so
may be pointless. At most, the recommendation for additional investigation is based on mere
speculation that it “may” reveal a need for more remediation in the future. Speculation cannot
defeat summary judgment. Robinson v. Allstate Ins. Co., 508 Fed. App’x 7, 9 (2d Cir. 2013).
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 13
C. Mr. Brown’s Report Is Insufficient To Raise a Genuine Issue of Material Fact
Showing a Need for Primary Restoration at the Ridgewood Trial Site
Plaintiffs’ evidence, in the form of Mr. Brown’s opinion about the need for further
investigation, is insufficient to establish the existence of any injury, as would be necessary for
Plaintiffs to maintain the claim for investigation costs. This Court recently rejected a similar
claim in the City of Fresno case. There, Fresno’s expert, David Norman, like Mr. Brown here,
opined that additional assessment activities like those Mr. Brown recommends were required to
determine if there was any injury that may require remediation. This Court summarized
Mr. Norman’s opinion in that case in words that aptly describe Mr. Brown’s opinion here:
[Fresno’s] remediation expert—David Norman—testified that he lacked sufficient
information to recommend remediation at any of the sites at issue, and therefore could
not state whether future remediation at any of these sites would be reasonable. However,
he recommended that site-assessments be performed for the sites, and opined that it
would cost between $23,000 and $135,000 per site to conduct an initial assessment in
order to determine whether remediation is reasonably required.
City of Fresno v. Chevron U.S.A., Inc., MDL 1358, 04 Civ. 4973, 2013 WL 4830965, *5
(S.D.N.Y. Sept. 10, 2013). The Court also summarized Fresno’s claim in terms that apply
equally to NJDEP’s claim for additional investigation at the Ridgewood Site: “Fresno seeks
damages … to perform site-assessments at the [defendants’] … Sites in order to determine
whether they must be remediated in order to protect its water production wells.” Id. at*17. The
Court held that, despite Mr. Norman’s opinion about the need for investigation to search for
proof of injury, “Fresno has presented no evidence from which a reasonable jury could infer that
MTBE contamination at the [defendants’] … Sites have caused appreciable injury to its water
production wells.” Id. at *16.
Mr. Brown’s opinion that past remediation and ongoing monitoring may be effective but
that additional remediation “may be required” amounts to a tacit admission that, although he
tried, he could not identify any “primary restoration” actually necessary at the Ridgewood Trial
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 14
Site. Plaintiffs cannot skip the threshold requirement of proving recoverable damages by
offering an expert opinion that more information is needed before that expert can decide whether
active remediation, or real “restoration” damages are “justified” or “warranted.” See Transcript
of MDL 1358 Hearing, August 19, 2013, p.45:18-23 (THE COURT: “You have to have some
damage. Nobody is going to order them to pay for damage that you can’t prove”).
Mr. Brown’s recommended investigation is impractical, as well as legally untenable. As
noted, he recommends installing 18 new monitoring wells and sampling them for five years (or
more precisely that the State recover $1.3 million representing his estimate of what this
investigation would cost if it were performed). If his plan were implemented, it would be
undertaken after trial and would continue for five years, all to determine whether there is
evidence that would “warrant” or “justify” additional remediation. In effect, Mr. Brown
acknowledges that Plaintiffs cannot prove a need for “primary restoration” damages, and
proposes a plan to investigate whether there is such a need over the course of five years after
trial, all based on his opinion that there “may” be a need for restoration or remediation after that
time. The Court should not allow the claim for “primary restoration” damages to proceed to trial
based on Mr. Brown’s mere speculation.
IV.
CONCLUSION
For the foregoing reasons, Shell’s motion for partial summary judgment on Plaintiffs’
claim for primary restoration damages at the Ridgewood Trial Site should be granted.
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 15
Dated: October 1, 2013
Respectfully submitted,
/s Richard E. Wallace, Jr.
Richard E. Wallace, Jr.
Michael L. Williams
Marie S. Dennis
SEDGWICK LLP
2900 K Street, NW
Harbourside, Suite 500
Washington, DC 20007
(202) 204-1000
Attorneys for Defendants Shell Oil Company, Shell Oil
Products Company LLC, Shell Trading (US) Company,
Equilon Enterprises LLC, and Motiva Enterprises LLC
Memo in Support of Shell Motion for Partial Summary Judgment re Ridgewood
Page 16
PROOF OF SERVICE VIA LEXIS/NEXIS FILE & SERVE AND E-MAIL
I, Kristin McCormick, hereby declare under penalty of perjury under the laws of the United
States of America that a true and accurate copy of the foregoing was served via Lexis/Nexis File
& Serve and ECF on all parties on this 1st day of October 2013.
________/s/ Kristin McCormick
Kristin McCormick