Apple Inc. v. Samsung Electronics Co. Ltd. et al

Filing 662

EXHIBITS re #660 Administrative Motion to File Under Seal Apple Inc.'s Notice of Motion and Motion for Partial Summary Judgment Exhibits to Mueller Declaration ISO Apple's Motion for Partial Summary Judgment [660-9] filed byApple Inc.(a California corporation). (Attachments: #1 Exhibit Mueller Decl Exhibit 26, #2 Exhibit Mueller Decl Exhibit 27, #3 Exhibit Mueller Decl Exhibit 28, #4 Exhibit Mueller Decl Exhibit 29, #5 Exhibit Mueller Decl Exhibit 30, #6 Exhibit Mueller Decl Exhibit 31, #7 Exhibit Mueller Decl Exhibit 32, #8 Exhibit Mueller Decl Exhibit 33, #9 Exhibit Mueller Decl Exhibit 34, #10 Exhibit Mueller Decl Exhibit 35, #11 Exhibit Mueller Decl Exhibit 36, #12 Exhibit Mueller Decl Exhibit 37, #13 Exhibit Mueller Decl Exhibit 38, #14 Exhibit Mueller Decl Exhibit 39, #15 Exhibit Mueller Decl Exhibit 40, #16 Exhibit Mueller Decl Exhibit 41)(Related document(s) #660 ) (Selwyn, Mark) (Filed on 1/25/2012)

Download PDF
Mueller Exhibit 40 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 04 - 08 April, 2005 R1-050369 Agenda item 3 Title: Approved report of 3GPP TSG RAN WG1 #40 in Scottsdale (Scottsdale, AZ, USA, 14- 18 February, 2005) Document for: Source: TSG RAN WG1 Secretary Notes: All timestamps in this document are in GMT-7Hunless otherwise noted. Fact Summary Meeting: Dates: Venue: Host: Attendees: Documents: 3GPP TSG RAN WG1 #40 14th through 18th February, 2005 Embassy Suites Hotel Phoenix - Scottsdale, Scottsdale, AZ, USA The North American Friends of 3GPP 81 delegates 195 (including some withdrawn and post-meeting artefacts) Yoshikazu Ishii ETSI Mobile Competence Center yoshikazu.ishii@etsi.org APLNDC-WH-A 0000011016 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Table of contents Executive summary ...................................................................................................................................... 1 1 Opening of the meeting .............................................................................................................................. 1.1 Call for IPR .................................................................................................................................................. 2 2 2 Approval of the agenda ....................................................................................................................... 2 3. Approval of the minutes from previous meetings ................................................................................. 2 4. Summary from TSG RAN#26 ............................................................................................................. 3 5. Liaison statement handling .................................................................................................................. 4 6. 6.1 6.2 6.3 6.4 6.5 Maintenance of R99, Rel4, Rel5, Rel6 ............................................................................................... R99 CRs + shadow CRs ............................................................................................................................... Rel4 CRs + shadow CRs .............................................................................................................................. Rel5 CRs + shadow CRs .............................................................................................................................. Rel6 CRs (if not covered by other agenda item) ............................................................................................ Other ........................................................................................................................................................... 6 6 6 6 6 7 7. MBMS UE capability ........................................................................................................................ 9 8. Optimisation of downlink channelisation code utilisation (FDD) ....................................................... 10 9. 9.1 9.2 9.3 9.4 9.5 9.6 9.6.1 9.6.2 9.6.3 9.6.4 9.6.5 FDD Enhanced Uplink .................................................................................................................... Reporting from the conference calls on Enhanced Uplink ............................................................................ Timing, HARQ and Scheduling .................................................................................................................. Measurements for RRM ............................................................................................................................. LIE categories (TS 25.306) ......................................................................................................................... Interaction with other features .................................................................................................................... Enhanced Uplink CRs on the specifications ................................................................................................ CRs for TS 25.211 ................................................................................................................................ CRs for TS 25.212 ................................................................................................................................ CRs for TS 25.213 ................................................................................................................................ CRs for TS 25.214 ................................................................................................................................ CRs for TS 25.215 ................................................................................................................................ 13 15 16 21 23 24 25 25 27 28 28 29 10. IMS (RAB support enhancement work item) ................................................................................... 30 11. Optimisation of downlink channelisation code utilisation (3.84 Mcps TDD) ......................................31 12. Optimisation of downlink channelisation code utilisation (1.28 Mcps TDD) ......................................32 13. Work Item on 7.68 Mcps TDD .......................................................................................................... 33 14. Study Item on TDD Enhanced Uplink ............................................................................................... 34 15. Review of RAN WG1 Terms of Reference ........................................................................................ 35 16. Other Business ................................................................................................................................ 35 17. Closing of the meeting : Friday 5.00 PM ........................................................................................... 36 Annex A: List of participants .................................................................................................................. 37 Annex B: TSG RAN WG1 meetings in 2005 .......................................................................................... 40 Annex C: List of CRs agreed at RANI#40 .............................................................................................. 41 Annex D: List of Outgoing LSs to 3GPP other groups ............................................................................. 43 Annex E: List of Tdocs at RAN1 #40 ..................................................................................................... 44 APLNDC-WH-A 0000011017 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Executive summary WG RAN1 #40 took place in Embassy Suites Hotel Phoenix - Scottsdale, AZ, USA. The meeting started at 9:00 on Monday 14al February 2005 and finished at 16:00 on Friday 18th. On Monday, "Maintenance of R99-Rel. 6", "MBMS UE capability", and "Optimisation of downlink channelisation code (FDD) were discussed. Regarding "Optimization of downlink channelization code", the set of CR for TS25.211-215 was agreed. Through Tuesday to Thursday, "FDD Enhanced Uplink" was mainly discussed. Timing/HARQ/Scheduling issues, UE capabilities, and compressed mode for EDCH were discussed and then more than ten CRs were agreed. Additionally, RAN1/2/3/4 joint session regarding RRM EDCH was held on Wednesday evening. The number of contribution documents for this meeting was 190, and those documents were categorized as followed. 16 14 Maintenance of R99, Rel4, Rel5, Rel6 MBMS UE Capability 8 8 Optimisation of downlink channelisation code (FDD) 25 19 FDD Enhanced Uplink 105 85 IMS(RAB support enhancement work item) 1 1 Optimisation of downlink channelisation code (3.84 Mcps 4 3 T.~[?) ................................................................................................................................................................................. Optimisation of downlink channelisation code (1.28 Mcps 2 2 ~:[?.D.) ................................................................................................................................................................................. Work Item on 7,68 Mcps TDD 4 2 Study Item on TDD Enhanced Uplink 5 4 Note: The w-ithdrawn and revised documents were counted in the numbers of document on this table. APLNDC-WH-A 0000011018 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 1 Opening of the meeting 1410212005 09:05 The RAN1 Chairman, Mr. Dirk Gerstenberger and welcomed the participants to the 40th RAN WG1 and opened the meeting at 09.05am. Mr. Donald E. Zelmer from Singular Wireless LLC welcomed the delegates on behalf of the North American Friends of 3 GPP. 1.1 Call for IPR 14/02/2005 09:05 The Chairman drew attention to Members’ obligations under the 3GPP Parmer Organizations’ IPR policies. Every Individual Member organization is obliged to declare to the Parmer Organization or Organizations of which it is a member any IPR owned by the Individual Member or any other organization which is or is likely to become essential to the work of 3GPP. The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational Partners to inform their respective Organizational Partners of Essential IPRs they become aware of. The members take note that they are hereby invited: ¯ to investigate in their company whether their company does own IPRs which are, or are likely to become Essential in respect of the work of the Technical Specification Group. ¯ to notif~v the Director-General, or the Chairman of their respective Organizational Partners, of all potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/). Approval of the agenda 2 R1-050035 Draft Agenda (RAN1 Chairman) 14/02/2005 09:10 Presented by Mr. Dirk Gerstenberger. Discussion (Question / Comment): The Mr. Chairman informed about the discussion in this week. Decision: This document was approved. Approval of the minutes from previous meetings 3. R1-050040 DRAFT Report of3GPP TSG RAN WG1 #39 (RAN1 Secretary) 14/02/2005 09:15 Presented by Mr. Yoshikazu Ishii. Decision: This document was approved in Tdoc R1-050180. R1-050180 R1-050075 Approved Report of3GPP TSG RAN WG1 #39 DRAFT Report of3GPP TSG RAN WG2 #45 (RAN1 Secretary) (RAN2 Secretary) 14/02/2005 09:15 Presented by Mr. Yoshikazu Ishii. Decision: This document was approved just on RAN1/2 Joint session topic in 12.2. APLNDC-WH-A 0000011019 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Summary from TSG RAN#26 R1-050041 Summary from TSG RAN#26 (RAN1 Chairman) 14/02/2005 09:25 Presented by Mr. Dirk Gerstenberger. Discussion (Question / Comment): Mr. Chairman informed about the discussion and decision regarding the last plenary meeting. At last plenary meeting, in addition to the normal discussion, the big topics "UTRAN evolution" was discussed a~d then the process of this topic and SI were approved. As the topic related to RAN1, MIMO was approved to postpone until RAN#28. As the other information, the WG1 election will be held at the WGs co-located meeting in May. Decision: This document was noted. APLNDC-WH-A 0000011020 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Liaison statement handling R1-050036 Reply LS on parameter set for PS streaming reference radio bearer combination with downlink rate up to 128 kbps (To ; T1, Cc ; RAN1) (WG RAN2) 14/02/2005 09:30 Presented by Dr. Stefan Parkvall. Decision: This document was noted. R1-050037 Reply LS on Synchronisation of FDD MBMS P-t-M Transmissions from Clusters of Cells (To ; RAN3, Cc ; RAN1, RAN4) (WG RAN2) 14/02/2005 09:35 Presented by Mr. Mark Harrison. Decision: This document was noted. R1-050038 LS on Layer 1 synchronization procedure (To ; RAN1, Cc ; RAN3, RAN4) (WG RAN2) 14/02/2005 09:35 Presented by Mrs. Ning He. Decision: This document was noted. R1-050039 LS on Radio link failure criteria on Fractional DPCH (To ; RAN3, RAN4, Cc ; RAN1) (WG RAN2) 14/02/2005 09:40 Presented by Mr. Markku Tarkiainen. Decision: This document was noted. R1-050123 LS on Details on MCCH (To ; RAN4, Cc ; RAN1) 14/02/2005 09:40 Presented by Mr. Elias Jonsson. (WG RAN2) Discussion (Question / Comment): There are some discussions on how to pick up the information from MCCH. Decision: This document was noted. R1-050124 LS on reference cell in SFN-SFN observed time difference measurement (To : RAN1, Cc : RAN2) (WG T1) 14/02/2005 09:45 Presented by Mr. Markku Tarkiainen. Discussion (Question / Comment): From Panasonic, it was informed that there is and contribution to this topics. From Nortel, it was commented that it should be confirmed whether the other WG spec (RAN4) have CRs or not in addition to TS25.215. Decision: This document was noted. R1-050125 LS on modified parameters for 5.9 speech radio bearer 6.10.2.4.1.9 in 34.108 (WG T1) (To ; RAN1, RAN2) 14/02/2005 09:55 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): It was commented that RAN2 discussion should be checked. Decision: This document was noted. R1-050175 LS on the measurements required for EDCH congestion control (To : RAN1, Cc : RAN2, RAN4) (WG RAN3) Discussion (Question / Comment): Decision: This LS was noted at RAN1/2/3/4 joint session on RRM EDCH. R1-050199 LS on alignment of MBMS transport channels (To : RAN1, RAN2) (WG RAN3) 18/02/2005 09:10 Presented by Dr. Joern Krause (Siemens). Discussion (Question / Comment): Decision: This document was noted. It was decided to send the reply LS indicating that no significant impact on RAN1 specifications is expected with an intxoduction of an SFN-MFN offset (no impact with introduction of ma SFN-CFN offset) that would lead to alignment of TTI starting times and the proposed solution CFN mod2 = 0 is not preferred in Tdoc R1-050214. R1-050214 [DRAFT] Reply LS on alignment of MBMS transport channels (Siemens) 18/02/2005 12:20 Presented by Dr. Joern Krause. APLNDC-WH-A 0000011021 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Discussion (Question / Comment): Decision: This draft LS was approved with modification in Tdoc R1-050221 R1-050221 Reply LS on alignment of MBMS transport channels (WG-RAN1) R1-050211 LS on Layer 1 synchronization procedure (To ; RAN1, Cc ; RAN3, RAN4) (WG RAN3) 18/02/2005 09:35 Presented by Ms. Ning He. Decision: This document was noted. APLNDC-WH-A 0000011022 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 6. Maintenance of R99, Rel4, Rel5, Rel6 6.1 R99 CRs + shadow CRs R1-050110 25.215CR150rl(ReI99, C),CR151rl(Rel-4, A), CR152rl(Rel-5, A), CR153rl(Rel-6, A) "Removal of TGPL2" (Ericsson, Samsung) 14/02/2005 10:00 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): It was commented that t~ere was a concerning for the removal on R99. Decision: ~ii~ii~iiI~ii~~i~. The decision on release will be taken at next RAN meeting. 6.2 Rel4 CRs + shadow CRs 6.3 Rel5 CRs + shadow CRs R1-050113 25.214CR365(Rel-5, F), CR366(Rel-6, A) "Correction to computed gain factors quantization" (QUALCOMM Europe) 14/02/2005 10:05 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): From Philips and Vodafone, it was commented that this issue is not sure to rely on from network side and so it should be checked by network manufacture side. Also there are some comments and question for the motivation and benefit of this issue. Decision: It was decided to revisit this topic after the offline discussion. In last day, from Qualcomm Europe, the following "Way forward" was proposal. Way forward proposal: Agreed Rel5 CR, but not Rel6 CR, principle agreement to increase the gain factor resolution from Rel6 onward (CR to be brought to RAN#40bis) Final decision: Relation to RAN4 specification should be checked w.r.t accuracy requirement and also whether the objective of the CRs is already possible with the current specifications. Companies cma raise concerns on the CR over the RAN1 refletor before the RAN meeting. ~iiNli~iiN~iiN~ ~. After the meeting, Lucent raised some concerns for Rel-5 CR on the RAN1 reflector. Not Treated R1-050171 UE behavior in DPCH frame offset reconfiguration 6.4 (Intel) Rel6 CRs (if not covered by other agenda item) R1-050099 25.214CR354r2(Rel-6, C)"Timing maintained Hard Handover" (Ericsson) 14/02/2005 11 : 10 Presented by Mrs. Ning He. Discussion (Question / Comment): There are some questions and comments on the behaviour on non-timing maintained handover, how to recognize between timing maintained and non-timing maintained handover. From Notre1, it was commented that from the influence of the issue should be checked from RAN3 aspects. Decision: It was decided to discuss more from viewpoint of"Node B indication needed?". This CR was revised in Tdoc R1-050201. R1-050201 25.214CR354r3(Rel-6, C)"Timing maintained Hard Handover" 18/02/2005 09:40 Presented by Ms. Ning He. (Ericsson) Discussion (Question / Comment): Decision: ~i~i~l For RAN plenary, MCC adds 25.433 to the cover page. R1-050100 25.214CR355rl(Rel-6, B)"Faster L1 DCH synchronization" (Ericsson) 14/02/2005 11:50 Presented by Ms. Ning He. APLNDC-WH-A 0000011023 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Discussion (Question / Comment): It was commented regarding the relation to the RAN4 specification Decision: It was decided to replace Qpost with Qont, and should be reconfirm with RAN2 about indication of the post-sync-failure (depends on RAN2 discussion). Revision 2 of the CR in tdoc R1-050173. Draft an LS to RAN4 in todc R1-050174. R1-050173 25.214CR355r2(Rel-6, B)"Faster L1 DCH synchronization" 18/02/2005 09:50 Presented by Ms. Ning He. (Ericsson) Discussion (Question / Comment): It was commented that L1 specification can not distinguish the content and information, so this issue may depend on RAN2. Decision: ~i~i~i~.’:~I~i~i~i~i~i~:. ¯ ............ .:................’:. ~. If RAN2 comes to another conclusion, the CR text shall be updated accordingly. R1-050174 Draft LS on Faster L1 DCH synchronization (Ericsson) 18/02/2005 09:55 Presented by Ms. Ning He. Discussion (Question / Comment): R1-050216 LS on Faster L1 DCH synchronization (To : RAN4) R1-050082 (WG RAN1) 25.215CR154(Rel-6, F)"Clarification of cell on SFN-SFN observed time difference" (Panasonic) 14/02/2005 12:00 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): From Mr. Chairman, it was suggested that the set for the earlier release should be prepared for the RAN Plenary. Decision: ~ii~i~ii~i It was decided to consider possibility for CRs to the earlier releases (R99...) at RAN Plenary as company proposal. R1-050096 25.224CR140r2(Rel-6, C) "Improvements to uplink closed-loop power control for 1.28Mcps TDD" (IPWireless) 14/02/2005 12:20 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): The CR was already agreed at the last meeting (RANl#39). Because the set of CRs from other group was not available, the approval for the CRs was postpone at the last plenary. And also, the version of specification was updated. As the results, this CR was checked for the new version of specification and was changed on only the cover sheet. Decision: ~ii~ii~ii~li The Category was changed from TEI6 to LCRTDD-Phys after meeting. R1-050114 25.215CR147r4"Introduction of ’DL Transmission Branch Load’ measurement" (Siemens) 14/02/2005 12:15 Presented by Dr. Joel Krause. Discussion (Question / Comment): The CR was already agreed at the last meeting (RANl#39). Because the set of CRs from other group was not available, the approval for the CRs was postpone at the last plenary. And also, the version of specification was updated. As the results, this CR was checked for the new version of specification and was changed on only the cover sheet. Decision: ~ii~i~:... ~ii~i 6.5 Other R1-050154 AMR-WB reference RAB configurations 14/02/2005 12:20 Presented by Mr. Mark1~ Tarkiainen. (Nokia) Discussion (Question / Comment): From Vodafone It was asked why the SRB5 was not used Decision: It was suggested to check PL 0.84 and why SRB5 is omitted. R1-050205 AMR-WB reference RAB configurations 18/02/2005 1 o: 10 Presented by Mr. Mark1~ Tarkiainen. (Nokia)(Revision of R1-050154) Discussion (Question / Comment): Decision: This document was noted. RAN 1 confirms the correctness of the RAN1 parameters. APLNDC-WH-A 0000011024 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050153 R1-050172 Feature Clean-Up Feature Clean-Up 14/02/2005 12:25 Presented by Mr. Markku Tarkiainen. R1-050369 (Nokia) (Withdrawn) (Nokia, Motorola) Discussion (Question / Comment): Decision: This document was noted. The decision on removal of features should be taken TSG RAN level. Hence this part of the discussion is deferred to RAN#27. APLNDC-WH-A 0000011025 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 7. R1-050369 MBMS UE capability R1-050083 MBMS UE capability (Panasonic) 14/02/2005 14:05 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): It was confirmed that 12kbps UE capability is the minimum but the technical discussion should be made from 64kbps. It was asked if both of the capability poxt A and B are mandatory. The answer to the question was Yes. Decision: This document was noted R1-050138 MBMS UE Capability for FDD (Motorola) 14/02/2005 14:20 Presented by Mr. Mark Harrison. Discussion (Question / Comment): There are many discussion regarding "Number of TTI", "Maximum TTI", "Simultaneous reception of DL DPCH and S-CCPCH". It was commented that "Maximum" should be removed from Table 4.X.2 because the relation of the maximum TTI and number of TrCH is not cleox. Decision: This document was noted R1-050152 On MBMS UE Minimum Capability (Nokia) Decision: This document was noted with relation to R1-050083 and R1-050138. It was decided to update Motorola proposal (R 1-050138) according to the discussion by considering as followed: PhCH limitation (PhCH bits, codes), 1TrCH for soft combining (also for the whole cluster), 64kbps simultaneous S-CCPCIq/DPCH, Keep or remove "MAX" TTI for the moment, could be limited to only one TTI per combination provide that RAN2 has no objections (Revision in Tdoc R1-050176). And also it was decided to indicate TTI issue together with the RAN1 parts of UE capabilities in an LS to RAN2 (Tdoc R1-050177). 1RL cluster and bitrates higher that 256kbps seem to be supported within this specification. R1-050176 MBMS UE Capability for FDD (Motorola, Panasonic) 18/02/2005 10:20 Presented by Mr. Mark Harrison. Discussion (Question / Comment): For the finalization for the UE capabilities, how do we treat this working assumption. How do we convert to RAN2 specifications in this 2 weeks for RAN plenaxy. It should be this proposal to RAN2. Decision: This document was noted. Include updated the proposal from176 (with limit on SCCPCH codes) and indicate TTI issue together with the RAN1 pa~ts of UE capabilities in draft LS R1-050177. R1-050177 LS on MBMS UE capability (Panasonic, Motorola) 18/02/2005 15:50 Presented by Mr. Mark Harrison Discussion (Question / Comment): Decision: N~i~.i~i.~i~.iN~ with modification on "Overall description" in Tdoc R1-050222. R1-050222 LS on MBMS UE capability (To : RAN2, RAN3, RAN4) (WG RAN1) R1-050092 TTI reordering with measurement gaps of 10 and 20 ms (Siemens) 14/02/2005 15:30 Presented by Dr. Juergen Michel. Discussion (Question / Comment): It was commented that how the RAN4 part is specified. There were some comments regarding how to switch off the power. Decision: This document was noted. R1-050093 Draft LS on TTI reordering 14/02/2005 15:30 Presented by Dr. Juergen Michel. (Siemens) Decision: The gain would be usable when the network does not utilise fiae freedom in scheduling provided by selection combining. Amount of gain would need to be compared to what is achievable using by MSCH properly. It was postponed to next meeting with waiting for RAN4 feed back. APLNDC-WH-A 0000011026 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Optimisation of downlink channelisation code utilisation (FDD) R1-050150 F-DPCH simulation results (Nokia) 14/02/2005 16:40 Presented by Mr. Markku Tarkiainen. Discussion (Question / Comment): It was asked if the simulation for the UE speed 120km was done. The answer to the question was that not yet. The other question was that the both of option 1 and 2 were mandatory or not. To the question, there are no differences for both options from implementation viewpoint. There was the other question regarding the definition of Ec/Ior in fig. 2. The answer to the question was that Ec/Ior is the average of one slot. Decision: This document was noted. R1-050151 F-DPCH operation in SHO (Nokia) 14/02/2005 17:10 Presented by Mr. Karri Ranto-aho, Discussion (Question / Comment): There are some comments regarding the timing reference. Decision: This document was noted. R1-050128 Introduction of F-DPCH without pilot field 14/02/2005 16:55 Presented by Mr. Matthew Baker. (Philips) Discussion (Question / Comment): There was a comment about the problem when the TPC power is weak. Decision: This document was noted Conclusion: 1. F-DPCH shall be mandatory for UEs supporting HSDPA 2. Only one slot format : 2TPC bits, without pilots 3. Phase reference other than P-CPICH. R1-050098 F-DPCH Downlink Power control 14/02/2005 17:25 Presented by Dr. Stefan Parkvall. (Ericsson) Discussion (Question / Comment): There are some discussions regarding the motivation and benefit for this new requirement. There are commented that the power offset is useful way from RAN3 specifications. Decision: This document was noted. 10 APLNDC-WH-A 0000011027 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Conclusion: Or of down shall be applied together with a quality criteria (to be defined by RAN4), network should ensure that reliable TPC commands reach the UE. Whether to satisf~v all RL with DL QoS target is FFS. Use of PO could simplif~v RAN3 specifications (assuming that the offsets are the same if pilots are used). R1-050066 Optimization of Outer Loop Power Control for F-DPCH (Top Optimized Technologies) 14/02/2005 17:45 Presented by Mr. Alfonso Campo. Discussion (Question / Comment): It was asked what the gain of this method. Decision: This document was noted. Outer loop convergence should not be a problem fro F-DPCH R1-050129 CR25.211-200 (Rel-6, B)"Introduction of F-DPCH without pilot field" (Philips, Nokia) 14/02/2005 18:25 Presented by Mr. Matthew Baker. This CR was based on Nortel CR (R1-050079). Decision: This CR was minor-revised in Tdoc R1-050178. R1-050178 CR25.211-200rl (Rel-6, B)"Introduction of F-DPCH without pilot field" (Philips, Nokia) 15/02/2005 09:15 Presented by Mr. Matthew Baker. Decision: (Nortel) R1-050080 25.212CR193rl(Rel-6, B)"Introduction of F-DPCH " 14/02/2005 18:30 Presented by Ms. Evelyne Le Strat. This document is just copy of the last meting for the current version specification. Decision: ~i~i~NNi (Nortel) R1-050081 25.213CR70rl(Rel-6, B)"Introduction of F-DPCH " 14/02/2005 18:35 Presented by Ms. Evelyne Le Strat. This document is just copy of the last meting for the current version specification. Decision: R1-050132 CR25.214-368 (Rel-6, B)"Introduction of F-DPCH without pilot field" (Philips, Nokia) 14/02/2005 18:35 Presented by Mr. Matthew Baker. This CR was based on Nortel CR (R1-050076). Discussion (Question / Comment): It was asked if the Qout/Qin is same for F-DPCH and DPCH. Decision: Qin/Qout kept for FDPCH, but separate parameters might be added in case RAN4 considers if necessary. It was decided to include the text from Tdoc R1-050098 (exclude part on multiple RL QoS ~The UE shall run a quality target control loop such that t~e quality requirement is met for each radio link set.") Revision in R1-050179. R1-050179 CR25.214-368rl(Rel-6, B)"Introduction of F-DPCH without pilot field" (Philips, Nokia) 15/02/2005 09:15 Presented by Mr. Matthew Baker. Decision: R1-050184 [Draft] LS on Introduction of Fractional DPCH (Philips, Nokia, Nortel, Ericsson) 16/02/2005 09:15 Presented by Mr. Matthew Baker. Discussion (Question / Comment): From Panasonic, Outer loop Power control for F-DPCH, already fixed value? It is RAN4 task. So discussed with RAN4. Add sentence ~RAN1 also asks RAN4 to consider with what granularity a signalled TPC error rate target could be followed by the UE" Decision: with addition of sentence ~RAN1 also asks RAN4 to consider with what granularity a signalled TPC error rate target could be followed by the UE" in Tdoc R1-050191. N .i i.NNiN .iN R1-050191 LS on Introduction of Fractional DPCH (To : RAN2, RAN3, RAN4) (WG-RAN1) 11 APLNDC-WH-A 0000011028 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050133 R1-050369 CR25.215-155 (Rel-6, B)"Introduction of F-DPCH without pilot field" (Philips, Nokia) 14/02/2005 18:50 Presented by Mr. Matthew Baker. This CR was based on Nortel CR (R1-050077). Decision: R1-050076 25.214CR357r2(Rel-6, B)"Introduction of F-DPCH " Decision: This document was noted (Nortel) R1-050077 25.215CR148r2(Rel-6, B)"Introduction of F-DPCH " Decision: This document was noted (Nortel) R1-050079 25.211CR194r2(Rel-6, B)"Introduction of F-DPCH " (Nortel) Decision: This document was noted R1-050047 Addition of support for BTFD in flexible position multiplexing of transport channels (include CR) (Mitsubishi Electric ; MMCE) 15/02/2005 09:30 Presented by Mr. Vincent BELAICHE. Discussion (Question / Comment): It was asked if it is required to change the RAN2 specification. The answer to the question was No. Some comments were that this feature in the specification can not arrive to the finalization by this March, that is the deadline of the Re1.6. Decision: This document was noted. As the conclusion of the R1-050047 and R1-050048, there was no agreement from the group to introduce this feature in the specifications. R1-050048 Gain of BTFD in flexible position multiplexing of transport channels (Mitsubishi Electric ; MMCE) 15/02/2005 09:30 Presented by Mr. Vincent BELAICHE. Discussion (Question / Comment): Decision: This document was noted. Conclusion No agreement from the group to introduce this feature in the specifications. R1-050042 R1-050043 R1-050044 R1-050045 R1-050046 R1-050130 25.211CR194r2(Rel-6, B)"Introduction of F-DPCH " (Nortel) (Withdrawn) 25.212CR193rl(Rel-6, B)"Introduction of F-DPCH " (Nortel) (Withdrawn) 25.213CR70rl(Rel-6, B)"Introduction of F-DPCH " (Nortel) (Withdrawn) 25.214CR357r2(Rel-6, B)"Introduction of F-DPCH " (Nortel) (Withdrawn) 25.215CR148r2(Rel-6, B)"Introduction of F-DPCH " (Nortel) (Withdrawn) CR25.212-200 (Rel-6, B)"Introduction of F-DPCH without pilot field" (Philips) (Withdrawn) 12 APLNDC-WH-A 0000011029 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 9. R1-050369 FDD Enhanced Uplink The overview of FDD Enhanced Uplink discussion is as followed. E DCH TT! [ms] EtH!CH TT! [~s] . . . . . . . . . . . i..:0, l 2 ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: t~O:l !280 1 8Z6/ ~02m in max tl 72 ~ / DCH TT! [eN~] DL T~I ~CNpS] Ped~d [Chips] UE P~oc time 38400 30720 ] ! 53600 ~ ~ [slot] Minimum ~o ~28° 876 1 ~72 7680 ?680 6] 440 8.34] 5.34 Maximum 1!.36~ UE Proc time [ms] 8.36 13 APLNDC-WH-A 0000011030 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 14 APLNDC-WH-A 0000011031 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 TS 25.211 25.211 25.211 25.212 25.212 25.213 25.213 25.214 25.214 25.214 CR 197 198 202 198 199 72 73 362 364 369 R 1 1 2 1 1 2 1 2 C Tdoc F R1-050182 F R1-050195 F R1-050223 F R1-050194 C R1-050108 F R1-050064 F R1-050204 F R1-050215 F R1-050198 F R1-050224 R1-050369 Title E-HICH/E-RGCH Signature Sequences E-HICH/E-RGCH Signature Sequence Hopping E-HICH/E-RGCH/E-AGCH timing PLnon-max and PLmax HARQ bit collection for E-DCH Correction on E-DPCCH power offset Defining E-DPDCH power offset Gain factor setting for E-DCH Reliable E-RGCH/E-HICH Detection DL/UL timing association of E-DCH operation R1-050057 TR25.808 FDD Enhanced Uplink; Physical Layer Aspects, vl.0.1 (Editor : Nokia) 15/02/2005 11:05 Presented by ]V[r. Karri Ranta-a~o. Decision: This document was agreed as version 1.1.0 in Tdoc R1-050188. R1-050188 TR25.808 FDD Enhanced Uplink; Physical Layer Aspects, vl.l.0 (Editor : Nokia) R1-050231 TR25.808 FDD Enhanced Uplink; Physical Layer Aspects, v2.0.0 (Editor : Nokia) This document was submitted to RAN#27 for approval. Reporting from the conference calls on Enhanced Uplink 9.1 R1-050049 Minutes from RAN1 Conference Call #1 on Scheduling and HARQ (RAN1 Chairman) 15/02/2005 11 : 15 Presented by ]V[r. Dirk Gerstenberger. Decision: This document was noted. R1-050050 Minutes from RAN1 Conference Call #2 on NodeB measurements and interaction with RNC admission/congestion control and RRM with EUL (RAN1 Chairman) 15/02/2005 11 : 15 Presented by Mr. Dirk Gerstenberger. Decision: This document was noted on R1/2/3/4 joint session. R1-050051 Minutes from RAN1 Conference Call #3 on UE categories for EUL (RAN1 Chairman) 15/02/2005 11 : 15 Presented by Mr. Dirk Gerstenberger. Decision: This document was noted. 15 APLNDC-WH-A 0000011032 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 9.2 R1-050369 Timing, HARQ and Scheduling Timing & number of HARQ processes R1-050145 E-AGCH Timing (NTT DoCoMo) 15/02/2005 11 : 15 Presented by Mr. Anil Umesh. Discussion (Question / Comment): There are many discussions on this contribution. From NTT DoCoMo, it was commented that this contribution is for the efficient HS-PDSCH power allocation not to waste the txansmission power resource. Decision: This document was noted. R1-050073 Relative timing of downlink signaling channels for E-DCH (Nortel) 15/02/2005 11:45 Presented by Ms. Evelyne Le Strat. Discussion (Question / Comment): Decision: This document was noted. R1-050078 E-DCH timing (Lucent Technologies) 15/02/2005 12:15 Presented by Dr. Rainer Bachl. Discussion (Question / Comment): Decision: This document was noted. R1-050105 R1-050186 E-DCH Downlink Timing Relations E-DCH Downlink Timing Relations (Ericsson) (Ericsson)(Revised from R1-050105) 15/02/2005 13:40 Presented by Dr. Stefan Parkvall. Decision: This document was noted. R1-050134 R1-050181 E-HICH timing relationship E-HICH timing relationship (Siemens) (=R1-050010) (Siemens) (Revised from R1-050134) 15/02/2005 13:50 Presented by Dr. Thomas Chapman. Decision: This document was noted. R1-050056 Timing of E-HICH and number of HARQ processes (ZTE) 15/02/2005 14:00 Presented by Mr. Wang Chen. Decision: This document was noted. R1-050070 Timing and the number of HARQ processes for HSUPA (LG Electronics) 15/02/2005 14:10 Presented by Mr. Joon-Kui Aim. Discussion (Question / Comment): Decision: This document was noted. R1-050087 EUL timing and the number of HARQ processes 15/02/2005 14:20 Presented by Mr. Hidetoshi Suzuki. (Panasonic) Discussion (Question / Comment): It was commented that the Node B process has several calculation as compared with HSDPA. Decision: This document was noted. R1-050165 Number of HARQ processes & DL timing (QUALCOMM Europe) 15/02/2005 14:30 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): Decision: This document was noted. R1-050063 Number of HARQ processes (Samsung) 15/02/2005 14:50 Presented by Mr. Yongjun Kwak Decision: This document was noted. R1-050074 Number of H-ARQ processes for E-DCH (Nortel) 15/02/2005 15:00 Presented by Ms. Evelyne Le Strat. 16 APLNDC-WH-A 0000011033 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Discussion (Question / Comment): It was asked if the number of HARQ process is configurable, that is, has 2 options. The answer to the question was that flae best way is one (fixed), but the comfigurable number is better from Network side. Decision: This document was noted. R1-050131 Number of HARQ processes (Siemens) (Revised from R1-050010) 15/02/2005 15:10 Presented by Dr. Thomas Chapman. Decision: This document was noted. On oft-line discussion, the different proposals from different companies were summarized and the summary was informed from Nortel as follows: 1. E-AGCH Nortel proposal ¯ RG based, 2ms TTI, per process : 2 ms ¯ RG based, 2ms TTI, per UE (AG applies to all processes): 2 ms ¯ Other cases : 2 or 10ms o RG based, 10 ms TTI (per UE) o Non RG based, 2ms TTI (does this case - RAN2??) o Non RG based 10ms TTI Ericsson/Panasonic/Qualcomm/LG/Siemens/Samsung proposal (AGCH duration = TTI duration) ¯ RG based, 2ms TTI, per process : 2 ms ¯ RG based, 2ms TTI, per UE : 2ms (10ms AGCH would not be of interest as UL direction would be the blocking direction,????) ¯ RG based, 10ms TTI (per UE) : 10ms ¯ Non RG based, 2ms : 2ms ¯ Non RG based 10ms : 10 ms Questions: ¯ Does the 2ms non RG based case apply ?? ¯ If 2ms non RG based apply, can we mix 2ms and 10ms UEs in the same group ? 2. E-RGCH for non serving cell Nortel proposal ¯ Non RG based : 2 or 10ms, probably one value only to be decided (depending on multi-bit overload) ¯ RG based : 2 or 10ms, probably one value only to be decided (depending on hysterisis) Generally : one value independently from TTI length possibly dependent on the scheduling type Ericsson ¯ 10 ms only ?? Question: Would 2ms lead to a power problem if the objective is to be received at cell edge. Should we have the same non serving RG duration for RG based and non RG based ? Panasonic ? 3. E-RGCH for serving cell Nortel proposal 2ms independently of TTI length LG proposal 2ms TTI : 2ms RGCH 10ms TTI : 2ms E-RGCH (TDM) Ericsson/Panasonic proposal 2ms for 2ms TTI 10ms for 10ms TTI Question : is power so much of a problem for E-HICH and E-RGCH ? 4. E-HICH Nortel proposal 2ms TTI : 2ms E-HICH 10 ms TTI (2 cases identical from HARQ process numbers) ¯ 2ms E-HICH (TDM) (no reduction of RTT) ¯ 10 ms E-HICH 17 APLNDC-WH-A 0000011034 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Siemens : 10ms TTI, 2ms E-HICH, "best" 2ms selected for RTT reduction. LG proposal 2ms TTI : 2ms E-HICH 10 ms TTI : 2ms E-HICH (TDM) (no reduction of RTT) Ericsson/Panasonic/Samsung/Qualcomm/Nokia proposal 2ms for 2ms TTI 10ms for 10ms TTI ¯ ¯ ¯ if power is an issue : for 10 ms TTI : 10ms E-HICH and 10 ms E-RGCH if power is "no" issue, RTT is not big issues but sequence/code management is : 2ms E-HICH, 2ms ERGCH and TDM (selectable timing within 10ms frame) if power is "no" issue, RTT is an issue and sequence management no big problem : 2ms E-HICH, 2ms E-RGCH ("best" 2ms chosen within 10ms frame) Discussion & Conclusion (Chairman’s note) 1. Relation ofEDCH TTI a~d Control channel duration ¯ AGCH ¯ RGCH(non-serving cell) ¯ RGCH(serving cell) ¯ HICH Using the excel sheet form Qualcomm ¯ 10EDCH TTI ¯ 8ms HICH, 4 processes (conditional to split in 203) ¯ 2 EDCH TTI ¯ 2ms HICH, 8 processes (conditional to split in 203) ¯ Control channels are sub-frame aligned ¯ Timing and duration of RGCH (non-serving cell) ¯ ~ Duration :~...o~/~ ox ~.-o°~ o o~ 10ms - consequence is that the channel timing is not linked to a particular LIE, process or TTI length. ) Timing ¯ Offset 2 slots relative to PCCPCH of the non-serving cell ¯ Timing and duration of HICH ) Duration : 2ms HICH for 2ms EDCH, 8ms HICH for 10ms EDCH ) Timing ¯ Offset ~ 2 slots relative to PCCPCH (i. e. aligned with HS-PDSCH) ¯ Timing and duration of RGCH (serving cell) ¯ ) Duration ¯ 2ms RGCH for 2ms EDCH, 8ms RGCH for 10ms EDCH (10ms EDCH ¯ ~8ms RGCH~ ~ Timing ¯ Off’set ~ 2 slots relative to PCCPCH(i.e. aligned with HS-PDSCH) ¯ Timing and duration ofAGCH ? Duration ÷ RG based ¯ same as EDCH TTI i.e. 2ms or 10ms, ~-- - ~o-~ ~n---ox % Non RG based ¯ 10ms AGCH, irrespective of EDCH TTI Timing Offset 2 slots relative to PCCPCH (i.e. aligned wil~ HS-PDSCH) The above agreement was captured in specification with the following CRs. R1-050206 25.211CR202(Rel-6, F)"E-HICH/E-RGCH/E-AGCH timing " (Qualcomm Europe) 18/02/2005 11 : 15 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): There are some editorial errors: The number of specification on the cover sheet (214=>211), Double sub-clause 7.11. Decision: This CR was revised in Tdoc R1-050217. R1-050217 25.211CR202rl(Rel-6, F)"E-HICH/E-RGCH/E-AGCH timing " (Qualcomm Europe) 18/02/2005 14:00 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): Decision: ~ii~ii~ii~li After the meeting, this document was revised in Tdoc R1-050223. 18 APLNDC-WH-A 0000011035 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 R1-050223 25.211CR202r2(Rel-6, F)"E-HICH/E-RGCH/E-AGCH timing " (Qualcomm Europe) Decision: ~i.~i.~i.~ on the RAN1 reflector after the meeting R1-050207 25.214CR369(Rel-6, B)" DL/UL timing assoication of E-DCH operation " (Qualcomm Europe) 18/02/2005 11:40 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): It was commented that E-AGCH duration for EDCH 10ms TTI could be 8 and 10ms. Remove "Note" Decision: This CR was revised in Tdoc R1-050218. R1-050218 25.214CR369rl(Rel-6, B)" DL/UL timing assoication of E-DCH operation " (Qualcomm Europe) 18/02/2005 14:05 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): Decision: ~i~ii~ii~li After the meeting, this document was revised in Tdoc R1-050224. R1-050224 25.214CR369r2(Rel-6, B)" DL/UL timing assoication of E-DCH operation " (Qualcomm Europe) Decision: ~ii~ii~!~ii~ on the RAN1 reflector after the meeting. 2. Timing relation on Control channels ¯ All aligned (to SFN, HS-DSCH, or other) ¯ Some aligned 3. Timing resolution of Control channels ¯ 3 slots, 1 slot, 15 slots RGCHAtICH timing are aligned, rounded with a resolution of 3 slots and offset with a multiple of 3 slots + x slots towards SFN. AGCH is offset with a multiple of 3 slots + x slots towards SFN. x=either 0 or 2 slots. (i.e. ~.~r~ ....1;~ ,~;~, ~ v~,~m ^,~,~ ; .... ~r~ a!i~ned "~vith HS v~,~ => need a little bit more discussion for the x 4. UE/NodeB processing times ¯ NodeB ¯ #HARQ processes for many possible combinations ¯ ¯ ¯ ¯ 2ms EDCH ¯ 6-11 10ms EDCH ¯ 3-5 Additional processes for SHO? Configurable or fixed For 10 ms E-DCH TTI: 1. 10ms E-HICH and 10 ms E-RGCH (#HARQ processes) 2. 2ms E-HICH, 2ms E-RGCH ¯ "best from RTT" 2ms within 10ms frame UE processing time ¯ 3ms(2ms and 10ms), max 2Mbps for 10ms) ¯ 4 slots (2ms), 8slots/5.2ms (10ms) ¯ 3 slots(2ms), 9slots/6ms (10ms) 19 APLNDC-WH-A 0000011036 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 ¯ 3 slots (2ms), 6 slots/4ms (10ms) ¯ Limit bitrate for 10ms to 2Mbps? 8 ms HICH? From Qualcomm, the results of the offline discussion regarding the "Timing & HARQ" on Tuesday evening was informed by using Table 9-1, and in Thursday afternoon by using Table 9-2 updated from Table 9-1. Table 9-1 A10 Configu ration # HARQ processes E-DCH TTI [ms] E-HICH TTI [ms] tau_ec0 [256 chips] Tec [ms] Constants RTT_max [chips] To min To max A2 B10 B2 10 10 -60 2 UE Proc time [ms] Minimum iiiiiiiiiiiiiii~I~ii~: ~ 14.912.9 Ma×imum I 6,2 4:2 I 6i9 4,9 10 10 -70 2 2 2 8O 2 1280 876 1172 Minimum :iiiiiiiiiiiiiiiiiiiiiiiii~l~iii} ~ I 734 4.34 ~ Ma×imum 2 2 90 2 1280 876 1172 1280 876 1172 1280 876 1172 9i36 6i36 11036 7.36 I IIII Table 9-2 Configuration C10 # HARQ processes E-DCH TTI [ms] E-HICH TTI [ms] tau_ec0 [256 chips] Tec [ms] C2 10 2 -50 2 70 2 1280 876 1172 1280 876 1172 38400 30720 153600 7680 7680 61440 Constants RTT_max [chips] To min To max Temp DCH TTI [chips] DL TTI [chips] Period [chips] Minimum, Ma×imum ~ I I 8:34 11i36 8i36 UEProctime[ms]~ I Maximum,, I 7i57 2O APLNDC-WH-A 0000011037 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050111 HARQ Operation Point R1-050369 (Siemens) 18/02/2005 15:00 Presented by Dr. Jurgen Michel. Discussion (Question / Comment): Decision: This document was noted. R1-050112 Retransmission Power Optimisation 18/02/2005 15:00 Presented by Dr. Jurgen Michel. (Siemens) Discussion (Question / Comment): Decision: This document was noted. R1-050200 EUL performance with de-boosting on E-DPDCH (QUALCOMM Europe) 18/02/2005 15:10 Presented by Dr. Durga Malladi Discussion (Question / Comment): There were some discussions regarding the scaling mismatch, RoT overshoot results, and gain factor. Decision: This document was noted. R1-050210 EUL E-DPDCH De-boosting Result 18/02/2005 15:20 Presented by Mr. Robert Love. (Motorola) Discussion (Question / Comment): Decision: This document was noted. R1-050122 Draft LS on Control of HARQ Operation (Siemens, Nokia, Philips) 18/02/2005 15:30 Presented by Dr. Jurgen Michel. Discussion (Question / Comment): It was commented from some company that we should sent the LS and ask RAN2 to evaluate the complexity taking this scheme into consideration. Also from some companies, it was commented that we have not convinced the real gain of this scheme and should be cleax. Decision: No recommendation from RAN1 to go further with this feature. Not Treated R1-050052 R1-050053 R1-050067 R1-050095 R1-050118 R1-050119 R1-050120 R1-050136 R1-050147 9.3 Efficiency of DL ACK (Via Telecom) (=R1-041410) Selecting the Primary Node(s) for DL ACK (Via Telecom) (=R1-041411) UE behaviour on RG from Non-serving RLS (Alcatel) Definition and Signalling way of Time Duration (Mitsubishi Electric) Comparative performance of dedicated vs. autonomous mode (Motorola) Performance of EUL in Autonomous mode with and without hysteresis (Motorola) Performance of EUL with and without happy bit (Motorola) Relative Grant Step Size (Siemens) Control over serving vs. non-serving E-DCH resource allocation (NTT DoCoMo) Measurements for RRM On the Wednesday (16th) evening, RAN1/2/3/4 joint session on E-DCH RRM was held. The following RAN 1 contributions were treated at the session. R1-050155 RRM aspects of the Enhanced Uplink feature (Vodafone Group) 16/02/2005 Presented by Mr. Ymmick Le Pezennec. 21 APLNDC-WH-A 0000011038 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Decision: This document was noted. R1-050062 UTRAN measurement for E-DCH RRM (Samsung) 16/02/2005 Presented by Dr. Juho Lee. Decision: This document was noted. R1-050069 Radio resource control and measurement for HSUPA (LG Electronics) 16/02/2005 Presented by Dr. Joon-Kui Aim. Decision: This document was noted. R1-050088 Uplink EDCH/DCH resource allocation and measurement (Panasonic) 16/02/2005 Presented by Dr Jinsong Duan. Decision: This document was noted. R1-050146 Measurement report of AG for common rate control (Autonomous ramping) (NTT DoCoMo) 16/02/2005 Presented by Mr. Masafumi Usuda. Decision: This document was noted. The contributions from other WGs are as followed: R2-050348, R2-050397, R2-050436, R2-050437, R2-050438, R2050449, R2-050511, R3-050097, R3-050254(R1-050175), R3-050218, R4-050201. As the decision of the joint session, RAN1 Chairman summarized as follows (Tdoc R1-050208). R1-050208 Notes of Joint Session on RRM EDCH (RAN1 Chairman) Decision: This document was noted. Discussion & Conclusion for Measurements for RRM (Chairman’s note) Scheduler limits/targets Set a limits to the NodeB & inaccuracy requirements for the scheduler 1. Total interference in the NodeB: RTWP or relative interference (e.g. RoT) 2. Power controlled part of the total interference or use of overload indicator triggering mechanism (RAN1/RAN2 to discuss) Inaccuracy of scheduler operation => RAN4 should investigate how accurate the scheduler can follow the targets set by the RNC in x% of the time New Measurements for admission control Non GBR E-DCH: Nothing needed. Non-scheduled GBR E-DCH: RNC rules, same as for DCH? GBR EDPDCH/DPCCH power ratio that is sent on AGCH? (reporting => RAN2) Interference headroom that can be used for additional GBR users? (RAN1) DCH: Nothing needed in principle due to EUL. Feasibility and accuracy of measurements Not Treated R1-050089 R1-050166 R1-050137 R1-050143 Long term solution for ping-pong effect Measurement in support of RRM RRM for E-DCH Common measurement for E-DCH (Panasonic) (QUALCOMM Europe) (Siemens) (Withdrwn) (NEC) (Not Available) 22 APLNDC-WH-A 0000011039 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 9.4 R1-050369 UE categories (TS 25.306) R1-050094 Proposal of UE categories for the Enhanced Uplink (Vodafone Group, NTT DoCoMo) 17/02/2005 09:55 Presented by Mr. Yannick Le Pezennec. Discussion (Question / Comment): There are some discussions regarding coding rate. Decision: This document was noted. R1-050106 E-DCH UE Categories (Ericsson) 17/02/2005 10:10 Presented by Dr. Stefan Parkvall. Decision: This document was noted. R1-050121 UE Capability for EUL (Motorola) 17/02/2005 10:15 Presented by Mr. Robert Love Discussion (Question / Comment): There are some discussions regarding number of category and simultaneous process, signalling for the LIE category. It was commented that the number of LIE categories could be reduced from viewpoint of network. Decision: This document was noted. R1-050141 HSUPA UE Capabilities (Nokia) (Revised from R1-050028) 17/02/2005 11:30 Presented by Mr. Karri Ranta-aho. Discussion (Question / Comment): From Samsung, limitation of DCH categories. Decision: This document was noted. R1-050167 E-DCH related UE categories (QUALCOMM Europe) 17/02/2005 11:40 Presented by Mr. Serge Willenegger. Decision: This document was noted. Discussion & Conclusion for UE categories (Chairman’s note) 1. Category definition (codes, TTI) ~ lxSF4, 2xSF4, 2xSF2, 2xSF2+2xSF4 =>Table 9-3 3. Joint with HSDPA or separate capabilities ->RAN2 4. SRB on EDCH->RAN2 Mr. RAN1 chairman drafted the category candidates as shown in Table 9-3 using the table on Qualcomm paper (R1050167). Table 9-3 Cat Maximum E-DPDCH set 1 2 3 4 5 6 7 8 SF4 S F4 2xSF4 2xSF4 2xSF2 2xSF2 2xSF2 + 2xSF4 2xSF2 + 2xSF4 Support for 2 ms TTI EDCH No Yes Yes No Yes No Yes Yes Maximum transport block size for 10 ms TTI [bits] 7296 7296 14592 14592 20000 20000 20000 20000 Maximum transport block size for 2 ms TTI [bits] 1460 2919 5837 8756 11520 From operator side, it was commented that the number of categories should be reduced more, 6 categories is quite enough. 23 APLNDC-WH-A 0000011040 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Conclusion UE categories will be a subset of the categories/parameter combinations listed in the table. Agreement on Cat 1, 3, 4, 5 and 8. No agreement whether cat 2, 6 and 7 are in or out, the most controversial issue being cat 2 and 6. The total number of categories should not exceed 6. Status : Cat 2 and 7 could be removed, no agreement on whether or not to have cat 6. Interaction with other features 9.5 R1-050107 E-DCH and Compressed Mode (Ericsson) 17/02/2005 17:00 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): Decision: This document was noted. R1-050127 Interactions between HSUPA and compressed mode (Philips) 17/02/2005 17:15 Presented by Mr. Matthew Baker. Discussion (Question / Comment): Decision: This document was noted. R1-050135 Compressed Mode for EDCH (Siemens) 17/02/2005 17:30 Presented by Dr. Thomas Chapman. Discussion (Question / Comment): Decision: This document was noted. R1-050144 Compressed mode handling (NEC) 17/02/2005 17:35 Presented by Ms. Nahoko Kuroda Discussion (Question / Comment): Decision: This document was noted. R1-050107 : Schedule around the gap for 2ms TTI, SF/2 for 10ms TTI R1-050127 : Schedule around the gap R1-050135 : Schedule around the gap for 2ms TTI, "HLS" for 10ms TTI R1-050144 : Schedule around the gap for 2ms TTI, SF/2 for 10ms TTI. Discussion (Chairman’s note) E-DPDCH ¯ Relation with compression-technique related power increase with grmated powers? ¯ How to deal with GBR? Temporary throughput decrease would need to be compensated with increased throughput =higher power ¯ Brute-force DTX ¯ No use of HARQ functionality : puncturing & HARQ retransmissions ¯ Method to choose : FFS E-DPCCH : FFS DL control channels : FFS Not Available R1-050149 TFC selection for EUDCH (NEC) 24 APLNDC-WH-A 0000011041 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 9.6 R1-050369 Enhanced Uplink CRs on the specifications 9.6.1 CRs for TS 25.211 R1-050148 Reserving Hadamard sequence to improve interference calculation for EHICH/E-RGCH (NTT DoCoMo) 16/02/2005 10:00 Presented by Mr. Masafumi Usuda. Discussion (Question / Comment): There are comments and questions regoxding the reason for the couple with the Code Hopping. From NTT DoCoMo, it was informed that the simulation results will be provided. Decision: This document was noted. It was decided that this topic can be considered at the next meeting if simulation results are available. R1-050116 E-HICH/E-RGCH Peak Power Requirement (Motorola) 16/02/2005 10:10 Presented by Mr. Decision: This document was noted. R1-050090 R1-050183 E-HICH/E-RGCH Signature Sequences E-HICH/E-RGCH Signature Sequences (Siemens) (Siemens) (Revision of R1-050090) 16/02/2005 10:25 Presented by Dr. Juergen Michel. Decision: ~iNN~NIiK~i~I R1-050091 25.211CR197(Rel-6, F)"E-HICH/E-RGCH Signature Sequences" (Siemens) R1-050182 25.211CR197rl(Rel-6, F)"E-HICH/E-RGCH Signature Sequences" (Siemens) (Revision of R1-050091) 16/02/2005 10:25 Presented by Dr. Juergen Michel. Decision: the cover page on "Proposed Change aspects") N~iiNi~ii@~Nii~@ii~iiNiNNNi~iNNi~Niii~. .:"®~iNNNi~iN). (It is necessaxy to modif~v R1-050103 E-RGCH/E-HICH Signature Sequences (Ericsson) 16/02/2005 11:25 Presented by Dr. Stefan Parkvall. Decision: This document was noted. R1-050104 25.211CR199(Rel-6, F)"E-RGCH/E-HICH Signature Sequences" (Ericsson) 16/02/2005 11:30 Presented by Dr. Stefan Parkvall. Decision: This document was noted. R1-050169 Structured and improved E-HICH/E-RGCH Signature Sequences (Huawei Technologies) 16/02/2005 11:25 Presented by Dr. Branislav Popovic. Decision: This document was noted. R1-050170 CR25.211-201(Rel-6, F) "E-HICH/E-RGCH Signature Sequences" (Huawei Technologies) 16/02/2005 11:25 Presented by Dr. Branislav Popovic. Decision: This document was noted. R1-050101 E-RGCH/E-HICH Sequence Hopping 16/02/2005 11:40 Presented by Dr. Stefan Parkvall. (Ericsson) Discussion (Question / Comment): It was commented that it is difficult to do a good allocation to UEs and implementation. Decision: This document was noted. R1-050102 25.211CR198(Rel-6, F)"E-HICH/E-RGCH Signature Sequence Hopping" (Ericsson) 16/02/2005 11:40 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): 25 APLNDC-WH-A 0000011042 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Decision: This CR was revised with linked to R1-050182 in R1-050195. R1-050195 25.211CR198rl(Rel-6, F)"E-HICH/E-RGCH Signature Sequence Hopping" (Ericsson) 18/02/2005 12:05 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): Decision: ~i~ii~!~ii~. For Plenary, MCC modif~v the cover page with CR linked to Tdoc R1-050182. R1-050187 Comparison of E-HICH/E-RGCH signature sequences (Ericsson) 16/02/2005 11:55 Presented by Dr. Stefan Parkvall. Decision: This document was noted. Discussion (Chairman’s note) Sequence hopping Sequence hopping pattern with 3 slot periodicity. An exact fixed pattern will be chosen depending on the sequence selected. Sequence to replace the current on the specification is either ~ Ericsson proposal (CR R1-050104) ~ Siemens (CR R1-050183) ~ Huawei (CR R1-050170) ~ Different sequences are similar complexity wise Regarding the above three sequence hopping, there was a long discussion. The comment was that now it was not possible to decide the best sequence because of the lack of the simulation results. Then, Mr. RAN1 Chairman proposed the following way forwaxd. Way Forward: Sequence hopping with Siemens sequence is taken as basis for CRs to be drafted Combinations of the other two sequences with hopping may be evaluated until 25 February. And if better performance is shown then the sequence will be changed. The corresponding CRs will be presented to RAN, sourced by RAN1. During the meeting, regarding above issues, the CR from Siemens was agreed in Tdoc R1-050182 and the CR from Ericsson was agreed with captured the CR from Siemens in Tdoc R1-050195. R1-050140 E-DPCCH performance in SHO: a comparison between CC and RM (Nokia) 16/02/2005 14:15 Presented by Mr. Karri Ranta-~ao. Decision: This document was noted. R1-050117 E-DPCCH performance with energy detction vs. CRC (Motorola) 16/02/2005 14:25 Presented by Dr. Amitava Ghosh. Decision: This document was noted. R1-050142 Number of Absolute Grant bits transmitted on E-AGCH (Nokia) (=R2-050079) 16/02/2005 14:50 Presented by Mr. Karri Ranta-aho. Decision: This document was noted. R1-050168 E-AGCH aspects (QUALCOMM Europe) 16/02/2005 14:55 Presented by Mr. Serge Willenegger. Decision: This document was noted. R1-050109 E-AGCH Power Consumption (Ericsson) 16/02/2005 15:00 Presented by Dr. Stefan Parkvall. Decision: This document was noted. 26 APLNDC-WH-A 0000011043 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 R1-050058 E-AGCH SF and channel coding (Samsung) 16/02/2005 15:05 Presented by Dr Juho Lee. Decision: This document was noted. R1-050115 Performance of E-AGCH 16/02/2005 15:10 Presented by Dr. Amitava Ghosh. (Motorola) Decision: This document was noted. Discussion (Chairman’s note) The difference of the four contributions: Current 25.211/25.212, SF256, CC1/3, x bits. R1-050168 SF256 CC1/3 <=7bit R1-050058 SF128, CC1/3, 5.Dbits R1-050109 SF256 CC1/3, 7-8bits R1-050115 SF256, CC1/3 Tailbiting <=10bits In order to inform the results of discussion on E-AGCH, it was decided to make the draft LS to RAN2 in Tdoc R1050193. For RAN2 LS With the current coding scheme, a total number of AGCH information bits should not exceed 7-8 information bits. With modifications of the current coding scheme, the total number of bits might be increased to 9-10 information bits. ¯ The power ratio should be represented with 5 bits. ¯ Single process flag (lbit) ¯ Other bit needed by RAN2 (x bits) R1-050193 Draft LS on E-AGCH contents (Ericsson) 18/02/2005 12:10 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): R1-050219 LS on E-AGCH contents (To :RAN2) (WG RAN1) Not Treated. R1-050054 25.211CR196(Rel-6, F)"Modify the alphabetic index of E-HICH and E-RGCH signature sequence" (ZTE) (Withdrawn) R1-050071 25.211CR196(Rel-6, F)"Modify the alphabetic index of E-HICH and E-RGCH signature sequence" (ZTE) 9.6.2 CRs for TS 25.212 R1-050059 25.212CR198(Rel-6, F)"PLnon-max and PLmax" (Samsung) 16/02/2005 16:30 Presented by Dr Juho Lee. Discussion (Question / Comment): It was commented that the value of PLmax could be related to the UE categories. Decision: The principle of this CR was agreed, and it was to revise the CR in accordance with the UE categories (e.g Pimax fro the highest category ). Revision in Tdoc R1-050194 R1-050194 25.212CR198rl(Rel-6, F)"PLnon-max and PLmax" (Samsung,Nokia, Philips) 18/02/2005 12:15 Presented by Dr Juho Lee. Discussion (Question / Comment): Decision: ~i~ii~!~ii~li In order to informed this proposal and CR, the draft LS was made in Tdoc R1050213. R1-050213 [Draft] LS on support for higher layer signalling of Plnon-max value (Samsung) 27 APLNDC-WH-A 0000011044 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 18/02/2005 12:15 Presented by Dr Juho Lee. Discussion (Question / Comment): R1-050220 LS on support for higher layer signalling of Plnon-max value (To : RAN2, RAN3) (WG RAND R1-050055 25.212CR197(Rel-6, F)"Modify the description of CRC attachment for E-AGCH" (ZTE) (Withdrawn) 25.212CR197(Rel-6, F)"Modify the description of CRC attachment for E-AGCH" R1-050072 (ZTE) 16/o2/2oo5 16:55 Presented by Mr. Wang Chert. Discussion (Question / Comment): It was commented that there are no problem on the current sentences in specification. Decision: ~ R1-050108 25.212CR199(Rel-6, C)"HARQ bit collection for E-DCH" (Ericsson) 16/02/2005 17:00 Presented by Dr. Stefan Parkvall. Decision: Not Treated R1-050164 CR25.212-201 (Rel-6, F)"E-AGCH channel coding specification" (Motorola) 9.6.3 CRs forTS 25.213 R1-050064 25.213CR72(Rel-6, F)"Correction on E-DPCCH power offset" (Samsung) 16/02/2005 17:00 Presented by Ms. Youn hyoung Heo. Decision: R1-050065 25.213CR73(Rel-6, F)"Defining E-DPDCH power offset" (Samsung) 16/02/2005 17:00 Presented by Ms. Youn hyoung Heo. Decision: ~i~i~’...~i~iiii After the discussion of other topic, this CR was revised in Tdoc R1-050204 in order to catch up the results of the discussion. R1-050204 25.213CR73rl(Rel-6, F)"Defining E-DPDCH power offset" (Samsung) 18/02/2005 14:00 Presented by Dr. Juho Lee. Discussion (Question / Comment): Decision: ~ii~....’~ii~ii~il 9.6.4 CRs for TS 25.214 R1-050060 25.214CR362(Rel-6, F)"Gain factor setting for E-DCH" (Samsung) 16/02/2005 17:05 Presented by Dr. Juho Lee. Discussion (Question / Comment): It was commented that which reference for E-TFC is not clear in this CR. There are some discussions regarding the power control. Decision: This document was noted, and revised in Tdoc R1-050209. R1-050209 25.214CR362rl(Rel-6, F)"Gain factor setting for E-DCH" (Samsung) This document was revised in Tdoc R1-050215. R1-050215 25.214CR362r2(Rel-6, F)"Gain factor setting for E-DCH" (Samsung, Nokia, Philips) 18/02/2005 17:05 Presented by Dr. Juho Lee. 28 APLNDC-WH-A 0000011045 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Discussion (Question / Comment): Decision: R1-050126 Uplink DPCCH power setting (Philips) R1-050185 CR25.214-367 Power ratio setting for UL physical channels in relation to E-DCH (Philips) (Revised of R1-050126) 17/02/2005 17:30 Presented by Mr. Matthew Baker. Discussion (Question / Comment): Some companies concerned this power setting scheme. It was commented that it was difficult to get the power setting information in SHO case. Decision: This document was noted. R1-050061 25.214CR363(Rel-6, F)"Power control at the maximum power limit" (Samsung) 17/02/2005 09:15 Presented by Ms. Youn hyoung Heo. Decision: The revised CR to be prepared for RANl#40bis. R1-050197 25.214CR363rl(Rel-6, F)"Power control at the maximum power limit" (Samsung, Nokia, Ericsson) (Withdrawn) R1-050139 UE behaviour when reaching the maximum tx power (Nokia) 17/02/2005 09:18 Presented by Mr. Karri Ranta-~o. Discussion (Question / Comment): Decision: This document was noted. Conclusion (Chairman’s note) First, E-DPDCH is scaled on sub-frame basis. Within the sub-frame, equal scaling. R1-050097 25.214CR364(Rel-6, F)"Reliable E-RGCH/E-HICH Detection" 17/02/2005 09:35 Presented by Dr. Stefan Parkvall. (Ericsson) Discussion (Question / Comment): It was commented that the performance should be checked from WG4 side. Decision: This CR was revised in Tdoc R1-050198. R1-050198 25.214CR364rl(Rel-6, F)"Reliable E-RGCH/E-HICH Detection" (Ericsson) 18/02/2005 14:40 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): Decision: 9.6.5 CRs forTS 25.215 There is no input. 29 APLNDC-WH-A 0000011046 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 10. R1-050369 IMS (RAB support enhancement work item) R1-050156 ROHC Packet Handling Using RLC Segmentation and Concatenation (Ericsson) 17/02/2005 18:20 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): Decision: This document was noted 3O APLNDC-WH-A 0000011047 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Optimisation of downlink channelisation code utilisation (3.84 Mcps TDD) 11. R1-050163 R1-050196 Out-of-sync detection for TDD HSDPA operation without an associated DL DPCH (IPWireless) Out-of-sync detection for TDD HSDPA operation without an associated DL DPCH (IPWireless) This document will be sent ~d discussed on the reflector after the meeting. Decision: This document was agreed on the RAN1 reflector after the meeting. As related to this document, the following CRs were also agreed on the RAN1 reflector after the meeting. R1-050227 CR25.221-118(Rel-6, B)"Release 6 HS-DSCH operation without a DL DPCH for 3.84Mcps TDD" (IPWireless) Decision: This document was agreed on the RAN1 reflector after the meeting. R1-050228 CR25.224-141(Rel-6, B)"Release 6 HS-DSCH operation without a DL DPCH for 3.84Mcps TDD" (IPWireless) Decision: This document was agreed on the RAN1 reflector after the meeting. 31 APLNDC-WH-A 0000011048 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 12. R1-050369 Optimisation of downlink channelisation code utilisation (1.28 Mcps TDD) R1-050068 Tx Power requirements for Optimisation of DL Code Utilisation for TDD LCR (UTStarcom, IPWireless) R1-050189 Tx Power requirements for Optimisation of DL Code Utilisation for TDD LCR (UTStarcom, IPWireless) (Revision of R1-050068) 17/02/2005 18:25 Presented by Mr. Ka Leong Lo. Discussion (Question / Comment): There are some discussions regarding smart antenna topic. Decision: This document was noted. 32 APLNDC-WH-A 0000011049 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 13. Work Item on 7.68 Mcps TDD R1-050157 7.68Mcps TDD option: work organisation (IPWireless) 17/02/2005 18:40 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): The comment was that which WG is responsible for the stage 2. Decision: This document was noted. It was decided to clarify responsibility for the stage at RAN#27 R1-050158 Draft TR: 7.68Mcps TDD option: physical layer (IPWireless) 17/02/2005 18:45 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): Not Treated R1-050159 Draft TS: 7.68Mcps TDD Option; Overall Description: Stage 2 (IPWireless) R1-050192 Draft TS: 7.68Mcps TDD Option; Overall Description: Stage 2 (IPWireless) (Revised of R1-050159) 33 APLNDC-WH-A 0000011050 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 14. Study Item on TDD Enhanced Uplink R1-050160 8-PSK for TDD Enhanced Uplink and text proposal for TR25.804 (IPWireless) 17/02/2005 18:55 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): From InterDigital, this proposal has no problem and is a beneficial Decision: ~i~ii~i~ii~ii~ii~il R1-050161 Text proposal on Node-B scheduling for TR25.804 (IPWireless) R1-050190 Text proposal on Node-B scheduling for TR25.804 (IPWireless) (Revised of R1-050161) 17/02/2005 19:05 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): R1-050162 Draft text on conclusions and recommendations for the TDD enhanced uplink SI (IPWireless) 17/02/2005 19:10 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): Decision: R1-050212 TR25.804 v.l.0.1 (InterDigital) Decision: This document was agreed as vl. 1.0 with some editorial modification on the reflector after the meeting. TR25.804 v.l.l.0 R1-050229 R1-050231 TR25.804 v.2.0.0 This document was submitted in RAN#27 for approval. (InterDigital) (InterDigital) 34 APLNDC-WH-A 0000011051 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 15. Review of RAN WG 1 Terms of Reference R1-050202 Review of WG RANI Terms of Reference (RANI Chairman) 18/02/2005 14:30 Presented by Mr. Dirk Gerstenberger. Decision: This document was endorsed. 16. Other Business After the meeting, the number of TR 7.68Mcps TDD option: physical layer was assigned as 25.809. 35 APLNDC-WH-A 0000011052 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 17. Closing of the meeting ¯ Friday 5.00 PM 18/02/2005 16: 00. The RAN1 chairman, Mr. Dirk Gerstenberger expressed his appreciation to the delegates and the host, the North American Friends for 3GPP for their works. The meeting was dismissed at this time. 36 APLNDC-WH-A 0000011053 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 AnnexA: List of participants Mr. Shinsuke Ogawa Dr. Jinsong Duan Mr. Hitoshi Iochi Mr. Prem Sood Ms. Nahoko Kuroda Mr. Tsukasa Sasaki Mr. Noriyuki FUKUI Mr. Hideji Wakabayashi Mr. Youngbum Kim Ms. Youn hyoung Hoe Mr. Elias Jonsson Mr. Anil Umesh Mr. Benoist S6bire Member 0f 3GPP (A~!S) Dr. Stefan Parkvall Mr. Donald E. Zelmer Mr. Karri Ranta-aho Member 0f 3GPP (CCSA) Ms. Sha Ma NTT DoCoMo Inc. Panasonic Mobile Comm. Panasonic Mobile Comm. SHARP Corporation NEC Corporation Fujitsu Limited Mitsubishi Electric Co. Mitsubishi Electric Co. Samsung Electronics Co., Ltd. Samsung Electronics Co., Ltd. Nippon Ericsson K.K. NTT DoCoMo Inc. Nokia Japan Co, Ltd 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) 3GPPMEMBER (ARIB) +81-468-40-3530 +81 46 840 5369 +81 46 840 5329 +1 360 834 8708 +81-44-396-2577 +81 44 754 8511 +81467 41 2885 +81468476013 +82-31-279-5092 +82-31-279-5362 +46 46 23 15 75 +81 468 40 3190 +8613801309020 Ogawa@cet.yrp. nttdocomo.co.jp Duan.jinsong@jp. panasonic.com Iochi. hitoshi@jp, panasonic.com plsi@sharplabs.com n-ku roda@cj.jp, nec. com t.sasaki@jp.fujitsu.com n-fukui@isl, melco.co.jp h.wakaba@cew, melco.co.jp Youngbum.kim@samsung.com Hush.heo@samsung.com Elias.jonsson@ericsson. com u mesh@wsp.yrp, ntttdocomo, co.j p benoist.sebire@nokia.com Ericsson Inc. Cingular Wireless LLC NOKIA Telecommunications Inc 3GPPMEMBER (ATIS) 3GPPMEMBER (ATIS) 3GPPMEMBER (ATIS) +46 8 58533855 +1 404 236 5912 +358 50 521 0651 stefan.parkvall@ericsson.com don.zelmer@cingular, com Karri.Ranta-aho@nokia.com HuaWei Technologies Co., Ltd +86-10-82882755 marsha@huawei.com Mrs. Ning He Nanjing Ericsson Panda Com Ltd +46 8 7575578 ning. he@ericsson.com Dr. Robert Karlsson ZTE Corporation +46 8 5552 8977 Robert. ka rlsso n @ztewist ro n. com Mr. Zhisong Zuo ZTE Corporation 3GPPMEMBER (CCSA) 3GPPMEMBER (CCSA) 3GPPMEMBER (CCSA) 3GPPMEMBER (CCSA) +86 755 26771477 zuo.zhisong@zte.com.cn Membei Of 3GPP (E~S!) Mr. Uwe Baeder Mr. Vincent Belaiche ROHDE & SCHWARZ MELCO MOBILE COMMUNICATIONS 3GPPMEMBER (ETSI) +49 89 4129 13462 3GPPMEMBER (ETSI) +33 2 99 27 47 70 Uwe. Baeder@rsd. rohd e-schwarz, com vincent, belaiche@mmce, mee.com 37 APLNDC-WH-A 0000011054 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 Mr. Hyung-Nam Choi Ms. Evelyne Le Strat Ms. Liliana Czapla Mr. Uwe Doetsch Mr. Dirk Gerstenberger Dr. Amitabha Ghosh Mr. Mark Harrison Dr. Joern Krause Mr. Yannick Le Pezennec Mr. Yongjun Kwak Dr. Branislav Popovic Mr. Philip Booker Dr. Thomas Chapman Mr. Heino Geilach Dr. Baijun Zhao Mr. Ka Leong Lo Mr. Robert Love Dr. Durga Malladi Dr. JQrgen Michel Mr. Dirk Kistowski Mrs. Nadege Noisette Mr. Alessandro Pace Mr. Enrico Buracchini Mr. Ville Steudle Mr. Hidetoshi Suzuki Mr. Markku Tarkiainen Mrs. Carolyn Taylor Mr. Serge Willenegger Mr. Nicholas Anderson Miss Eliza Wong Dr. Rainer Bachl Mr. Matthew Baker Mr. Chris Barroso Mr. Eric Fablet Dr. Stefan Brueck Mr. Alfonso Campo INFINEON TECHNOLOGIES Nortel INTERDIGITAL COMMUNICATIONS ALCATEL S.A. ERICSSON LM MOTOROLA Ltd MOTOROLA GmbH SIEMENS AG VODAFONE Group PIc SAMSUNG Electronics Huawei Siemens NV/SA BELGIUM ETSI Siemens Mobile Siemens Communications UTStarcom UTStarcom MOTOROLA Ltd QUALCOMM EUROPE S.A.R.L. SIEMENS AG T-Mobile International ORANGE SA TELECOM ITALIA S.p.A. TELECOM ITALIA S.p.A. NOKIA UK Ltd PANASONIC R&D Center Germany NOKIA Corporation MOTOROLA Ltd QUALCOMM EUROPE S.A.R.L. I PWireless ALCATEL S.A. Lucent Technologies Philips Semiconductors Sophia Freescale Semiconductors Freescale Semiconductors Lecent Technologies Top Optimized Technologies S.L R1-050369 3GPPMEMBER (ETSI) 3GPPMEMBER (ATIS) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) +49-5341-9061812 + 33 1 39 44 53 39 +1 631 622 4358 +49 711821 47176 +46 8 585 33901 +1 8476324121 +18172456259 +49-30-386-23417 +447748938886 +82-31-279-5112 +46 8 477 0808 +44 1794 833227 +44 1094 833241 +49 89 722 57569 +86 138 2363 1996 +86755 26952899 +1 847 523 3702 +1 858 651 2288 +49 89 722 49911 +49 228 936 18419 +33 1 45 29 44 02 +390639009044 +390112287118 +358 50 307 3923 +81 468 40 5164 +358 50 518 3406 +1 847 523 0458 +41 244 363 541 +44 1249 800020 +33130775698 +49 911 526 2656 +44 1293 815287 +1 512 996 4209 +33561 19 12 +49 911 526 4834 +34 619 233378 Hyung-Nam.Choi@infineon. com elestrat@nortel.com liliana.czapla@interdigital.com Uwe.doetsch@alcatel.de dirk.gerstenberger@ERICSSON.COM qa0047@email.mot.com mark. harrison@motorola.com joern, krause@siemens, com Yannick. LePezennec@vodafone.com evatt@samsung.com Branislav. popovic@huawei.com philip.booker@roke.co.uk thomas.chapman@roke.co.uk heino.gerlach@simens.com baijun.zhao@utstarcom.com kaleong.lo@utstarcom.com qa2178@email.mot.com dmalladi@qualcomm.com michel.juergen@siemens.com dirk. kistowski@t-mobile.de nadege.noisette@francetelecom.com apace@mail.tim.it Enrico.buracchini@tilab.com ville.steudle@nokia, com Suzuki. Hidetoshi@jp.panasonic.com markku.tarkiainen@nokia.com carolyn.taylor@motorola.com sergew@qualcomm.com nanderson@ipwireless.com eliza.wong@alcatel.fr Rbachl@lucent.com Bakermp2@prl. research, philips.com Chris.Barroso@freescale.com eric.fablet@freescale.com sbrueck@lucent.com Alfonso. cam po@opti mizedtech, ney 38 APLNDC-WH-A 0000011055 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 Mr. Alvaro Lopez medrano Dr. Luis Mendo Dr. Stamatis Georgoulis Mr. Asbjorn Grovlen Mr. Arik Gubeskys Ms. Mariana Lyu Mr. Diptendu Mitra Dr. Tarik Muharemovic Mr. Mark Murphy Dr. Manook Soghomonian Mr. Alex Margulis Member 0f 3GPP (TTA) Dr. Joon-Kui Ahn Dr. Sung Lark Kwon Dr. Juho Lee Mr. Ilgyu Kim Mr. Bong Hoe Kim Mr. Dong Wook Roh Mr. Yujian Zhang Mr. Dragan Vujcic Mr. Kyung Park Member af 3GPP (TTC) Mr. Mikhail Shnaider Mr. Masafumi Usuda Oiga~isatia~ pa~ne~ representative Mr. Yoshikazu Ishii R1-050369 Top Optimized Technologies S.L 3GPPMEMBER (ETSI) +34 647 608403 Top Optimized Technologies S.L UbiNetics Ltd NOKIA Corporation Freescale Semiconductor Israel Research in Motion Limited Telecom Modus Ltd. TEXAS Instruments TTP Communication plc 3 Intel Corporation SARL 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) 3GPPMEMBER (ETSI) +915495700 +44 1763 267317 +358 405642489 +972 9 9522681 +1 972 870 4370 +44 1372 381 812 +1 214 567 5853 +44 1763 266266 +44 1279 464200 +972 3 920 7024 alvaro.lopezmedrano@optimizedtech.ney Imendo@grc.ssr. upm.es Stamatis.georgoulis@ubinetics.com Asbjorn.grovlen@nokia.com Arik.gubeskys@freescale.com mlyu@rim.com Diptendu.mitra@t-modus.nec.co.uk tarik@ti, com mark. m urphy@ttpcom, com Manook.Soghomonian@THREE.CO.UK Alex.margulis@intel.com LG Electronics Inc. LG Electronics Inc. Samsung Electronics Co., Ltd ETRI LG Electronics Inc. LG Electronics Inc. Samsung Electronics Co., Ltd LG Electronics Inc. ETRI 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) 3GPPMEMBER (TTA) +82-31-450-4131 +82-31-450-2908 +82-31-279 5115 +82-42-860-5490 +82 343 450 4131 +82 31 450 2906 +86 10 684277112 +33 1 41 59 93 78 +82 42 860 1836 jkan@lge, com slkwon@lge.com Juho95.1ee@samsung.com igkim@etri.re.kr ofdm88@lge.com dwroh@lge, com yujian.zhang@samsung, com dvujcic@lge, com kyungp@etri, re. kr NEC Corporation NTT DoCoMo Inc. 3GPPMEMBER (TTC) 3GPPMEMBER (TTC) +(61 3) 92714042 +81 468 40 3190 mikhail@3g, nec.com.au usud a@wsp, yrp. ntttdocom o. co.j p Mobile Competence Centre ETSI +33 4 92 93 42 06 ishii.yoshikazu@etsi, org 39 APLNDC-WH-A 0000011056 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Annex B: TSG RAN WG1 meetings in 2005 TITLE 3GPPRANI#40 TYPE WG DATES 14- 18 Feb 2005 LOCATION Scottsdale CTRY USA 3GPPRANI#40bis WG 04 - 08April 2005 Beijing 3GPPRAN1#41 WG 09- 13 May 2005 Athens China GR 3GPPRAN1#42 WG 29 Aug -02 Sept 2005 London UK 3GPPRAN1#43 WG 07 - 11 Nov 2005 TBD Asia MEETING TYPES AH = Ad Hoc CM = Chairmen’s meeting JM = Joint OR = Ordinary PM = Preparatory Meeting RG = Rapporteurs Group RM = Resolution Meeting SG = Steering Group ST = Startup Meeting TG = Task Group WG = Working Group XO = Extraordinary 4O APLNDC-WH-A 0000011057 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Annex C List of CRs agreed at RAN 1#40 25.211 200 1 B Rel-6 25.212 193 B Rel-6 RANimp-RABSECodeOptFDD RANimp-RABSECodeOptFDD RANimp-RABSE- R1-050178 Introduction of F-DPCH without pilot field R1-050080 Introduction of F-DPCH 1 25.213 70 1 B Rel-6 R1-050081 Introduction of F-DPCH 25.214 368 1 B Rel-6 R1-050179 Introduction of F-DPCH without pilot field 25.215 155 - B Rel-6 R1-050133 Introduction of F-DPCH without pilot field 25.215 150 251215 15i 25.215 152 25.215 153 25.214 354 25.214 355 25.214 365 25.215 147 251215 154 25.224 140 25.211 197 25.211 198 25.211 202 25.212 198 251212 199 25.213 72 25.213 73 25.214 362 25.214 364 25.214 369 1 i 1 1 3 2 4 ~ 2 1 1 2 1 ~ 1 2 1 2 C C C C C B F B F C F F F F C F F F F F Re199 RelL4 Rel-5 Rel-6 Rel-6. Rel-6. Rel-5 Rel-6 RelL6 Rel-6 Rel-6 Rel-6 Rel-6 Rel-6 RelL6 Rel-6 Rel-6 Rel-6 Rel-6 Rel-6 R1-050110 Removal of TGPL2 R1L050110 Rem0~al0fTGPL2 R1-050110 Removal of TGPL2 R1-050110 Removal of TGPL2 R1-050201 Timing maintained Hard Handover R1-050173 Faster L1 DCH synchronization R1-050113 Correction to computed gain factors quantization R1-050114 Introduction of’DL Transmission Branch Load’ measurement R1L050082 ciarificati0n0fceii0nsFN~sFN0bservedtimediffe~ence R1-050096 Improvements to uplink closed-loop power control for 1.28Mcps TDD R1-050182 E-HICH/E-RGCH Signature Sequences R1-050195 E-HICH/E-RGCH Signature Sequence Hopping R1-050223 E-HICH/E-RGCH/E-AGCH timing R1-050194 PLnon-maxand PLmax R1L050108 HARQbitc011ecti0nf0rELDCH R1-050064 Correction on E-DPCCH power offset R1-050204 Defining E-DPDCH power offset R1-050215 Gain factor setting for E-DCH R1-050198 Reliable E-RGCH/E-HICH Detection R1-050224 DL/ULtiming association of E-DCH operation 25.221 118 - B Rel-6 R1-050227 Release6HS-DSCHoperationwithoutaDLDPCHfor3.84McpsTDD 25.224 141 B Rel-6 R1-050228 Release 6 HS-DSCH operation without a DL DPCH for 3.84Mcps TDD - RANimp-RABSECodeOptFDD RANimp-RABSECodeOptFDD TEl TEl TEl TEl TEl6 TEl6 TEl5 TEl6 TEl LCRTDD-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys EDCH-Phys RANimp-RABSECodeOptTDD RANimp-RABSECodeOptTDD 41 APLNDC-WH-A 0000011058 R1-050369 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 Note ¯ The CRs in Tdoc R1-050223, R1-050224, R1-050227 and R1-050228 were agreed on the RAN1 reflector after the meeting. After the meeting, the category of CR 140r2 for TS25.224 in R1-050096 was changed from TEI6 to LCRTDD-phys for RAN#27 proposal. 42 APLNDC-WH-A 0000011059 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Annex D List of Outgoing LSs to 3GPP other groups R1-050191 LS on Introduction of Fractional DPCH R1-050216 R1-050219 R1-050220 R1-050221 R1-050222 LS on Faster L1 DCH synchronization LS on E-AGCH contents LS on support for higher layer signalling of PLnon-max value Reply LS on alignment of MBMS transport channels LS on MBMS UE capability RAN2, RAN3, RAN4 RAN4 RAN2 RAN2, RAN3 RAN3 RAN2, RAN3, RAN4 RAN2 43 APLNDC-WH-A 0000011060 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Annex E: List of Tdocs at RAN1 #40 rom ji ua~e ~-~i R1-050035 Draft Agenda RAN1 Chairman R1-050036 Reply LS on parameter set for PS streamingWG RAN2 eference radio bearer combination with Jownlink rate up to 128 kbps (To ¯ T1, Cc ¯ :~AN1) R1-050037 Reply LS on Synchronisation of FDD MBMS WG RAN2 D-t-M Transmissions from Clusters of Cells ’ToRAN& Cc RAN1, RAN4) R1-050038 _S on Layer 1 synchronization procedure WG RAN2 ’To RAN1, Cc RAN3, RAN4) R1-050039 _S on Radio link failure criteria on Fractional WG RAN2 DPCH (To RAN3, RAN4, Cc RAN1) R1-050040 DRAFT Report of 3GPP TSG RAN WG1 RAN1 Secretary ~39 R1-050041 Summary from TSG RAN#26 RAN1 Chairman 2 5 =R2-042698 14/o2/2oos~,pproved 14/o2/2OOSNoted :R2-042706 14/02/2005 Noted 5 :R2-050249 14/02/2005 Noted 5 :R2-050300 14/02/2005 Noted 3 14/02/2005 &pproved 4 8 14/02/2005 Noted ~Vithdrawn 8 8 ~Vithdrawn 8 ~Vithdrawn 8 R1-050047 &ddition of suppo~ for BTFD in flexible Mitsubishi 3osition multiplexing of transpo~ channels Electric(MMCE) ’include CR) ~Vithdrawn ~Vithdrawn 8 R 1-041312) R1-050048 3ain of BTFD in flexible position Mitsubishi 8 R1-041478) ~ultiplexing of transpo~ channels Electric(MMCE) R1-050049 ~inutes from RAN1 Conference Call #1 on RAN1 Chairman 9.1 R1-050022) ~cheduling and HARQ 44 15/02/2005Noted. As the conclusion of the R1-050047 and R1-050048, there was no agreement [rom the group to introduce this feature in the specifications. 15/o2/2oo5Noted 15/o2/2oo5 Noted APLNDC-WH-A 0000011061 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Date(CET)i T EM i R1-050050 Vlinutes from RAN1 Conference Call #2 on RAN1 Chairman ~lodeB measurements and interaction with :~NC admission/congestion control and :~RM with EUL R1-050051 Vlinutes from RAN1 Conference Call #3 on RAN1 Chairman JE categories for EUL R1-050052 Efficiency Analysis of DL ACK Structures Via Telecom R1-050053 Selecting the Primary Node(s) for DL ACK Via Telecom LZTE (From) i 9.1 R1-050027) 16/02/2005 Noted 9.1 R1-050033) 15/02/2005 Noted 9.2 9.2 = R1-041410 = R1-041411 Not Treated Not Treated ~Vithdrawn ~l~+i~ i~v ~ C ~1~ ~ C D~ ~Vithdrawn R1-050056 Timing of E-HICH and number of HARQ ZTE ~rooesses R1-050057 TR25,808 FDD Enhanced Uplink; Physical Editor (Nokia) _ayer Aspects, v1,0,1 R1-050058 E-AGCH SF and channel coding Samsung Samsung 25,212CR198(ReI-6, F)"PLnon-max and R1-050059 ~Lmax" 25,214CR362(Rel-6, F)"GaJn factor setting Sa msu ng or E-DCH" Samsung R1-050061 25,214CR363(Rel-6, F)"Power control at the ~axJmum power limit" R1-050062 JTRAN measurement for E-DCH RRM Samsung R1-050063 1umber of HARQ processes Samsung 25,213CR72(Rel-6, F)"CorrectJon on ER1-050064 DPCCH power offset" Samsung 25,213CR73(Rel-6, F)"Defining E-DPDCH R1-050065 ~ower offset" Samsung DptJmJzatJon of Outer Loop Power Control Top Optimized R1-050066 or F-DPCH Technologies R1-050067 JE behaviour on RG from Non-serving RLS Alcatel R1-050060 9.2 15/02/2005 Noted 15/02/2005 &g reed as versi on 1.1.0 in Tdoc R 1-050188. 9 9.6.2 9.6.2 9.6.4 9.6.4 9.3 9.2 9.6.3 9.6.3 8 9.2 16/02/2005 Noted 16/°2/2°°SThe principle of this CR was agreed, and it was to revise the CR in accordance with the LIE categories (e.g Pimax fro the highest ,~ategory )in Tdoc R1-050194 16/o2/2oo5 Revised in Td oc R 1-050209 17/o2/2oosThe revised CR to be prepared for RAN l#40bis. 16/o2/2oo5 Noted 15/o2/2oo5 Noted 16/o2/2oo5 &g reed 16/o2/2oos&greed. After the discussion of other topic, lhis CR was revised in Tdoc R1-050204 14/o2/2oo5 Noted Not Treated 45 APLNDC-WH-A 0000011062 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 T EM i (From)i Date(CET)i Tx Power requirements for Optimisation of UTSarcom, 12 R1-050068 DL Code Utilisation for TDD LCR IPWireless Radio resource control and measurement 9.3 R1-050069 LG Electronics or HSUPA Timing and the number of HARQ processes LG Electronics 9.2 R1-050070 or HSUPA 25.211CR196(Rel-6, F)"Modify the 9.6.1 R1-050071 alphabetic index of E-HICH and E-RGCH ZTE signature sequence" 9.6.2 R1-050072 _5.212CR197(Rel-6, F)"Modify the ZTE Jescription of CRC attachment for E-AGCH" R1-050073 Relative timing of downlink signaling Nortel 9.2 :hannels for E-DCH R1-050074 ~lumber of H-ARQ processes for E-DCH Nortel 9.2 R1-050075 DRAFT Report of 3GPP TSG RAN WG2 RAN2 Secretary 3 = R2-050233 ~45 8 R1-050076 _5.214CR357r2(Rel-6, B)"lntroduction of F- Nortel R1-041523) DPCH " 8 R1-050077 _5.215CR148r2(Rel-6, B)"lntroduction of F- Nortel R1-041524) DPCH " R1-050078 ---DCH timing Lucent 9.2 R1-050079 __.5.211CR194r2(Rel-6, B)"lntroduction of F- Nortel 8 R1-041522) DPCH " R1-050080 _5.212CR193r1(Rel-6, B)"lntroduction of F- Nortel 8 R1-041307) DPCH " R1-050081 _5.213CR70r1(Rel-6, B)"lntroduction of F- Nortel 8 R1-041308) DPCH " R1-050082 _5.215CR154(Rel-6, F)"Clarification of cellPanasonic 6.4 3n SFN-SFN observed time difference" R1-050083 VIBMS UE capability R1-050084 Void R1-050085 Void R1-050086 Void R1-050087 --UL timing and the number of HARQ 3rooesses Revised in Tdoc R1-050189 16/o2/2oo5 Noted 15/o2/2OO5Noted Not treated 16/o2/2OO5Not agreed 15/o2/2OO5Noted 15/o2/2OO5Noted 14/o2/2OO5 RAN1/2 Joint session part was approved 14/o2/2OO5Noted 14/o2/2OO5Noted 15/o2/2OO5Noted 14/o2/2OO5Noted 14/o2/2oosAgreed 14/o2/2oosAgreed 14/o2/2oosAgreed. Itwas decided to consider possibility Ior CRs to the earlier releases (R99...) at RAN Plenary as company proposal. Panasonic 7 14/o2/2OO5Noted Panasonic 9.2 15/o2/2OO5Noted 46 APLNDC-WH-A 0000011063 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Date(CET)i T EM R1-050088 Jplink EDCH/DCH resource allocation and Panasonic "neasurement R1-050089 _ong term solution for ping-pong effect Panasonic R1-050090 ---HICH/E-RGCH Signature Sequences Siemens R1-050091 25.211CR197(Rel-6, F)"E-HICH/E-RGCH Siemens Signature Sequences" R1-050092 ]-TI reordering with measurement gaps of Siemens 0 and 20 ms R1-050093 Draft LS on TTI reordering Siemens R1-050094 aroposal of UE categories for the Enhanced Vodafone Jplink Group, NTT DoCoMo R1-050095 Definition and Signalling way of Time Mitsubishi Duration Electric R1-050096 25,224CR140r2(Rel-6, C) "Improvements toPWireless I Jplink closed-loop power control for ,28Mcps TDD" R1-050097 25,214CR364(Rel-6, F)"Reliable EEricsson :~GCH/E-H ICH Detection" R1-050098 ---DPCH Power control Ericsson R1-050099 25,214CR354r2(Rel-6, C)"Timing Ericsson qqaintained Hard Handover" R1-050100 25,214CR355rl(Rel-6, B)"Faster L1 DCH Ericsson synchronization" 9.3 9.3 9.6.1 9.6.1 i (From) i 16/o2/2OOSNoted Not treated Revised in Tdoc R1-050183 Revised in Tdoc R1-050182 7 14/o2/2OOSNoted 7 9.4 14/o2/2OOSNoted 17/o2/2OOSNoted 9.2 6.4 9.6.4 Not treated 14/o2/2oo5 &greed 17/o2/2OOSRevised in Tdoc R1-050198 8 6.4 14/o2/2oo5 Noted 14/o2/2oosThis CR was revised in Tdoc R1-050201. 6.4 14/o2/2oo5It was decided to replace Qpost with Qout, and should be reconfirm with RAN2 about indication of the post-sync-failure (depends 3n RAN2 discussion). Revision 2 of the CR in ldoc R1-050173. R1-050101 ---RGCH/E-HICH Sequence Hopping Ericsson R1-050102 25.211CR198(Rel-6, F)"E-RGCH/E-HICH Ericsson Sequence Hopping" 9.6.1 9.6.1 16/02/2005Noted 16/o2/2oo5 R_e¥ised with ]hLked to R_]-050]S2 iuR_]-050]gi R1-050103 ---RGCH/E-HICH Signature Sequences Ericsson R1-050104 25.211CR199(Rel-6, F)"E-RGCH/E-HICH Ericsson Signature Sequences" R1-050105 ---DCH DownlinkTiming Relations Ericsson R1-050106 ---DCH UE Categories Ericsson R1-050107 ---DCH and Compressed Mode Ericsson 9.6.1 9.6.1 16/o2/2OOSNoted 16/o2/2OOSNoted 9.2 9.4 9.5 Revised in Tdoc R1-050186 17/o2/2OOSNoted 17/o2/2OOSNoted 47 APLNDC-WH-A 0000011064 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Date(CET)i T EM R1-050108 _5.212CR199(Rel-6, C)"HARQ bit collection Ericsson or E-DCH" R1-050109 ---AGCH Contents and Power Consumption Ericsson R1-050110 _5.215CR150r1(Re199, C),CR151r1(Rel-4,Ericsson, ~,), CR152r1(Rel-5, A), CR153r1(Rel-6, A) Samsung ’Removal of TGPL2" R1-050111 -IARQ Operation Point Siemens R1-050112 :~etransmission Power Optimisation Siemens R1-050113 _5.214CR365(Rel-5, F), CR366(Rel-6, A) QUALCOMM ’Correction to computed gain factors Europe :luantization" R1-050114 __5.215CR147r4"lntroduction of’DL Siemens Transmission Branch Load’ measurement" R1-050115 Performance of E-AGCH Motorola R1-050116 ---HICH/E-RGCH Peak Power Requirement Motorola R1-050117 ---DPCCH performance with energy Motorola Jetection vs. CRC R1-050118 Comparative performance of dedicated and Motorola autonomous modes R1-050119 Performance of EUL in Autonomous mode Motorola ~vith and without hysteresis R1-050120 Derformance of EUL with and without happy Motorola 3it R1-050121 JE Capabilities for EUL Motorola R1-050122 ::)raft LS on Control of HARQ Operation Siemens, Nokia, Philips R1-050123 _S on Details on MCCH (To ; RAN4, Cc; WG-RAN2 :~AN1) R1-050124 _S on reference cell in SFN-SFN observed WG-T1 :ime difference measurement (To: RAN1, Cc: RAN2) R1-050125 _S on modified parameters for 5.9 speech WG-T1 adio bearer 6.10.2.4.1.9 in 34.108 (To; :~AN 1, RAN2) R1-050126 Jplink DPCCH power setting Philips R1-050127 nteractions between HSUPA and Philips :ompressed mode i (From) 9.6.2 9.2 6.1 i 16/o2/2oosAgreed 16/o2/2OO5Noted 14/o2/2oosFechnically agreed 9.2 9.2 6.3 R1-050003) R1-050004) 18/o2/2OO5Noted 18/o2/2OO5Noted 14/o2/2oos:Dnly Rel-5 was agreed, but Rel-6 was not agreed. 6.4 R1-041494) 14/o2/2oosAgreed 16/o2/2oo5 Noted 16/o2/2OO5Noted 16/o2/2oo5 Noted 9.6.2 9.6.1 9.6.2 9.2 Not treated 9.2 Not treated 9.2 Not treated 9.4 9.2 17/o2/2OO5Noted 18/o2/2OO5Noted. No recommendation from RAN1 to go [urther with this feature 14/o2/2OO5Noted 5 = R2-050307 5 = T1-050483 14/o2/2OO5Noted 5 = T1-050490 14/o2/2OO5Noted 9.6.4 9.5 Revised in Tdoc R1-050185 17/o2/2OO5Noted 48 APLNDC-WH-A 0000011065 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 T EM i (From)i Date(CET)i R1-050128 ntroduction of F-DPCH without pilot field Philips R1-050129 CR25.211-200 (Rel-6, B)"lntroduction of F- Philips, Nokia 3PCH without pilot field" 8 14/02/2005 Noted 8 14/o2/2OOSMinor-revised in Tdoc R1-050178 8 R1-050131 klumber of HARQ processes Siemens ~Vithdrawn 9.2 R1-050132 CR25.214-368 (Rel-6, B)"lntroduction of F- Philips, Nokia 3PCH without pilot field" 15/o2/2oo5 N oted 14/02/2005 It 8 R1-050133 CR25.215-155 (Rel-6, B)"lntroduction of F- Philips, Nokia 3PCH without pilot field" R1-050134 ---HICH timing relationship Siemens R1-050135 Compressed Mode for EDCH Siemens R1-050136 .~tep size for relative grants Siemens 8iepae~ R! 050137 R4R4~C4e~4:~ R1-050138 VIBMS UE Capability for FDD Motorola R1-050139 JE behaviour when reaching the maximum Nokia :x power R1-050140 ---DPCCH performance in SHO: a Nokia :omparison between CC and RM R1-050141 -ISUPA UE Capabilities Nokia R1-050142 ~lumber of Absolute Grant bits transmitted Nokia 3n E-AGCH R1-050143 Common measurement for E-DCH NEC R1-050144 Compressed mode handling NEC R1-050145 ---AGCH Timing NTT DoCoMo R1-050146 Vleasurement report of E-DPDCH/DPCCHNTT DoCoMo 3ower ratio for common rate control ’Autonomous ramping) R1-050147 Control over serving vs. non-serving E-DCH NTT DoCoMo esource allocation R1-050148 NTT DoCoMo :~eserving Hadamard sequence to improve nterference calculation for E-HICH/E-RGCH R 1-050010) was decided to include the text from Tdoc R1-050098 (exclude part on multiple RL QoS ’The UE shall run a quality target control loop such that the quality requirement is met for ~ach radio link set.") Revision in R1-050179. 14/o2/2oo5&greed 8 9.2 9.5 9.2 8~3 7 9.6.4 =R1-050011 16/o2/2oo5 Noted 9.6.1 9.4 9.2 9.3 9.5 9.2 9.3 9.2 9 Revised in Tdoc R1-050181 17/o2/2oo5 Noted Not treated ~Vithdrawn 14/o2/2oo5 Noted 17/o2/2oo5 Noted R1-050028) = R2-050079 17/o2/2oo5 Noted 16/o2/2oo5 Noted Not available 17/o2/2oo5 Noted 15/o2/2oo5 Noted 16/o2/2oo5 Noted Not treated 17/o2/2OOSNoted. It was decided that this topic can be ,~onsidered at the next meeting if simulation results are available. 4g APLNDC-WH-A 0000011066 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 T EM i (From)i Date(CET)i R1-050149 ]-FC selection for EUDCH R1-050150 ---DPCH simulation results R1-050151 ---DPCH operation in SHO R1-050152 Dn MBMS UE Minimum Capability R! 050153 ~ R1-050154 ~,MR-WB reference RAB configurations NEC Nokia Nokia Nokia Nek4a Nokia 9.5 8 8 7 6:8 6.5 R1-050155 :~RM aspects of the Enhanced Uplink Vodafone Group ’eature R1-050156 :~OHC Packet Handling Using RLC Ericsson .~egmentation and Concatenation R1-050157 A68Mcps TDD option: work organisation IPWireless 9.3 Not available 14/o2/2OOSNoted 14/o2/2OOSNoted 14/o2/2OOSNoted ~Vithdrawn 14/o2/2oosFhis document was revised in Tdoc R1::)50205. 16/o2/2OOSNoted 10 17/o2/2OOSNoted 13 17/o2/2OOSNoted. It was decided to clarify responsibility Ior the stage at RAN#27 R1-050158 ::)raft TR: 7.68Mcps TDD option: physical IPWireless ayer 13 17/o2/2oos~,greed as v0.1.0 as soon as TR number is available. R1-050159 ::)raft TS: 7.68Mcps TDD Option; Overall IPWireless ::)escription: Stage 2 R1-050160 3-PSK for TDD Enhanced Uplink and text IPWireless 3roposal for TR25.804 R1-050161 Text proposal on Node-B scheduling for IPWireless ]-R25.804 R1-050162 ::)raft text on conclusions and IPWireless ecommendations for the TDD enhanced Jplink SI R1-050163 ::)ut-of-sync detection for TDD HSDPA IPWireless 3peration without an associated DL DPCH R1-050164 CR25.212-201 (Rel-6, F)"E-AGCH channel Motorola :oding specification" R1-050165 ~lumber of HARQ processes & DL timing QUALCOMM Europe R1-050166 Measurement in support of RRM QUALCOMM Europe R1-050167 ---DCH related UE categories QUALCOMM Europe R1-050168 ---AGCH aspects QUALCOMM Europe 13 14 14 14 11 9.6.2 9.2 9.3 Revised in Tdoc R1-050192 17/o2/2oos]-his text proposal was agreed into TR. Revised in Tdoc R1-050190 17/o2/2oos]-his text proposal was agreed into TR. Revised in Tdoc R1-050196 Not treated 15/o2/2OOSNoted Not treated 9.4 17/o2/2OOSNoted 9.6.1 16/o2/2OOSNoted 5O APLNDC-WH-A 0000011067 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 Date(CET)i T EM R1-050169 Structured and improved E-HICH/E-RGCH Huawei Signature Sequences R1-050170 3R25.211-201(Rel-6, F) "E-HICH/E-RGCH Huawei Signature Sequences" R1-050171 JE behavior in DPCH frame offset Intel econfiguration R1-050172 --eature Clean-Up Nokia, Motorola i (From) 9.6.1 9.6.1 i 16/o2/2OOSNoted 16/o2/2OOSNoted 6.3 Not Treated 6.5 14/o2/2OOSNoted. The decision on removal of features ~hould be taken TSG RAN level 18/o2/2oosTechnically agreed from RAN1 perspective R1-050173 __.5.214CR355r2(Rel-6, B)"Faster L1 DCH Ericsson synchronization" R1-050174 Ericsson 6.4 graft LS on Faster L1 DCH synchronization 6.4 R1-050175 _S on the measurements required for WG-RAN3 --DCH Congestion Control (To:RAN1, Cc: :~AN2, RAN4) R1-050176 VIBMS UE Capability for FDD Motorola 5 = R3-050254 14/o2/2OOSNoted 7 R1-050138) 18/o2/2oo5Noted. Include updated the proposal from R1:)50176 (with limit on SCCPCH codes) and indicate TTI issue together with the RAN1 )arts of UE capabilities in draft LS R1:)50177. R1-050177 graft LS on MBMS UE capability 7 Panasonic R1-050178 3R25.211-200 rl(Rel-6, B)"lntroduction of Philips, Nokia ---DPCH without pilot field" R1-050179 3R25.214-368 rl(Rel-6, B)"lntroduction of Philips, Nokia ---DPCH without pilot field" R1-050180 ~,pproved Report of 3GPP TSG RAN WG1 RAN1 Secretary ~39 R1-050181 ---HICH timing relationship Siemens S R1-050182 __.5.211CR197rl(Rel-6, F)"E-HICH/E-RGCHiemens Signature Sequences" R1-050183 ---HICH/E-RGCH Signature Sequences Siemens R1-050184 EDraft] LS on Introduction of Fractional Philips, Nokia, ::)PCH Nortel, Ericsson R1-050185 3R25.214-367 Power ratio setting for UL Philips 3hysical channels in relation to E-DCH 18/o2/2oosApproved with the modification in Tdoc R1:)50216 8 R1-050129) 18/o2/2oosApproved with modification on "Overall description" in Tdoc R1-050222 18/o2/2oosAgreed 8 R1-050132) 15/o2/2oosAgreed 3 R1-050140) 9.2 9.6.1 R1-050134) R1-050091) 9.6.1 8 R1-050090) 9.6.4 R1-050126) Approved version 15/o2/2OOSNoted 16/o2/2oosAgreed and captured by CR25.211CR198rl Tdoc R1-050195). 16/o2/2oosAgreed 16/o2/2oosApproved with addition of sentence ""in Tdoc R1-050191 17/o2/2OOSNoted 51 APLNDC-WH-A 0000011068 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 T EM i (From)i Date(CET)i R1-050186 ---DCH DownlinkTiming Relations Ericsson R1-050187 .Comparison of E-HICH/E-RGCH signatureEricsson sequences R1-050188 ]-R25.808 FDD Enhanced Uplink; Physical Editor (Nokia) _ayer Aspects, vl. 1.0 R1-050189 ]-x Power requirements for Optimisation of UTSarcom, I PWireless :)L Code Utilisation for TDD LCR R1-050190 Text proposal on Node-B scheduling for IPWireless ]-R25.804 R1-050191 _S on Introduction of Fractional DPCH (To WG-RAN1 : :~AN2, RAN3, RAN4) R1-050192 :)raft TS: 7.68Mcps TDD Option; Overall IPWireless :)escription: Stage 2 Ericsson R1-050193 :)raft LS to RAN2 on AGCH R1-050194 25.212CR198r1(Rel-6, F)"PLnon-max and Samsung, =hmax" Nokia, Philips R1-050195 25.211CR198r1(Rel-6, F)"E-RGCH/E-HICH Ericsson Sequence Hopping" IPWireless R1-050196 ::)ut-of-sync detection for TDD HSDPA ~peration without an associated DL DPCH 9.2 9.6.1 R1-050105) 9 R1-050057) 12 R1-050068) 17/02/2005 Noted 14 R 1-050161 ) 17/02/2005 ]-his 8 15/o2/2oo5 Noted 16/02/2005 N oted Approved version text proposal was agreed into TR. Approved version 13 R1-050159) Not treated 9.6.1 18/02/2005 Approved 9.6.2 R1-050059) :)50219. 18/02/2005 Agreed. 9.6.1 R1-050102) 18/02/2005 Agreed 11 R1-050163) with modification in Tdoc R1- ]-his document will be sent and discussed on lhe reflector after the meeting. ~Vithdrawn R1-050198 __5.214CR364r1(Rel-6, F)"Reliable E:~GCH/E-H ICH Detection" R1-050199 18/02/2005 Agreed Ericsson WG-RAN3 18/02/2005 Noted. It was decided to send the reply LS indicating that no significant impact on RAN1 ~pecifications is expected with an introduction 3f an SFN-MFN offset (no impact with introduction of an SFN-CFN offset) that would lead to alignment of TTI starting times and the proposed solution CFN mod2 = 0 is not )referred in Tdoc R1-050214. 18/02/2005Noted 5 _S on alignment of MBMS transport :hannels (To : RAN1, RAN2) R1-050200 --UL performance with de-boosting on E- QUALCO M M Europe :)PDCH 25.214CR354r3(Rel-6, C)"Timing R1-050201 Ericsson qqaintained Hard Handover" 9.2 6.4 R1-050099) 18/o2/2oo5Agreed 52 APLNDC-WH-A 0000011069 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050369 T EM i (From)i Date(CET)i R1-050202 Review of WG RAN1 Terms of Reference RAN1 Chairman 15 R1-050203 Timing and process number QUALCOMM 9.2 Europe R1-050204 _5.213CR73r1(Rel-6, F)"Defining E-DPDCHsamsung 9.6.3 ~ower offset" R1-050205 ~,MR-WB reference RAB configurations Nokia 6.5 R1-050206 3R 25.211-202 (Rel6, F) "E-HICH/EQUALCOMM :~GCH/E-AGCH timing" Europe R1-050207 3R 25.214-369 (Rel6, F) "DL/UL timing QUALCOMM association of E-DCH operation" Europe R1-050208 ~lote of Joint Session on RRM EDCH RAN1 Chairman Samsung, R1-050209 _5.214CR362r1(Rel-6, F)"Gain factor setting for E-DCH" Nokia, Philips R1-050210 --UL E-DPDCH De-boosting Result Motorola R1-050211 _S on Layer 1 synchronization procedure WG RAN3 ’To ; RAN1, Cc; RAN3, RAN4) R1-050212 TR25.804 v.1.0.1 InterDigital R1-050213 Draft] LS on support for higher layer Samsung signalling of Plnon-max value R1-050214 DRAFT] Reply LS on alignment of MBMS Motorola :ransport channels Samsung, R1-050215 _5.214CR362r2(Rel-6, F)"Gain factor setting for E-DCH" Nokia, Philips R1-050216 _S on Faster L1 DCH synchronization WG RAN1 R1-050217 3R 25.211-202 rl(Rel6, F)"E-HICH/EQUALCOMM :~GCH/E-AGCH timing" Europe R1-050218 3R 25.214-369r1(Re16, F)"DUULtiming QUALCOMM association of E-DCH operation" Europe R1-050219 _S to RAN2 on AGCH (To : RAN2) WG RAN1 R1-050220 _S on support for higher layer signalling ofWG RAN1 =lnon-max value (To : RAN2, RAN3) R1-050221 Reply LS on alignment of MBMS transport WG RAN1 shannels (To : RAN3, Cc : RAN2) R1-050222 _S on MBMS UE capability WG RAN1 R1-050223 3R 25.211-202 r2(Rel6, F)"E-HICH/E- QUALCOMM :~GCH/E-AGCH timing" Europe 18/o2/2OO5Endorsed Noted R1-050065) 18/o2/2oosAgreed R1-050154) 9.6.1 18/o2/2OO5Noted. RAN 1 confirms the correctness of the RAN 1 parameters. 18/o2/2OO5Revised in Tdoc R1-050217. 9.6.4 18/o2/2OO5Revised in Tdoc R1-050218. 9.3 9.6.4 9.2 5 R1-050060) 16/o2/2OO5Noted Revised in Tdoc R1-050215. = R3-050320 18/o2/2OO5Noted 18/o2/2OO5Noted 14 9.6 Agreed as v1.1.0 in Tdoc R1-050229. 18/o2/2oo5 Approved in Tdoc R1-050220. 5 9.6.4 R1-050209) 6.4 9.6.1 R1-050206) 9.6.4 R1-050207) 9.6.1 9.6 5 7 9.6.1 18/o2/2oosApproved with modification in Tdoc R1:)50221 18/o2/2oosAgreed Approved version 18/o2/2oosAgreed. After the meeting, this document was revised in Tdoc R1-050223. 18/o2/2oosAgreed. After the meeting, this document was revised in Tdoc R1-050224. Approved version Approved version Approved version R1-050217) Approved version After the meeting, agreed on the reflector APLNDC-WH-A 0000011070 3GPP TSG RAN WG1 Meeting #40bis Beijing, China, 4 - 8 April, 2005 R1-050224 3R 25.214-369r2(Re16, F)"DL/UL timing QUALCOMM association of E-DCH operation" Europe R1-050225 3omparison of E-HICH/E-RGCH SignatureSiemens Sequences R1-050226 _~5.211CR197r2(Rel-6, F)"E-HICH/E-RGCH Siemens Signature Sequences" R1-050227 3R25.221-118 (Rel-6, B)"Release 6 HS- IPWireless 3SCH operation without a DL DPCH for 3.84Mcps TDD" R1-050228 3R25.224-141(Rel-6, B) "Release 6 HS- IPWireless 3SCH operation without a DL DPCH for 3.84Mcps TDD" R1-050229 ]-R25.804 v. 1.1.0 InterDigital InterDigital R1-050230 ]-R25.804 v.2.0.0 R1-050231 ]-R25.808 FDD Enhanced Uplink; Physical Editor (Nokia) _ayer Aspects, v2.0.0 R1-050369 9.6.4 R1-050218) 9.6.1 9.6.1 ~,fter the meeting, agreed on the reflector Not available R1-050182) Not available 11 ~,fter the meeting, agreed on the reflector 11 ~,fter the meeting, agreed on the reflector 14 14 9 ~,greed version. Submitted in RAN#27 for approval. Submitted in RAN#27 for approval. 54 APLNDC-WH-A 0000011071

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?