Apple Inc. v. Samsung Electronics Co. Ltd. et al

Filing 662

EXHIBITS re #660 Administrative Motion to File Under Seal Apple Inc.'s Notice of Motion and Motion for Partial Summary Judgment Exhibits to Mueller Declaration ISO Apple's Motion for Partial Summary Judgment [660-9] filed byApple Inc.(a California corporation). (Attachments: #1 Exhibit Mueller Decl Exhibit 26, #2 Exhibit Mueller Decl Exhibit 27, #3 Exhibit Mueller Decl Exhibit 28, #4 Exhibit Mueller Decl Exhibit 29, #5 Exhibit Mueller Decl Exhibit 30, #6 Exhibit Mueller Decl Exhibit 31, #7 Exhibit Mueller Decl Exhibit 32, #8 Exhibit Mueller Decl Exhibit 33, #9 Exhibit Mueller Decl Exhibit 34, #10 Exhibit Mueller Decl Exhibit 35, #11 Exhibit Mueller Decl Exhibit 36, #12 Exhibit Mueller Decl Exhibit 37, #13 Exhibit Mueller Decl Exhibit 38, #14 Exhibit Mueller Decl Exhibit 39, #15 Exhibit Mueller Decl Exhibit 40, #16 Exhibit Mueller Decl Exhibit 41)(Related document(s) #660 ) (Selwyn, Mark) (Filed on 1/25/2012)

Download PDF
Mueller Exhibit 34 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan, 15 - 19 November, 2004 Agenda item R1-041469 3 Title: Approved Report of 3GPP TSG RAN WG1 #38 (Prague, Czech Republic, 16- 20 August, 2004) Document for: Source: Comments and approval TSG RAN WG1 Secretary Notes: All timestamps in this document are in UTC/GMT+lHunless otherwise noted. Fact Summary Meeting: Dates: Venue: Host: Attendees: Documents: 3GPP TSG RAN WG1 #38 16th through 20th August, 2004 HILTON PRAGUE, Prague, Czech Republic The European Friends of 3GPP1 96 delegates 246 (including some withdrawn and post-meeting artefacts) Yoshikazu Ishii ETSI Mobile Competence Center yoshikazu.ishii@etsi.org *1 Alcatel, Ericsson, Lucent Technologies, Nokia, Nortel Networks, 02, Orange, Siemens, SIMAlliance, Sonera, Telefonica, TIM, T-Mobile, VodaJbne, Panasonic. APLNDC-WH-A 0000010870 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Table of contents Executive summary ...................................................................................................................................... 1 1 Opening of the meeting .............................................................................................................................. 1.1 Call for IPR .................................................................................................................................................. 2 2 2 Approval of the agenda and the minutes of the previous RAN WG1 meetings ..................................... 2 3. Summary from RAN#24 and RAN1/2 Ad Hoc .................................................................................... 3 4. Liaison statement handling ................................................................................................................. 3 5. 5.1 5.2 5.3 5.4 5.5 5.6 Maintenance of R99, Rel4, Rel5, Rel6 ................................................................................................ 5 R99 CRs + shadow CRs ............................................................................................................................... 5 Rel4 CRs + shadow CRs .............................................................................................................................. 5 5 Rel5 CRs + shadow CRs .............................................................................................................................. Rel6 CRs + shadow CRs .............................................................................................................................. 6 Inputs for TS 34.108 + TR 25.993 ................................................................................................................ 6 Other ........................................................................................................................................................... 8 6. 6.1 6.2 6.3 MIMO ............................................................................................................................................... TR 25.876 structure, MIMO requirements .................................................................................................... System evaluation methodology ................................................................................................................. MIMO Ad Hoc Meeting ............................................................................................................................. 7. 7.1 7.2 7.3 7.4 MBMS ............................................................................................................................................. 12 13 MBMS indicator channel (MICH) ............................................................................................................. Other MBMS L1 specification aspects ........................................................................................................ 14 UE capability definition (incl. macro-diversity) .......................................................................................... 14 MBMS UE performance requirements (joint with RAN4) ........................................................................... 16 8 8.1 8.2 FDD Enhanced Uplink ...................................................................................................................... 17 Basic E-DCH physical layer structure (Code mapping, E-DPCCH) ............................................................. 17 E-DCH TrCH processing (E-DCH channel coding aspects, self-decodable/non-self-decodable transmissions) ............................................................................................................................................ 19 19 E-DCH transmit power issues (Power offsets, PAR) ................................................................................... Signalling support for HARQ ..................................................................................................................... 20 8.3 8.4 9 9.1 9.2 9.3 9.4 9 9 10 10 Joint session on FDD Enhanced uplink with RAN2 ........................................................................... 22 HARQ principles: Synchronous vs asynchronous retransmissions, SHO operation (continuation of discussion from joint RAN 1/RAN2 session in Cannes) ............................................................................... 23 Scheduling principles (continuation of discussion from joint RAN 1/RAN2 session in Cannes) .................... 24 Outer loop power control aspects ................................................................................................................ 26 Physical layer model and physical layer error requirements ......................................................................... 26 10 Other issues for joint discussion with RAN2 ..................................................................................... 27 10.1 Review of UL-TDOA Study Item description ............................................................................................. 27 10.2 Use of secondaxy scrambling code for IMS ................................................................................................. 28 APLNDC-WH-A 0000010871 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 11 Uplink Enhancements for UTRA TDD .............................................................................................. 29 12 Analysis of higher chip rates for UTRAN evolution (TDD) ............................................................... 30 13 Improvement of inter-frequency and inter-system handover measurements ....................................... 31 14 Optimisation of downlink channelisation code utilisation (FDD) ....................................................... 32 15 Optimisation of downlink channelisation code utilisation (TDD) ..................................................... 32 16 HSDPA ACK/NACK enhancements ................................................................................................. 33 (Discussion is limited to coverage improvement and decoder complexity aspects) ....................................... 33 17 Other issues ...................................................................................................................................... 34 18 Joint session RAN1 & RAN4 ............................................................................................................ 34 18.1 Rel5/Rel CRs ............................................................................................................................................. 34 18.2 MBMS Requirements ................................................................................................................................. 34 18.3 Rel-6 PAR ................................................................................................................................................. 35 19 Closing of the meeting ¯ Friday 5.00 PM ........................................................................................... 35 Annex A: Report from Joint Ad Hoc RAN WG1 - WG4 ......................................................................... 36 A. 1 Minimum power limit ................................................................................................................................ 36 A.2 MBMS ....................................................................................................................................................... 36 UE output power back off ........................................................................................................................... A. 3 37 Annex B: List of participants .................................................................................................................. 38 Annex C: TSG RAN WG1 meetings through 2004 to 2005 ..................................................................... 43 Annex D: List of CRs agreed at RANl#38 .............................................................................................. 44 Annex E: List oftdocs at RAN1 #38 ....................................................................................................... 45 APLNDC-WH-A 0000010872 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Executive summary WG RAN1 # 38 took place in Hilton Prague, Prague, Czech Republic. The meeting started at 9:00 on Monday 16st August 2004 and finished at 17:00 on Friday 20th. In the duration of the meeting, the several sessions by only RAN1 delegates were held, and also the joint session with RAN2 delegates regarding "Enhanced Uplink", and the joint session with RAN4 delegates regarding "MBMS" were held. On MIMO discussion, the ad hoc meeting was held to resolve the differences among delegates regarding the system evaluation methodology. On MBMS discussion, the approach of describing MICH was generally agreed, and also the baseline for the further work to finalise soft combining was decided On FDD Enhanced Uplink, the working assumption fro "E-DPCCH structure" and "E-DCH Timing" was agreed, and at the Joint session with RAN2, the agreement was obtained in "HARQ Principles" and "Scheduling Principles" The number of contribution documents for this meeting was 246, and those documents were categorized as followed. 5. Maintenance of R99, Rel4, Rel5, Rel6 6. MIMO 7. MBMS 8. FDD Enhanced Uplink 9. Joint session on FDD Enhanced uplink with RAN2 10. Other issues for joint discussion with RAN2 11. Uplink Enhancements for UTRA TDD 12. Analysis of higher chip rates for UTRAN evolution (TDD) 13. Improvement of inter-frequency and inter-system measuremetns 14. Optimisation of downlink channelisation code utilisation (FDD) 15. Optimisation of downlink channelisation code utilisation (TDD) 16. HSDPA ACK/NACK enhancements 17. Other 16 35 29 76 40 1 9 10 16 14 26 15 6 1 8 10 2 2 2 0 1 5 1 0 5 0 Note ¯ In above table, the revised and withdrawn contributions are included in the input documents. The contributions of RAN1 were only counted for Joint Session. APLNDC-WH-A 0000010873 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 1 Opening of the meeting 1610812004 09:05 The RAN1 Chairman, Mr. Dirk Gerstenberger started the meeting. Mr. Enrico Buracchini from Telecom Italia Lab welcomed the delegates on behalf of the host companies of The European Friends of 3GPP (Alcatel, Ericsson, Lucent Technologies, Nokia, Nortel Networks, 02, Orange, Siemens, SIMAlliance, Sonera, Telefonica, TIM, T-Mobile, VodaJbne, Panasonic). Short wlwcome introduction, enjoy Prague. 1.1 Call for IPR 16/08/2004 09:10 The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a member any IPR owned by the Individual Member or any other organization which is or is likely to become essential to the work of 3GPP. The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational Partners to inform their respective Organizational Partners of Essential IPRs they become aware of. The members take note that they are hereby invited: ¯ ¯ 2 to investigate in their company whether their company does own IPRs which are, or are likely to become Essential in respect of the work of the Technical Specification Group. to notif~v the Director-General, or the Chairman of their respective Organizational Partners, of all potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/). Approval of the agenda and the minutes of the previous RAN WG1 meetings R1-040810 Draft Agenda for RAN WG1 #38 (RAN1 Chairman) 16/08/2004 09:10 Presented by Mr. Dirk Gerstenberger. Mr. Chairman explained the overview of meeting items. CR input in the first morning and afternoon, and then treat MIMO, Later MBMS in tomorrow morning. We will have a Joint session with RAN4 on Tuesday evening. Regarding E-DCH on Tuesday afternoon, Joint session with RAN2 on Wed. E-DCH, and UL-TDOA. On Thursday or Friday, treat TDD. We will close meeting at 5:00 pm on Firday. Discussion (Question / Comment): Decision: This document was approved. R1-040811 Draft Report of3GPP TSG RAN WG1 #37 (RAN1 Secretary) Decision: This document was not available. R1-040812 Draft Report of3GPP TSG RAN WG1 Rel.6 Ad Hoc Meeting in Cannes (RAN1 Secretary) 16/08/2004 09:15 Discussion (Question / Comment): No Decision: This document was approved with correction the name of the company. R1-041020 Approved Report of3GPP TSG RAN WG1 Rel.6 Ad Hoc Meeting in Cannes (RAN1 Secretary) APLNDC-WH-A 0000010874 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Summary from RAN#24 and RAN1/2 Ad Hoc 3. R1-040835 Summary from RAN#24 (RAN1 Chairman) 16/08/2004 09:20 Presented by Mr. Dirk Gerstenberger. Mr. Chairman, Mr. Dirk Gerstenberger presented about the overview of he discussion and decision on the RAN#24, and also announced the meeting plan in flae next year. In order to cope with several WIs speedy, RAN1 would have five or six regular WG meetings in next year. Decision: This document was noted. R1-040836 Summary from RAN1/2 Ad hoc meeting in Cannes (RAN1 Chairman) (Withdrawn) Liaison statement handling R1-040813 (To) Reply LS on Code Sharing during Compressed Mode (To:R1 Cc:R3) (Reply to R1-040386) TSG RAN WG2 (Nokia) 16/08/2004 09:29 Presented by Mr. Markku Tarkiainen. Discussion (Question / Comment): No Decision: This document was noted. R1-040814 (Cc) Reply LS on Multiple MBMS Issues (To: $4, R4 Cc: $2, S1, R1, R3, G1, G2, N1) (Reply to $4-040132) TSG RAN WG2 (Samsung) Discussion (Question / Comment): This document was already treated in Cannes Meeting Decision: This document was noted. R1-040815 (Cc) Reply to "LS on RRC release aspects of CS video and voice service improvements" (To:S2 Cc: R1, R3) (Reply to $2-041641) TSG RAN WG2 (Vodafone) 16/08/2004 09:33 Presented by Mr. Yannick Le Pezennec. Discussion (Question / Comment): There are some discussions for this LS. It commented that it was necessary to look at RAN3 aspects. Decision: This document was noted. R1-040816 (Cc) LS on RRC release aspects of CS video and voice service improvements (To:S2, Cc: R1,R2,GP) (Reply to $2-041641) TSG RAN WG3 (Alcatel) 16/08/2004 09:40 Presented by Mr. Stefan Russ. Discussion (Question / Comment): Wait for the any proposal regarding the LS in this week. Decision: This document was noted. R1-040817 (To) Response LS on Multiple MBMS Issues (To: R1, R2, R3, GP, G2) (Reply to R1-040385, R1-040651, etc) TSG SA WG4 (Siemens) Discussion (Question / Comment): This document was already treated in Cannes Meeting. Decision: This document was noted. R1-040818 (Cc) LS on Proposed Modification to HSDPA Radio Bearer Settings (To: R2 Cc: R1) TSG T WG1 (QUALCOMM) 16/08/2004 09510 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): I was commented about PDU size 656. Decision: This document was noted. R1-041014 (To) LS on the material to be submitted to ITU-R WP8F#14 for Revision 5 of Recommendation ITU-R M.1457 ITU-R Ad Hoc (To:R1, R2, R3, R4) (Telecomm Italia) 16/08/2004 09:56 Presented by Mr. Enrico Buracchini. APLNDC-WH-A 0000010875 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Discussion (Question / Comment): Mr. Chairman commented that anyone who have some comments about the LS should provided them until Friday morning. Decision: This documents was noted. R1-041045 Response to LS on the material to be submitted to ITU-R WPSF#14 for Revision 5 of Recommendation ITU-R M.1457(To:ITU-R Ad Hoc) ITU-R Ad Hoc (Telecomm Italia) 20/08/2004 11:31 Presented by Mr. Enrico Buracchini. Discussion (Question / Comment): No Decision: This draft was approved in Tdoc R1-041046. R1-041039 (Cc) Reply LS on Proposed Modification to HSDPA Radio Bearer Settings (To:T1 Cc: R1) TSG RAN WG2 (NTT DoCoMo) 20/08/2004 13:52 Presented by Mr. Chairman on behalf ofNTT DoCoMo. Decision: This document was noted. R1-041040 (Cc) LS on enhancing L1 multiplexing test coverage in 3GPP test specifications (To:T1, Cc: R1) TSG RAN WG2 (Nokia) 20/08/2004 13:55 Presented by Mr. Markku Tarkiainen. Discussion (Question / Comment): Decision: It was decided to provide quick feedback to TSG WG-T1 that RAN1 would review the L1 aspects and provide more feedback from RAN#38bis in Tdoc R1-041049. R1-041049 DRAFT LS on L1 multiplexing test coverage in 3GPP test specifications TSG RAN WG1 (Nokia) 20/08/2004 14:45 Presented by Mr. Markku Tarkiainen. Discussion (Question / Comment): Decision: This draft was approved as Tdoc R1-041053 and it was decided to continue the discussion also whether R99 or Rel.5 until RAN#38bis. APLNDC-WH-A 0000010876 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 5. Maintenance of R99, Rel4, Rel5, Rel6 5.1 R99 CRs + shadow CRs There were no contributions to this Agenda Item. 5.2 Rel4 CRs + shadow CRs R1-040826 25222CR122(Rel-4, F)&CR123(Rel-5, A)&CR124(Rel-6, A): "Correction of symbol Xi defined in sub-frame segmentation step" (Siemens) 16/08/2004 09:57 Presented by Mr. Huang Xue Gang. Discussion (Question / Comment): It was commented that there was no isolated impact analysis and how impacts was this CR. Decision: This document was not approved and would be provided the revision with isolated impact analysis in R1041017. R1-041017 25222CR122rl(Rel-4, F)&CR123rl(Rel-5, A)&CR124rl(Rel-6, A): "Correction of symbol Xi defined in sub-frame segmentation step" (Siemens) 20/08/2004 14:50 Presented by Mr. Huang Xue Gang. Decision: This CR was approved. R1-040883 25.224CR132(Rel-4, F)&CR133(Rel-5, A)&CR134(Rel-6, A) "Transmit diversity usage for beacon channels in LCR TDD" (IPWireless, Interdigital, Siemens) 16/08/2004 10;01 Presented by Mr. Ma Sha. Decision: This document was approved. R1-040913 25224CR135(Rel-4, F)&CR136(Rel-5, A)&CR137(Rel-6, A): "Corrections of radio access procedure for 1.28Mcps TDD" (Siemens AG, CATT) 16/08/2004 09:15 Presented by Mr. Huang Xue Gang. Discussion (Question / Comment): It was commented that RAN2 would discussed also same CR in Prague. Decision: This document was approved with modification in the cover sheet (list RAN2 affected specification) in R1-041018. R1-041018 5.3 25224CR135rl(Rel-4, F)&CR136rl(Rel-5, A)&CR137rl(Rel-6, A): "Corrections of radio access procedure for 1.28Mcps TDD" (Siemens AG, CATT) Rel5 CRs + shadow CRs R1-040839 25.214CR343rl(Rel-5, F)&CR344rl(Rel-6, A) "Clarification of minimum power limit" (Panasonic) (Revised R1-040198) 16/08/2004110:20 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): Decision: This document would be looked at again in Joint session with RAN4 on Tuesday. (See Annex A) R1-041037 25.214CR343r2(Rel-5, F) CR344r2(Rel-6, A) "Clarification of minimum power limit" (Panasonic) (Revised R1-040839) 20/08/2004 14:55 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): Decision: It was not clear if CR is need or not. It was decided to conclude discussion in RANl#38bis APLNDC-WH-A 0000010877 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040874 R1-041469 25.211CR191(Rel-5, F)&CR192(Rel-6, A) "Correction for the slot range of DL DPCCH power control preamble for CPCH" (LG Electronics) 16/08/2004 10:14 Presented by Mr. Hak-Seong Kim. Discussion (Question / Comment): It was commented whether this CR should be for R99 or Rel.4, but it was decided that it was not necessoxy. Decision: This document was approved. 5.4 Rel6 CRs + shadow CRs R1-040823 Introduction of a new Node B measurement ’DL Transmission Branch Load’ (Siemens) 16/08/2004 11 : 15 Presented by Dr. Joern Krause. R1-040824 CR147 to 25.215 v6.0.0 Introduction of ’DL Transmission Branch Load’ measurement (Siemens) 16/08/2004 11:23 Presented by Dr. Joern Krause. Discussion (Question / Comment): There were some questions about the situation in this Tdoc. It was commented that this Tdoc and CR should be discussed with RAN4 or RAN3 regarding diversity, power definition, Maximum power, in especially, power was the most impact to Node B. Decision: It was decided that Tdoc R1-040823and R1-040824 would be discussed again with RAN4 on Tuesday. See Annex A. R1-040875 25.214CR349(Rel-6, F) "Clarification of SSDT uplink only signaling" (LG Electronics) 16/08/2004 10:23 Presented by Mr. Hak-Seong, Kim. Discussion (Question / Comment): It was commented whether this CR is necessary for Rel.5. Decision: This document was technically endorsed. The CR was needed to provide the CR for Rel.5 also revised in Tdoc R1-041019. R1-041019 25.214CR349rl(Rel-6, F)&CR350(Rel-5, A) "Clarification of SSDT uplink only signaling" (LG Electronics) 19/08/2004 15:10 Presented by Mr. Hak-Seong, Kim. Discussion (Question / Comment): Decision: This CR was approved. MCC will correct cover sheets (RE6 Cat F and appropriate WI code). R1-041059 25.214CR352rl(Rel-6, F)&CR353(Rel-5, A) "Clarification of SSDT uplink only signaling" (LG Electronics) Decision: The CR numbers of Tdoc R1-041019 was overlapped with other document. In order to cope with this problem, the new CR numbers (352 and 353) and Tdoc numner (R1-041059) were allocated by MCC after the meeting closed. R1-041059 was approved as the final version. [Editor Note] Coffee Break in the morning. 5.5 Inputs for TS 34.108 + TR 25.993 R1-040882 HS RAB combinations for testing (Ericsson) 16/08/2004 11:47 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): Decision: This document was noted APLNDC-WH-A 0000010878 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040834 R1-041469 Inclusion of combinations of multiple radio bearers with HSDPA into TS 34.108 (Vodafone Group) 16/08/2004 11:52 Presented by Mr. Yannick Le P~zermec. Discussion (Question / Comment): It was commented that t~is topic should be treated in RAN2, but the chairman commented that there were some discussion points regarding this issue in RAN1. It was another commented there were overlaps and differences between this proposal and Ericsson’s proposal, so they should be checked. Decision: Regarding above two paper (R1-040882 and R1-04083ZD, it was decided that the offline discussion would be continued during this week and given the feedback to Vodafone and Ericsson again. This topic was treated again on Joint session with RAN2 on Thursday. Joint Session RAN1/RAN2 regarding "HSDPA RABs" was held on Thursday morning. R2-041856 HSDPA RAB methodology (Qualcomm) 19/08/2004 11:30 Presented by Mr. Hector Vaymaos. Discussion (Question / Comment): It was commented that the link between 34.108/25.993 and the responsibility from T1, RAN2 or other groups should be carefully considered. However, it was also commented that for the very short future some very basic RAB combinations were needed to increase the HSDPA test coverage in 34.108, and are also needed in TR 25.993. Decision: This document was noted, and there were the sentence revisions on this document as followed. On DL, all PS RABs will be mapped on the HS-DSCH. o When with voice/video, all PS-RABs mapped on HS-DSCH o When no voice/video, test 2 PS RABs on HS-DSCH or sprit DCH/HS-DSCH. Use MAC-d flow multiplexing to when of RABs on GHS-DSCH > la!!ew the expansien efthe numSer ef P~,Es On UL, a single transport channel is sufficient for supporting all PS RABs. Define RABs with support for MAC-d multiplexing on UL to allow the expansion of the number of RABs supported. For the PS RAB, support TTI durations of 10 and 20ms, and RLC PDU sizes of 336bits and 656bits. For the DCCH, use 20ms TTI instead of 40ms (no need to add a new DPCH RAB). Provide support for NB-AMR and 64kbps CS video on the associated DPCH. R2-041605 Inclusion of combinations of multiple radio bearers with HSDPA into TS 34.108 (Vodafone Group, Qualcomm) This document was already seen by the working groups separately @1-04083@ Discussion: It was commented that there was an earlier discussion in RAN WG1 for the uplink rate (lower rates to be included or not), and also for e.g. video (restricting the TFC or not). Decision: The conclusion was agreed, expect WB-AMR combination, which is FFS, 128kbps UL is FFS. Agreed to add 64kpbs support at the next meeting. RABs proposed to 25.993 may be given to T-Mobile. The updated CR on 34.108 is in tdoc R2-041810 Additional HSDPA RABs for inclusion into 25.993 have been proposed and presented in RAN2 (R2-041811). RAN1 chairman asked for review and input to RAN1 separately. The corresponding input for 25.993 is in R1041038 from T-Mobile and was presented during the RAN1 #38 meeting (also containing the "pointers" to the agreed RABs included from R2-041810). Due to time contains it was agreed that RAN1 will check the layerl parameters in flae September ’04 RAN 1 # 38bis meeting. [Editor Note] R1-041038 Lunch Break. Proposed addition for TR25.993 (T-Mobile, Siemens, Nokia) 20/08/2004 13:58 Presented by Mr. Dirk Kistowski from T-Mobile. Discussion: Decision: This document was noted. It was decided to be reviewed by RAN1 until RANl#38bis. APLNDC-WH-A 0000010879 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 5.6 R1-041469 Other R1-040904 Issues with Radio Link Synchronization (Ericsson) 16/08/2004 14:13 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): There were some questions about A a~d B synchronization. It was commented that the document had two issue, one is Timing maintain handover and link synchronization. Decision: This document was noted and more discussion was continued till next meeting. APLNDC-WH-A 0000010880 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 6. R1-041469 MIMO The overview of MIMO discussion was as followed. 6.1 TR 25.876 structure, MIMO requirements R1-040931 TR25.876 v.l.5.l "Multiple-Input Multiple Output in UTRA" (Editor : Lucent Technologies) 16/08/2004 14:50 Presented by Mr. Teck Hu. Decision : This document was approved as version 1.6.0 in Tdoc R1-041021. R1-040870 MIMO generic scheme and text proposal for the MIMO TR 25.876 (Nortel Networks) 16/08/2004 14:59 Presented by Mr. Hassan E1 Nahas. Discussion (Question / Comment): It was commented about ~he difference form the Nokia proposal in Montreal meeting. Decision: This document was noted. It was decided to have the offline discussion until Wednesday evening. R1-040915 Tx Diversity and MIMO (Alcatel) 16/08/2004 15:19 Presented by Mr. Stefan Russ. Discussion (Question / Comment): It was commented that we need the definition of MIMO and TX Diversity. Decision: This document was not approved and the text proposal was not included. [Editor Note]Take break for coffee. R1-040905 MIMO Evolution Path requirements (Siemens) 16/08/2004 16:20 Presented by Dr. Seyed H Mortazavi Discussion (Question / Comment): It was commented that for time consuming we should have offline discussion before the conclusion. Decision: This document was noted. It was decided to have the offline discussion until Wednesday evening. R1-040981 MIMO Reference Cases (Nokia) 16/08/2004 16:45 Presented by Mr. Jean-Philippe Kermoal. Discussion (Question / Comment): It was commented that flais reference cases were very useful. Decision: It was agreed to use 6 sectors and 2Rx LMMSE as reference case for MIMO for MIMO studies. It was decided to provide a TP after the offline discussion in Tdoc R1-041022. R1-041022 MIMO Reference Cases (Nokia) 19/08/2004 14:45 Presented by Jean-Philippe Kermoal. Discussion (Question / Comment): no Decision: This document was approved. APLNDC-WH-A 0000010881 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041050 R1-041469 TR25.876 v.l.6.1 "Multiple-Input Multiple Output in UTRA" (Lucent Technologies) Decision: This document was not available. It was decided to approval via email until August 31 6.2 System evaluation methodology R1-040982 Comments and TP on MIMO Compatibility Assessment (QUALCOMM Europe) 16/08/2004 16:55 Presented by Mr. Hans Schotten.. Discussion (Question / Comment): Decision: It was decided to provide the revision after offline discussion in Tdoc R1-041023 by Wednesday evening. R1-041023 Comments and TP on MIMO Compatibility Assessment (QUALCOMM Europe) 19/08/2004 14:55 Presented by Mr. Hans Schotten. Discussion (Question / Comment): no Decision: This document was approved. R1-040934 Text Proposal on MIMO System Simulation Evaluation Methodology (Mitsubishi Electric Research Labs : MERL) 16/08/2004 17:14 Presented by Dr. Neelesh B. Mehta. Discussion (Question / Comment): Decision: This document was noted. R1-040980 Text Proposal on System Setup for MIMO (Nokia, TeliaSonera, T-Mobile) 16/08/2004 17:18 Presented by Mr. Jean-Philippe Kermoal. Discussion (Question / Comment): Decision: This document was noted. Regarding the above two proposal, it should be resolved the differences : Scheduler, LIE speed model, traffic model, inclusion of HSDPA traffic models, modelling of overhead channels fixed/variable power, wrap-around. With regard to MIMO, we have more offline discussion and after Wednesday, we would check the discussion results. 6.3 MIMO Ad Hoc Meeting The Ad Hoc meeting for MIMO was held on Tuesday morning (17/08/2004). Participating companies: Alcatel, ETRI, TMobile, Ericsson, Nokia, Siemens, TeliaSonera, Mitsubishi, Nortel, Huawei, Siemens, Lucent, Samsung, Qualcomm. R1040982, R1-040870, and R1-040905 were also discussed in fiae MIMO AdHoc meeting. The outcome of the discussions was summarized in R 1-041036. R1-041036 Summary from MIMO ad hoc meeting (MIMO ad hoc) 19/08/2004 14:50 Presented by Mr. Hans Schotten of Qualcomm on behalf of the ad hoc meeting Discussion (Question / Comment): No Decision: This summary was approved. R1-041034 Text proposal on System setup to MIMO (MIMO ad hoc) 19/08/2004 14: 58Presented by Dr. Neelesh B. Mehta on behalf of the ad hoc meeting. Discussion (Question / Comment): It was commented about editorial revision. Decision: The document was approved with addition of reference of [6] and correction "the reference cases" in A. 2.1.10.2. And also it was decided to continue discussion of particular proposals (with indication of gains) at RANl#39. The following documents were not treated. lO APLNDC-WH-A 0000010882 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040820 R1-040821 R1-040829 R1-040830 R1-040871 R1-040920 R1-040921 R1-040868 R1-040869 R1-040916 R1-040917 R1-040930 R1-040986 R1-040987 R1-040988 R1-040989 R1-041007 R1-041011 R1-041012 R1-041013 R1-040990 R1-041469 Modified per stream rate control for 2-antenna MIMO (TI) (=R1-040517) Text proposal for modified per stream rate control for 2-antenna (TI) (=R1-040518) Double-ASTTD with Sub-Group Rate Control (Huawei Technologies) Text Proposal for Double-ASTTD with Sub-Group Rate Control (Huawei Technologies) CQI feedback for RC-MPD (Nortel Networks) Spatial channel coding (SCC) for high throughput with a single receive antenna (Philips) Text Proposal for Spatial Channel Coding (Philips) Further simulations on RC-MPD and comparison with PARC, DSTTD, and R’99 TxDiv (Nortel Networks) First MIMO Traffic simulations for RC-MPD and PARC with real channnel estimation (Nortel Networks) 4Tx open-loop closed-loop (OL-CL) MIMO (Alcatel) (=R1-040521) Text Proposal for 4Tx open-loop closed-loop (OL-CL) MIMO (Alcatel) (=R1-040595) Performance aspects of advanced spectral processing MIMO receivers for multi-code reception (Fujitsu, Dune Srl) Comparison of D-ASTTD-SGRC and DSTTD-SGRC using full-queue system simulations (Huawei Technologies) Midamble Allocation and Channelistion Code Allocation Signaling to Support MIMO in UTRA TDD (IPWireless) (R1-040580) Text Proposal for MIMO TR 25.876 (Midamble Allocation and Code Allocation Signaling) (IPWireless) (R1-040581) Per Antenna Rate Control for UTRA TDD (IPWireless) (R1-040582) Per-Stream Rate Control for LCR TDD_System Proposal and Initial Link Level Results (CATT) Fairness based multiuser MIMO scheduling (Samsung) Antenna selection based MIMO (Samsung & SNU) PU2RC Simulation (Samsung & SNU) Text Proposal for MIMO TR 25.876 (MIMO Proposal for UTRA TDD) (IPWireless) (R1-040583) 11 APLNDC-WH-A 0000010883 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 7. MBMS The overview of discussion and conclusion about MBMS was as followed. , PP gq ......... g .........P ........ ..................... P P, .... R1-040983 TR 25.803 vl.3.1 16/08/2004 17:41 Presented by Mr. Serge Willenegger. (QUALCOMM Europe) Decision : This document was approved as v1.4.0 in R1-041024. R1-041024 TR 25.803 vl.4.0 R1-041026 TR 25.803 vl.4.1 20/08/2004 16:40 Presented by Mr. Serge Willenegger. (QUALCOMM Europe) (QUALCOMM Europe) Decision : It was decided to approve via E-mail until August 30 (only Siemens TPs will be included. Qualcomm TPs will be proposed in a separate TP for approval) R1-040827 Simulation results for 1.28Mcps TDD MBMS (Revised R1-040441) (Siemens) 16/08/2004 17:44 Presented by Mr. Huang Xue Gang. Decision: This document was agreed for inclusion in TR. 12 APLNDC-WH-A 0000010884 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040828 R1-041469 Coverage Results for MBMS (1.28Mcps TDD): Updated Text Proposal for TR 25.803 (Siemens) (Revised R1-040620) 16/08/2004 17:46 Presented by Mr. Huang Xue Gang. Decision: This document was agreed for inclusion in TR. 7.1 MBMS indicator channel (MICH) R1-040884 Draft CR for introduction of MICH in 25.21x (QUALCOMM Europe) 16/08/2004 17:52 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): It was commented that there were some editorial errors. Decision: This document was noted R1-040867 MBMS notification procedure on MICH (Panasonic) 16/08/2004 18:09 Presented by Mr. Frdddric Charpentier. Discussion (Question / Comment): There are many comments and questions about the proposal notification procedure from especially Qualcomm and NEC. Decision: This document was noted R1-041015 Comments on MICH mapping proposal in R1-040867 (NEC) 16/08/2004 18:34 Presented by Mr. Thanh Bui. Discussion (Question / Comment): Decision: This document was noted. R1-040984 On NI mapping (QUALCOMM) 16/08/2004 18:41 Presented by Mr. Hector Vaya~os. Discussion (Question / Comment): There are many comments and questions from Panasonic. Regarding MICH, NEC was objective to Panasonic, Panasonic was objective to Qualcomm. Decision: This document was noted. R1-040848 On MICH mapping (NEC) 16/08/2004 19:05 Presented by Mr. Thanh Bui. Discussion (Question / Comment): It was commented that in this situation, there are no progress, so take this proposal as working assumption and analyse until next meeting whether it has any problem. Decision: This document was noted. From the discussion about above contributions, the following conclusion was completed. Conclusion about MICH ¯ General agreement with the approach of describing MICH in R1-040884. Proceed with drafting of RAN1 CRs. ¯ NI mapping (q formula): Take proposal in R1-040984 as working assumption, perform further simulations until RAN1 #38bis regarding f(.) to confirm the performance. ¯ Inform other WGs about RANI’s decisions on MICH ( in R1-041025). ¯ Version 1.4.1 of the TR 25.803 (in R1-04102f!). [Editor Note] The first day was finished. R1-041025 [DRAFT] LS on introduction of the MICH in 25.21 (QUALCOMM) 20/08/2004 12:25 Presented by Mr. Serge Willenegger. Decision: The draft was approved in Tdoc R1-041048. 13 APLNDC-WH-A 0000010885 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 7.2 R1-041469 Other MBMS L1 specification aspects R1-040840 MBMS L1 possible limitations (Panasonic) (Revised R1-040710) 17/08/2004 09:09 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): There are many questions and comments for the issues describing in this contributions. It was commented that it was good idea to reduce unnecessary functions and BLER measurement of S-CCPCH was necessary. The question was asked what kind of scenoxio was assumed on BLER measuremsnts. Decision: This document was noted. I was decided to make a draft LS to RAN2/3/4 with the points where RAN1 can agree on R1-041029. R1-041029 DRAFT Question on the impact of L1 limitations on MBMS (Panasonic) 20/08/2004 11:35 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): There were some comments and suggestion of sentence revision. Decision: The draft was approved with modifications in Tdoc R1-041047. R1-040918 Reordering of TTIs in MBMS (Siemens) (Revised R1-040775) 17/08/2004 09:51 Presented by Mr. Thomas Hindelang. Discussion (Question / Comment): It was commented that MTCH level measurement was not really RAN1 matter and also the similox effect might be achievable by time shifting TX from Node B. Decision: This document was noted. Only applicable for Soft Conbining depending on measurement time in LIE. But, this topic is the higher layer issue, RAN1 could not agree at the moment. It was necessary to discuss with other RAN WG. [Editor Note] Coffee break UE capability definition (incl. macro-diversity) 7.3 R1-040841 How MBMS UE capability is defined? 17/08/2004 14:39 Presented by Mr. Hidetoshi Suzuki. (Panasonic) Discussion (Question / Comment): It was commented about the capability about reception of MTCH. It was commented that this contribution was not only for LIE capability, some description fro network side was necessary. The question was asked if 6.6 rule was applied. The answer to the question was that it was not necesarrt for SCCPCH carrying MTCH. Decision: This document was noted R1-040886 UE Capability for MBMS 17/08/2004 14:52 Presented by Mr. Serge Willenegger. (QUALCOMM Europe) Discussion (Question / Comment): There were some question and comments and also objections for the LIE capability on this contribution. It was commented that soft combining buffer shoud be configured depending on the configured TTI and the other parameters. Decision: This document was noted R1-040919 R1-041016 Further considerations on the UE capability for MBMS (FDD) (Siemens) Further considerations on the UE capability for MBMS (FDD) (Siemens) (revised R1-040919) 17/08/2004 15:13 Presented by Mr. Thomas Hindelang. Discussion (Question / Comment):.It was commented that 256kbps service and around 25% overhead should be claified. Decision: This document was noted 14 APLNDC-WH-A 0000010886 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 [Chairman’s Note] Discussion to continue on how to define the MBMS capability requirement [Editor Note] Coffee break, Soft Combining R1-040885 Soft combining aspects of MBMS (QUALCOMM Europe) 17/08/2004 11 : 15 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): There were some comments and questions regarding the conditions and type for SC. The question was asked if S-CCPCH needed indentical. Decision: This document was noted R1-040998 MBMS Transport and Physical Layer Soft Combining 17/08/2004 11:28 Presented by Mr. Mark Harrison. (Motorola) Discussion (Question / Comment): There are some comments about time relation and difference. It was commented that it should be discussed with RAN2 before decision. Decision: This document was noted. Discussion Point for Soft Combining Time multiplexing on TTI basis & (PhCH) soft combining? ) Allowing for different MTCH or MTCH and MCCH in different RL to be combined. ) Combining decision could be based e.g. on TFCI and/or scheduling information TFCI combining cannot be assumed a-priori. (more pessimistic TFCI power setting ? Or use single TF detection on each TrCH, fixed position and no TFCI bits) Draft a compromise proposal for LLR combining in (R1-041030) Draft an LS to RAN2 with specific questions related to the compromise proposal in (R1-041031_) Nortel R1-041030 Baseline for finalization of MBMS soft combining (Qualcomm Europe, Motorola) 20/08/2004 12:45 & 14:30 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): Decision: This document was agreed as baseline for the further work to finalise soft combining. It was decided to continue discussion via reflector before RAN1 #38bis. R1-041031 Draft LS on questions on MBMS (Nortel Networks) 20/08/2004 12:30 Presented by Ms. Evelyne Le Strat. Discussion (Question / Comment): Decision: This draft was approved with modifications (removal last two bullets + grammar) in Tdoc R1-041052 (cc: RAN3) R1-041002 Soft Combining for MBMS (Ericsson) 17/08/2004 12:16 Presented by Dr. Stefan Parkvall. The summ~y of discussion points was presented. Discussion (Question / Comment): Decision: This document was noted. It was decided to continue the discussion about timing different. [Editor Note] Lunch break R1-040887 S-CCPCH performance with 256 kbps (QUALCOMM Europe) (=R1-040716) 15 APLNDC-WH-A 0000010887 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 17/08/2004 14:16 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): It was commnetd that the performance difference between 80 ms TTI and 40 ms TTI would become more large if we have taken into account the measurement gap Decision: This document was noted. The simulation results on this contribution would be included in the TR. R1-040849 7.4 UE Capability (NEC) MBMS UE performance requirements (joint with RAN4) The report of this AI was described in clause 18 and also the draft report of RAN1/RAN4 Joint Session was distributed from WG4 secretary as shown in Annex A. 16 APLNDC-WH-A 0000010888 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 8 FDD Enhanced Uplink The overview of conclusion about this AI was as followed. R1-040971 TR25.808 v0.0.3 (Nokia) 17/08/2004 16:23 Presented by Mr. Karri Ranta-~ao. Discussion (Question / Comment): Decision: This document was approved as version 0.1.0 in Tdoc R1-041033 R1-041033 8.1 TR25.808 v0.1.0 (Nokia) Basic E-DCH physical layer structure (Code mapping, EDPCCH) E-DPCCH Structure ¯ TDM R1-040962 Proposal on RR, SI time multiplexing with HS-DPCCH (NTT DoCoMo) 17/08/2004 16:32 Presented by Mr. Anil Umesh Discussion (Question / Comment): The question was asked what was flae impact to HSDPA on this method. The answer to the question was that the proposal was to link with Rel-6. Decision: This document was noted. R1-040972 HSUPA Requirements for uplink signalling (Nokia) 17/08/2004 16;52 Presented by Mr. Karri Ranta-~ao. Discussion (Question / Comment): Decision: This document was noted. 17 APLNDC-WH-A 0000010889 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040872 R1-041004 R1-041469 UL signalling for FDD enhanced UL (Nortel Networks) UL signalling for FDD enhanced UL (Nortel Networks) (Revised R1-040872) 17/08/2004 17:03 Presented by Ms. Sarah Boumendil. Discussion (Question / Comment): There was a question about the simulation assumption. It was commented that TDM might impact to PAR due to different gain factors. The question was asked that tailing was assumed or not. The answer to the question was that it’s not a particular isuue. Decision: This document was noted R1-040880 Uplink Signalling alternatives for FDD Enhanced Uplink (Mitsubishi Electronic) 17/08/2004 17:15 Presented by Mr. Michiaki Takanoy. Discussion (Question / Comment): Decision: This document was noted. ¯ CDM R1-040956 Uplink Control Signaling (Ericsson) 17/08/2004 17:27 Presented by Dr. Stefan Parkvall. Decision: This document was noted. Mr. Chairman asked companies for their preference between TDM and CDM. NTT DoCoMo, Motorola, Nortel, Mitsubishi supports TDM approach, Other supports CDM approach. And then it was decided that we should have the offline discussion for this topic, and also come back in this week. Regarding this topic, the discussion started again on Thursday afternoon, and as result of the discussion, the following conclusion could be obtained. Working assumption For 2ms TTI CDM Power requirement accounted for by E-TFC selection For 10ms TTI Either CDM (E-DPPCH same as for 2ms, e.g. 5 times repeated) or TDM (e.g. E-DPCCH same as for 2ms, timemux in first 3 slots of E-DCH) Power requirements accounted for by E-TFC selection Additional ways of dealing with power limitation might be necessary -~Work on a 2ms coding structure can start already. -~Discussion on CDM/TDM for 10ms taken at RANl#38bis --~No more simultaneously code channels will be added for E-UL Uplink signalling Information Transmission format and HARQ related information up to in the order of 10 bits E-TFRI [5] bites, Boost [1] bit, NDI[2-3]bits, TSN/RSN[0-3]bits, RV[0-2]bits Scheduling information up to in the order of 12 bits Rate request [1-5]bits, power info [4-5]bits, Buffer info [3-4]bits, time duration [0-5]bits assumed TFC for SHO [3-5]bits, QoS requirements [4]bis E-DCH Timing (Huawei Technologies) R1-040833 EDCH timing 19/08/2004 17:40 Presented by Ms. Ma Sha. Discussion (Question / Comment): Decision: This document was noted. R1-040843 Channel priority and uplink transmission timing (Panasonic) 19/08/2004 17:55 Presented by Mr. Hidetoshi Suzuki. Discussion (Question / Comment): 18 APLNDC-WH-A 0000010890 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Decision: This document was noted. R1-040890 TP on E-DCH Timing (QUALCOMM Europe) 19/08/2004 18:00 Presented by Mr. Serge Willenegger. Discussion (Question / Comment): It was commented that DPDCH aligmnet was better for TFC selection. Decision: This document was noted. Regarding E-DCH timing, many discussion were repeated. Nokia, Ericsson, Samsung, Motorola, and Lucent agreed with Qualcomm. In especially, Panasonic objected that E-DCH timing was DPDCH flame aligned. Regarding this topic, the discussion started again on Friday afternoon, and Panasonic supported to the contribution, as result of the discussion, the following working assumption could be obtained. Working assumption E-DCH timing is DPCH frame aligned. The following documents were not treated. Uplink signaling for E-DCH R1-040943 (LG Electronics) R1-040865 EUL scheduling: signalling support (Samsung) EUL physical channel code mapping (Samsung) R1-040850 R1-040888 OVSF code space for E-DCH (QUALCOMM Europe) R1-040889 TP on PhCH mapping of E-DCH (QUALCOMM Europe) R1-040941 Physical channel code mapping for E-DCH (LG Electronics) R1-040949 Secondary Pilot for E-DCH (NEC) R1-040955 System performance with low capability UE (2ms TTI vs 10ms TTI) (eanasonic) R1-040957 Downlink Control Signaling (Ericsson) R1-041008 Simulations related to R1-040962 (NTT DoCoMo) 8.2 E-DCH TrCH processing (E-DCH channel coding aspects, self-decodable/non-self-decodable transmissions) R1-040855 HARQ: physical layer aspects R1-040891 R1-040892 R1-040893 R1-040894 R1-040958 Choice of RV and code rates TP on IR versions Impact of SNR mismatch on turbo decoding Reference short-term link curves for 10ms TTI E-DCH Physical Layer Hybrid ARQ Processing 8.3 (Samsung) (Revised R1-040797) (QUALCOMM Europe) (QUALCOMM Europe) (QUALCOMM Europe) (QUALCOMM Europe) (Ericsson) E-DCH transmit power issues (Power offsets, PAR) In RAN1 #38, there was no time to treat this topic. R1-040831 R1-040859 R1-040909 R1-040927 R1-040928 R1-041005 Power adjustment of ACK/NACK signaling based on ACK/NACK error rate (Huawei Technologies) Power control at the maximum power limit for EUL (Samsung) EUL Power Requirements (Motorola) Retransmission Power Optimisation (Siemens) E-DCH HARQ with Power Offset (Siemens) Traffic to Pilot Ratio Settings and Pilot Powers for EDCH (Lucent Technologies) 19 APLNDC-WH-A 0000010891 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 8.4 R1-041469 Signalling support for HARQ In RAN1 #38, there was no time to treat this topic. R1-040832 R1-040837 R1-040838 R1-040842 R1-040862 R1-040895 R1-040896 R1-040897 R1-040922 Downlink Signalling Mapping of ACK and NACK DL ACK structure DL ACK Selection Number of simultaneous reception of Acks in SHO RV Signalling E-TFICH performance with synchronous HARQ E-TFICH performance with asynchronous HARQ HARQ channel mapping in DL (Huawei Technologies) (Via Telecom) (Via Telecom) (eanasonic) (Samsung) (QUALCOMM Europe) (QUALCOMM Europe) (QUALCOMM Europe) (=R1-040723) Interaction between Enhanced Uplink and Compressed Mode(Philips) (Revised R1-040770) R1-040923 HARQ in SHO for Enhanced Uplink R1-040942 R1-040944 R1-040952 R1-040973 Signaling to support 2 ms and 10 ms TTIs for E-DCH (LG Electronics) Principles of downlink ACK/NACK signaling for E-DCH (LG Electronics) HARQ Downlink Signalling (NEC) (R1-040742) Implicit Redundancy Version for IR HARQ Scheme (Nokia) (=R1-040752) HSUPA HARQ ACK/NACK signalling performance (Nokia) R1-040974 8.5 (Philips) (Revised R2-041286) Signalling support for Scheduler In RAN1 #38, there was no time to treat this topic. R1-040844 R1-040854 R1-040856 R1-040857 R1-040879 R1-040912 R1-040924 R1-040932 R1-040933 R1-040945 R1-040953 R1-040968 R1-040969 R1-040975 R1-040999 R1-041001 R1-041009 R1-041010 R1-040976 Uplink power signalling information for the scheduling (Panasonic) Uplink signalling for Node B controlled scheduling (Samsung) (Revised R1-040696) Downlink control channel structure (Samsung) (Withdrawn) System level performance with periodic TPS reporting (Samsung) Signalling for primary Node-B selection in SHO (Mitsubishi Electric) Multi-step rate scheduling and synchronization scheme (Alcatel Shanghai Bell) Node B controlled scheduling in soft handover (Philips) (Revised R2-041286) Principles of scheduling for enhanced uplink (Fujitsu) Node B controlled scheduling in soft handover (Fujitsu) Timing of downlink signaling with 10 ms TTI for E-DCH (LG Electronics) Robust Signalling in Rate Scheduling (NEC) (R1-040740) (Not Available) UL Signalling overhead for node B scheduling in SHO (Siemens) (Revised R1-040788) DL Signalling overhead for node B scheduling (Siemens) (Revised R1-040787) HSUPA Signalling aspects of the rate scheduling (Nokia) (=R1-040750) Signalling framework for Enhanced Uplink scheduling (Fujitsu) E-DCH scheduling method in SHO (Panasonic) (withdrawn) RoT information broadcast as auxiliary information (Panasonic) Signalling for E-DCH Scheduling - Text proposal (Fujitsu) HSUPA Downlink scheduling signalling performance (Nokia) 2O APLNDC-WH-A 0000010892 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040852 Selection of primary scheduling Node B in SHO R1-040908 R1-040910 R1-040914 Time and Rate scheduler for Enhanced Uplink Signalling Support for EUL Target RoT control methods for HSUPA R1-040907 R1-040911 Rate Contol Scheduler for Enhanced Uplink Outer loop power control for EUL R1-041469 (Samsung) (Revised R1-040691) (Motorola) (Motorola) (eanasonic) (Revised R1-040780) (Motorola) (Motorola) 21 APLNDC-WH-A 0000010893 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 9 Joint session on FDD Enhanced uplink with RAN2 RAN1/2 Joint Session on this topic started at 09:00 on Wednesday (18/08/2004). The overview of conclusion was as followed. The draft report of this Joint Session ~vas distributed from WG-RAN2 secretary. (The draft report could be obtained on FTP server of 3GPP home page). 22 APLNDC-WH-A 0000010894 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R2-041408 Agenda of the RAN1-RAN2 joint session R1-041469 (Chairman) HARQ principles Synchronous vs asynchronous retransmissions, SHO operation (continuation of discussion from joint RAN1/RAN2 session in Cannes) 9.1 R1-040898 Impact of asynchronous HARQ (QUALCOMM Europe) 18/08/2004 09:15 Presented by Ms. Jelena Damnjanovic. Discussion (Question / Comment): Decision: This document was noted. R2-041620 E-DCH HARQ delay; synchronous versus asynchonous retransmission (Ericsson) 18/08/2004 09:45 Presented by Mr. Sven Ekemark. Discussion (Question / Comment): Decision: This document was noted. R2-041589 E-DCH - Comparison of process modes for HARQ (Siemens) 18/08/2004 10:0 Presented by Mr. Thomas Stadler. Discussion (Question / Comment): Decision: This document was noted. R1-040864 HARQ principle (Samsung) 18/08/2004 1 o: 15 Presented by Dr. Juho Lee. Discussion (Question / Comment): Decision: This document was noted. R1-040940 HARQ Processes for 2ms and 10ms (Lucent Technologies) 18/08/2004 11:25 Presented by Mr. Teck Hu. Discussion (Question / Comment): Decision: This document was noted. R1-040906 Fully sychronous HARQ and reliable signaling in SHO (Motorola) 18/08/2004 09:15 Presented by Mr. Robert Love. Discussion (Question / Comment): Decision: This document was noted. After discussion for the above 6 contributions, WG1/WG2 Chairman summarised about HARQ as followed. ¯ ¯ ¯ ¯ ¯ ¯ ¯ Synchronous repetitions How many processes: to be discussed with Lucent paper > 3 or 4 processes in 10 ms TTI > 5 or 6 processes in 2 ms TTI Trmasmission up to N times, Network parameter, or more complex..., per MAC-d flow (diff parameters for diff QoS support)... Beta factors up to NW. Fixed or dynamic or diffirent for transmission and re-transmission, etc. IR agreed in RAN1 Redundancy versions taken in a given order, with first txansmission always selfdecordable. Retransmissions may not be self-decordable. Number of RVs to cycle use is controlled by the Nw and may be different for different TFRCs. No need to recoginize the Node-B from upper layers when moving in/out SHO) however, Node-B may have SHO status via SHO indicator). LIE selects E-TFC. RV for certain E-TFC may be linked to CFN, some explicitly signalled for other E-TFC(How and where TBD) The following documents were not treated. R1-040876 R1-040899 R1-040938 R1-040939 Multiple number of SAW ARQ processes TP on synchronous/asynchronous HARQ System Performance with IR/Chase SHO Operation for EDCH (Mitsubishi Electric) (QUALCOMM Europe) (Lucent Technologies) (Lucent Technologies) 23 APLNDC-WH-A 0000010895 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040948 R2-041628 9.2 HARQ signalling in Soft Handover Robust HARQ R1-041469 (NEC) (NEC, Telecom Modus) Scheduling principles (continuation of discussion from joint RAN1/RAN2 session in Cannes) R1-040959 E-DCH Scheduling - Way Forward (Ericsson) 18/08/2004 15:00 Presented by Dr. Stefan Parkvall. Discussion (Question / Comment): Decision: This document was noted. R1-040900 Scheduling for EUL (QUALCOMM Europe) (R1-040728) 18/08/2004 16:55 Presented by Ms. Jelena Danmjanovic. Discussion (Question / Comment): Decision: This document was noted. R1-040978 HSUPA Dynamic Step Adjustment for Node B Controlled Scheduling (Nokia) 18/08/2004 17:25 Presented by Mr Sebir. Discussion (Question / Comment): Decision: This document was noted. After discussion for the above contributions, WG2/WG1 Chairman summarised about Scheduling as followed based on Tdoc R1-040959. It is proposed to agree on the following items as a basis for the scheduling schemes supported by the E-DCH: ¯ The scheduling grant controls the maximum allowed E DPDCH2DPCCH power ratio. o E-DPDCH/DPDCH power ratio o e-TFC index o E-DPDCH+DPDCH/DPCCH power ratio o other ¯ This is used only in e-TFC selection algo ¯ All groats are deterministic. v~;~ grants sent on the shared channel ~ .... ....... ~;~’~ on a per ~ basis)are supported. ~ .... to applicable Tr~ ....... ¯ ......... ~, ~ .... ....... vv for groups of UEs can be considered as a oomp!emerX. Grants can be valid for one ~, for a goups of~s, or all UE o These are absolute scheduling gants. o These gants can have an associated duration * Dedicated grants can have an associated validity * Scheduling gonts can be sent once per TTI or less frequently? * * . A shared chapel is used to transmit the absolute scheduling grants. ~e absolute scheduling grant contains at least the identity of the ~ (or goup of ~s) for which the grant is intended and the maximum resources the ~(s) may use. Relative gants (updates) are supported as a complement to absolute grants. o Dedicated resources are used to transmit relative grants to each ~. ~is is on the same chapel as the AC~ACK Dedicated rc~curcc~ arc used to transmit rdativc grant~ to each ~. ~ ~ ~: ....... ¯ .... :~ ~ ~ ~:__~ ~/u: ....... ¯ ...... u:~ The relative grant consists of a ~D bits x absolute and relative grants I FFS , SHO is FFS o Some information from all cells from E-DCH active set have to be taken into account. But What ? ;- t~e v n~n~/n~ power ratio a~so fo~ retransmissions handling vs scheduler gants is FFS. 24 APLNDC-WH-A 0000010896 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Regarding the continued discussion about the scheduling, RAN1 would be finish at the September meeting and input to RAN2 October meeting, and finally RAN1/RAN2 would complete the discussion at November meeting. R1-040963 R1-040964 Configurable Cell Level Rate Controller for EUL (NTT DoCoMo) Autonomous Rate Ramping for Cell Level Rate Control (NTT DoCoMo) 18/08/2004 18:33 Presented by Mr. Masafumi Usuda. He gave the summary of 0963 and 0964 and claimed that is depicted in figure 4 and 5 of this document. R2-041617 E-DCH HARQ protocol 18/08/2004 19:35 Presented by Dr. Stefan Parkvall. (Ericsson) Decision: This document was noted. R2-041650 Discussion document on PHY/HARQ requirements (Qualcomm) 18/08/2004 20:10 Presented by Mr. Hector Vaymaos. Decision: This document was noted. R2-041727 Mapping of SRB with HSUPA 18/08/2004 20:20 Presented by Mr. Denis Faucolmier on behalf of Nortel. (Nortel Networks) Decision: This document was noted. The following documents were not treated. R1-040845 Comparison on the scheduling points on coding chain (Panasonic) (Revised R1-040711) R1-040851 Node B controlled scheduling (Samsung) R1-040853 System level performance with various scheduling schemes (Samsung) R1-040858 System level performance with SHO scheduling (Samsung) R1-040860 Overall RoT management strategy (Samsung) Primary Node-B Selection by UE in SHO R1-040877 (Mitsubishi Electric) R1-040878 Primary Node-B Selection in SHO (Mitsubishi Electric) R1-040881 Consideration to Autonomous Transmission on E-DCH(Mitsubishi Electric) (=R1-040680) R1-040901 System performance with T&R scheduling and load control (QUALCOMM Europe) Adjustment of Scheduling Timing by UE R1-040929 (Siemens) Scheduling Schemes for EDCH (Lucent Technologies) R1-040936 Scheduling Performance for EDCH (Lucent Technologies) R1-040937 R1-040946 Node B scheduling with transmit power restriction for E-DCH (LG Electronics) Per Priority Queue basis Rate Scheduling R1-040950 (NEC) (R1-040739) R1-040960 On Scheduling Delays (Ericsson) R1-040961 E-DCH Autonomous Transmissions (Ericsson) R1-040965 Considerations on Enhanced Uplink Scheduling Options (Siemens) Uplink signalling for E-DCH scheduling based on predicted TFC (Siemens) R1-040966 (=R1-040785) Efficient scheduling in SHO by means of UE feedback (Siemens) R1-040967 (Revised R1-040786) R1-040977 1-bit Rate Request/Rate Grant Scheduling Signalling (Nokia) R1-040985 Position on scheduler design parameters (QUALCOMM Europe) R2-041629 Position on scheduler design parameters (NEC, Telecom Modus) R2-041641 Node B controlled scheduling in soft handover (Philips) 25 APLNDC-WH-A 0000010897 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 9.3 R1-041469 Outer loop power control aspects In RAN1 #38, there was no time to treat this topic. R1-040863 R1-040947 R1-040951 R2-041618 R2-041630 9.4 E-DCH outer loop power control (Samsung) Outer loop power control aspects of E-DCH (LG Electronics) Outer Loop power control in E-DCH (NEC) (R1-040738) E-DCH outer loop power control (Ericsson) Outer Loop Transmission Power Control in Enhanced Uplink (NEC, Telecom Modus) Physical layer model and physical layer error requirements In RAN1 #38, there was no time to treat this topic. R1-040866 R1-040902 R1-040903 Error requirements of scheduling grants (Samsung) (QUALCOMM Europe) (=R1-040730) HARQ states for EUL EUL Requirements (QUALCOMM Europe) (=R1-040731) R1-040861 R1-040954 R2-041461 R2-041519 R2-041621 R2-041622 R2-041729 Autonomous transmission with TDM approach Filtering on E-DCH TFCS (NEC) TR text proposal on Basic physical layer structure QoS and Scheduling Principles in HSUPA Principles of scheduling for enhanced uplink Signalling framework for enhanced uplink scheduling Node-B scheduler architecture proposal (Samsung) (R1-040741) (Nortel) (Nokia) (Fujitsu) (Fujitsu) (Nortel) 26 APLNDC-WH-A 0000010898 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 10 Other issues for joint discussion with RAN2 RAN1/2 Joint Session on this topic started at 08:30 on Thursday (19/08/2004). The overview of conclusion was as followed. The draft report of this Joint session ~vas distributed from WG-RAN2 secretary. (The draft report could be obtained on FTP server of 3GPP home page). 10.1 Review of UL-TDOA Study Item description R2-041413 PowerPoint presentation to accompany #2, proposed Inclusion of U-TDOA UE positioning method in the UTRAN specifications SI (TruePosition) 19/08/2004 08:40 Presented by Mr. Rob Anderson. Discussion (Question / Comment): Decision: This document was noted. R2-041726 Inclusion of U-TDOA UE positioning method in the UTRAN specifications Study Item Request (TruePosition) 19/08/2004 09:25 Presented by Mr. Rob Anderson. Discussion (Question / Comment): There was some discussion on how the process can be handled, especially in about the output from SI (Feasibility Study ). Supposing the SI is going to be approved in September TSG, the earliest closing date is December 2004, which TluePosition and the supporters see too late. The consequence was to modif~v the objectives and output statements of the draft SJD to fit into the current practice of 3GPP working procedures i.e., instead of including the techniques into the specifications. The sentence of objection was revised as followed "The objective this study item is to study enhanced network based positioning methods for FDD, without the need for modif~ving UEs and Node B and thus is compatible with existing LIEs and Node Bs" Decision: AWI description sheet will be proposed instead (TS 25.331 will be removed in the affected specifications). In response to questions from the RAN1 chair, it was confirmed by TrnePosition that there would be no modification to the physical layer in the UE or NodeB (e.g. no modification to power control behaviour), hence there would be no work to be done in RAN1. This was the reason that no study phase would be required from RAN1 perspective. It was proposed by the WG2 chairman that this should be specific to FDD. lPWireless expressed their concerns with this decision, commenting that there was no technical justification for this restriction. Resolution on this aspect was not found". Proposed completion date: RAN#32. (the new proposed WI description sheet is in R2-041857). R2-041412 Proposed Inclusion of U-TDOA UE positioning method in the UTRAN specifications Study Item (TruePosition) Decision: This document was noted without presentation. 27 APLNDC-WH-A 0000010899 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 10.2 Use of secondary scrambling code for IMS R1-040935 Secondary Scrambling Code for IMS (Siemens) 19/08/2004 10:10 Presented by Dr. Przemyslaw CZEREP1NSKI. Discussion (Question / Comment): There were some discussions whether the secondary scrambling code on this contribution was proper. The question was asked what channelization code was used. The answer to question was that one chanelization code was used and differeut acrambling code was used. Decision: This document was noted. R2-041523 Considerations on Single CCTrCH multi-code solution for IMS over radio (Nortel Networks) 19/08/2004 10:40 Presented by Ms. Sar~a Boumendil Discussion (Question / Comment): Decision: This document was noted. After the discussion about above contributions, Mr. RAN1 Chairman commented that the discussion point seems to be more focused on to a RAN1 issue. R2-041524 Considerations on Multiple-CCTrCH solution for IMS over radio (Nortel Networks) [Editor Note]Coffee break 28 APLNDC-WH-A 0000010900 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 11 Uplink Enhancements for UTRA TDD R1-040819 TR 25.804 "Uplink Enhancements for UTRA TDD" v0.2.1 (InterDigital) 20/08/2004 08:45 Presented by Ms. Liliana Czapla. Discussion (Question / Comment): No. Decision: This document was approved as version 0.3.0 in Tdoc R1-041041. R1-040846 Geometry Distribution for LCRTDD (Samsung) 20/08/2004 08:50 Presented by Mr. Sun Chengjun. Discussion (Question / Comment): Decision: This document was noted. R1-040847 Impact of Downlink Signalling for EUCH in LCRTDD (Samsung) 20/08/2004 08:55 Presented by Mr. Sun Chengjun. Discussion (Question / Comment): There are some comments. Decision: This document was noted. R1-040991 Intra-frame Code Hopping for EU-TDD and Text Proposal for 25.804 (IPWireless) 20/08/2004 08:58 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): Decision: It was decided to include TP with a note that applicability of the scheme for 1.28Mcps TDD is FFS. HARQ Performance for TDD Enhanced Uplink and Text Proposal for 25.804 (IPWireless) 20/08/2004 09:10 Presented by Mr. Nicholas Anderson. R1-040992 Discussion (Question / Comment): No. Decision: This TP was agreed. R1-040993 R1-041035 Power Control for TDD Enhanced Uplink and Text Proposal for 25.804 (IPWireless) Power Control for TDD Enhanced Uplink and Text Proposal for 25.804 (IPWireless) (Revised R1-040993) 20/08/2004 09:15 Presented by Mr. Nicholas Anderson. Discussion (Question / Comment): Decision: This TP was agreed. R1-041006 Modulation for TDD Enhanced Uplink and Text Proposal for 25.804 (IPWireless) (Withdrawn) 29 APLNDC-WH-A 0000010901 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 12 R1-041469 Analysis of higher chip rates for UTRAN evolution (TDD) R1-041000 TR25.895 vl.3.4: Analysis of Higher Chip Rates for UTRA TDD Evolution (IPWireless) 20/08/2004 09:25 Presented by Dr. Martin Beale. Discussion (Question / Comment): No. Decision: This document was approved as version 1.4.0 in Tdoc R1-041042. R1-040994 System Simulation Results for Release 99 type channels for TR25.895 (with text proposal) (IPWireless) R1-041027 System Simulation Results for Release 99 type channels for TR25.895 (with text proposal) (IPWireless) (Revised R1-040994) 20/08/2004 09:30 Presented by Dr. Martin Beale. Discussion (Question / Comment): Decision: This TP was agreed to include in the TR with modification in the last sentence "two 3.84Mops systems.." R1-040995 Text Proposal for Application to 3GPP systems and services (IPWireless) 20/08/2004 09:35 Presented by Dr. Martin Beale. Discussion (Question / Comment): There were some comments. Decision : This document was revised wording in Tdoc R1-041043. R1-041043 Text Proposal for Application to 3GPP systems and services (IPWireless) (Revised R1-040995) 20/08/2004 14:25 Presented by Dr. Martin Beale. Discussion (Question / Comment): Decision :This document was approved. R1-040996 Text Proposal for Conclusion to TR25.895 (IPWireless) Text Proposal for Conclusion to TR25.895 (IPWireless) (Revised R1-040996) R1-041028 20/08/2004 09:45 Presented by Dr. Martin Beale. Discussion (Question / Comment): There are many comments and suggestions about the conclusion, most of all, the conclusion should be more summarized and more simplified. The addition of WI proposal in recommendation was not supported from some companies. Decision: This document was revised regaxding conclusions for R1-041044. RAN1 does not agree to recommend the creation ofa WI decision is up to RAN. R1-041044 Text Proposal for Conclusion to TR25.895 (IPWireless) (Revised R1-04028) 20/08/2004 14:25 Presented by Dr. Martin Beale. Discussion (Question / Comment): Decision : This documents was approved. Additionally, it was decided that Update TRv. 1.4.1 in Tdoc R1-041051 would be provided on the reflector, and E-mail approval deadline would be August 30. 3O APLNDC-WH-A 0000010902 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Improvement of inter-frequency and inter-system handover measurements 13 R1-040822 Proposal for multiframe compressed mode by puncturing and unequal frame segmentation (Mitsubishi Electric: MMCE) 20/08/2004 15:10 Presented by Mr. Mickael Bouyaud. Discussion (Question / Comment): Some companies took objection to the contribution with comment of more detail investigation. Decision: This document was noted. In current contribution, there is no backward compatibility in SHO. It was decided to continue discussion and proposal. R1-040979 On channelisation code sharing during compressed mode (Nokia) 20/08/2004 15:40 Presented by Mr. Karri Ranta-~ao. Discussion (Question / Comment): Mr. Chairman suggested that it was necessary to discuss more about coding save gain. Decision: RAN1 could not conclude on a significmat code saving gain. Raise question to RAN whether further work on compressed mode enhancements is useful in RAN1. 31 APLNDC-WH-A 0000010903 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 14 R1-041469 Optimisation of downlink channelisation code utilisation (FDD) In RAN1 #38, there was no time to treat this topic. R1-040825 R1-040873 Concerns on Fractional DPCH Concept (Revised from R1-031227) Power control for F-DPCH (Siemens) (Nortel Networks) 15 Optimisation of downlink channelisationcode utilisation (TDD) In RAN1 #38, there was no time to treat this topic. R1-040997 Downlink Code Resource Optimisation for TDD HSDPA (IPWireless) 32 APLNDC-WH-A 0000010904 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 16 R1-041469 HSDPA ACK/NACK enhancements (Discussion is limited to coverage improvement and decoder complexity aspects) R1-040925 Implementation complexity of ACK/NACK performance improvement (including CR to 25.899) (Philips) 20/08/2004 16:15 Presented by Dr. Tim Moulsley. Discussion (Question / Comment): Decision: This Draft CR was endorsed. It was decided to provide official CR (number #1) on the reflector by August 27 in Tdoc R1-041054 and approve on E-mail until August 31. R1-040926 R1-041032 Effect of PRE/POST scheme on HSDPA cell coverage (including CR to 25.899) (Philips) Effect of PRE/POST scheme on HSDPA cell coverage (including CR to 25.899) (Philips) (Revised R1-040926) 20/08/2004 16:35 Presented by Dr. Tim Moulsley. Discussion (Question / Comment): Decision: This Draft CR was endorsed. It was decided to provide official CR (number #2) on the reflector by August 27 in Tdoc R1-041055 and approve on E-mail approval until August 31. 33 APLNDC-WH-A 0000010905 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 17 R1-041469 Other issues In RAN1 #38, there was no time to treat this topic. R1-040970 HSDPA Code Allocation/Measurement per Cell Portion (Nokia) 18 Joint session RAN 1 & RAN4 RAN1/4 Joint Session started at 18:30 on Tuesday (17/08/2004). The draft report of this Joint session ~vas distributed from WG-RAN4 secretary as sho~vn in Annex A. 18.1 Rel5/Rel CRs R4-040536 Requirement on UE minimum output power when transmitting HS-DPCCH (QUALCOMM Europe) 17/08/2004 18:33 Presented by RAN4 Qualcomm delegate. Discussion (Question / Comment): It was asked what difference was between option A and B Decision: This document was noted. R4-040468 Response LS on minimum power limit (From R4 to R1 CC: T1RF) (Nokia) (R1-041058) 17/08/2004 18:42 Presented by RAN4 Nokia delegate Discussion (Question / Comment): Decision: This document was noted. R1-040839 25.214CR343Rl(Rel-5, F) "Clarification of minimum power limit" (Panasonic) (Revised R1-040198) 17/08/2004 18:45 Mr. Suzuki wanted to have oft-line discussion before discussion at WG meeting. R4-040468 author (Mr. Markus Pettersson) agreed with Suzuki’s plan. R1-040823 Introduction of a new Node B measurement ’DL Transmission Branch Load’ (Siemens) 17/08/2004 17:55 Presented by Dr. Joern Krause. Discussion (Question / Comment): WG4 Chairman commented that we have to look at carefully from RAN4 perspective based on TS25.133. Decision: This document was noted. R1-040824 CR147 to 25.215 v6.0.0 Introduction of ’DL Transmission Branch Load’ measurement (Siemens) For the contribution R1-040823 and R1-040824. it was decided that RAN4 would provide feedback to RAN1 at their next meeting 18.2 MBMS Requirements R1-041003 UE performance requirements for MBMS reception 17/08/2004 19:04 Presented by Mr. Dirk Gerstenberger on behalf of Ericsson. Discussion (Question / Comment): Decision: This document was noted R4-040528 New UE Test for MBMS 17/08/2004 19:14 Presented by Panasonic RAN4 delegate Discussion (Question / Comment): Decision: This document was noted. (Ericsson) (Panasonic) 34 APLNDC-WH-A 0000010906 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 R4-040403 MBMS Link Level simulations in the presence of measurement gaps (Mitsubishi) 17/08/2004 19:20 Presented by Mitsubishi RAN4 delegate. Discussion (Question / Comment): It was asked about the performance degradation on "Norman S-CCPCH and MBMS S-CCPCH. Decision: This document was noted. R4-040413 Measurement requirements and MBMS reception in CelI-FACH state (Siemens) 17/08/2004 19:36 Presented by Dr. Joem Krause. Discussion (Question / Comment): Decision: This document was noted. R4-040437 Measurement requirements and MBMS reception. (Ericsson) 17/08/2004 19:50 Presented by Ericsson RAN4 delegate. Discussion (Question / Comment): It was asked if another setting is necessary for UE. It was commented that issues was the interaction on measurement, large interaction and small interaction depending on TTI Decision: This document was noted. 18.3 Rel-6 PAR Cubic Metric LS from R1 to R4 ¯ RAN4 is pleased to adopt cubic metric Parameters in equation for Cubic Metric discussed via e-mail before next RAN1 meeting. HSDPA output power reduction (rel-6) o Rel6CR was not approved in RAN4 so far (Rel-6 HSDPA-only transmission, i.e., no E-UL considered) o RAN1 can use Cubic Metric or PAR as tools helping to define the PhCH structure. The WG4 Chairman commented that the problem was how to handle this discussion because R4 is responsible for 24.101 but does not have expertise that R1 has. Wish delegates can communicate within companies. 19 Closing of the meeting ¯ Friday 5.00 PM 20/08/2004 17: 00. The chairman, Mr. Dirk Gerstenberger expressed his appreciation to the delegates and the host companies for their works, and also RAN1 Secretary, Mr. Tsukasa Sasaki finished his work as secretary on this meeting, so Mr. Dirk Gerstenbergar appreciated for his work. 35 APLNDC-WH-A 0000010907 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Annex A: Report from Joint Ad Hoc RAN WG1 - WG4 A j oint meeting was held on Tuesday 17~1 from 18:00 to 20:30. The main topic for discussion was the MBMS requirements and measurements. R1-040823 Introduction of a new Node B measurement ’DL Transmission Branch Load’ (Siemens) The issue of testing TX diversity has always been controversial in WG4, proposals had been presented and reviewed a number of times but finally nothing was accepted. On t~is particular paper, WG4 chairman suggested that WG4 would analyse and review it and provide feedback in t~e future. Minimum power limit A.1 R4-040468 Response LS on minimum power limit (Nokia) (R1-041058) This draft LS, to be sent to WG1, represents the agreed view of WG4 on the issue and its feedback to WG1. The actual behaviour doesn’t exactly map to any of the options presented by the first LS from WG1. Rather, it is a combination of options 1 and 2. R4-040536 Requirement on UE minimum output power when transmitting HS-DPCCH (Qualcomm) Document illustrates the power variation over time, when TPC commands mandate the UE to lower power to its minimum or further. It is necessary to look at the issue over time, and not only one DPCCH timeslot, in order to get the correct understanding. One way to express this behaviour would be that the UE does not need to go below the limit for the minimum Tx power over any DPCH slot, no matter which channel combinations are transmitted during that slot. With this contribution, WG4 further clarifies the LS above. Here, the possibility of changing the power level of the DPDCH and DPCCH within the timeslot is introduced. If WG1 believes this is possible, a third alternative behaviour can be adopted. R1-040839 Clarification of minimum power limit (CR343 to 25.214) (Panasonic) This CR was produced before the information from WG4 was received. It needs to be checked that ~e new requirements introduced in the CR align wi~ WG4 understanding in R4-040468. WG1 also will need to consider if it is possible to change the power level of Re199 channels within the timeslot, and then take it into account for a revision of the CR. A.2 MBMS R1-041003 UE performance requirements for MBMS reception (Ericsson) S-CCPCH can be transmitted by multiple cells, 3 types of combining are being envisaged for the UE: Selective combining, RAKE level combining, Symbol level combining. Performance requirements for the UE for the 3 cases will need to be specified. Sari Nielsen (Nokia) reminded WG1 that some of the existing performance requirements in WG4 do not have a test associated, it was impossible to define due to the complexity. She warned that this could be the case for MBMS, which presents different complexity issues than the Re199 channels. R4-040528 New UE test for MBMS (Panasonic) Two different aspects ofMBMS UE testing are raised, measurement performance and S-CCPCH reception performance. The proposal is to consider both together in the same test suite. R4-040403 MBMS Link Level simulations in the presence of measurement gaps (Mitsubishi) It is noted that these simulation only consider one radio link, the advantages of combining are not taken into account. The case of reception of normal S-CCPCH together with a MBMS S-CCPCH was raised. It may happen that when measurements occasions are scheduled having to receive both, these occasions may end up colliding wi~ most of the TTI of a given MBMS transmission. 36 APLNDC-WH-A 0000010908 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 R4-040413 Measurement requirements and MBMS reception in CelI-FACH state (Siemens) It was noted that SA4 is assuming an error rate, at higher layers and after FEC, of 1% with a possible relaxation to 10%. WG1 chairman clarified that the measurement occasions to be used with the S-CCPCH could blank out FACH TTIs, of 10ms, and not the whole MBMS TTI of 80ms. The resulting data loss can be tempered by the fact that the same MBMS TTI can be received from a different cell if macro diversity is available, and with a different timing due to the RL timing differences. The combining will then decrease the losses. R4-040437 Interfrequency measurements during MBMS sessions (Ericsson) It was clarified that the TTIs considered in this paper are those commonly used in R99. It was clarified that a restriction of a 10 ms FACH TTI when operating MBMS is not the best way forward, as Siemens paper shows there is a trade off between UE mobility and MBMS reception. This trade off should be left available for network operation. Additionally, new techniques are being considered: TTI scrambling, or scheduling of measurement occasions, but WG1 chairman warned against adding new features to the specification that may not be implemented, in particula~ when other, simpler, solution can be found. WG4 couldn’t provide a definite view on the need to set a restriction on t~e TTI size to 10 ms. A.3 UE output power back off WG4 chairman explained that WG4 agreed that the Cubic Metric is a better indication to determine the power back off than the Peak to Average Ratio, as the mapping "CM to back-oft~’ seems to be close to one-to-one. This mapping has only been show so far for a reduced number of PA implementation and seems to be dependant on the ACLR assumption, so results from more companies have been requested in order to determine the coefficients of the mapping formula in a manner that is accurate for all types of PAs. A separate email reflector will be set for the purpose, WG1 member are invited to join their WG4 colleagues in the discussion. The CM, or t~e PAR, are only tools that will finally help to decide the amount of power reduction for a given combination of channels. Agreement on this reduction is very likely going to need long and heated discussions in WG4, and it will involve system simulations and the participation of operators. The main result of the issue will affect the output power requirement in 25.101, like it has been the case for the Rel-5 HSDPA power back oft’; but it will also need to be forwarded to WG1 as useful contributions for the EDCH specification. 37 APLNDC-WH-A 0000010909 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Annex B: List of participants Title / Name Organization Represented Status Code (Category Code) Phone Email Guest organisation for 3GPP (OTHER) DUNE S.R.L. 3GPPGUEST (OTHER) IT +39 6 70451252 Dr. Jinsong Duan Panasonic Mobile Comm. 3GPPMEMBER (ARIB) JP + 81 46 840 5369 duanjinsong@jp.panasonic.com Mr. Noriyuki Fukui Mitsubishi Electric Co. 3GPPMEMBER (ARIB) JP +81 467 41 2885 Miss Youn hyoung Heo SAMSUNG Eleclxonics Co. 3GPPMEMBER (ARIB) JP +82-31-279-5362 hush.heo@samsung, com Mr. Hitoshi Iochi Panasonic Mobile Comm. 3GPPMEMBER (ARIB) JP +81 46 840 5329 iochi.hit oshi@j p.panasonic, com Mr. Yoshikazu Ishii Panasonic Mobile Comm. 3GPPMEMBER (ARIB) JP +81 45 939 1760 ishii.yoshikazu@jp.panasonic.com Mr. Jussi Kahtava Nokia Japan Co, Ltd 3GPPMEMBER (ARIB) JP +81 3 5759 7471 j ussi.kahtava@nokia.com Ms. Nahoko Kuroda NEC Corporation 3GPPMEMBER (ARIB) JP +81-44-396-2577 n-kuroda@cj.j p.nec.com Mr. Jinsock Lee NEC EUROPE LTD 3GPPMEMBER (ARIB) JP +81 459392672 j-lee@ap.jp.nec.com Dr. Neelesh Mehta Mitsubishi Electric Co. 3GPPMEMBER (ARIB) JP +16176217597 mehta@merl.com Mr. Shinsuke Ogawa NTT DoCoMo Inc. 3GPPMEMBER (ARIB) JP +81 468 40 3835 ogawa@cet.yrp.nttdocomo.co.j p Mr. Anil Umesh NTT DoCoMo 3GPPMEMBER (ETSI) JP +81-468-40-3190 umesh@wsp.yrp.nttdocomo.codp Mr. Aris Papasakellaa:iou TEXAS Instruments 3GPPMEMBER (ARIB) FR +1 214 480 4572 Mr. Prem Sood SHARP Corporation 3GPPMEMBER (ARIB) US Mr. Michiaki Takano Mitsubishi Electric Co. 3GPPMEMBER (ARIB) JP +81-467-41-2885 m_takax~o@isl.melco, co.jp Mr. Hideji Wakabayashi Mitsubishi Eleclxic Co. 3GPPMEMBER (ARIB) JP +81468476013 wakabava@csc.melco, co.jp Mr. Hidetoshi Suzuki Panasonic Mobile Comm. 3GPPMEMBER (ARIB) JP +81 468 40 5164 Suzuki.Hidetoshi@j p.panasonic, com Mr. Enrico de Marinis demaxinis@dune. 191.it Member of 3GPP (ARIB) n-fukui@isl.melco.co j p aris@ti.com +1 360 834 8708 pls@sharplabs.com Member of 3GPP (ATIS) 38 APLNDC-WH-A 0000010910 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 Mr. Teck Hu R1-041469 Lucent Technologies 3GPPMEMBER (ATIS) US +1 973 386 2593 calhu@lucent, com Dr. Bo G6ra~sson Nanjing Ericsson Panda Com Ltd 3GPPMEMBER (CCSA) SE Mr. Huabin Liu HuaWei Technologies Co., Ltd 3GPPMEMBER (CCSA) CN +86-10-82882562 lhblhb@huawei, com Ms. Sha Ma HuaWei Technologies Co., Ltd 3GPPMEMBER (CCSA) CN +86-10-82882755 marsha@huawei.com Dr. Bramslav Popovic HuaWei Technologies Co., Ltd 3GPPMEMBER (CCSA) SE Mr. Ke Wang CATT 3GPPMEMBER (CCSA) CN +86 10 82029090 wangke@datangmobile.cn Dr. Saied Abedi FUJITSU Laboratories of Europe 3GPPMEMBER (ETSI) GB +44 (0) 20 8606 466 S.Abedi@fle.fujitsu.com Mr. Nicholas Anderson IPWireless Inc. 3GPPMEMBER (ETSI) GB +44-1249-467332 nanderson@ipwireless.com Mr. Uwe Baeder ROHDE & SCHWARZ 3GPPMEMBER (ETSI) DE +49 89 4129 13462Uwe.B aeder@r sd.rohde-schwaxz, com Dr. Martin Beale IPWireless Inc. 3GPPMEMBER (ETSI) GB +44 1249 800022 mbeale@ipwireless.com Mr. Pierre Bertxand TEXAS Instruments 3GPPMEMBER (ETSI) p-bertrand@ti, com FR +33(0)4 93 22 23 9 Mr. Nicolas Billy ALCATEL S.A. 3GPPMEMBER (ETSI) FR +33 1 30 77 54 64 nicolas.billy@alcatel, fr Ms. Saxah Boumendil NORTEL NETWORKS (EUROPE) 3GPPMEMBER (ETSI) FR +33 1 39 44 58 16 boumendi@nortelnetworks.com Mr. Mickael Bouyaud MELCO MOBILE COMMLrNICATIO 3GPPMEMBER (ETSI) FR +33 2 99 27 47 70 mbd@mef-rd.com Mr. Enrico Buracchini TELECOM ITALIA S.p.A. 3GPPMEMBER (ETSI) IT +39 011 2287118 enrico.buracchini@telecomitalia.it Dr. Thomas Chapman SIEMENS AG 3GPPMEMBER (ETSI) DE +44 1794 833241 thomas.chapman@roke.co.uk Mr. Amir Chass MOTOROLA SEMICONDUCTOR IS 3GPPMEMBER (ETSI) IL +97 29 952 2718 Amir.Chass@FREESCALE.COM Dr. Stash Czaja VIA Technologies Inc US +858-523-5305 Ms. Liliana Czapla 1NTERDIGITAL COMMUNICATION 3GPPMEMBER (ETSI) US +1 631 622 4358 liliana.czapla@interdigital, com Dr. Przemek Czerepinski Siemens nv/sa 3GPPMEMBER (ETSI) GB +44 1794 833179 przemek, czerepinski@roke, co.uk Dr. Jelena Damnj a~ovic QUALCOMM EUROPE S.A.R.L. 3GPPMEMBER (ETSI) FR +1 858 6515387 j elenad@qualcomm, corn Member of 3GPP (CCSA) +46 87570703 +4684770808 bo.goransson@ericsson.com braxtislav.popovic@at eliertelecom, se Member of 3GPP (ETS1) 3GPPMEMBER (ETSI) sczaj a@via-telecom, com 39 APLNDC-WH-A 0000010911 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Mr. Uwe Doetsch ALCATEL S.A. 3GPPMEMBER (ETSI) FR +49 71182147176 Uwe.doetsch@alcatel.de Mr. Jea~-Aicard Fabien MOTOROLA Ltd 3GPPMEMBER (ETSI) US +1 847 632 7249 jean-aicasd.fabien@motorola.com Mr. Lindsay Frost NEC Technologies (UK) LTD 3GPPMEMBER (ETSI) GB +49 6221 905 11 30Lindsay.Frost@netlab.nec.de Mr. Dirk Gerstenberger ERICSSON LM 3GPPMEMBER (ETSI) SE +46 8 585 33901 dirk.gerstenberger@ERIC SSON.COM Dr. Stefan Paskvall Ericsson Inc. 3GPPMEMBER (ETSI) SE +46 8 58533855 stefma.paskvall@ericsson, com Mr. Mask Harrison MOTOROLA GmbH 3GPPMEMBER (ETSI) US +18172456259 Mr. Michael Haxt FUJITSU Laboratories of Europe 3GPPMEMBER (ETSI) GB +44 20 8606 4523 mike.hart@uk, fujitsu, com Mr. Thomas Hindelmag SIEMENS Mobile Communications 3GPPMEMBER (ETSI) DE +49 89 722 46 722 thomas.hindelmag@siemens.com Mr. Juergen Hofmann SIEMENS AG 3GPPMEMBER (ETSI) DE +49 89 636-75196 j uergen-ho fmaxm@siemens, com Mr. Xuegang Huang SIEMENS AG 3GPPMEMBER (ETSI) DE +861064721888-84xuegang.huang@siemens, com Dr. Jean-philippe Kermoal NOKIA Corporation 3GPPMEMBER (ETSI) FI Mr. Dirk Kistowski T-Mobile International AG 3GPPMEMBER (ETSI) DE +49 228 936 1 8419 dirk.kistowski@t-mobile.de Dr. Joern Krause SIEMENS AG 3GPPMEMBER (ETSI) DE +49-30-386-23417 j oem.krause@siemens.com Mr. Ymmick Le Pezermec VODAFONE Group Plc 3GPPMEMBER (ETSI) GB +447748938886 Ms. Evelyne Le Strat NORTEL NETWORKS (EUROPE) 3GPPMEMBER (ETSI) FR + 33 1 394453 39 elestsat @nort elnetworks, com Mr. Rickard Ljung TeliaSonera AB 3GPPMEMBER (ETSI) SE Dr. Caslo Luschi Icera Semiconductor 3GPPMEMBER (ETSI) GB +44 1249700618 carlo@icerasemi, corn Dr. Esa MaJkmnaki NOKIA Corporation 3GPPMEMBER (ETSI) FI Dr. Beale Maxtin IPWireless Inc. 3GPPMEMBER (ETSI) GB +44-1249-800022 mbeale@ipwireless.com Dr. Jtirgen Michel SIEMENS AG 3GPPMEMBER (ETSI) DE +49 89 722 49911 michel.j uergen@siemens, com Dr. Seyed Mortazavi SIEMENS AG 3GPPMEMBER (ETSI) DE +44-(0)1794-83361 seyed.mortazavi@roke, co.uk Dr. Tim Moulsley PHILIPS Semiconductors 3GPPMEMBER (ETSI) GB +44 1293 815 717 moul sle2 @prl.reseasch. philips, com Mr. Mask Murphy TTP Communications plc 3GPPMEMBER (ETSI) GB +44 1763 266266 mark.murphy@ttpcom.com +358504821495 +46 40 10 51 40 mark.harrison@motorola, com j ean-philippe.kermoal @nokia. com Yannick.LePezennec@vodafone. com rickasd.m.ljung@teliasonera, corn +358 7180 36562 esa.malkamaki@nokia, com 4O APLNDC-WH-A 0000010912 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Mr. Alessandro Pace TELECOM ITALIA S.p.A. 3GPPMEMBER (ETSI) IT +390639009044 apace@mail.tim.it Mr. Feng Qian VIA Technologies Inc 3GPPMEMBER (ETSI) US +1 858 523 5287 Mr. Ka~i Ranta-a~o NOKIA Corporation 3GPPMEMBER (ETSI) FI Mr. Stefan Russ ALCATEL S.A. 3GPPMEMBER (ETSI) FR +4971182135763 stefan.russ@alcatel.de Mr. Hans Schotten QUALCOMM EUROPE S.A.R.L. 3GPPMEMBER (ETSI) FR +49 173 388 3470 hans.schotten@qualcomm, com Mr. Ville Steudle NOKIA Corporation 3GPPMEMBER (ETSI) FI +358 50 307 3923 ville, steudle@nokia, com Mr. Ma~kku Ta~kiainen NOKIA Corporation 3GPPMEMBER (ETSI) FI +358 50 518 3406 markku.tarkiainen@nokia.com Mr. Frdddric Charpentier PANASONIC Deutschland GmbH 3GPPMEMBER (ETSI) DE +49 6103 766 1308 charpentier@panasonic.de Dr. Said Tatesh Lucent Technologies N. S. UK 3GPPMEMBER (ETSI) GB +44 1793 883 293 statesh@lucent.com Mrs. Caxolyn Taylor MOTOROLA Ltd 3GPPMEMBER (ETSI) US +1 847 523 0458 Mr. Sunil Vadgama FUJITSU Laboratories of Europe 3GPPMEMBER (ETSI) GB +44 20 8606 4514 s. vadgama@fuj itsu. co. uk Mr. Hans van der Veen Telecom Modus Ltd. 3GPPMEMBER (ETSI) DE +49 (0)6221 905 11Hans.vanderVeen@netlab.nec.de Dr. Mattias Wennstr0m HUAWEI TECHNOLOGIES Co. Ltd. 3GPPMEMBER (ETSI) CN +46 847 70803 Mr. Nick Whinnett MOTOROLA Ltd 3GPPMEMBER (ETSI) GB +44 1 793 566 201 Nick.Whinnett@motorola.com Mr. Serge Willenegger QUALCOMM EUROPE S.A.R.L. 3GPPMEMBER (ETSI) CH +41 244 363 541 Ms. Nadege Noisette ORANGE SA. 3GPPMEMBER (ETSI) FR Mr. Hyung-Nam Choi 1NF1NEON TECHNOLOGIES 3GPPMEMBER (ETSI) DE +49-5341-9061812 Hyung-Nam.Choi@infineon.com Dr. Joon-Kui Ahn LG Electronics Inc. 3GPPMEMBER (TTA) KR +82-31-450-4131 j kan@lge, corn Dr. Bing Bu Samsung Electronics Co., Ltd 3GPPMEMBER (TTA) CN +8610 684277112 bing.bu@samsung.com Dr. Byung-jang Jeong ETRI 3GPPMEMBER (TTA) KR +82 42 860 6765 bjjeong@eM.re.kr Mr. Hojin kim Samsung Electronics Co., Ltd 3GPPMEMBER (TTA) KR +82 31 280 8192 wireless@sait, samsung, co.kr Mr. Yongjun Kwak SAMSUNG Electxonics 3GPPMEMBER (TTA) KR +82 31 279 5112 evatt@samsung, com fqian@via-telecom, corn +358 50 521 0651 Kam.Ranta-aho@nokia.com carolyn, taylor@motorola, com mattias.wennstrom@huawei, com sergew@qualcomm.com +33 1 45 29 44 02 nadege.noisette@fra~cetelecom.com. Member of 3GPP (TTA) 41 APLNDC-WH-A 0000010913 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Mr. Hok-Seong Kim LG Electronics Inc. 3GPPMEMBER (TTA) KR +82 31 450 4127 bryankim@lge, com Mr. I1 Gyu Kim ETRI 3GPPMEMBER (TTA) KR +82 2 860 5490 igkim@etri.re.kr Mr. Sung jin Kim Samsung Electronics Co., Ltd 3GPPMEMBER (TTA) KR +82-31-280-8175 communication@soxnsung, com Mr. Bong Hoe Kim LG Electronics Inc. 3GPPMEMBER (TTA) KR +82 343 450 4131 ofdm88@lge.com Mr. Sung Lark Kwon LG Electronics Inc. 3GPPMEMBER (TTA) KR +82 31 450 4162 slkwon@lge.com Mr. Hyeon Woo Lee Samsung Electronics Co., Ltd 3GPPMEMBER (TTA) KR +82 31 279 5120 wooj aa@soxnsung.com Dr. Juho Lee Samsung Electronics Co., Ltd 3GPPMEMBER (TTA) KR +82-31-279-5115 j uho95.1ee@samsung.com Mr. Kyung Park ETRI 3GPPMEMBER (TTA) KR +82-42-860-1836 kyungp@etxi.re.kr Miss Eunjeong Shin ETRI 3GPPMEMBER (TTA) KR +82-42-860-1688 ej shin@etxi.re.kr Mr. Yujian Zho~g Samsung Electronics Co., Ltd 3GPPMEMBER (TTA) CN +86 10 68427711 2 yujian.zhang@samsung.com Mr. Th~xkh Bui NEC Corporation 3GPPMEMBER (TTC) JP +61 3 9271 4027 Mr. Masafumi Usuda NTT DoCoMo Inc. 3GPPMEMBER (TTC) JP +81 468-40-3190 usuda@wsp.yrp.nttdocomo, co.jp Member of 3GPP (TTC) thanhb@icpdd.neca.nec.com.au Organisation partner representative (ETS1) Mr. Tsukasa Sasoki Mobile Competence Centxe FR +33 4 92 94 42 06 tsukasa, sasaki@etsi.org 42 APLNDC-WH-A 0000010914 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Annex C TSG RAN WG1 meetings through 2004 to 2005 TITLE 3GPPRAN1#38bis CTRY KR TYPE WG DATES 20 - 24 Sept 2004 LOCATION Seoul 3GPPRAN1#39 3GPPRANI#40 WG WG 15- 19 Nov 2004 14 - 18 Feb 2005 Shin-Yokohama Phoenix JP USA 3GPPRANI#40bis WG TBD TBD 3GPPRAN1#41 WG 04 - 08 April 2005 09- 13 May 2005 TBD EU 3GPPRAN1#42 WG 29 Aug -02 Sept 2005 TBD EU 3GPPRAN1#43 WG 07 - 11 Nov 2005 TBC Asia MEETING TYPES AH = Ad Hoc CM = Chairmen’s meeting JM = Joint OR = Ordinary PM = Preparatory Meeting RG = Rapporteurs Group RM = Resolution Meeting SG = Steering Group ST = Startup Meeting TG = Task Group WG = Working Group XO = Extraordinary 43 APLNDC-WH-A 0000010915 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Annex D List of CRs agreed at RAN1#38 25.211 191 25.211 192 25.224 132 25.224 133 25.224 134 25.222122 25.222 123 25.222 124 25.224 135 25.224 136 25.224 137 25.214 353 25.214 352 25.899 1 25.899 2 1 1 1 1 1 1 1 1 - F Rel-5 . R1-040874 Correction for the slot range of DL DPCCH power control preamble for CPCH A Rel-6 . R1-040874 Correction for the slot range of DL DPCCH power control preamble for CPCH F Rel-4 . R1-040883 Transmit diversity usage for beacon channels in LCR TDD A Rel-5 . R1-040883 Transmit diversity usage for beacon channels in LCR TDD A Rel-6 . R1-040883 Transmit diversity usage for beacon channels in LCR TDD F Rel-4. R1-041017 Correction ofsymbolXidefined in sub-framesegmentationstep A Rel-5 . R1-041017 Correction of symbol Xi defined in sub-frame segmentation step A Rel-6 . R1-041017 Correction of symbol Xi defined in sub-frame segmentation step F Rel-4 . R1-041018 Corrections of radio access procedure for 1.28Mcps TDD A Rel-5 . R1-041018 Corrections of radio access procedure for 1.28Mcps TDD A Rel-6 . R1-041018 Corrections of radio access procedure for 1.28Mcps TDD F Rel-5. R1-041059 Clarification ofSSDTuplinkonlysignalling A Rel-6. R1-041059 Clarification ofSSDTuplinkonlysignalling F Rel-6 : R1-041056 Implementation Complexity of ACK/NACK performance improvement F Rel-6. R1-041055 Effect of PRE/POST scheme on HSDPA cell coverage TEl 4 TEl 4 TEl 4 TEl 4 TEl 4 TEl 4 LCRTDD_Phys LCRTDD_Phys LCRTDD_Phys TEl4 TEl4 Rlnlmp-Rlperf Rlnlmp-Rlperf 44 APLNDC-WH-A 0000010916 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 Annex E: List of tdocs at RAN1 #38 TSG RAN WG1 Chairman R1-040811 DRAFT Report of 3GPP TSG RAN WG1 RAN1 Secretary ~37 Report of 3GPP TSG RAN WG1 RAN1 Secretary R1-040812 DRAFT1 Hoc meeting in Cannes Rel.6 Ad [To) Reply LS on Code Sharing during TSG RAN WG2 R1-040813 Sompressed Mode (To:R1 Cc:R3) (Nokia) [Reply to R1-040386) [Cc) Reply LS on Multiple MBMS Issues TSG RAN WG2 R1-040814 To: $4, R4 Cc: $2, $1, R1, R3, G1, G2, (Samsung) ~11) (Reply to $4-040132) [Cc) Reply to "LS on RRC release aspects voice service TSG RAN WG2 R1-040815 9f CS video and (To:S2 Cc: R1, R3) mprovements" (Vodafone) [Reply to $2-041641) [Cc) LS on RRC release aspects of CS video and voice service improvements R1-040816 To:S2, Cc: R1,R2,GP) (Reply to $2- TSG RAN WG3 (Alcatel) :341641) [To) Response LS on Multiple MBMS Issues R1-040817 To: R1, R2, R3, GP, G2) (Reply to R1- TSG SA WG4 (Siemens) :340385, R1-040651, etc) [Cc) LS on Proposed Modification to TSG T WG1 R1-040818 -ISDPA Radio Bearer Settings (To: R2 Cc:(QUALCOMM) 16/08/2004 ~,pproved 2 2 R1-040810 Draft Agenda ~lot Available 16/08/2004 2 4 :R1-040666 :R2-041241 4 =R1-040667 =R2-041244 4 :R1-040668 :R2-041249 =R1-040670 =$4-040356 4 =R1-040671 =T1-040957 ~loted ~loted 16/08/2004 ~loted (Treated at Cannes Meeting) 16/08/2004 ~loted =R1-040669 =R3-040941 4 ~loted (Treated at Cannes Meeting) 16/08/2004 4 16/08/2004 16/08/2004 R1) TR 25.804 "Uplink Enhancements for UTRA R1-040819 TDD" v0.2.1 InterDigital Modified per stream rate control for 2R1-040820 antenna MIMO TI ~,pproved with correction the name of the sompany 16/08/2004 ~loted 20/08/2004 ~,pproved 11 6.1 as version 0.3.0 in Tdoc R1- :341041. =R1-040517 ~lot Treated 45 APLNDC-WH-A 0000010917 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 Text proposal for modified per stream rate TI R1-040821 :ontrol for 2-antenna Proposal for multiframe compressed mode Mitsubishi R1-040822 oy puncturing and unequal frame Electric (MMCE) segmentation Introduction of a new Node B measurement R1-040823 DL Transmission Branch Load’ Siemens SR147 to 25.215 v6.0.0 Introduction of ’DL R1-040824 Transmission Branch Load’ measurement Siemens R1-040825 Soncerns on Fractional DPCH Concept Siemens _5.222CR122(Rel-4, F)&CR123(Rel-5, R1-040826 A)&CR124(Rel-6, A): "Correction of symbol Siemens defined in sub-frame segmentation step" R1-040827 ~imulation results for 1.28Mcps TDD MBMS Siemens R1-040828 2overage Results for MBMS (1.28Mcps TDD): Siemens ~Jpdated Text Proposal for TR 25.803 Huawei R1-040829 :::)ouble-ASTTD with Sub-Group Rate Technologies Sontrol R1-040830 Text Proposal for Double-ASTTD with Sub-Huawei Sroup Rate Control Technologies Dower adjustment of ACK/NACK signaling Huawei R1-040831 Technologies oased on ACK/NACK error rate R1-040832 :)ownlink Signalling Mapping of ACK and Huawei ~IACK Technologies Huawei R1-040833 --DCH timing Technologies R1-041469 6.1 20/08/2004 ~loted 13 16&17/08/2004 ~loted. For the contribution R1-040823 and R1-040824:, it was decided that RAN4 would 16&17/08/2004 3rovide feedback to RAN1 at their next ~qeeting 5.4 5.4 14 5.2 5.3 5.4 7 R1-031227) 16/08/2004 R1-040441) 7 R1-040620) 6 6 16/08/2004 16/08/2004 R1-040430) R1-040431) ~lot Treated ~lot approved and would be provided the "evision with isolated impact analysis in R1:)41017. Agreed for inclusion in TR Agreed for inclusion in TR ~lot Treated ~lot Treated 8.3 ~lot Treated 8.4 ~lot treated 8.1 19/08/2004 ~loted 16/08/2004 R1-040834 Inclusion of combinations of multiple radio Vodafone Group oearers with HSDPA into TS 34.108 5.5 R1-040835 Summary from RAN#24 3 RAN1 Chairman ~lot Treated =R1-040518 3 The conclusion was agreed in RANI/RAN2 oint sesion, expect WB-AMR combination, ~vhich is FFS, 128kbps UL is FFS. 16/08/2004 ~loted ~Vithdrawn 46 APLNDC-WH-A 0000010918 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 R1-040837 3L ACK structure R1-040838 3L ACK Selection R1-040839 _5.214CR343R1(Rel-5, F)&CR344(Rel-6, ~,) "Clarification of minimum power limit" R1-040840 MBMS L1 possible limitations R1-040841 -low MBMS UE capability is defined? R1-040842 ~lumber of simultaneous reception of Acks n SHO Shannel priority and uplink transmission R1-040843 :iming Jplink power signalling information for the R1-040844 scheduling Somparison on the scheduling points on R1-040845 :oding chain R1-040846 Seometry Distribution for LCRTDD R1-040847 Impact of Downlink Signalling for EUCH in _CRTDD R1-040848 3n MICH mapping R1-040849 JE Capability R1-040850 --UL physical channel code mapping R1-040851 ~lode B controlled scheduling R1-040852 Selection of primary scheduling Node B in SHO R1-040853 System level performance with various scheduling schemes R1-040854 Jplink signalling for Node B controlled scheduling R1-040855 -lARQ: physical layer aspects Via Telecom Via Telecom 8.4 8.4 ~ot treated ~ot treated 16&17/08/2004 ~ot approved. It was decided to conclude discussion in RAN1#38bis 17/08/2004 ~oted 17/08/2004 ~oted ~ot treated Panasonic 5.3 R1-040198) Panasonic Panasonic 7.2 7.3 R1-040710) Panasonic 8.4 Panasonic 8.1 Panasonic 8.5 Panasonic 9.2 Samsung 11 20/08/2004 ~oted Samsung 11 20/08/2004 ~oted NEC NEC Samsung Samsung 7.1 7.3 8.1 9.2 Samsung 8 Samsung 9.2 Samsung 8.5 R1-040696) ~ot treated Samsung 8.2 R1-040797) R1-040857 System level performance with periodic TPS reporting Samsung 8.5 ~ot treated ~Vithdrawn ~ot treated 19/08/2004 ~oted ~ot treated ~ot treated R1-040711) 16/08/2004 R1-040691) ~oted ~ot treated ~lot treated ~lot treated ~lot treated ~ot treated 47 APLNDC-WH-A 0000010919 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 System level performance with SHO R1-040858 Samsung scheduling ~ower control at the maximum power limit R1-040859 Ior EUL Samsung R1-040860 :Dverall RoT management strategy Samsung R1-040861 ~,utonomous transmission with TDM Samsung approach R1-040862 RV Signalling Samsung R1-040863 ---DCH outer loop power control Samsung Samsung R1-040864 -IARQ principle --UL scheduling: signalling support Samsung R1-040865 R1-040866 Error requirements of scheduling grants Samsung R1-040867 MBMS notification procedure on MICH Panasonic =urther simulations on RC-MPD and R1-040868 somparison with PARC, DSTTD, and R’99 Nortel Net~vorks TxDiv R1-040869 =irst MIMO Traffic simulations for RC-MPD Nortel Net~vorks and PARC with real channnel estimation MIMO generic scheme and text proposal for R1-040870 :he MIMO TR 25.876 Nortel Net~vorks R1-040871 SQI feedback for RC-MPD Nortel Net~vorks R1-040872 JL signalling for FDD enhanced UL Nortel Net~vorks R1-040873 ~ower control for F-DPCH Nortel Net~vorks __.5.211CR191(Rel-5, F)&CR192(Rel-6, A) R1-040874 ’Correction for the slot range of DL DPCCHLG Electronics 3ower control preamble for CPCH" R1-040875 _5.214CR349(Rel-6, F)"Clarification of LG Electronics SSDT uplink only signaling" Mitsubishi R1-040876 Multiple number of SAW ARQ processes Electric Mitsubishi R1-040877 Primary Node-B Selection by UE in SHO Electric R1-041469 9.2 ~lot treated ~lot treated 8.3 ~lot treated ~lot treated 9.2 8 8.4 9.3 9.1 8.5 9.4 7.1 =R2-041440 ~lot treated ~lot treated 18/08/2004 ~loted ~lot treated ~lot treated 17/08/2004 ~loted ~lot treated 6.2 ~lot treated 6.2 6.1 6.1 8.4 14 16/08/2004 ~loted ~lot treated Revised to R1-041004 ~lot treated 16/08/2004 ~,pproved 5.3 5.4 Revised to R 1-041019 9.1 ~lot treated 9.2 ~lot treated 48 APLNDC-WH-A 0000010920 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 R1-040878 Primary Node-B Selection in SHO 9.2 ~ot treated R1-040879 8.5 ~ot treated R1-040880 R1-040881 R1-040882 R1-040883 R1-040884 R1-040885 R1-040886 R1-040887 R1-040888 R1-040889 R1-040890 R1-040891 R1-040892 R1-040893 Mitsubishi Electric Mitsubishi gignalling for primary Node-B selection in SHO Electric Jplink Signalling alternatives for FDD Mitsubishi --nhanced Uplink Electric ~onsideration to Autonomous Transmission on Mitsubishi g-DCH Electric -IS RAB combinations for testing Ericsson IPWireless, __.5.224CR 132(Rel-4, F)&CR133(Rel-5, ~,)&CR134(Rel-6, A) "Transmit diversity Interdigital, Jsage for beacon channels in LCR TDD" Siemens Draft CR for introduction of MICH in 25.21xQUALCOMM Europe QUALCOMM Soft combining aspects of MBMS Europe QUALCOMM JE Capability for MBMS Europe QUALCOMM S-CCPCH performance with 256 kbps Europe QUALCOMM 3VSF code space for E-DCH Europe QUALCOMM ]-P on PhCH mapping of E-DCH Europe QUALCOMM ]-P on E-DCH Timing Europe QUALCOMM 3hoice of RV and code rates Europe QUALCOMM ]-P on IR versions Europe Impact of SNR mismatch on turbo decodingQUALCOMM Europe 17/08/2004 8.5 9.2 ~oted ~ot treated :R1-040680 16/08/2004 ~oted Cpproved 16/0~2004 ~oted 17/0~2004 ~oted 17/0~2004 ~oted 17/0~2004 8.1 ~oted. The simulation results on this sontributionwould be included in the TR ~ot treated 8.1 ~ot treated 16/08/2004 5.5 5.2 7.1 7.3 7.3 7.3 8.1 8.2 8.2 8.2 =R1-040716 19/08/2004 ~oted ~ot treated ~ot treated ~ot treated 49 APLNDC-WH-A 0000010921 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 Reference short-term link curves for 10ms R1-040894 TTI ---TFICH performance with synchronous R1-040895 -IARQ ---TFICH performance with asynchronous R1-040896 -IARQ R1-040897 R1-040898 R1-040899 R1-040900 R1-040901 R1-040902 R1-040903 QUALCOMM Europe QUALCOMM Europe QUALCOMM Europe QUALCOMM -IARQ channel mapping in DL Europe QUALCOMM Impact of asynchronous HARQ Europe TP on synchronous/asynchronous HARQ QUALCOMM Europe QUALCOMM Scheduling for EUL Europe System performance with T&R scheduling QUALCOMM Europe and load control QUALCOMM -IARQ states for EUL Europe QUALCOMM --UL Requirements Europe R1-041469 8.4 9.2 R1-040910 Signalling Support for EUL Motorola R1-040911 :Duter loop power control for EUL Motorola =R1-040728 18/08/2004 ~loted ~lot treated 9.4 9.4 ~lot treated =R1-040730 =R1-040731 6.1 8 9 8 9 8 9 8 8 9 8 5O ~loted ~lot treated 9.2 Siemens Motorola 18/08/2004 9.1 R1-040905 MIMO Evolution Path requirements =ully sychronous HARQ and reliable R1-040906 signaling in SHO Motorola ~lot treated =R1-040723 9.1 5.6 R1-040908 Time and Rate scheduler for Enhanced Jplink R1-040909 --UL Power Requirements ~lot treated 8.4 Ericsson R1-040907 Rate Contol Scheduler for Enhanced UplinkMotorola ~lot treated 8.4 R1-040904 Issues with Radio Link Synchronization Motorola ~lot treated 8.2 ~lot treated 16/08/2004 ~loted and more discussion was continued till qext meeting 16/08/2004 ~loted 18/08/2004 ~loted ~lot treated ~lot treated ~lot treated ~lot treated ~lot treated APLNDC-WH-A 0000010922 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 Multi-step rate scheduling and Alcatel Shanghai R1-040912 synchronization scheme Bell _5224CR135(Rel-4, F)&CR136(Rel-5, R1-040913 ~,)&CR137(Rel-6, A): "Corrections of radio Siemens AG, CATT access procedure for 1.28Mcps TDD" R1-040914 Target RoT control methods for HSUPA Panasonic R1-040915 Tx Diversity and MIMO Alcatel R1-040916 4Tx open-loop closed-loop (OL-CL) MIMO Alcatel R1-040917 Text Proposal for 4Tx open-loop closed- Alcatel oop (OL-CL) MIMO R1-040918 Reordering of TTIs in MBMS Siemens =urther considerations on the UE capability R1-040919 Ior MBMS (FDD) Siemens Spatial channel coding (SCC) for high R1-040920 :hroughput Philips ~vith a single receive antenna R1-040921 Text Proposal for Spatial Channel Coding Philips Interaction bet~veen Enhanced Uplink and R1-040922 Sompressed Philips Mode Philips R1-040923 -IARQ in SHO for Enhanced Uplink ~lode B controlled scheduling in soft R1-040924 qandover Philips Implementation complexity of ACK/NACK R1-040925 3erformanoe Philips mprovement (including CR to 25.899) Effect of PRE/POST scheme on HSDPA cellPhilips R1-040926 soverage (including CR to 25.899) R1-040927 :~etransmission Power Optimisation Siemens R1-040928 ---DCH HARQ with Power Offset Siemens R1-040929 ~,djustment of Scheduling Timing by UE Siemens R1-041469 ~lot treated 8.5 5.2 5.3 5.4 8.5 6.1 6 6 7.2 7.3 16/o~2oo4pproved with modificationinthe coversheet n R1-011018 R1-040780) 16/08/2004 =R1-040521 =R1-040595 R1-040775) R1-041016 17/08/2004 ~lot treated ~loted ~lot treated ~lot treated ~loted Revised by R1-041016 ~lot treated 6.1 R1-040770) ~lot treated ~lot treated R2-041286) R1-040769) ~lot treated ~lot treated 6.1 8.4 8.4 8.5 20/08/2004 Endorsed. 16 16 8.3 8.3 9.2 R1-041032 It was decided to provide official SR (number #1) on the reflector by August 27 n Tdoc R1-041054 and approve on E-mail Jntil August 31. Revised by R1-041032 ~lot treated ~lot treated ~lot treated 51 APLNDC-WH-A 0000010923 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 =erformance aspects of advanced spectral R1-040930 3rocessing MIMO receivers for multi-code Fujitsu, Dune Srl "eception R1-040931 TR25.876 v.1.5.1 "Multiple-Input Multiple Editor(Lucent 9utput in UTRA" Technologies) R1-040932 =rinciples of scheduling for enhanced uplink Fujitsu R1-040933 ~lode B controlled Scheduling for EnhancedFujitsu Jplink R1-040934 Mitsubishi Text Proposal on MIMO System Simulation Electric --valuation Methodology Research Labs (MERL) R1-040935 Secondary Scrambling Code for IMS Siemens Lucent R1-040936 Scheduling Schemes for EDCH Technologies Lucent R1-040937 Scheduling Performance for EDCH Technologies Lucent R1-040938 System Performance with IR/Chase Technologies Lucent R1-040939 SHO Operation for EDCH Technologies Lucent R1-040940 -IARQ Processes for 2ms and 10ms Technologies R1-040941 Physical channel code mapping for E-DCH LG Electronics R1-040942 Signaling to support 2 ms and 10 ms TTIs LG Electronics Ior E-DCH R1-040943 Jplink signaling for E-DCH LG Electronics R1-040944 Principles of downlink ACK/NACK signaling LG Electronics Ior E-DCH R1-040945 Timing of downlink signaling with 10 ms TTI LG Electronics Ior E-DCH R1-040946 ~lode B scheduling with transmit power LG Electronics "estriction for E-DCH R1-041469 ~lot treated 6 16/08/2004 6 9.2 ~,pproved as version 1.6.0 in Tdoc R1-041021 ~lot treated ~lot treated 8.5 16/08/2004 ~loted 6 10.2 20/08/2004 ~loted ~lot treated 9.2 ~lot treated 9.2 ~lot treated 9.1 ~lot treated 9.1 9.1 8.1 8.4 8.4 8.4 8.5 9.2 18/08/2004 ~loted ~lot treated ~lot treated ~lot treated ~lot treated ~lot treated ~lot treated 52 APLNDC-WH-A 0000010924 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040947 R1-040948 R1-040949 R1-040950 R1-040951 R1-040952 R1-040953 R1-040954 R1-040955 R1-040956 R1-040957 R1-040958 R1-040959 R1-040960 R1-040961 R1-040962 R1-040963 R1-040964 R1-040965 R1-040966 R1-040967 R1-040968 :Duter loop power control aspects of E-DCH LG Electronics 9.3 -IARQ signalling in Soft Handover NEC 9.1 Secondary Pilot for E-DCH NEC 8.1 Per Priority Queue basis Rate Scheduling NEC 9.2 :Duter Loop power control in E-DCH NEC 9.3 -IARQ Downlink Signalling NEC 8.4 Robust Signalling in Rate Scheduling NEC 8.5 =iltering on E-DCH TFCS NEC 9 System performance with low capability UE Panasonic 2ms TTI vs 10ms TTI) Jplink Control Signaling Ericsson 8.1 3ownlink Control Signaling Ericsson 8.1 ---DCH Physical Layer Hybrid ARQ Ericsson 8.2 ~rocessing ---DCH Schduling - Way Forward Ericsson 9.2 3n Scheduling Delays Ericsson 9.2 ---DCH Autonomous Transmissions Ericsson 9.2 Proposal on RR, SI time multiplexing with NTT DoCoMo 8.1 -IS-DPCCH Sonfigurable Cell Level Rate Controller for 8 NTT DoCoMo --UL 9.2 ~,utonomous Rate Ramping for Cell Level 8 NTT DoCoMo Rate Control 9.2 Sonsiderations on Enhanced Uplink Siemens 9.2 Scheduling Options Jplink signalling for E-DCH scheduling Siemens 9.2 oased on predicted TFC Efficient scheduling in SHO by means of UE Siemens 9.2 Ieedback JL Signalling overhead for node B Siemens 8.5 scheduling in SHO R1-041469 R1-040739) R1-040738) R1-040742) R1-040740) R1-040741) 8.1 ~lot treated ~lot treated ~lot treated ~lot treated ~lot treated ~lot treated ~lot Available ~lot treated ~lot treated 17/08/2004 XJ oted ~lot treated ~lot treated 18/08/2004 XJ oted ~lot treated ~lot treated 17/08/2004 XJ oted 18/08/2004 XJ oted 18/08/2004 XJ oted ~lot treated =R1-040785 ~lot treated R1-040786) ~lot treated R1-040788) ~lot treated APLNDC-WH-A 0000010925 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-040969 3L Signalling overhead for node B Siemens scheduling -ISDPA Code Allocation/Measurement per R1-040970 Sell Portion Nokia R1-040971 TR25.808 v0.0.3 Nokia R1-040972 -ISUPA Requirements for uplink signalling Nokia Implicit Redundancy Version for IR HARQ R1-040973 Scheme Nokia -ISUPA HARQ ACK/NACK signalling R1-040974 3erformance Nokia -ISUPA Signalling aspects of the rate R1-040975 scheduling Nokia -ISUPA Downlink scheduling signalling R1-040976 3erformance Nokia 1-bit Rate Request/Rate Grant Scheduling R1-040977 Signalling Nokia -ISUPA Dynamic Step Adjustment for Node R1-040978 B Controlled Scheduling Nokia :Dn channelisation code sharing during R1-040979 Nokia sompressed mode R1-040980 Nokia, Text Proposal on System Setup for MIMO TeliaSonera, T-Mobile R1-040981 MIMO Reference Cases Nokia Somments and TP on MIMO Compatibility QUALCOMM R1-040982 ~,ssessment Europe QUALCOMM R1-040983 TR 25.803 v1.3.1 Europe QUALCOMM R1-040984 3n NI mapping Europe R1-041469 8.5 ~ot treated R1-040787) ~ot treated 17 8 8.1 =R1-040805 8.4 17/0~2004 =R1-040752 17/0~2004 ~ot treated 8.4 8.5 ~ot treated =R1-040750 ~ot treated 8.5 ~ot treated 9.2 9.2 13 Cpproved as version 0.1.0 in R1-041033 ~oted ~ot treated 18/08/2004 ~oted 20/08/2004 ~oted. RAN1 could not conclude on a significant code saving gain 16/08/2004 ~oted 6 16/08/2004 ~loted. Agreed to use 6 sectors and 2Rx _MMSE as reference case for MIMO for MIMO studies 16/08/2004 ~oted 16/08/2004 ~,pproved as vl.4.0 in R1-041024 16/08/2004 ~oted 6 6.1 7 7.1 APLNDC-WH-A 0000010926 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 QUALCOMM R1-040985 Position on scheduler design parameters Europe Somparison of D-ASTTD-SGRC and Huawei R1-040986 DSTTD-SGRC using full-queue system Technologies simulations Midamble Allocation and Channelistion R1-040987 ?ode Allocation Signaling to Support MIMO IPWireless n UTRA TDD Text Proposal for MIMO TR 25.876 R1-040988 Midamble Allocation and Code Allocation IPWireless Signaling) R1-040989 Per Antenna Rate Control for UTRA TDD IPWireless R1-040990 Text Proposal for MIMO TR 25.876 (MIMO IPWireless Proposal for UTRA TDD) R1-040991 Intra-frame Code Hopping for EU-TDD andIPWireless Text Proposal for 25.804 -IARQ Performance for TDD Enhanced R1-040992 Jplink and Text Proposal for 25.804 Dower Control for TDD Enhanced Uplink R1-040993 and Text Proposal for 25.804 System Simulation Results for Release 99 R1-040994 :ype channels for TR25.895 (with text 3roposal) R1-040995 Text Proposal for Application to 3GPP systems and services R1-040996 Text Proposal for Conclusion to TR25.895 R1-040997 Downlink Code Resource Optimisation for TDD HSDPA R1-040998 MBMS Transport and Physical Layer Soft ?ombining R1-040999 Signalling framework for Enhanced Uplink scheduling R1-041469 ~ot treated 9,2 ~ot treated 6 =R1-040580 ~ot treated =R1-040581 ~ot treated =R1-040582 =R1-040583 ~ot treated ~ot treated 6 6 6 6 20/08/2004 Decided to include TP with a note that applicability of the scheme for 1.28Mcps TDD s FFS. 20/0~2004 ~,greed 11 IPWireless 11 IPWireless 11 12 IPWireless 7.3 Fujitsu 8.5 by R1-041027 20/0~2004 Revised wording in R1-041043 15 Motorola 20/0~2004 Revised 12 IPWireless by R1-041035 12 IPWireless 20/0~2004 Revised R1-041027 IPWireless R1-041035 R1-041028 20/0~2004 Revised by R1-041028 ~ot treated 17/0~2004 ~oted ~ot treated 55 APLNDC-WH-A 0000010927 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 TR25.895 vl.3.4: Analysis of Higher Chip R1-041000 Rates for UTRA TDD Evolution IPWireless R1-041002 Soft Combining for MBMS R1-041003 JE performance requirements for MBMS "eception R1-041004 JL signalling for FDD enhanced UL R1-041005 Traffic to Pilot Ratio Settings and Pilot ~owers for EDCH R1-041469 20/08/2004 Cpproved 12 Ericsson 7.4 Nortel Net~vorks Lucent Technologies 8.4 ~Vithdrawn ~oted 17/08/2004 ~oted 17/08/2004 7.3 Ericsson 8.3 R1-040872) 17/08/2004 ~oted ~ot treated ~Vithdrawn r~/l~l,,l~÷i~n f~r TOO r-nk~nr,~l I I~lin# ~nN ~ .......... ~er-Stream Rate Control for LCR R1-041007 TDD_System Proposal and Initial Link Level CATT Results R1-041008 Simulations related to R1-040962 NTT DoCoMo RoT information broadcast as auxiliary R1-041009 nformation Panasonic Signalling for E-DCH Scheduling -Te~ Fujistu R1-041010 oroposal R1-041011 =airness based multiuser MIMO scheduling Samsung Samsung & R1-041012 Cntenna selection based MIMO SNU Samsung & R1-041013 ~U2RC Simulation SNU [To) LS on the material to be submi~ed to ITU-R Ad Hoc R1-041014 ITU-R WP8F#14 for Revision 5 of Recommendation ITU-R M. 1457 (Telecom Italia) To:R1, R2, R3, R4) R1-041015 Somments on MICH mapping proposal in NEC R1-040867 :u~her considerations on the UE capability R1-041016 Siemens For MBMS (FDD) as version 1.4.0 in R1-041042 ~ot treated 6 8.5 ~ot treated ~ot treated 8.5 ~ot treated 8.1 6 ~ot treated ~ot treated 6 ~ot treated 6 16/08/2004 ~oted 4 7.1 7.3 16/08/2004 ~oted 17/08/2004 ~oted 56 APLNDC-WH-A 0000010928 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041017 R1-041018 R1-041019 R1-041020 R1-041021 R1-041022 R1-041023 R1-041024 R1-041025 R1-041026 R1-041027 R1-041028 R1-041029 R1-041030 R1-041031 _5.222CR122r1(Rel-4, F)&CR123r1(Rel-5, ~,)&CR124r1(Rel-6, A): "Correction of Siemens symbol Xi defined in sub-frame segmentation step" _5224CR135r1(Rel-4, F)&CR136r1(Rel-5, Siemens AG, ~,)&CR137r1(Rel-6, A): "Cou:ections of radio CATT ~ccess procedure for 1.28Mcps TDD" _5.214CR349r1(Rel-6, F)&CR350(Rel-5, A) Electronics ’Clarification of SSDT uplink only signaling" LG ~,pproved Report of 3GPP TSG RAN WG1 RAN1 Secretary :~el.6 Ad Hoc meeting in Cannes TR25.876 v.1.6.0 "Multiple-Input Multiple Editor(Lucent :Dutput in UTRA" Technologies) Text Proposal " MIMO Reference Case" Nokia Somments and TP on MIMO Compatibility QUALCOMM ~,ssessment Europe QUALCOMM TR 25.803 vl.4.0 Europe Draft LS on introduction of the MICH in QUALCOMM Europe _5.21x TR 25.803 vl.4.1 QUALCOMM Europe System Simulation Results for Release 99 :ype channels for TR25.895 (with text IPWireless 3roposal) Text Proposal for Conclusion to TR25.895 IPWireless DRAFT Question on the impact of L1 Panasonic imitations on MBMS Baseline for finalization of MBMS soft Qualcomm sombining Europe, Motorola Nortel Net~vorks Draft LS on questions on MBMS R1-041469 5.2 5.3 5.4 R 1-040826) 20/08/2004 ~,pproved 5.2 5.3 5.4 R1-040913) 20/08/2004 ~,pproved 5.4 R1-040875) 20/08/2004 ~,pproved 2 R1-040812) 6 ~,pproved Version ~,pproved Version 6 6 R1-040981) R1-040982) 20/08/2004 ~,pproved ~lot treated 7.1 20/08/2004 ~,pproved 7.1 7.1 20/08/2004 ~,pproved R1-041024) in Tdoc R1-041048 Decided to approve via E-mail until August 30 R1-040994) 20/08/2004 ~,greed R1-040996) 20/08/2004 Revised to include in the TR with modification 12 12 7.2 regarding conclusions for R1-041044 with modifications in R1-041047 20/08/2004 ~,pproved 7.3 20/08/2004 ~,greed 7.3 20/08/2004 ~,pproved with modifications in R1-041052. 57 APLNDC-WH-A 0000010929 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 16 R1-040926) Nokia Nokia 8 6 =R1-040971 IPWireless 11 R1-040993) MIMO ad hoc 6 scheme on HSDPA cellPhilips R1-041032 ,,ffect of PRE/POST CR to 25.899) :overage (including R1-041033 TR25.808 v0.1.0 R1-041034 Text proposal on System setup to MIMO ~ower Control for TDD Enhanced Uplink R1-041035 and Text Proposal for 25.804 R1-041036 Summary from MIMO adhoc meeting 2o/o8/2oo4--ndorsed. Decided to provide official OR number #2) on the reflector by August 27 in R1-041055 and approve on E-mail approval Jntil August 31. ~,pproved Version 20/08/2004 ~,pproved with addition and correction 2o/o8/2oo4~,greed 20/08/2004 ~,pproved 20/08/2004 [t was not clear if CR is need or not. It was decided to conclude discussion in RAN 1#38bis R1-041037 __.5.214CR343r2(Rel-5, F)&CR344r2(Rel-6,Panasonic ~,) "Clarification of minimum power limit" 5.3 R1-041038 =roposed addition for TR25.993 5.5 20/08/2004 ~oted 4 20/08/2004 ~oted 4 20/08/2004 Decided T-Mobile, Siemens, Nokia :Cc) Reply LS on Proposed Modification to RAN2 R1-041039 -ISDPA Radio Bearer Settings (To:T1 Cc: R1) (Reply to) RAN2 :Cc) LS on enhancing L1 multiplexing test R1-041040 soverage in 3GPP test specifications To:T1, Cc:R1) R1-041041 R1-041042 R1-041043 R1-041044 R1-041045 TR 25.804 "Uplink Enhancements for UTRAInterDigital TDD" v0.3.0 TR25.895 vl.4.0: Analysis of Higher Chip IPWireless Rates for UTRA TDD Evolution Text Proposal for Application to 3GPP IPWireless systems and services Text Proposal for Conclusion to TR25.895 IPWireless Draft Response to LS on the material to be RAN1 submitted to ITU-R WP8F#14 for Revision 5 3f Recommendation ITU-R M.1457 (To:ITUR Ad Hoc) R1-040839) 11 to provide quick feedback to TSG ~VG-T1 that RAN1 would review the L1 aspects and provide more feedback from RAN#38bis in R1-041049. ~,pproved version 12 ~,pproved version 12 R1-040995) 20/08/2004 ~,pproved 12 4 R1-041028) 20/08/2004 ~,pproved 20/08/2004 ~,pproved in R1-041046 58 APLNDC-WH-A 0000010930 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041046 R1-041047 R1-041048 R1-041049 R1-041050 Response to LS on the material to be RANl(Telecom submitted to ITU-R WP8F#14 for Revision 5 Italia) 3f Recommendation ITU-R M.1457 (To:ITUR Ad Hoc) _S on Question on the impact of L1 RANl(Panasoni imitations on MBMS (To: R2, R3, R4) c) _S on introduction of the MICH in 25.21x RANl(Qualcom To:R2, R3 Cc: R4) m) DRAFT LS on enhancing L1 multiplexing :est coverage in 3GPP test specifications RAN1 (Nokia) To:T1, Cc:RAN2) TR25.876 v. 1.6.1 "Multiple-Input Multiple Lucent :Dutput in UTRA" Technologies R1-041051 TR 25.895. version 1.4.1 IPWireless R1-041052 _S on questions on MBMS (To :R2, Cc :R3)RANl(Nortel Networks) _S on enhancing L1 multiplexing test R1-041053 soverage in 3GPP test specifications RAN1 (Nokia) To:T1, Cc:R2) _5.899CR1(Rel-6, F)"lmplementation R1-041054 somplexity of ACK/NACK performance mprovement" R1-041055 _5.899CR2(Rel-6, F)"Effect of PRE/POST scheme on HSDPA cell coverage" _5.899CR1r1(Rel-6, F)"lmplementation R1-041056 somplexity of ACK/NACK performance mprovement" rVlIMO TR25.876 vl.7.0 R1-041057 R1-041469 4 =R1-041045 ~,pproved version 7 R1-041029) ~,pproved version ~,pproved version 7 20/08/2004 ~,pproved 4 Decided to approve via email until August 31 6 12 7.3 R1-041031) 4 ~rovided on the reflector, and E-mail approval deadline would be August 30 ~,pproved version R1-041049) ~,pproved version Philips 16 =R1-040925 Philips 16 =R1-041032 Philips 16 R1-041054) Editor(Lucent Technologies) RAN4 6 =R1-041050 :Dn the reflector by August 27 and approve on E-mail until August 31. There were some comments from Samsung. Revised to R1-041056) :Dn the reflector by August 27 and approve on E-mail until August 31. Approved on E-mail. ~,pproved on E-mail. R1-041058 Response LS on minimum power limit To:RI,CC:T1RF) _5.214CR352r1(Rel-6, F)&CR353(Rel-5, A) LG Electronics R1-041059 ’Clarification of SSDT uplink only signaling" 4 ~,pproved version ~loted 5.4 R1-041019) ~,pproved. 59 APLNDC-WH-A 0000010931 3GPP TSG RAN WG1 Meeting #39 Shin-Yokohama, Japan 15- 19 November, 2004 R1-041469 6O APLNDC-WH-A 0000010932

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?